TYLER FM 1943 (1828-01-024)

Items: 73

County: TYLER
Length: N/A
Highway: FM 1943
District: BEAUMONT
Control Number: 1828-01-024
DBE Goal: N/A
Project: BR 2020(656)
Guaranty: N/A
Time: 0 X
Engineer's Estimate: $1,845,661.90
Date: 03/04/2020 (6 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$1,845,661.90
$1,955,026.71
Over/Under Est: 5.93% $109,364.81
Over/Under Est: 20.51% $378,547.60
Amt Left: 13.77% $269,182.79
Over/Under Est: 70.88% $1,308,140.10
Amt Left: 61.32% $1,198,775.29
Delta: -41.79% -$929,592.50

Bid Items & Bid Tabulations

73 Total 0 of 73
TYLER  |  FM 1943  |  BEAUMONT  |  1828-01-024  |  03/04/2020  |  $1,845,661.90  |  BR 2020(656)  |  BRIDGE REPL  |  0 X
Item Code
Description
Unit
Quantity
Engineer's Estimate
MBN ENTERPRISES LLC
TEXAS MATERIALS GROUP, INC.
DREWERY CONSTRUCTION COMPANY, INCORPORATED
PREPARING ROW
STA 12.200 $2,000.000 $2,500.000 $1,000.000 $2,100.000
REMOVING STAB BASE & ASPH PAV (8"-14")
SY 2,475.000 $5.000 $0.600 $11.000 $40.000
EXCAVATION (ROADWAY)
CY 1,494.000 $8.000 $8.000 $11.000 $21.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 1,435.000 $15.000 $8.000 $16.000 $29.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 620.000 $30.000 $8.000 $47.000 $58.000
BACKFILL (TY B)
STA 12.200 $175.000 $270.000 $254.000 $525.000
BROADCAST SEED (TEMP) (WARM)
SY 443.000 $0.100 $2.000 $1.250 $1.250
BROADCAST SEED (TEMP) (COOL)
SY 444.000 $0.100 $2.000 $1.250 $1.250
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
SY 887.000 $0.300 $2.000 $1.550 $1.600
VEGETATIVE WATERING
MG 27.700 $15.000 $110.000 $20.000 $75.000
SOIL RETENTION BLANKETS (CL 1) (TY D)
SY 2,445.000 $1.000 $2.500 $1.300 $1.350
ASPHALT STAB BASE (GR 1)(PG 64)
TON 2,134.000 $75.000 $100.000 $100.000 $150.000
D-GR HMA(SQ) TY-C SAC-B PG70-22
TON 534.000 $120.000 $100.000 $135.000 $170.000
TACK COAT
GAL 291.000 $5.000 $8.000 $8.500 $3.750
CEM STABIL BKFL
CY 50.000 $55.000 $350.000 $183.000 $200.000
PRESTR CONC PIL (20 IN SQ)
LF 1,428.000 $128.000 $160.000 $117.000 $146.000
CL C CONC (ABUT)
CY 29.600 $1,550.000 $800.000 $2,400.000 $1,800.000
CL C CONC (CAP)
CY 23.400 $1,550.000 $1,100.000 $2,700.000 $2,000.000
REINF CONC SLAB
SF 5,525.000 $20.000 $20.500 $40.000 $27.000
APPROACH SLAB
CY 87.000 $25.000 $380.000 $479.000 $650.000
PRESTR CONC SLAB BEAM (4SB15)
LF 385.450 $170.000 $160.000 $165.000 $168.000
PRESTR CONC SLAB BEAM (5SB15)
LF 770.900 $190.000 $160.000 $165.000 $168.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 247.000 $105.000 $155.000 $179.000 $230.000
RIPRAP (MOW STRIP)(4 IN)
CY 38.900 $440.000 $650.000 $680.000 $525.000
RAIL (TY T223)
LF 284.000 $90.000 $120.000 $190.000 $165.000
ARMOR JOINT (SEALED)
LF 84.000 $95.000 $110.000 $143.000 $105.000
RC PIPE (CL III)(18 IN)
LF 24.000 $90.000 $110.000 $117.000 $85.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 8.000 $750.000 $800.000 $770.000 $1,000.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $50,000.000 $45,000.000 $78,000.000 $165,000.000
MOBILIZATION
LS 1.000 $100,000.000 $190,000.000 $215,000.000 $635,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 14.000 $2,000.000 $3,000.000 $700.000 $9,500.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 80.000 $25.000 $40.000 $33.000 $34.000
ROCK FILTER DAMS (REMOVE)
LF 80.000 $8.000 $10.000 $9.500 $9.500
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,260.000 $3.000 $2.500 $2.900 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,260.000 $1.000 $0.500 $1.050 $1.050
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 230.000 $5.000 $8.000 $5.100 $5.250
BIODEG EROSN CONT LOGS (REMOVE)
LF 230.000 $1.000 $1.000 $1.050 $1.050
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 13.000 $4,000.000 $3,000.000 $2,000.000 $4,700.000
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 750.000 $50.000 $73.000 $47.000 $110.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 630.000 $10.000 $2.500 $7.500 $8.500
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 750.000 $10.000 $6.000 $14.000 $15.000
DRIVEWAYS (BASE)
SY 57.000 $50.000 $55.000 $55.000 $67.000
MTL W-BEAM GD FEN (TIM POST)
LF 525.000 $22.000 $22.000 $20.000 $20.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,000.000 $1,500.000 $1,350.000 $3,100.000
REMOVE METAL BEAM GUARD FENCE
LF 775.000 $5.000 $2.700 $3.050 $5.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,400.000 $2,700.000 $2,500.000 $2,600.000
GUARDRAIL END TREATMENT (MOVE & RESET)
EA 2.000 $2,000.000 $1,100.000 $1,275.000 $1,300.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $400.000 $220.000 $380.000 $300.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $2,200.000 $2,200.000 $1,210.000 $1,300.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $1,200.000 $550.000 $760.000 $800.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $15,000.000 $9,300.000 $8,600.000 $9,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 7.000 $450.000 $670.000 $470.000 $490.000
REMOVE SM RD SN SUP&AM
EA 9.000 $75.000 $160.000 $96.000 $90.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 6.000 $22.000 $28.000 $15.100 $16.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 8.000 $30.000 $49.000 $28.000 $29.000
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 36.000 $0.500 $13.150 $12.100 $13.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 2,993.000 $0.500 $1.100 $1.050 $1.050
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 470.000 $0.500 $1.100 $1.050 $1.050
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 126.000 $1.000 $2.190 $1.750 $2.000
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 132.000 $0.500 $1.640 $1.550 $1.600
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 2,572.000 $0.350 $0.880 $0.850 $0.850
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 2,512.000 $0.350 $0.880 $0.850 $0.850
PREFAB PAV MRK TY C (W) (ARROW)
EA 1.000 $175.000 $328.660 $305.000 $315.000
REFL PAV MRKR TY I-C
EA 7.000 $3.500 $10.960 $10.100 $10.500
REFL PAV MRKR TY II-A-A
EA 32.000 $3.500 $10.960 $10.100 $10.500
ELIM EXT PAV MRK & MRKS (4")
LF 3,463.000 $0.400 $0.990 $0.950 $1.000
ELIM EXT PAV MRK & MRKS (12")
LF 30.000 $2.250 $2.190 $2.050 $2.100
RELOCATE RDSD FLASH BEACON ASSEMBLY
EA 1.000 $2,000.000 $4,300.000 $5,600.000 $5,300.000
NO. OF WORKING DAYS
$/D 2,000.000 $210.000 $180.000 $190.000 $165.000
TEMPORARY CONSTRUCTION MATTING
SY 250.000 $25.000 $15.000 $88.000 $150.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 3.000 $10,000.000 $8,000.000 $8,400.000 $18,000.000
TMA (STATIONARY)
DAY 24.000 $300.000 $165.000 $395.000 $560.000
TMA (MOBILE OPERATION)
DAY 2.000 $500.000 $110.000 $104.000 $105.000
Totals: $1,845,661.900 $1,955,026.710 $2,224,209.500 $3,153,802.000