PREPARING ROW
|
STA
|
12.200
|
$2,000.000
|
$2,500.000
|
$1,000.000
|
$2,100.000
|
|
|
REMOVING STAB BASE & ASPH PAV (8"-14")
|
SY
|
2,475.000
|
$5.000
|
$0.600
|
$11.000
|
$40.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
1,494.000
|
$8.000
|
$8.000
|
$11.000
|
$21.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
1,435.000
|
$15.000
|
$8.000
|
$16.000
|
$29.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
620.000
|
$30.000
|
$8.000
|
$47.000
|
$58.000
|
|
|
BACKFILL (TY B)
|
STA
|
12.200
|
$175.000
|
$270.000
|
$254.000
|
$525.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
443.000
|
$0.100
|
$2.000
|
$1.250
|
$1.250
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
444.000
|
$0.100
|
$2.000
|
$1.250
|
$1.250
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
|
SY
|
887.000
|
$0.300
|
$2.000
|
$1.550
|
$1.600
|
|
|
VEGETATIVE WATERING
|
MG
|
27.700
|
$15.000
|
$110.000
|
$20.000
|
$75.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY D)
|
SY
|
2,445.000
|
$1.000
|
$2.500
|
$1.300
|
$1.350
|
|
|
ASPHALT STAB BASE (GR 1)(PG 64)
|
TON
|
2,134.000
|
$75.000
|
$100.000
|
$100.000
|
$150.000
|
|
|
D-GR HMA(SQ) TY-C SAC-B PG70-22
|
TON
|
534.000
|
$120.000
|
$100.000
|
$135.000
|
$170.000
|
|
|
TACK COAT
|
GAL
|
291.000
|
$5.000
|
$8.000
|
$8.500
|
$3.750
|
|
|
CEM STABIL BKFL
|
CY
|
50.000
|
$55.000
|
$350.000
|
$183.000
|
$200.000
|
|
|
PRESTR CONC PIL (20 IN SQ)
|
LF
|
1,428.000
|
$128.000
|
$160.000
|
$117.000
|
$146.000
|
|
|
CL C CONC (ABUT)
|
CY
|
29.600
|
$1,550.000
|
$800.000
|
$2,400.000
|
$1,800.000
|
|
|
CL C CONC (CAP)
|
CY
|
23.400
|
$1,550.000
|
$1,100.000
|
$2,700.000
|
$2,000.000
|
|
|
REINF CONC SLAB
|
SF
|
5,525.000
|
$20.000
|
$20.500
|
$40.000
|
$27.000
|
|
|
APPROACH SLAB
|
CY
|
87.000
|
$25.000
|
$380.000
|
$479.000
|
$650.000
|
|
|
PRESTR CONC SLAB BEAM (4SB15)
|
LF
|
385.450
|
$170.000
|
$160.000
|
$165.000
|
$168.000
|
|
|
PRESTR CONC SLAB BEAM (5SB15)
|
LF
|
770.900
|
$190.000
|
$160.000
|
$165.000
|
$168.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
247.000
|
$105.000
|
$155.000
|
$179.000
|
$230.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
38.900
|
$440.000
|
$650.000
|
$680.000
|
$525.000
|
|
|
RAIL (TY T223)
|
LF
|
284.000
|
$90.000
|
$120.000
|
$190.000
|
$165.000
|
|
|
ARMOR JOINT (SEALED)
|
LF
|
84.000
|
$95.000
|
$110.000
|
$143.000
|
$105.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
24.000
|
$90.000
|
$110.000
|
$117.000
|
$85.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
8.000
|
$750.000
|
$800.000
|
$770.000
|
$1,000.000
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
1.000
|
$50,000.000
|
$45,000.000
|
$78,000.000
|
$165,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$100,000.000
|
$190,000.000
|
$215,000.000
|
$635,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
14.000
|
$2,000.000
|
$3,000.000
|
$700.000
|
$9,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
80.000
|
$25.000
|
$40.000
|
$33.000
|
$34.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
80.000
|
$8.000
|
$10.000
|
$9.500
|
$9.500
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,260.000
|
$3.000
|
$2.500
|
$2.900
|
$3.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,260.000
|
$1.000
|
$0.500
|
$1.050
|
$1.050
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
230.000
|
$5.000
|
$8.000
|
$5.100
|
$5.250
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
230.000
|
$1.000
|
$1.000
|
$1.050
|
$1.050
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
13.000
|
$4,000.000
|
$3,000.000
|
$2,000.000
|
$4,700.000
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
750.000
|
$50.000
|
$73.000
|
$47.000
|
$110.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
630.000
|
$10.000
|
$2.500
|
$7.500
|
$8.500
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
750.000
|
$10.000
|
$6.000
|
$14.000
|
$15.000
|
|
|
DRIVEWAYS (BASE)
|
SY
|
57.000
|
$50.000
|
$55.000
|
$55.000
|
$67.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
525.000
|
$22.000
|
$22.000
|
$20.000
|
$20.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,000.000
|
$1,500.000
|
$1,350.000
|
$3,100.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
775.000
|
$5.000
|
$2.700
|
$3.050
|
$5.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,400.000
|
$2,700.000
|
$2,500.000
|
$2,600.000
|
|
|
GUARDRAIL END TREATMENT (MOVE & RESET)
|
EA
|
2.000
|
$2,000.000
|
$1,100.000
|
$1,275.000
|
$1,300.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$400.000
|
$220.000
|
$380.000
|
$300.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$2,200.000
|
$2,200.000
|
$1,210.000
|
$1,300.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,200.000
|
$550.000
|
$760.000
|
$800.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$15,000.000
|
$9,300.000
|
$8,600.000
|
$9,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
7.000
|
$450.000
|
$670.000
|
$470.000
|
$490.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
9.000
|
$75.000
|
$160.000
|
$96.000
|
$90.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
6.000
|
$22.000
|
$28.000
|
$15.100
|
$16.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
8.000
|
$30.000
|
$49.000
|
$28.000
|
$29.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
36.000
|
$0.500
|
$13.150
|
$12.100
|
$13.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
2,993.000
|
$0.500
|
$1.100
|
$1.050
|
$1.050
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
470.000
|
$0.500
|
$1.100
|
$1.050
|
$1.050
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
126.000
|
$1.000
|
$2.190
|
$1.750
|
$2.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
132.000
|
$0.500
|
$1.640
|
$1.550
|
$1.600
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
2,572.000
|
$0.350
|
$0.880
|
$0.850
|
$0.850
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
2,512.000
|
$0.350
|
$0.880
|
$0.850
|
$0.850
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
1.000
|
$175.000
|
$328.660
|
$305.000
|
$315.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
7.000
|
$3.500
|
$10.960
|
$10.100
|
$10.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
32.000
|
$3.500
|
$10.960
|
$10.100
|
$10.500
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
3,463.000
|
$0.400
|
$0.990
|
$0.950
|
$1.000
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
30.000
|
$2.250
|
$2.190
|
$2.050
|
$2.100
|
|
|
RELOCATE RDSD FLASH BEACON ASSEMBLY
|
EA
|
1.000
|
$2,000.000
|
$4,300.000
|
$5,600.000
|
$5,300.000
|
|
|
NO. OF WORKING DAYS
|
$/D
|
2,000.000
|
$210.000
|
$180.000
|
$190.000
|
$165.000
|
|
|
TEMPORARY CONSTRUCTION MATTING
|
SY
|
250.000
|
$25.000
|
$15.000
|
$88.000
|
$150.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
3.000
|
$10,000.000
|
$8,000.000
|
$8,400.000
|
$18,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
24.000
|
$300.000
|
$165.000
|
$395.000
|
$560.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
2.000
|
$500.000
|
$110.000
|
$104.000
|
$105.000
|
|
Totals: |
$1,845,661.900
|
$1,955,026.710
|
$2,224,209.500
|
$3,153,802.000
|