PREPARING ROW
|
STA
|
122.000
|
$1,000.000
|
$1,325.000
|
$3,400.000
|
$4,000.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
89.000
|
$25.000
|
$80.000
|
$31.900
|
$32.000
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
122.000
|
$400.000
|
$400.000
|
$481.810
|
$900.000
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY B)
|
CY
|
15,549.000
|
$20.000
|
$32.000
|
$21.000
|
$28.500
|
|
|
BLADING
|
STA
|
122.000
|
$200.000
|
$285.000
|
$398.560
|
$500.000
|
|
|
SPEC EXCAV WORK (HYD EXCAVATOR)
|
HR
|
143.000
|
$175.000
|
$230.000
|
$150.000
|
$72.000
|
|
|
BLOCK SODDING
|
SY
|
1,455.000
|
$5.000
|
$6.300
|
$5.850
|
$6.500
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
47,048.000
|
$0.150
|
$0.160
|
$0.140
|
$0.200
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
47,048.000
|
$0.150
|
$0.160
|
$0.130
|
$0.200
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
|
SY
|
94,095.000
|
$0.400
|
$0.400
|
$0.390
|
$0.440
|
|
|
BONDED FBR MTRX SEED (TEMP)(WARM)
|
SY
|
400.000
|
$1.000
|
$2.650
|
$2.620
|
$1.000
|
|
|
BONDED FBR MTRX SEED (TEMP)(COOL)
|
SY
|
400.000
|
$1.000
|
$2.650
|
$2.620
|
$1.000
|
|
|
VEGETATIVE WATERING
|
MG
|
3,794.400
|
$10.000
|
$5.000
|
$0.010
|
$0.800
|
|
|
SPRINKLING (DUST CONTROL)
|
MG
|
381.000
|
$10.000
|
$5.000
|
$0.010
|
$9.250
|
|
|
FL BS (RDWY DEL) (TY D GR 1-2)
|
TON
|
13,617.000
|
$55.000
|
$53.000
|
$61.980
|
$71.000
|
|
|
CEMENT
|
TON
|
686.000
|
$250.000
|
$265.000
|
$269.280
|
$260.000
|
|
|
CEMENT TREAT(MX EXST MTL & NW BS)(12")
|
SY
|
37,069.000
|
$4.000
|
$6.500
|
$5.500
|
$6.500
|
|
|
EMULS ASPH (EROSN CONT)(SS-1)
|
GAL
|
28,229.000
|
$6.000
|
$4.000
|
$0.010
|
$4.400
|
|
|
FOG SEAL (SS-1 OR CSS-1)
|
GAL
|
1,483.000
|
$12.000
|
$9.000
|
$8.280
|
$8.500
|
|
|
ASPH (RC-250)
|
TON
|
42.000
|
$1,400.000
|
$1,100.000
|
$1,354.510
|
$1,100.000
|
|
|
AGGR (TY-PE, E, L OR PL GR 3)
|
CY
|
317.000
|
$300.000
|
$230.000
|
$205.590
|
$324.000
|
|
|
AGGR (TY E OR L GR 5)
|
CY
|
273.000
|
$300.000
|
$205.000
|
$185.770
|
$297.000
|
|
|
AGGR(TY PE,TY-PL,TY-E,TY-L GR-4)(SAC-B)
|
CY
|
283.000
|
$200.000
|
$240.000
|
$155.940
|
$348.000
|
|
|
ASPH (AC-15P OR CRS-2P)
|
TON
|
152.000
|
$1,000.000
|
$1,100.000
|
$1,025.090
|
$1,000.000
|
|
|
CEM STABIL BKFL
|
CY
|
261.000
|
$150.000
|
$278.250
|
$291.500
|
$292.000
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
79.000
|
$175.000
|
$152.250
|
$159.500
|
$160.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
7.000
|
$100.000
|
$50.000
|
$36.340
|
$36.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
2,710.000
|
$30.000
|
$47.000
|
$49.500
|
$50.000
|
|
|
CL C CONC (COLLAR)
|
EA
|
3.000
|
$1,300.000
|
$945.000
|
$990.000
|
$990.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
90.000
|
$1,000.000
|
$997.500
|
$1,045.000
|
$1,045.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(18 IN)
|
CY
|
293.000
|
$225.000
|
$210.000
|
$220.000
|
$220.000
|
|
|
CONC BOX CULV (8 FT X 7 FT)
|
LF
|
58.000
|
$1,200.000
|
$1,890.000
|
$1,980.000
|
$1,980.000
|
|
|
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
|
LF
|
6.000
|
$850.000
|
$1,210.000
|
$1,155.000
|
$1,155.000
|
|
|
CONC BOX CULV (7 FT X 7 FT)(EXTEND)
|
LF
|
42.000
|
$1,200.000
|
$1,315.000
|
$1,155.000
|
$1,155.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
954.000
|
$55.000
|
$85.000
|
$88.000
|
$88.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
40.000
|
$80.000
|
$130.000
|
$132.000
|
$132.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 33 IN)
|
EA
|
1.000
|
$7,200.000
|
$9,000.000
|
$9,350.000
|
$9,350.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 48 IN)
|
EA
|
1.000
|
$11,500.000
|
$16,000.000
|
$16,500.000
|
$16,500.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 54 IN)
|
EA
|
1.000
|
$17,000.000
|
$21,000.000
|
$21,391.700
|
$21,391.700
|
|
|
HEADWALL (CH - PW - 0) (DIA= 66 IN)
|
EA
|
3.000
|
$19,000.000
|
$22,000.000
|
$23,100.000
|
$23,100.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 72 IN)
|
EA
|
3.000
|
$21,000.000
|
$23,500.000
|
$24,200.000
|
$24,200.000
|
|
|
WINGWALL (PW - 2) (HW=8 FT)
|
EA
|
5.000
|
$24,000.000
|
$34,650.000
|
$36,300.000
|
$36,300.000
|
|
|
WINGWALL (PW - 2) (HW=9 FT)
|
EA
|
1.000
|
$27,000.000
|
$40,950.000
|
$42,900.000
|
$42,900.000
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$1,000.000
|
$1,000.000
|
$1,045.000
|
$1,045.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
52.000
|
$750.000
|
$1,100.000
|
$1,100.000
|
$1,100.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
3.000
|
$1,100.000
|
$1,900.000
|
$1,320.000
|
$1,320.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
40.000
|
$100.000
|
$262.500
|
$275.000
|
$275.000
|
|
|
REMOV STR (PIPE)
|
EA
|
26.000
|
$300.000
|
$472.500
|
$495.000
|
$495.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$353,300.000
|
$425,000.000
|
$499,000.000
|
$470,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
14.000
|
$2,500.000
|
$11,000.000
|
$3,500.000
|
$11,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
600.000
|
$30.000
|
$42.000
|
$17.000
|
$38.500
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
600.000
|
$8.000
|
$13.000
|
$6.000
|
$11.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
250.000
|
$20.000
|
$5.000
|
$1.000
|
$10.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
250.000
|
$10.000
|
$1.000
|
$1.000
|
$2.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
3,435.000
|
$3.000
|
$4.000
|
$10.000
|
$4.250
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
3,435.000
|
$1.000
|
$1.000
|
$4.000
|
$1.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
130.000
|
$165.000
|
$160.650
|
$168.300
|
$168.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
555.000
|
$70.000
|
$88.000
|
$59.120
|
$55.000
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
1,516.000
|
$55.000
|
$62.000
|
$59.120
|
$108.000
|
|
|
TURNOUTS (SURF TREAT)
|
SY
|
626.000
|
$50.000
|
$70.000
|
$66.170
|
$118.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
375.000
|
$40.000
|
$25.000
|
$35.270
|
$33.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$3,200.000
|
$3,150.000
|
$3,410.000
|
$3,200.000
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 1
|
EA
|
1.000
|
$540.000
|
$600.000
|
$721.600
|
$610.000
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
14.000
|
$400.000
|
$310.000
|
$309.100
|
$325.000
|
|
|
MAILBOX INSTALL-D (WC-POST) TY 3
|
EA
|
3.000
|
$280.000
|
$310.000
|
$357.500
|
$325.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
2.000
|
$670.000
|
$735.000
|
$781.000
|
$770.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
1.000
|
$1,000.000
|
$1,250.000
|
$1,113.210
|
$1,300.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
12.000
|
$450.000
|
$460.000
|
$522.500
|
$479.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
8.000
|
$100.000
|
$170.000
|
$103.400
|
$105.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
9.000
|
$35.000
|
$26.000
|
$35.200
|
$43.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)SRF(BI)
|
EA
|
16.000
|
$120.000
|
$79.000
|
$148.500
|
$99.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
48,715.000
|
$0.350
|
$0.420
|
$0.440
|
$0.440
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
48,600.000
|
$0.350
|
$0.420
|
$0.440
|
$0.440
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
3,648.000
|
$1.200
|
$1.800
|
$2.000
|
$2.000
|
|
|
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
|
LF
|
24,358.000
|
$1.750
|
$1.050
|
$1.100
|
$1.100
|
|
|
REF PROF PAV MRK TY I(Y)6"(BRK)(100MIL)
|
LF
|
900.000
|
$3.000
|
$2.100
|
$2.200
|
$2.250
|
|
|
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
|
LF
|
19,800.000
|
$2.000
|
$1.050
|
$1.100
|
$1.100
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
22.000
|
$35.000
|
$21.000
|
$22.000
|
$22.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
293.000
|
$9.000
|
$5.250
|
$5.500
|
$5.500
|
|
|
SP MIXES SP-B PG64-22
|
TON
|
595.000
|
$200.000
|
$235.000
|
$288.750
|
$225.000
|
|
|
SP MIXES SP-D PG64-22 (EXEMPT)
|
TON
|
57.000
|
$300.000
|
$560.000
|
$370.640
|
$426.000
|
|
|
BONDING COURSE
|
GAL
|
91.000
|
$10.000
|
$8.000
|
$11.000
|
$39.500
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
60.000
|
$100.000
|
$10.000
|
$1.000
|
$300.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$22,000.000
|
$60,000.000
|
$25,000.000
|
|
|
PREFORMED CENTERLINE RUMBLE STRIP
|
LF
|
135.000
|
$15.000
|
$16.000
|
$16.500
|
$16.500
|
|
|
TMA (STATIONARY)
|
DAY
|
148.000
|
$250.000
|
$100.000
|
$300.000
|
$190.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
8.000
|
$200.000
|
$50.000
|
$50.000
|
$920.000
|
|
Totals: |
$4,151,943.750
|
$4,866,130.710
|
$4,999,999.994
|
$5,718,414.720
|