|
|
PREPARING ROW
|
AC
|
0.360
|
$50,000.000
|
$10,000.000
|
$15,000.000
|
$30,000.000
|
|
|
PREPARING ROW
|
STA
|
303.100
|
$2,000.000
|
$1,600.000
|
$1,800.000
|
$4,000.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
40.200
|
$50.000
|
$50.000
|
$42.000
|
$30.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
41.000
|
$30.000
|
$20.000
|
$93.000
|
$30.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (6")
|
SY
|
48,417.000
|
$8.000
|
$2.500
|
$12.000
|
$6.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (2"-6")
|
SY
|
1,933.000
|
$8.000
|
$2.000
|
$29.000
|
$6.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (4"-8")
|
SY
|
2,906.000
|
$10.000
|
$6.000
|
$22.000
|
$10.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
5,565.000
|
$25.000
|
$25.000
|
$29.000
|
$20.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
1,978.000
|
$35.000
|
$15.000
|
$43.000
|
$30.000
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
|
CY
|
833.000
|
$60.000
|
$20.000
|
$35.000
|
$30.000
|
|
|
BLADING
|
STA
|
136.000
|
$200.000
|
$150.000
|
$380.000
|
$300.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
36,329.000
|
$3.000
|
$1.500
|
$4.650
|
$3.000
|
|
|
BROADCAST SEED (PERM) (RURAL) (SANDY)
|
SY
|
18,166.000
|
$0.200
|
$0.250
|
$0.120
|
$0.200
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
|
SY
|
36,329.000
|
$0.800
|
$0.750
|
$0.610
|
$0.650
|
|
|
BONDED FBR MTRX SEED (TEMP)(WARM)
|
SY
|
18,166.000
|
$1.000
|
$0.750
|
$0.570
|
$0.650
|
|
|
BONDED FBR MTRX SEED (TEMP)(COOL)
|
SY
|
18,166.000
|
$1.000
|
$0.750
|
$0.550
|
$0.250
|
|
|
VEGETATIVE WATERING
|
MG
|
999.000
|
$10.000
|
$0.010
|
$1.000
|
$25.000
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2) (6")
|
SY
|
150,799.000
|
$20.000
|
$28.840
|
$29.000
|
$45.000
|
|
|
REWORK BS MTL (TY C)(12")(ORD COMP)
|
SY
|
88,477.000
|
$5.000
|
$9.000
|
$7.500
|
$9.000
|
|
|
CEMENT
|
TON
|
2,873.000
|
$270.000
|
$250.000
|
$268.000
|
$325.000
|
|
|
CEMENT TREAT (EXIST MATL) (10")
|
SY
|
159,633.000
|
$4.750
|
$6.000
|
$5.750
|
$5.000
|
|
|
EMULS ASPH (EROSN CONT)(CSS-1)
|
GAL
|
5,166.000
|
$8.000
|
$8.000
|
$7.000
|
$7.000
|
|
|
ASPH (RC-250)
|
GAL
|
29,730.000
|
$7.000
|
$7.000
|
$6.000
|
$6.000
|
|
|
ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR)
|
GAL
|
118,631.000
|
$6.500
|
$6.000
|
$4.500
|
$4.500
|
|
|
AGGR (TY-PD GR-3 OR TY-PL GR-3)
|
CY
|
1,370.000
|
$180.000
|
$190.000
|
$225.000
|
$165.000
|
|
|
AGGR(TY-PD GR-4 OR TY-PL GR-4)
|
CY
|
1,229.000
|
$180.000
|
$190.000
|
$205.000
|
$165.000
|
|
|
AGGR (TY-PD GR-5 OR TY-PL GR-5)
|
CY
|
1,143.000
|
$300.000
|
$250.000
|
$210.000
|
$165.000
|
|
|
PLANE ASPH CONC PAV(1/2" TO 1-1/2")
|
SY
|
2,075.000
|
$5.000
|
$8.000
|
$14.000
|
$15.000
|
|
|
CUT & RESTORING PAV
|
SY
|
62.800
|
$200.000
|
$350.000
|
$236.000
|
$150.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
99.400
|
$400.000
|
$500.000
|
$590.000
|
$1,000.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
141.000
|
$10.000
|
$10.000
|
$16.000
|
$30.000
|
|
|
CL C CONC (COLLAR)
|
EA
|
11.000
|
$2,000.000
|
$3,200.000
|
$2,600.000
|
$1,500.000
|
|
|
CL C CONC(PILE ENCASEMENT)
|
LF
|
64.000
|
$1,200.000
|
$2,500.000
|
$1,600.000
|
$2,500.000
|
|
|
PENETRATING CONCRETE SURFACE TREATMENT
|
SY
|
3,295.000
|
$20.000
|
$30.000
|
$25.000
|
$15.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
8.000
|
$300.000
|
$1,500.000
|
$1,100.000
|
$500.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
22.200
|
$850.000
|
$1,200.000
|
$945.000
|
$1,500.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(12 IN)
|
CY
|
26.000
|
$250.000
|
$250.000
|
$158.000
|
$400.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
987.100
|
$630.000
|
$1,200.000
|
$945.000
|
$800.000
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL3)
|
LF
|
580.000
|
$50.000
|
$50.000
|
$53.000
|
$65.000
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL7)
|
LF
|
212.000
|
$100.000
|
$75.000
|
$63.000
|
$65.000
|
|
|
RETROFIT RAIL (ADD HSS)
|
LF
|
1,228.000
|
$150.000
|
$175.000
|
$184.000
|
$160.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)
|
LF
|
58.000
|
$450.000
|
$1,000.000
|
$900.000
|
$1,000.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
1,334.000
|
$65.000
|
$75.000
|
$70.000
|
$70.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
288.000
|
$100.000
|
$190.000
|
$155.000
|
$90.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
92.000
|
$175.000
|
$225.000
|
$200.000
|
$140.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
68.000
|
$200.000
|
$250.000
|
$240.000
|
$200.000
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
32.000
|
$225.000
|
$450.000
|
$375.000
|
$300.000
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
20.000
|
$250.000
|
$600.000
|
$475.000
|
$400.000
|
|
|
RC PIPE (CL III)(72 IN)
|
LF
|
72.000
|
$500.000
|
$750.000
|
$555.000
|
$800.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 42 IN)
|
EA
|
3.000
|
$10,000.000
|
$12,000.000
|
$11,000.000
|
$15,000.000
|
|
|
HEADWALL (CH - PW - S) (DIA= 36 IN)
|
EA
|
2.000
|
$10,000.000
|
$10,000.000
|
$9,000.000
|
$15,000.000
|
|
|
HEADWALL (CH - PW - S) (DIA= 48 IN)
|
EA
|
2.000
|
$15,000.000
|
$15,000.000
|
$14,000.000
|
$25,000.000
|
|
|
HEADWALL (CH - PW - S) (DIA= 72 IN)
|
EA
|
2.000
|
$17,500.000
|
$32,000.000
|
$27,500.000
|
$45,000.000
|
|
|
WINGWALL (PW - 2) (HW=5 FT)
|
EA
|
2.000
|
$14,000.000
|
$12,000.000
|
$10,000.000
|
$10,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$1,200.000
|
$950.000
|
$1,000.000
|
$600.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
78.000
|
$1,000.000
|
$975.000
|
$1,050.000
|
$800.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
6.000
|
$1,800.000
|
$2,000.000
|
$1,260.000
|
$1,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
6.000
|
$1,400.000
|
$2,500.000
|
$2,100.000
|
$1,300.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
6.000
|
$3,000.000
|
$5,000.000
|
$3,150.000
|
$2,200.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
2.000
|
$1,500.000
|
$1,500.000
|
$2,600.000
|
$2,000.000
|
|
|
REMOV STR (PIPE)
|
EA
|
51.000
|
$500.000
|
$1,200.000
|
$1,600.000
|
$500.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,275,000.000
|
$990,000.000
|
$1,300,000.000
|
$1,800,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
15.000
|
$5,000.000
|
$4,000.000
|
$35,000.000
|
$15,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
2,775.000
|
$30.000
|
$50.000
|
$29.500
|
$37.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
60.000
|
$35.000
|
$50.000
|
$36.000
|
$50.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
2,835.000
|
$10.000
|
$12.000
|
$11.500
|
$9.000
|
|
|
EARTHWORK (EROSN & SEDMT CONT, IN VEH)
|
CY
|
540.000
|
$40.000
|
$75.000
|
$39.000
|
$40.000
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
300.000
|
$110.000
|
$200.000
|
$280.000
|
$100.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
56,210.000
|
$3.150
|
$3.500
|
$3.100
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
56,210.000
|
$1.000
|
$1.000
|
$0.650
|
$0.250
|
|
|
TRACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
60.000
|
$150.000
|
$200.000
|
$310.000
|
$125.000
|
|
|
INTERSECTIONS (ACP)
|
SY
|
2,001.000
|
$100.000
|
$75.000
|
$53.000
|
$85.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
1,700.000
|
$100.000
|
$75.000
|
$63.000
|
$80.000
|
|
|
DRIVEWAYS (BASE)
|
SY
|
892.000
|
$100.000
|
$75.000
|
$72.000
|
$50.000
|
|
|
DRIVEWAYS (CONC) (HES)
|
SY
|
40.000
|
$150.000
|
$250.000
|
$210.000
|
$200.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
16,087.500
|
$25.000
|
$29.000
|
$23.100
|
$25.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
24.000
|
$2,000.000
|
$2,500.000
|
$3,250.000
|
$2,200.000
|
|
|
MTL BM GD FEN TRANS (ANCHOR PLATE)
|
EA
|
24.000
|
$1,000.000
|
$1,000.000
|
$895.000
|
$1,000.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
15,736.000
|
$3.000
|
$7.000
|
$2.100
|
$3.500
|
|
|
RM MTL BM GD FEN TRANS (T101)
|
EA
|
24.000
|
$250.000
|
$300.000
|
$110.000
|
$230.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
63.000
|
$3,400.000
|
$5,000.000
|
$2,900.000
|
$3,000.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
60.000
|
$275.000
|
$600.000
|
$210.000
|
$230.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
1.000
|
$20,000.000
|
$35,000.000
|
$37,000.000
|
$33,000.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
1.000
|
$400.000
|
$500.000
|
$352.000
|
$300.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
56.000
|
$750.000
|
$750.000
|
$653.000
|
$700.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
1.000
|
$800.000
|
$1,000.000
|
$720.000
|
$900.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
57.000
|
$130.000
|
$150.000
|
$185.000
|
$120.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
46.000
|
$30.000
|
$75.000
|
$58.000
|
$25.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
281.000
|
$30.000
|
$50.000
|
$26.000
|
$25.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
46.000
|
$70.000
|
$100.000
|
$73.000
|
$70.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
102,298.000
|
$1.500
|
$0.750
|
$0.550
|
$0.550
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
48.000
|
$5.000
|
$6.000
|
$5.250
|
$6.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
|
LF
|
4,220.000
|
$1.500
|
$0.750
|
$0.550
|
$0.550
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
78,740.000
|
$1.500
|
$0.750
|
$0.550
|
$0.550
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
10,414.000
|
$2.000
|
$1.000
|
$2.900
|
$1.500
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
48.000
|
$8.000
|
$10.000
|
$7.350
|
$8.000
|
|
|
PAVEMENT SEALER 6"
|
LF
|
1,049.000
|
$1.000
|
$2.000
|
$1.050
|
$1.100
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
8,132.000
|
$1.200
|
$2.000
|
$1.050
|
$1.100
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
510.000
|
$1.200
|
$4.000
|
$2.100
|
$2.200
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
5,557.000
|
$1.200
|
$2.000
|
$1.050
|
$1.100
|
|
|
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
|
LF
|
93,218.000
|
$1.200
|
$1.250
|
$0.950
|
$1.000
|
|
|
REF PROF PAV MRK TY I(Y)6"(BRK)(100MIL)
|
LF
|
4,210.000
|
$1.600
|
$2.000
|
$1.200
|
$1.300
|
|
|
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
|
LF
|
72,047.000
|
$1.200
|
$1.250
|
$0.950
|
$1.000
|
|
REFL PAV MRKR TY I-A
|
EA
|
128.000
|
$5.000
|
$8.000
|
$5.250
|
$6.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,205.000
|
$4.500
|
$6.000
|
$4.200
|
$5.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
408.000
|
$1.200
|
$4.000
|
$2.100
|
$3.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
1,049.000
|
$0.200
|
$1.250
|
$1.050
|
$1.200
|
|
|
SP MIXES SP-C PG64-22
|
TON
|
1,279.000
|
$190.000
|
$200.000
|
$215.000
|
$200.000
|
|
|
TACK COAT
|
GAL
|
291.000
|
$5.000
|
$8.000
|
$10.000
|
$15.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
6.000
|
$20,000.000
|
$15,000.000
|
$16,500.000
|
$40,000.000
|
|
|
PREFORMED CENTERLINE RUMBLE STRIP
|
LF
|
555.000
|
$15.000
|
$20.000
|
$10.500
|
$12.000
|
|
|
TMA (STATIONARY)
|
DAY
|
220.000
|
$300.000
|
$250.000
|
$245.000
|
$300.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
15.000
|
$300.000
|
$600.000
|
$55.000
|
$300.000
|
|
Totals: |
$14,016,829.350
|
$15,996,365.900
|
$16,395,513.880
|
$19,279,397.450
|