Show Job Controls
Bid Cobra

TRINITY FM 357 (2117-02-015)

Items: 62

County: TRINITY
Length: N/A
Highway: FM 357
District: LUFKIN
Control Number: 2117-02-015
DBE Goal: N/A
Project: BR 2022(101)
Guaranty: N/A
Time: 57 WORKING DAYS
Engineer's Estimate: $1,301,823.90
Date: 11/04/2021 (4 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (3)
E
Engineer's Estimate
$1,301,823.90
Over/Under Est: 18.62% $242,339.16
Over/Under Est: 31.53% $410,502.00
Amt Left: 10.89% $168,162.84
$1,722,623.96
Over/Under Est: 32.32% $420,800.06
Amt Left: 11.56% $178,460.90
Delta: -0.60% -$10,298.06

Bid Items & Bid Tabulations

62 Total 0 of 62
TRINITY  |  FM 357  |  LUFKIN  |  2117-02-015  |  11/04/2021  |  $1,301,823.90  |  BR 2022(101)  |  BRIDGE REPL  |  57 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DREWERY CONSTRUCTION COMPANY, INCORPORATED
HODGES AND SON CONSTRUCTION COMPANY, INC.
A. L. HELMCAMP, INC.
PREPARING ROW
STA 8.800 $1,000.000 $5,700.000 $7,000.000 $14,000.000
EXCAVATION (ROADWAY)
CY 292.000 $12.000 $18.000 $20.000 $30.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 1,715.000 $12.000 $30.000 $25.000 $22.000
FURNISHING AND PLACING TOPSOIL (4")
SY 4,941.000 $2.000 $2.000 $3.000 $2.000
BROADCAST SEED (TEMP) (WARM)
SY 2,471.000 $0.250 $0.400 $1.000 $0.450
BROADCAST SEED (TEMP) (COOL)
SY 2,471.000 $0.250 $0.400 $1.000 $0.450
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
SY 4,941.000 $0.400 $0.550 $2.000 $0.560
VEGETATIVE WATERING
MG 197.600 $25.000 $36.000 $1.000 $15.000
SOIL RETENTION BLANKETS (CL 1) (TY B)
SY 552.000 $1.000 $2.100 $4.000 $2.300
SPRINKLING (DUST CONTROL)
MG 23.700 $1.000 $35.000 $1.000 $30.000
PROOF ROLLING
HR 3.000 $200.000 $100.000 $1.000 $90.000
FL BS (RDWY DEL) (TY D GR 1-2)
TON 1,338.000 $45.000 $52.000 $60.000 $65.000
CEMENT
TON 43.000 $220.000 $200.000 $250.000 $198.000
CEMENT TREAT(MX EXST MTL & NW BS)(12")
SY 416.000 $6.000 $7.200 $30.000 $25.000
CEMENT TREAT (NEW BASE)(12")
SY 1,943.000 $3.000 $7.200 $20.000 $15.000
ASPH (RC-250)
TON 5.000 $750.000 $1,250.000 $2,250.000 $1,600.000
AGGR (TY-PE, E, L OR PL GR 3)
CY 20.000 $300.000 $615.000 $550.000 $800.000
AGGR (TY E OR L GR 5)
CY 16.000 $300.000 $745.000 $250.000 $800.000
AGGR(TY PE,TY-PL,TY-E,TY-L GR-4)(SAC-B)
CY 19.000 $300.000 $650.000 $550.000 $800.000
ASPH (AC-15P, AC-10-2TR, OR CRS-2P)
TON 13.000 $700.000 $850.000 $2,250.000 $1,100.000
CEM STABIL BKFL
CY 43.000 $200.000 $210.000 $250.000 $350.000
DRILL SHAFT (30 IN)
LF 603.000 $300.000 $212.000 $135.000 $230.000
CL C CONC (ABUT)
CY 34.800 $1,000.000 $900.000 $1,100.000 $1,500.000
CL C CONC (CAP)
CY 22.700 $1,000.000 $950.000 $1,200.000 $1,300.000
CL C CONC (COLUMN)
CY 9.100 $1,000.000 $1,050.000 $1,200.000 $2,200.000
REINF CONC SLAB (BOX BEAM)
SF 5,150.000 $16.000 $17.850 $26.000 $22.000
APPROACH SLAB
CY 55.100 $800.000 $525.000 $600.000 $850.000
SHEAR KEY
CY 23.600 $350.000 $370.000 $400.000 $580.000
PRESTR CONC BOX BEAM (4B20)
LF 148.500 $190.000 $252.000 $320.000 $335.000
PRESTR CONC BOX BEAM (5B20)
LF 895.030 $210.000 $252.000 $320.000 $220.000
RIPRAP (CONC)(4 IN)
CY 5.000 $550.000 $525.000 $800.000 $1,000.000
RIPRAP (STONE PROTECTION)(24 IN)
CY 1,557.000 $140.000 $170.000 $120.000 $130.000
RAIL (TY T223)
LF 332.000 $100.000 $95.000 $120.000 $140.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 68.000 $100.000 $105.000 $150.000 $140.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $30,000.000 $31,500.000 $80,000.000 $35,000.000
MOBILIZATION
LS 1.000 $116,000.000 $182,000.000 $150,000.000 $165,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $3,000.000 $2,800.000 $22,000.000 $12,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 280.000 $40.000 $36.000 $5.000 $38.000
ROCK FILTER DAMS (REMOVE)
LF 280.000 $10.000 $8.400 $1.000 $9.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 222.000 $15.000 $29.000 $1.000 $10.000
CONSTRUCTION EXITS (REMOVE)
SY 222.000 $3.000 $8.400 $1.000 $2.000
CONSTRUCTION PERIMETER FENCE
LF 54.000 $3.000 $5.250 $1.000 $8.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,780.000 $3.500 $3.100 $1.000 $3.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,780.000 $1.000 $1.050 $1.000 $1.100
MTL W-BEAM GD FEN (TIM POST)
LF 600.000 $25.000 $28.000 $25.000 $31.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,700.000 $3,100.000 $2,000.000 $2,000.000
REMOVE METAL BEAM GUARD FENCE
LF 386.000 $3.000 $8.000 $4.000 $3.400
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,500.000 $3,100.000 $3,500.000 $3,300.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $275.000 $400.000 $500.000 $300.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 2.000 $350.000 $445.000 $800.000 $480.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 6.000 $20.000 $16.000 $30.000 $17.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 10.000 $30.000 $38.000 $30.000 $45.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 22.000 $1.000 $9.000 $5.000 $1.000
REFL PAV MRK TY II (W) 4" (SLD)
LF 1,750.000 $0.200 $2.100 $2.000 $2.250
REFL PAV MRK TY II (Y) 4" (BRK)
LF 230.000 $0.200 $2.100 $2.000 $2.250
PAVEMENT SEALER 4"
LF 430.000 $2.000 $2.100 $1.000 $2.250
REFL PAV MRKR TY II-A-A
EA 11.000 $5.000 $26.250 $15.000 $30.000
PAV SURF PREP FOR MRK (4")
LF 430.000 $0.500 $2.100 $1.000 $2.250
D-GR HMA TY-B PG64-22 (EXEMPT)
TON 87.000 $200.000 $260.000 $300.000 $250.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $8,000.000 $7,800.000 $5,000.000 $8,000.000
TMA (STATIONARY)
DAY 5.000 $150.000 $400.000 $250.000 $280.000
TMA (MOBILE OPERATION)
DAY 4.000 $150.000 $150.000 $250.000 $500.000
Totals: $1,301,823.900 $1,544,163.060 $1,712,325.900 $1,722,623.960