0133-07-026
|
ARCHER
|
WICHITA FALLS
|
$483,977
|
SH 114
|
STP 1702(138)HES
|
04/04/2017
|
11/15/2023
|
CENTERLINE TEXTURING
|
L&L COMPANY
($273,291)
|
|
|
1308-01-024
|
BELL
|
WACO
|
$3,317,844
|
FM 1123
|
BR 1602(576)
|
04/05/2017
|
11/15/2023
|
REPLACE BRIDGE & APPROACHES
|
J.D. ABRAMS, L.P.
($2,950,399)
|
|
|
0915-00-204
|
BEXAR
|
SAN ANTONIO
|
$1,458,810
|
VA
|
STP 2017(894)
|
04/04/2017
|
11/15/2023
|
DISTRICTWIDE TRAF CONTROL DEVICE
|
D&G ENERGY CORPORATION
($1,349,187)
|
|
|
2230-01-018
|
BEXAR
|
SAN ANTONIO
|
$3,577,844
|
FM 1560
|
STP 2016(752)MM
|
04/05/2017
|
11/15/2023
|
CONSTRUCT 2 LANE ROADWAY ON NEW LOCA...
|
DAN WILLIAMS COMPANY
($3,419,685)
|
|
|
0909-28-022
|
BOSQUE
|
WACO
|
$1,353,297
|
CR
|
BR 2000(962)
|
04/05/2017
|
11/15/2023
|
REPLACE BRIDGE AND APPROACHES
|
HODGES AND SON CONSTRUCTION COMPANY, INC.
($1,451,177)
|
|
|
0085-04-035
|
BOWIE
|
ATLANTA
|
$5,660,757
|
US 259
|
STP 2013(615)
|
04/04/2017
|
11/15/2023
|
GR,STR,BS,SURF & PAV MRK
|
H. H. HOWARD & SONS, INC.
($5,371,370)
|
|
|
0178-02-088
|
BRAZORIA
|
HOUSTON
|
$232,590
|
SH 35
|
NH 2017(483)
|
04/05/2017
|
11/15/2023
|
ADD LEFT TURN LANE
|
DURWOOD GREENE CONSTRUCTION CO.
($261,916)
|
|
|
6314-86-001
|
BRAZORIA
|
HOUSTON
|
$151,728
|
SH0035
|
RMC - 631486001
|
04/11/2017
|
11/15/2023
|
EMBANKMENT RESTOR-SLOPE REPAIR
|
BECK-REIT & SONS, LTD.
($243,557)
|
|
|
0050-01-079
|
BRAZOS
|
BRYAN
|
$1,810,027
|
BS 6-R
|
STP 2017(914)HES
|
04/04/2017
|
11/15/2023
|
IMPROVE TRAF SIG
|
KNIFE RIVER CORPORATION - SOUTH
($1,474,038)
|
|
|
0384-04-030
|
CALDWELL
|
AUSTIN
|
$1,059,359
|
FM 1854
|
STP 2017(947)HES
|
04/05/2017
|
11/15/2023
|
SAFETY TREAT FIXED OBJECTS
|
RELMCO, INC.
($986,626)
|
|
|
0007-01-054
|
CALLAHAN
|
ABILENE
|
$10,397,195
|
IH 20
|
NH 2017(855)
|
04/04/2017
|
11/15/2023
|
OVERLAY
|
J. H. STRAIN & SONS, INC.
($8,248,492)
|
|
|
0342-04-032
|
CAMERON
|
PHARR
|
$4,345,457
|
SH 107
|
NH 2017(971)
|
04/05/2017
|
11/15/2023
|
WIDEN TO 4 LANE UNDIVIDED C&G
|
FOREMOST PAVING, INC.
($4,313,270)
|
|
|
6316-29-001
|
CAMERON
|
PHARR
|
$746,800
|
US0083
|
RMC - 631629001
|
04/05/2017
|
11/15/2023
|
DEBRIS RMVL AND DISPOSAL
|
T.F.R. ENTERPRISES, INC.
($599,300)
|
|
|
6314-70-001
|
CHEROKEE
|
TYLER
|
$314,090
|
US0069
|
RMC - 631470001
|
04/05/2017
|
11/15/2023
|
SIGN & SIGN SUPPORT INSTL
|
JASCO
($190,640)
|
|
|
0913-26-058
|
COLORADO
|
YOAKUM
|
$231,797
|
CR
|
BR 2012(731)
|
04/05/2017
|
11/15/2023
|
REPLACE BRIDGE AND APPROACHES
|
TREVWAY, INC.
($233,008)
|
|
|
0312-01-078
|
COOKE
|
WICHITA FALLS
|
$783,989
|
FM 51
|
STP 2017(403)
|
04/05/2017
|
11/15/2023
|
ADD SHOULDERS
|
JAGOE-PUBLIC COMPANY
($706,190)
|
|
|
6311-98-001
|
CROSBY
|
LUBBOCK
|
$6,524,712
|
US0082
|
RMC - 631198001
|
04/05/2017
|
11/15/2023
|
TOTAL REST AREA MAINT
|
A. L. HELMCAMP, INC.
($5,842,800)
|
|
|
0233-01-044
|
CULBERSON
|
EL PASO
|
$4,141,460
|
US 62
|
STP 2017(953)HES
|
04/05/2017
|
11/15/2023
|
MODERNIZE BRIDGE RAIL/APR GUARDRAIL,...
|
VIZCAINO, L.P.
($3,783,684)
|
|
|
0581-02-145
|
DALLAS
|
DALLAS
|
$1,512,508
|
SL 12
|
STP 1702(156)
|
04/05/2017
|
11/15/2023
|
MILL,FULL DEPTH REPAIR & OVERLAY ON...
|
O. TREVINO CONSTRUCTION, LLC
($1,463,103)
|
|
|
6310-26-001
|
DENTON
|
DALLAS
|
$390,000
|
IH0035
|
RMC - 631026001
|
04/04/2017
|
11/15/2023
|
POTHOLE REPAIR
|
IIPL USA LLC
($357,000)
|
|
|
6310-27-001
|
DENTON
|
DALLAS
|
$601,354
|
FM0407
|
RMC - 631027001
|
04/04/2017
|
11/15/2023
|
SPECIALTY MRK
|
TOTAL HIGHWAY MAINTENANCE, LLC
($592,023)
|
|
|
6310-28-001
|
DENTON
|
DALLAS
|
$97,753
|
IH0035W
|
RMC - 631028001
|
04/11/2017
|
11/15/2023
|
RAISED PAVMT MARKERS
|
BRYDL CONTRACTING, INC.
($116,731)
|
|
|
2638-01-022
|
EASTLAND
|
BROWNWOOD
|
$382,863
|
SH 206
|
STP 1702(168)HES
|
04/05/2017
|
11/15/2023
|
PROFILE CENTER AND EDGELINE MRK
|
FLAT LINE, INC.
($397,732)
|
|
|
2638-01-023
|
EASTLAND
|
BROWNWOOD
|
$895,888
|
SH 206
|
STP 1702(177)
|
04/05/2017
|
11/15/2023
|
RECON ROADWAY
|
A. L. HELMCAMP, INC.
($712,724)
|
|
|
6312-41-001
|
ECTOR
|
ODESSA
|
$499,350
|
IH0020
|
RMC - 631241001
|
04/05/2017
|
11/15/2023
|
STRIPING_(CALLOUT)
|
L&L COMPANY
($325,900)
|
|
|
6312-94-001
|
ECTOR
|
ODESSA
|
$225,274
|
IH0020
|
RMC - 631294001
|
04/18/2017
|
11/15/2023
|
STREET SWEEPING
|
J-MEN CONCRETE CONSTRUCTION
($270,035)
|
|
|
6314-54-001
|
ECTOR
|
ODESSA
|
$279,750
|
IH0020
|
RMC - 631454001
|
04/11/2017
|
11/15/2023
|
RE-ERECTING LARGE SIGNS(CALLOUT)
|
HJC FARMS, INC.
($348,000)
|
|
|
0002-12-023
|
EL PASO
|
EL PASO
|
$3,541,670
|
US 62
|
STP 2017(574)HES
|
04/04/2017
|
11/15/2023
|
IMPROVE TRAF SIGNAL, ETC.
|
TRI STATE ELECTRIC, LTD.
($3,537,953)
|
|
|
6314-51-001
|
EL PASO
|
EL PASO
|
$451,000
|
IH0010
|
RMC - 631451001
|
04/05/2017
|
11/15/2023
|
ROADWAY SPALL & FULL DEPTH REPAIR
|
SYNERGY PROJECT CONSULTANTS, INC.
($450,425)
|
|
|
6315-91-001
|
EL PASO
|
EL PASO
|
$205,208
|
SL0478
|
RMC - 631591001
|
04/20/2017
|
11/15/2023
|
TRAMWAY PARK REHAB
|
ALLIED PAVING CO.
($178,718)
|
|
|
6312-42-001
|
FANNIN
|
PARIS
|
$173,014
|
FM0824
|
BPM - 631242001
|
04/20/2017
|
11/15/2023
|
EROSION REPAIR
|
HARTBEAT CONSTRUCTION
($168,515)
|
|
|
6314-29-001
|
FANNIN
|
PARIS
|
$609,628
|
FM0100
|
RMC - 631429001
|
04/05/2017
|
11/15/2023
|
CULVERT REPAIR
|
SAMMY GIST ENTERPRISES, INC.
($620,554)
|
|
|
6316-34-001
|
FAYETTE
|
YOAKUM
|
$273,264
|
SH0159
|
RMC - 631634001
|
04/26/2017
|
11/15/2023
|
STRUCT IMPRVS
|
TREVWAY, INC.
($293,197)
|
|
|
3422-01-011
|
FORT BEND
|
HOUSTON
|
$581,592
|
PR 72
|
C 3422-1-11
|
04/04/2017
|
11/15/2023
|
1.5 INCH PLANING, 1.5 INCH ACP OVERL...
|
MAIN LANE INDUSTRIES LTD.
($563,996)
|
|
|
6313-26-001
|
FORT BEND
|
HOUSTON
|
$280,265
|
US0059
|
RMC - 631326001
|
04/11/2017
|
11/15/2023
|
ASPH PAVMT REPAIR
|
FORDE CONSTRUCTION COMPANY, INC.
($264,040)
|
|
|
3595-01-017
|
GALVESTON
|
HOUSTON
|
$824,531
|
SH 275
|
NH 2017(970)
|
04/04/2017
|
11/15/2023
|
MILL, FULL DEPTH REP, O/L & STRIP
|
ANGEL BROTHERS HOLDINGS CORP.
($985,672)
|
|
|
6307-61-001
|
GALVESTON
|
HOUSTON
|
$291,827
|
SH0003
|
RMC - 630761001
|
04/11/2017
|
11/15/2023
|
BRIDGE JOINT RPR,CLEAN & SEAL BRIDGE...
|
ISI CONTRACTING, INC.
($286,222)
|
|
|
0053-04-042
|
GARZA
|
LUBBOCK
|
$3,021,299
|
US 84
|
NH 1702(189)
|
04/05/2017
|
11/15/2023
|
CONC REPAIR
|
TOTAL HIGHWAY MAINTENANCE, LLC
($2,405,440)
|
|
|
0072-01-052
|
GILLESPIE
|
AUSTIN
|
$1,141,920
|
US 87
|
STP 2017(940)HES
|
04/04/2017
|
11/15/2023
|
INSTL CONTINUOUS TURN LANE
|
RAY FARIS, INC.
($963,063)
|
|
|
6314-95-001
|
GRAYSON
|
PARIS
|
$670,077
|
US0075
|
RMC - 631495001
|
04/04/2017
|
11/15/2023
|
ON CALL TY I & SPECIALTY STRIPING
|
TOTAL HIGHWAY MAINTENANCE, LLC
($667,264)
|
|
|
6314-96-001
|
GRAYSON
|
PARIS
|
$130,200
|
US0075
|
RMC - 631496001
|
04/20/2017
|
11/15/2023
|
ON CALL TY II STRIPING
|
STRIPING TECHNOLOGY, L.P.
($142,200)
|
|
|
0096-04-066
|
GREGG
|
TYLER
|
$3,122,457
|
US 80
|
NH 2017(893)
|
04/04/2017
|
11/15/2023
|
GR,BS,ACP SURF,STRM SWR,C&G,SFTY IMP...
|
LONGVIEW BRIDGE AND ROAD, LTD.
($3,538,933)
|
|
|
0393-01-097
|
GREGG
|
TYLER
|
$2,445,588
|
SH 149
|
BR 1502(474)
|
04/04/2017
|
11/15/2023
|
CONC BR RAIL, MBGF, CONC STR RPR
|
GIBSON & ASSOCIATES, INC.
($3,114,798)
|
|
|
6314-00-001
|
GUADALUPE
|
SAN ANTONIO
|
$297,112
|
UA0090
|
BPM - 631400001
|
04/12/2017
|
11/15/2023
|
BRIDGE PREVENT MAINT
|
CRG
($270,770)
|
|
|
0028-01-101
|
HARRIS
|
HOUSTON
|
$643,588
|
BU 90-U
|
NH 2017(967)
|
04/05/2017
|
11/15/2023
|
INSTL MBGF/SGTS
|
ISI CONTRACTING, INC.
($554,116)
|
|
|
0500-03-107
|
HARRIS
|
HOUSTON
|
$95,014,210
|
IH 45
|
NH 2017(906)
|
04/04/2017
|
11/15/2023
|
WIDEN TO 10 MAIN LANES, TWO 3-LANE F...
|
WILLIAMS BROTHERS CONSTRUCTION CO., INC.
($99,783,477)
|
|
|
0912-71-003
|
HARRIS
|
HOUSTON
|
$10,889,403
|
CS
|
C 912-71-3
|
04/04/2017
|
11/15/2023
|
ROADWAY RECON
|
J.D. ABRAMS, L.P.
($12,380,277)
|
|
|
6312-33-001
|
HARRIS
|
HOUSTON
|
$701,623
|
IH0010
|
RMC - 631233001
|
04/05/2017
|
11/15/2023
|
RETRACE & REPLACE PAVMT MRK
|
PROFESSIONAL TRAFFIC CONTROL LLC
($522,230)
|
|
|
6313-22-001
|
HARRIS
|
HOUSTON
|
$147,941
|
SH0249
|
BPM - 631322001
|
04/11/2017
|
11/15/2023
|
RIPRAP & SCOUR REPAIR
|
BECK-REIT & SONS, LTD.
($160,887)
|
|
|
6316-26-001
|
HARRIS
|
HOUSTON
|
$2,574,500
|
US0059
|
RMC - 631626001
|
04/04/2017
|
11/15/2023
|
DEBRIS RMVL AND DISPOSAL
|
T.F.R. ENTERPRISES, INC.
($1,873,100)
|
|
|
3123-01-014
|
HOOD
|
FORT WORTH
|
$3,819,821
|
FM 4
|
STP 2017(925)
|
04/04/2017
|
11/15/2023
|
GR, BS, STRUC, AND PAVMT
|
JAY MILLS CONTRACTING, INCORPORATED
($3,211,242)
|
|
|
0911-28-033
|
HOUSTON
|
LUFKIN
|
$751,029
|
CR
|
BR 2014(435)
|
04/04/2017
|
11/15/2023
|
REPLACE BRIDGE AND APPROACHES
|
HODGES AND SON CONSTRUCTION COMPANY, INC.
($619,444)
|
|
|
6315-88-001
|
HUDSPETH
|
EL PASO
|
$50,660
|
IH0010
|
RMC - 631588001
|
04/27/2017
|
11/15/2023
|
JANITORIAL PICNIC MAINT
|
CM COMPANY
($46,895)
|
|
|
0173-07-055
|
HUNT
|
PARIS
|
$1,873,751
|
SH 34
|
NH 2017(926)
|
04/04/2017
|
11/15/2023
|
OVERLAY
|
AUSTIN BRIDGE & ROAD SERVICES, LP
($1,683,588)
|
|
|
6314-97-001
|
HUNT
|
PARIS
|
$952,310
|
IH0030
|
RMC - 631497001
|
04/05/2017
|
11/15/2023
|
ON CALL TY I & SPECIALTY STRIPING
|
STRIPING TECHNOLOGY, L.P.
($860,465)
|
|
|
6315-37-001
|
HUNT
|
PARIS
|
$131,750
|
IH0030
|
RMC - 631537001
|
04/20/2017
|
11/15/2023
|
BRIDGE RAIL REPAIR
|
SJ&J CONSTRUCTION, LLC
($190,925)
|
|
|
0913-18-029
|
JACKSON
|
YOAKUM
|
$547,067
|
CR
|
BR 1602(012)
|
04/04/2017
|
11/15/2023
|
REPLACE BRIDGE AND APPROACHES
|
CONSTAR CONSTRUCTION
($462,864)
|
|
|
0710-01-049
|
JASPER
|
BEAUMONT
|
$1,156,391
|
FM 105
|
STP 2017(961)
|
04/04/2017
|
11/15/2023
|
OVERLAY EXIST ROADWAY
|
OLDCASTLE MATERIALS TEXAS, INC.
($1,012,112)
|
|
|
6315-89-001
|
JEFF DAVIS
|
EL PASO
|
$48,950
|
SH0017
|
RMC - 631589001
|
04/27/2017
|
11/15/2023
|
PICNIC LITTER BARREL MAINT
|
CM COMPANY
($37,860)
|
|
|
6310-29-001
|
JEFFERSON
|
BEAUMONT
|
$158,500
|
US0069
|
RMC - 631029001
|
04/11/2017
|
11/15/2023
|
INSTL OF DELINEATORS
|
JASCO
($155,900)
|
|
|
6316-25-001
|
JEFFERSON
|
BEAUMONT
|
$1,690,000
|
IH0010
|
RMC - 631625001
|
04/04/2017
|
11/15/2023
|
CALLOUT DEBRIS RMVL AND DISPOSAL
|
TOM-MAC, INC.
($1,358,501)
|
|
|
0197-03-075
|
KAUFMAN
|
DALLAS
|
$5,833,573
|
US 175
|
NH 2017(922)
|
04/05/2017
|
11/15/2023
|
MILL, OVERLAY, BRIDGE JOINT REPAIR A...
|
AUSTIN BRIDGE & ROAD SERVICES, LP
($4,046,960)
|
|
|
0918-11-091
|
KAUFMAN
|
DALLAS
|
$759,083
|
CR
|
BR 1602(004)
|
04/04/2017
|
11/15/2023
|
REPLACE BR AND APPRS
|
STATELINE CONSTRUCTION, LLC
($696,777)
|
|
|
1016-06-011
|
KAUFMAN
|
DALLAS
|
$5,972,164
|
FM 1392
|
STP 2017(888)
|
04/04/2017
|
11/15/2023
|
REHAB OF EXIST ROADWAY
|
A. L. HELMCAMP, INC.
($5,676,173)
|
|
|
6287-24-001
|
KERR
|
SAN ANTONIO
|
$249,931
|
FM1338
|
RMC - 628724001
|
04/12/2017
|
11/15/2023
|
RIPRAP MAINT_ETC
|
K-BAR SERVICES, INC.
($276,014)
|
|
|
0907-20-006
|
KIMBLE
|
SAN ANGELO
|
$2,934,158
|
VA
|
NH 2017(956)
|
04/04/2017
|
11/15/2023
|
REPLACE AND REFURBISH LARGE SIGNS
|
COLLINS & HERMANN, INC.
($3,089,230)
|
|
|
0023-04-065
|
KINNEY
|
LAREDO
|
$12,383,484
|
US 90
|
NH 2017(587)
|
04/05/2017
|
11/15/2023
|
ACP OVERLAY, PAV MRKS
|
HUNTER INDUSTRIES, LTD.
($10,014,131)
|
|
|
6311-57-001
|
LAMAR
|
PARIS
|
$1,246,861
|
FM0079
|
RMC - 631157001
|
04/04/2017
|
11/15/2023
|
I STRIPING
|
STRIPING TECHNOLOGY, L.P.
($1,026,958)
|
|
|
6314-23-001
|
LAMAR
|
PARIS
|
$317,274
|
US0082
|
RMC - 631423001
|
04/04/2017
|
11/15/2023
|
ILLUM MAINT
|
STRIPING TECHNOLOGY, L.P.
($387,411)
|
|
|
6314-93-001
|
LAMAR
|
PARIS
|
$671,005
|
US0082
|
RMC - 631493001
|
04/05/2017
|
11/15/2023
|
ON CALL TY I & SPECIALTY STRIPING
|
STRIPING TECHNOLOGY, L.P.
($642,955)
|
|
|
6314-94-001
|
LAMAR
|
PARIS
|
$140,740
|
US0082
|
RMC - 631494001
|
04/20/2017
|
11/15/2023
|
ON CALL TY II STRIPING
|
STRIPING TECHNOLOGY, L.P.
($147,690)
|
|
|
0018-01-076
|
LA SALLE
|
LAREDO
|
$1,519,355
|
IH 35
|
NH 2017(325)
|
04/04/2017
|
11/15/2023
|
REHAB OF EXIST HWY
|
ANGEL BROTHERS HOLDINGS CORP.
($1,622,860)
|
|
|
1564-02-010
|
LEE
|
AUSTIN
|
$401,442
|
FM 1697
|
STP 2017(950)HES
|
04/04/2017
|
11/15/2023
|
SAFETY TREAT FIXED OBJECTS
|
BECK-REIT & SONS, LTD.
($455,922)
|
|
|
0150-02-035
|
LLANO
|
AUSTIN
|
$374,397
|
SH 29
|
STP 2017(944)HESG
|
04/04/2017
|
11/15/2023
|
TEXTURIZE SHOULDERS - PROFILE PAVMT...
|
TOTAL HIGHWAY MAINTENANCE, LLC
($214,229)
|
|
|
0052-07-070
|
LUBBOCK
|
LUBBOCK
|
$6,974,761
|
US 84
|
C 52-7-70
|
04/04/2017
|
11/15/2023
|
MILL AND INLAY
|
FNF CONSTRUCTION, INC.
($5,963,457)
|
|
|
6308-77-001
|
LUBBOCK
|
LUBBOCK
|
$793,161
|
IH0027
|
RMC - 630877001
|
04/05/2017
|
11/15/2023
|
ON-CALL GUARDRAIL INSTL
|
T & L CLEANING SERVICES
($737,215)
|
|
|
0068-13-003
|
LYNN
|
LUBBOCK
|
$1,008,365
|
SL 472
|
C 68-13-3
|
04/05/2017
|
11/15/2023
|
SMA OVERLAY
|
ALLEN BUTLER CONSTRUCTION, INC.
($754,510)
|
|
|
2697-01-034
|
MATAGORDA
|
YOAKUM
|
$3,775,729
|
FM 2668
|
STP 2017(975)HES
|
04/04/2017
|
11/15/2023
|
SAFETY TREAT FIXED OBJECTS
|
REXCO CONSTRUCTION SERVICES, INC.
($3,844,068)
|
|
|
6312-46-001
|
MCLENNAN
|
WACO
|
$442,766
|
SH0006
|
BPM - 631246001
|
04/04/2017
|
11/15/2023
|
BRIDGE PREVENT MAINT
|
BECK-REIT & SONS, LTD.
($322,993)
|
|
|
6312-85-001
|
MEDINA
|
SAN ANTONIO
|
$280,951
|
FM0462
|
RMC - 631285001
|
04/12/2017
|
11/15/2023
|
CULVERT REPAIR AT VARIOUS LOCATIONS
|
TMES LLC
($279,243)
|
|
|
0035-05-057
|
MENARD
|
SAN ANGELO
|
$2,117,837
|
US 83
|
STP 2017(955)
|
04/05/2017
|
11/15/2023
|
ASPH CONC PAVMT OVERLAY
|
LONE STAR PAVING COMPANY
($1,881,273)
|
|
|
0044-04-059
|
MONTAGUE
|
WICHITA FALLS
|
$6,499,672
|
US 82
|
NH 2017(401)
|
04/05/2017
|
11/15/2023
|
FULL DEPTH REPAIR AND OVERLAY
|
JAGOE-PUBLIC COMPANY
($4,894,838)
|
|
|
6315-46-001
|
MONTAGUE
|
WICHITA FALLS
|
$522,135
|
US0287
|
RMC - 631546001
|
04/04/2017
|
11/15/2023
|
METAL BEAM GUARD FENCE UPGRADE
|
ODUM SERVICES, L.P.
($518,214)
|
|
|
6316-35-001
|
MONTAGUE
|
WICHITA FALLS
|
$206,690
|
US0081
|
RMC - 631635001
|
04/18/2017
|
11/15/2023
|
DELINEATOR INSTL
|
L. UNITED BUILDING COMPANY
($157,741)
|
|
|
6314-25-001
|
MONTGOMERY
|
HOUSTON
|
$292,000
|
IH0069
|
RMC - 631425001
|
04/11/2017
|
11/15/2023
|
CLEANING AND RESHAPING DITCHES
|
TEXAS DRAINAGE INC.
($281,900)
|
|
|
0121-05-050
|
NAVARRO
|
DALLAS
|
$2,427,472
|
SH 22
|
STP 2017(921)
|
04/05/2017
|
11/15/2023
|
FOR THE CONSTRUCTION OF MILL & INLAY...
|
KNIFE RIVER CORPORATION - SOUTH
($1,989,594)
|
|
|
6311-44-001
|
NAVARRO
|
DALLAS
|
$621,091
|
FM1394
|
RMC - 631144001
|
04/05/2017
|
11/15/2023
|
FLEXIBLE PAVMT STRUCT REPAIR AND OVE...
|
KNIFE RIVER CORPORATION - SOUTH
($401,955)
|
|
|
6311-76-001
|
NAVARRO
|
DALLAS
|
$253,105
|
IH0045
|
RMC - 631176001
|
04/11/2017
|
11/15/2023
|
FULL DEPTH CONC REPAIR
|
ROY JORGENSEN ASSOCIATES, INC.
($185,050)
|
|
|
6312-16-001
|
NAVARRO
|
DALLAS
|
$84,191
|
IH0045
|
RMC - 631216001
|
04/11/2017
|
11/15/2023
|
RAISED PAVMT MARKERS
|
BRYDL CONTRACTING, INC.
($62,884)
|
|
|
0305-04-037
|
NEWTON
|
BEAUMONT
|
$2,488,227
|
SH 87
|
STP 2017(958)
|
04/05/2017
|
11/15/2023
|
OVERLAY EXIST ROADWAY
|
OLDCASTLE MATERIALS TEXAS, INC.
($2,270,329)
|
|
|
1069-01-037
|
NUECES
|
CORPUS CHRISTI
|
$6,539,842
|
SH 357
|
NH 2017(964)
|
04/05/2017
|
11/15/2023
|
NOVACHIP ROADWAY
|
CLARK CONSTRUCTION OF TEXAS, INC.
($6,082,985)
|
|
|
6312-82-001
|
NUECES
|
CORPUS CHRISTI
|
$1,463,217
|
SH0358
|
RMC - 631282001
|
04/04/2017
|
11/15/2023
|
MILL & INLAY
|
BAY LTD.
($1,452,118)
|
|
|
6313-60-001
|
NUECES
|
CORPUS CHRISTI
|
$2,145,617
|
SH0358
|
RMC - 631360001
|
04/05/2017
|
11/15/2023
|
NOVACHIP
|
CLARK CONSTRUCTION OF TEXAS, INC.
($2,081,078)
|
|
|
6316-28-001
|
NUECES
|
CORPUS CHRISTI
|
$1,097,500
|
US0077
|
RMC - 631628001
|
04/05/2017
|
11/15/2023
|
DEBRIS RMVL AND DISPOSAL
|
T.F.R. ENTERPRISES, INC.
($900,100)
|
|
|
0306-02-069
|
ORANGE
|
BEAUMONT
|
$4,735,833
|
SH 73
|
NH 2017(959)
|
04/05/2017
|
11/15/2023
|
OVERLAY EXIST ROADWAY
|
OLDCASTLE MATERIALS TEXAS, INC.
($5,658,758)
|
|
|
0882-01-013
|
ORANGE
|
BEAUMONT
|
$347,865
|
FM 2177
|
STP 2017(962)HES
|
04/04/2017
|
11/15/2023
|
PROVIDE ADDITIONAL PAVED SURF
|
OLDCASTLE MATERIALS TEXAS, INC.
($328,093)
|
|
|
0250-02-050
|
PALO PINTO
|
FORT WORTH
|
$4,695,468
|
US 281
|
BR 1602(431)
|
04/05/2017
|
11/15/2023
|
REHAB BRIDGE
|
HODGES AND SON CONSTRUCTION COMPANY, INC.
($4,656,946)
|
|
|
0080-06-030
|
PARKER
|
FORT WORTH
|
$8,634,292
|
US 377
|
NH 2017(923)
|
04/05/2017
|
11/15/2023
|
MILL AND OVERLAY
|
NORTHEASTERN PAVERS, INC.
($7,889,840)
|
|
|
6314-42-001
|
PARKER
|
FORT WORTH
|
$1,405,585
|
IH0020
|
RMC - 631442001
|
04/05/2017
|
11/15/2023
|
MULTIPOLYMER STRIPING
|
TRP CONSTRUCTION GROUP, LLC
($972,564)
|
|
|
6312-43-001
|
PECOS
|
ODESSA
|
$499,350
|
IH0010
|
RMC - 631243001
|
04/04/2017
|
11/15/2023
|
STRIPING (CALLOUT)
|
L&L COMPANY
($290,250)
|
|
|
6315-12-001
|
PECOS
|
ODESSA
|
$218,250
|
IH0010
|
RMC - 631512001
|
04/11/2017
|
11/15/2023
|
RE-ERECTING LARGE SIGNS (CALL OUT)
|
DOUBLE A CONTRACTING, L.P.
($271,265)
|
|
|
0275-01-187
|
POTTER
|
AMARILLO
|
$5,406,076
|
IH 40
|
BR 2017(934)
|
04/05/2017
|
11/15/2023
|
REPLACE BRIDGES,FRT RD IMPROVE,REHAB...
|
GILVIN-TERRILL, LTD.
($7,472,230)
|
|
|
6313-53-001
|
POTTER
|
AMARILLO
|
$2,658,550
|
IH0040
|
RMC - 631353001
|
04/04/2017
|
11/15/2023
|
MISC ROADWAY REPAIRS
|
J. LEE MILLIGAN, INC.
($2,347,860)
|
|
|
6311-78-001
|
RED RIVER
|
PARIS
|
$443,705
|
FM0114
|
RMC - 631178001
|
04/04/2017
|
11/15/2023
|
CROSS DRAINAGE STRUCT REPAIR
|
CDM HOLDINGS, LLC
($478,008)
|
|
|
0139-05-044
|
REEVES
|
ODESSA
|
$921,318
|
US 285
|
BR 1702(146)
|
04/04/2017
|
11/15/2023
|
REPAIR BEAMS AND REPLACE BENT CAPS
|
SCR CIVIL CONSTRUCTION, LLC
($936,605)
|
|
|
6315-07-001
|
REEVES
|
ODESSA
|
$63,800
|
IH0020
|
RMC - 631507001
|
04/11/2017
|
11/15/2023
|
PICNIC AREA MAINT
|
CM COMPANY
($71,500)
|
|
|
6307-60-001
|
SABINE
|
LUFKIN
|
$137,561
|
SH0184
|
RMC - 630760001
|
04/19/2017
|
11/15/2023
|
DRAINAGE REPAIR
|
L.C. JORDAN & SON
($149,008)
|
|
|
0180-10-077
|
SAN PATRICIO
|
CORPUS CHRISTI
|
$3,786,956
|
SH 361
|
STP 2017(963)
|
04/04/2017
|
11/15/2023
|
OVERLAY BOTH DIRECTIONS
|
HAAS-ANDERSON CONSTRUCTION, LTD.
($3,335,329)
|
|
|
0911-39-048
|
SHELBY
|
LUFKIN
|
$479,100
|
CR
|
BR 1602(394)
|
04/05/2017
|
11/15/2023
|
REPLACE BRIDGE AND APPROACHES
|
STATELINE CONSTRUCTION, LLC
($432,714)
|
|
|
0910-16-138
|
SMITH
|
TYLER
|
$141,497
|
VA
|
STP 2017(928)
|
04/05/2017
|
11/15/2023
|
CONSTRUCT SIDEWALKS & ADA CURB RAMPS
|
M & M STRIPING & POWER WASHING, LLC
($97,066)
|
|
|
0257-01-041
|
STEPHENS
|
BROWNWOOD
|
$3,926,759
|
US 183
|
STP 1602(303)
|
04/05/2017
|
11/15/2023
|
REHAB EXIST ROADWAY
|
PRATER EQUIPMENT CO., INC.
($3,737,969)
|
|
|
1068-02-142
|
TARRANT
|
FORT WORTH
|
$6,860,088
|
IH 30
|
NH 2017(924)
|
04/05/2017
|
11/15/2023
|
MILL AND OVERLAY
|
AUSTIN BRIDGE & ROAD SERVICES, LP
($4,616,650)
|
|
|
0006-04-079
|
TAYLOR
|
ABILENE
|
$1,836,367
|
IH 20
|
NH 2017(931)
|
04/04/2017
|
11/15/2023
|
INSTL PAVMT MRK
|
L&L COMPANY
($1,158,772)
|
|
|
0114-02-103
|
TRAVIS
|
AUSTIN
|
$3,248,297
|
US 290
|
NH 2017(941)
|
04/04/2017
|
11/15/2023
|
OVERLAY, CLEANING & SEALING JOINTS
|
OLDCASTLE MATERIALS TEXAS, INC.
($3,108,528)
|
|
|
0151-09-145
|
TRAVIS
|
AUSTIN
|
$2,686,728
|
US 183
|
NH 2017(946)
|
04/05/2017
|
11/15/2023
|
REPAIR, MILL,SEAL & OVERLAY NB & SB...
|
LONE STAR PAVING COMPANY
($2,711,158)
|
|
|
6313-71-001
|
TYLER
|
BEAUMONT
|
$550,502
|
US0287
|
RMC - 631371001
|
04/05/2017
|
11/15/2023
|
FLEXIBLE PAVMT STRUCT REPAIR
|
OLDCASTLE MATERIALS TEXAS, INC.
($532,283)
|
|
|
1385-01-036
|
UPSHUR
|
ATLANTA
|
$3,114,000
|
SH 300
|
NH 1702(149)
|
04/04/2017
|
11/15/2023
|
PLANE ACP, ACP SURF, & PAV MARK
|
MADDEN CONTRACTING COMPANY, LLC.
($2,285,448)
|
|
|
1673-02-017
|
VAN ZANDT
|
TYLER
|
$2,575,467
|
FM 1861
|
STP 2017(929)
|
04/04/2017
|
11/15/2023
|
SCARIFY,FLEX BS,TCST,STRS,PV MK
|
A. L. HELMCAMP, INC.
($2,436,392)
|
|
|
6316-27-001
|
VICTORIA
|
YOAKUM
|
$1,525,500
|
US0077
|
RMC - 631627001
|
04/05/2017
|
11/15/2023
|
DEBRIS RMVL AND DISPOSAL
|
T.F.R. ENTERPRISES, INC.
($877,600)
|
|
|
6312-14-001
|
WALLER
|
HOUSTON
|
$287,400
|
US0290
|
RMC - 631214001
|
04/11/2017
|
11/15/2023
|
DITCH CLEANING AND RESHAPING
|
TEXAS DRAINAGE INC.
($259,600)
|
|
|
6313-17-001
|
WEBB
|
LAREDO
|
$197,076
|
IH0035
|
RMC - 631317001
|
04/06/2017
|
11/15/2023
|
MOW OF HWYS RIGHT-OF-WAY
|
SPARTAN DIRECT SOLUTIONS LLC
($174,224)
|
|
|
6313-28-001
|
WEBB
|
LAREDO
|
$274,416
|
IH0035
|
RMC - 631328001
|
04/06/2017
|
11/15/2023
|
TIRE RUBBER DEBRIS RMVL ON ROADWAYS
|
M & M STRIPING & POWER WASHING, LLC
($273,421)
|
|
|
0266-06-047
|
WHARTON
|
YOAKUM
|
$1,685,729
|
SH 71
|
STP 2017(972)
|
04/05/2017
|
11/15/2023
|
PAVMT REPAIR AND SURF
|
HUNTER INDUSTRIES, LTD.
($1,713,209)
|
|
|
0913-09-059
|
WHARTON
|
YOAKUM
|
$775,371
|
CR
|
BR 2012(412)
|
04/04/2017
|
11/15/2023
|
REPLACE BRIDGE AND APPROACHES
|
JOHN REED AND COMPANY, LLC
($746,501)
|
|
|
1200-01-023
|
WILLIAMSON
|
AUSTIN
|
$4,671,890
|
FM 1660
|
STP 2017(949)
|
04/05/2017
|
11/15/2023
|
REHAB RDWY
|
HUNTER INDUSTRIES, LTD.
($4,076,992)
|
|
|
6278-11-001
|
WOOD
|
TYLER
|
$1,293,021
|
FM2869
|
RMC - 627811001
|
04/04/2017
|
11/15/2023
|
ROADWAY WIDENING
|
A. L. HELMCAMP, INC.
($1,287,285)
|