Show Job Controls
Bid Cobra

BRAZORIA SH0035 (6314-86-001)

Items: 13

County: BRAZORIA
Length: N/A
Highway: SH0035
District: HOUSTON
Control Number: 6314-86-001
DBE Goal: N/A
Project: RMC - 631486001
Guaranty: N/A
Time: 20 W
Engineer's Estimate: $151,727.75
Date: 04/11/2017 (9 years ago)
Contract Number: N/A
Type: EMBANKMENT RESTORATION-SLOPE REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$151,727.75
$243,556.50
Over/Under Est: 60.52% $91,828.75
Over/Under Est: 62.23% $94,424.25
Amt Left: 1.07% $2,595.50
Over/Under Est: 63.92% $96,977.75
Amt Left: 2.11% $5,149.00
Delta: -1.04% -$2,553.50
Over/Under Est: 241.56% $366,511.25
Amt Left: 112.78% $274,682.50
Delta: -108.37% -$269,533.50

Bid Items & Bid Tabulations

13 Total 0 of 13
BRAZORIA  |  SH0035  |  HOUSTON  |  6314-86-001  |  04/11/2017  |  $151,727.75  |  RMC - 631486001  |  EMBANKMENT RESTOR-SLOPE REPAIR  |  20 W
Item Code
Description
Unit
Quantity
Engineer's Estimate
BECK-REIT & SONS, LTD.
MAIN LANE INDUSTRIES LTD.
ISI CONTRACTING, INC.
CHAMPION INFRASTRUCTURE, LLC
REMOVING STAB BASE & ASPH PAV(14")
SY 300.000 $10.000 $4.000 $10.000 $27.000 $120.000
EXCAVATION (ROADWAY)
CY 4,730.000 $10.000 $12.000 $17.000 $14.000 $30.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 4,730.000 $10.000 $25.000 $18.000 $26.000 $45.000
DRILL SEEDING (PERM)(WARM OR COOL)
SY 1,800.000 $1.000 $1.000 $0.470 $1.000 $5.000
FERTILIZER
AC 0.370 $1,500.000 $1,000.000 $2,300.000 $1,500.000 $2,500.000
VEGETATIVE WATERING
MG 44.400 $65.000 $50.000 $20.000 $30.000 $400.000
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 1,800.000 $1.000 $3.000 $2.000 $2.000 $11.000
ASPHALT STAB BASE (GR 2)(PG 64)
TON 227.700 $100.000 $95.000 $110.000 $70.000 $120.000
D-GR HMA(SQ) TY-D SAC-B PG70-22
TON 34.000 $145.000 $200.000 $180.000 $238.000 $320.000
MOBILIZATION
LS 1.000 $13,300.000 $25,000.000 $20,000.000 $18,000.000 $35,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 2.000 $3,000.000 $2,000.000 $10,000.000 $1,000.000 $3,250.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 25.000 $2.400 $3.000 $5.000 $2.000 $8.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 25.000 $1.070 $2.000 $5.000 $1.500 $4.000
Totals: $151,727.750 $243,556.500 $246,152.000 $248,705.500 $518,239.000