Show Job Controls
Bid Cobra

KINNEY US 90 (0023-04-065)

Items: 67

County: KINNEY
Length: N/A
Highway: US 90
District: LAREDO
Control Number: 0023-04-065
DBE Goal: N/A
Project: NH 2017(587)
Guaranty: N/A
Time: 300 WORKING DAYS
Engineer's Estimate: $12,383,484.00
Date: 04/05/2017 (9 years ago)
Contract Number: N/A
Type: ACP OVERLAY, PAV MRKS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$12,383,484.00
$10,014,131.22
Over/Under Est: -19.13% -$2,369,352.78
Over/Under Est: -15.07% -$1,866,512.33
Amt Left: 5.02% $502,840.45

Bid Items & Bid Tabulations

67 Total 0 of 67
KINNEY  |  US 90  |  LAREDO  |  0023-04-065  |  04/05/2017  |  $12,383,484.00  |  NH 2017(587)  |  ACP OVERLAY, PAV MRKS  |  300 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HUNTER INDUSTRIES, LTD.
H. L. ZUMWALT CONSTRUCTION, INC.
BACKFILL (TY A)
STA 985.000 $140.000 $71.280 $100.000
ASPH (AC-15P)
GAL 124,384.000 $2.300 $2.290 $2.250
AGGR(TY-PB GR-4S OR TY-PB GR-4)(SAC-B)
CY 2,991.000 $64.000 $51.950 $60.000
D-GR HMA (SQ) TY-D PG 70-22(LEVEL-UP)
TON 10,451.000 $75.000 $61.980 $58.200
SUPERPAVE MIXTURES SP-C SAC-A PG76-22
TON 104,505.000 $75.000 $62.760 $64.500
FLEXIBLE PAVEMENT STRUCTURE REPAIR(5")
SY 23,772.000 $28.000 $17.380 $24.500
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
SY 12,000.000 $28.000 $13.910 $19.500
PLANE ASPH CONC PAV(0" TO 2")
SY 12,636.000 $2.500 $0.890 $1.000
PLANE ASPH CONC PAV (1")
SY 9,766.000 $1.250 $0.890 $1.000
PLANE ASPH CONC PAV (2")
SY 6,720.000 $2.000 $0.890 $1.100
CONC STR REPAIR(DECK REP(PART DEPTH))
SF 9.000 $1,000.000 $539.000 $315.000
RIPRAP (CONC)(4 IN)
CY 88.000 $540.000 $435.000 $560.000
RIPRAP (MOW STRIP)(4 IN)
CY 94.000 $540.000 $490.000 $470.000
CLEANING AND SEALING EXISTING JOINTS
LF 606.000 $30.000 $36.760 $50.000
SET (TY I)(S= 4 FT)(HW= 6 FT)(4:1) (C)
EA 10.000 $5,750.000 $4,800.000 $7,500.000
SET (TY I)(S= 6 FT)(HW= 6 FT)(4:1) (C)
EA 8.000 $7,500.000 $5,800.000 $8,000.000
SET (TY I)(S= 6 FT)(HW= 8 FT)(4:1) (C)
EA 22.000 $7,600.000 $4,700.000 $8,400.000
DIAMOND GRINDING SLAB
SY 4,669.000 $9.000 $10.250 $10.000
REMOV STR (SET)
EA 8.000 $350.000 $1,900.000 $2,650.000
REMOV STR (WINGWALL)
EA 4.000 $1,350.000 $1,900.000 $2,700.000
MOBILIZATION
LS 1.000 $797,831.000 $600,521.480 $425,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 15.000 $7,500.000 $3,986.050 $6,000.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 182.000 $42.000 $56.000 $60.000
ROCK FILTER DAMS (REMOVE)
LF 182.000 $14.000 $32.000 $34.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 620.000 $2.500 $3.900 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 620.000 $0.750 $1.700 $2.000
ONE-WAY TRAF CONT (FLAGGER CONT)
HR 2,140.000 $80.000 $57.000 $70.000
RUMBLE STRIPS (SHOULDER)
LF 322,962.000 $0.150 $0.120 $0.120
RUMBLE STRIPS (CENTERLINE)
LF 158,615.000 $0.310 $0.180 $0.130
MTL W-BEAM GD FEN (TIM POST)
LF 1,825.000 $20.000 $18.010 $19.250
MTL W-BEAM GD FEN (STEEL POST)
LF 362.500 $40.000 $20.800 $22.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 7.000 $1,600.000 $2,051.000 $1,650.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,000.000 $1,073.000 $1,150.000
MTL BM GD FEN TRANS (NON - SYM)
EA 1.000 $800.000 $933.000 $1,000.000
REMOVE METAL BEAM GUARD FENCE
LF 2,200.000 $3.000 $0.500 $0.500
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $200.000 $50.000 $53.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 7.000 $170.000 $30.000 $32.000
GUARDRAIL END TREATMENT (INSTALL)
EA 7.000 $2,100.000 $1,831.000 $1,950.000
GUARDRAIL END TREATMENT (REMOVE)
EA 6.000 $225.000 $30.000 $32.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 107.000 $22.000 $30.000 $30.000
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
EA 12.000 $57.000 $60.000 $75.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 85.000 $22.000 $26.000 $35.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 4,495.000 $0.850 $1.300 $1.250
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 18,881.000 $0.710 $1.300 $1.250
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 560.000 $1.070 $0.800 $0.840
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 3,591.000 $5.620 $4.800 $5.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 43.000 $100.000 $83.000 $87.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 5.000 $141.570 $87.000 $92.000
PAVEMENT SEALER 4"
LF 322,546.000 $0.150 $0.110 $0.120
PAVEMENT SEALER 8"
LF 560.000 $0.350 $0.400 $0.420
PAVEMENT SEALER 24"
LF 3,591.000 $2.160 $2.330 $2.500
PAVEMENT SEALER (ARROW)
EA 43.000 $30.910 $55.000 $60.000
PAVEMENT SEALER (WORD)
EA 5.000 $34.800 $55.000 $60.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 14,300.000 $0.450 $0.270 $0.290
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 364,598.000 $0.270 $0.270 $0.290
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 26,992.000 $0.320 $0.270 $0.290
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 214,861.000 $0.270 $0.270 $0.290
PREFAB PAV MRK TY B (W)(4")(BRK)CNTST
LF 68.000 $5.770 $25.000 $27.000
REFL PAV MRKR TY I-C
EA 759.000 $3.750 $2.500 $2.700
REFL PAV MRKR TY II-A-A
EA 3,989.000 $2.850 $2.500 $2.700
PAV SURF PREP FOR MRK (4")
LF 3,416.000 $0.050 $0.250 $0.270
PAV SURF PREP FOR MRK (ARROW)
EA 6.000 $14.740 $50.000 $53.000
PAV SURF PREP FOR MRK (WORD)
EA 3.000 $19.220 $50.000 $53.000
SPALLING REPAIR (HYDRAULIC CEMENT)
CF 4.000 $500.000 $2,564.000 $110.000
CNC CRACK REPAIR (DISCRETE)(GRAVITY)
LF 67.000 $75.000 $67.000 $190.000
CONTINUOUS DIAMOND GRINDING CONC PVMT
SY 5,098.000 $5.750 $10.750 $10.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $9,500.000 $7,036.250 $24,000.000
Totals: $12,383,484.000 $10,014,131.220 $10,516,971.670