REMOVING CONC (RIPRAP)
|
SY
|
52.000
|
$20.000
|
$30.000
|
$30.000
|
$20.000
|
$18.000
|
$22.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
365.000
|
$14.000
|
$34.000
|
$45.000
|
$20.000
|
$26.000
|
$26.000
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
918.000
|
$5.000
|
$8.500
|
$9.000
|
$7.000
|
$10.000
|
$9.000
|
|
|
REMOVING STAB BASE & ASPH PAV (0"-10")
|
SY
|
3,112.000
|
$4.000
|
$6.500
|
$6.000
|
$7.000
|
$10.250
|
$5.000
|
|
|
REMOVING STAB BASE & ASPH PAV (6" - 8")
|
SY
|
15,436.000
|
$6.000
|
$3.250
|
$4.000
|
$6.500
|
$2.900
|
$5.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
7,277.000
|
$4.000
|
$14.000
|
$20.000
|
$10.000
|
$15.000
|
$10.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
3,383.000
|
$10.000
|
$16.000
|
$27.000
|
$12.000
|
$15.000
|
$11.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
14,813.000
|
$1.500
|
$2.250
|
$2.000
|
$2.000
|
$3.150
|
$1.200
|
|
|
BLOCK SODDING
|
SY
|
14,813.000
|
$3.250
|
$3.800
|
$5.000
|
$4.000
|
$4.950
|
$3.000
|
|
|
STRAW/HAY MLCH SEED(TEMP)(WARM)
|
SY
|
14,813.000
|
$0.200
|
$0.520
|
$0.250
|
$0.520
|
$0.250
|
$0.400
|
|
|
STRAW/HAY MLCH SEED(TEMP)(COOL)
|
SY
|
14,813.000
|
$0.500
|
$0.500
|
$0.250
|
$0.500
|
$0.250
|
$0.400
|
|
|
VEGETATIVE WATERING
|
MG
|
0.330
|
$10.000
|
$100.000
|
$10.000
|
$200.000
|
$150.000
|
$100.000
|
|
|
FL BS (CMP IN PLACE)(TY A GR 1-2)(8")
|
SY
|
16,465.000
|
$13.000
|
$20.000
|
$18.500
|
$22.000
|
$21.250
|
$22.500
|
|
|
LIME (HYDRATED LIME (SLURRY))
|
TON
|
156.000
|
$168.000
|
$235.000
|
$190.000
|
$200.000
|
$216.000
|
$185.000
|
|
|
LIME TRT (EXST MATL)(8")
|
SY
|
8,694.000
|
$3.000
|
$3.000
|
$3.000
|
$4.250
|
$6.250
|
$2.600
|
|
|
CEMENT
|
TON
|
156.000
|
$155.000
|
$180.000
|
$140.000
|
$175.000
|
$167.500
|
$154.000
|
|
|
CEMENT TREAT(EXIST MATL)(8")
|
SY
|
8,694.000
|
$2.500
|
$2.500
|
$2.500
|
$3.500
|
$5.000
|
$2.600
|
|
|
PRIME COAT & BLOTTER (MC-30)
|
GAL
|
3,293.000
|
$4.000
|
$4.900
|
$8.000
|
$6.000
|
$4.350
|
$6.500
|
|
|
ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR)
|
GAL
|
14,385.000
|
$2.750
|
$4.500
|
$2.750
|
$3.750
|
$3.350
|
$3.800
|
|
|
AGGR (TY-PD GR-3 OR TY-PL GR-3)
|
CY
|
381.000
|
$105.000
|
$195.000
|
$135.000
|
$145.000
|
$145.500
|
$150.000
|
|
|
D-GR HMA (SQ) TY-D PG64_22(LEVEL-UP)
|
TON
|
248.000
|
$75.000
|
$160.000
|
$165.000
|
$145.000
|
$160.000
|
$135.000
|
|
|
SUPERPAVE MIXTURES SP-B PG64-22
|
TON
|
2,989.000
|
$90.000
|
$115.000
|
$99.000
|
$110.000
|
$106.000
|
$105.000
|
|
|
SUPERPAVE MIXTURES SP-C SAC-A PG70-22
|
TON
|
3,767.000
|
$100.000
|
$115.000
|
$92.000
|
$115.000
|
$114.000
|
$110.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
200.000
|
$55.000
|
$70.000
|
$80.000
|
$55.000
|
$88.000
|
$90.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
3,556.000
|
$1.750
|
$3.000
|
$5.000
|
$3.000
|
$3.200
|
$2.000
|
|
|
PLANE ASPH CONC PAV(0" TO 3")
|
SY
|
15,964.000
|
$2.750
|
$2.250
|
$3.000
|
$3.500
|
$2.650
|
$2.000
|
|
|
PLANE ASPH CONC PAV(2" TO 4")
|
SY
|
15,438.000
|
$4.000
|
$2.250
|
$2.000
|
$3.750
|
$2.400
|
$2.300
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
578.000
|
$2.250
|
$6.600
|
$10.000
|
$6.000
|
$6.300
|
$4.500
|
|
|
FLOWABLE BACKFILL
|
CY
|
22.000
|
$150.000
|
$350.000
|
$200.000
|
$225.000
|
$150.000
|
$320.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
3,297.000
|
$6.000
|
$6.000
|
$4.000
|
$7.000
|
$1.000
|
$13.000
|
|
|
CL C CONC (COLLAR)
|
EA
|
3.000
|
$1,500.000
|
$1,600.000
|
$2,500.000
|
$1,000.000
|
$835.000
|
$1,300.000
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
18.000
|
$420.000
|
$540.000
|
$1,500.000
|
$550.000
|
$695.000
|
$660.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
27.000
|
$490.000
|
$525.000
|
$600.000
|
$450.000
|
$615.000
|
$680.000
|
|
|
RIPRAP (STONE COMMON)(GROUT)(18 IN)
|
CY
|
24.000
|
$150.000
|
$325.000
|
$380.000
|
$225.000
|
$242.000
|
$220.000
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
280.000
|
$25.000
|
$30.000
|
$5.000
|
$35.000
|
$34.250
|
$36.000
|
|
|
RETROFIT RAIL (TY T631)
|
LF
|
260.000
|
$110.000
|
$125.000
|
$75.000
|
$80.000
|
$79.000
|
$93.000
|
|
|
JOINT SEALANT
|
LF
|
280.000
|
$18.000
|
$30.000
|
$2.000
|
$6.500
|
$4.500
|
$11.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
2,217.000
|
$50.000
|
$48.000
|
$66.000
|
$36.000
|
$50.000
|
$53.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
2,580.000
|
$60.000
|
$55.000
|
$75.000
|
$55.000
|
$48.000
|
$85.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
1,141.000
|
$67.000
|
$73.000
|
$100.000
|
$70.000
|
$74.000
|
$110.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
825.000
|
$100.000
|
$84.000
|
$110.000
|
$90.000
|
$87.000
|
$150.000
|
|
|
INLET (COMPL)(PCO)(4FT)(BOTH)
|
EA
|
22.000
|
$4,750.000
|
$6,000.000
|
$6,000.000
|
$5,500.000
|
$5,285.000
|
$5,100.000
|
|
|
INLET (COMPL)(PCO)(5FT)(BOTH)
|
EA
|
18.000
|
$5,500.000
|
$6,800.000
|
$6,850.000
|
$6,000.000
|
$6,150.000
|
$5,700.000
|
|
|
INLET (COMPL)(POD)(FG)(4FTX4FT)
|
EA
|
3.000
|
$4,500.000
|
$5,500.000
|
$5,000.000
|
$4,500.000
|
$4,675.000
|
$4,300.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
1.000
|
$610.000
|
$850.000
|
$825.000
|
$650.000
|
$1,115.000
|
$1,100.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (P)
|
EA
|
2.000
|
$850.000
|
$875.000
|
$900.000
|
$800.000
|
$1,035.000
|
$1,300.000
|
|
|
SET (TY II) (36 IN) (RCP) (3: 1) (P)
|
EA
|
3.000
|
$2,200.000
|
$1,450.000
|
$1,600.000
|
$1,600.000
|
$2,100.000
|
$3,200.000
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
1.000
|
$3,250.000
|
$3,500.000
|
$4,000.000
|
$4,000.000
|
$3,700.000
|
$3,700.000
|
|
|
REMOV STR (INLET)
|
EA
|
1.000
|
$680.000
|
$1,000.000
|
$1,075.000
|
$1,100.000
|
$950.000
|
$800.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
4.000
|
$1,000.000
|
$800.000
|
$1,200.000
|
$1,500.000
|
$1,200.000
|
$1,300.000
|
|
|
REMOV STR (PIPE)
|
LF
|
17.000
|
$20.000
|
$50.000
|
$500.000
|
$25.000
|
$26.000
|
$35.000
|
|
|
REMOVE STR (JUNCTION BOX)
|
EA
|
1.000
|
$3,500.000
|
$1,000.000
|
$2,200.000
|
$1,000.000
|
$950.000
|
$800.000
|
|
|
REMOV STR (DRIVEWAY CULVERT)
|
EA
|
35.000
|
$600.000
|
$825.000
|
$225.000
|
$500.000
|
$650.000
|
$950.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$274,000.000
|
$200,000.000
|
$275,000.000
|
$340,000.000
|
$400,000.000
|
$380,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
13.000
|
$5,000.000
|
$3,000.000
|
$2,500.000
|
$4,000.000
|
$6,000.000
|
$10,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
78.000
|
$30.000
|
$26.800
|
$20.000
|
$30.000
|
$50.000
|
$50.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
78.000
|
$8.000
|
$9.500
|
$5.000
|
$5.000
|
$17.000
|
$12.000
|
|
|
EXCAV (EROSN & SEDMT CONT, IN VEH)
|
CY
|
200.000
|
$20.000
|
$30.000
|
$20.000
|
$20.000
|
$10.000
|
$15.000
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
200.000
|
$100.000
|
$200.000
|
$150.000
|
$70.000
|
$55.000
|
$65.000
|
|
|
SANDBAGS FOR EROSION CONTROL
|
EA
|
200.000
|
$8.000
|
$8.250
|
$3.250
|
$7.500
|
$6.500
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
5,224.000
|
$2.750
|
$2.850
|
$3.000
|
$3.000
|
$2.150
|
$2.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
5,224.000
|
$0.750
|
$1.100
|
$1.000
|
$0.500
|
$0.650
|
$0.700
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
3,406.000
|
$4.000
|
$4.750
|
$4.750
|
$4.800
|
$2.750
|
$5.500
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
3,406.000
|
$1.000
|
$2.150
|
$0.750
|
$1.000
|
$0.550
|
$0.700
|
|
|
TRACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
200.000
|
$100.000
|
$200.000
|
$175.000
|
$100.000
|
$111.000
|
$85.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
8,784.000
|
$20.000
|
$18.000
|
$23.000
|
$19.000
|
$25.000
|
$32.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
2,860.000
|
$37.000
|
$36.000
|
$30.000
|
$65.000
|
$43.850
|
$26.000
|
|
|
DRIVEWAYS (CONC) (HES)
|
SY
|
1,315.000
|
$90.000
|
$95.000
|
$95.000
|
$75.000
|
$93.000
|
$160.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
275.000
|
$20.000
|
$25.000
|
$21.000
|
$22.000
|
$23.000
|
$22.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
275.000
|
$3.150
|
$5.500
|
$2.000
|
$2.200
|
$2.250
|
$4.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
2.000
|
$170.000
|
$135.000
|
$200.000
|
$220.000
|
$229.000
|
$250.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,300.000
|
$2,280.000
|
$2,300.000
|
$2,400.000
|
$2,490.000
|
$2,500.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
2.000
|
$300.000
|
$245.000
|
$200.000
|
$220.000
|
$229.000
|
$250.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
11.000
|
$225.000
|
$280.000
|
$290.000
|
$280.000
|
$283.000
|
$240.000
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 2
|
EA
|
2.000
|
$250.000
|
$300.000
|
$265.000
|
$300.000
|
$309.000
|
$290.000
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 2
|
EA
|
1.000
|
$300.000
|
$400.000
|
$370.000
|
$400.000
|
$413.000
|
$380.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
6.000
|
$325.000
|
$455.000
|
$425.000
|
$470.000
|
$475.000
|
$440.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
6.000
|
$85.000
|
$200.000
|
$80.000
|
$100.000
|
$208.000
|
$190.000
|
|
|
REMOVE LRSA
|
EA
|
1.000
|
$825.000
|
$385.000
|
$900.000
|
$1,200.000
|
$2,290.000
|
$1,000.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
6.000
|
$60.000
|
$71.500
|
$42.000
|
$45.000
|
$46.000
|
$85.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
12.000
|
$30.000
|
$46.000
|
$26.000
|
$30.000
|
$28.500
|
$70.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
5,090.000
|
$0.210
|
$0.220
|
$0.200
|
$0.220
|
$0.220
|
$0.220
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
9,499.000
|
$0.150
|
$0.220
|
$0.200
|
$0.220
|
$0.220
|
$0.220
|
|
|
WK ZN PAV MRK NON-REMOV (W)(ARROW)
|
EA
|
12.000
|
$45.000
|
$49.500
|
$47.000
|
$50.000
|
$51.500
|
$48.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
2,703.000
|
$0.170
|
$0.220
|
$0.200
|
$0.220
|
$0.220
|
$0.220
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
21,620.000
|
$0.150
|
$0.220
|
$0.200
|
$0.220
|
$0.220
|
$0.220
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
1,145.000
|
$1.000
|
$1.000
|
$0.900
|
$1.750
|
$1.050
|
$1.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
1,351.000
|
$0.900
|
$1.000
|
$0.750
|
$1.750
|
$1.050
|
$1.000
|
|
|
WK ZN PAV MRK SHT TERM RMV (W)(4")
|
LF
|
1,718.000
|
$1.550
|
$1.250
|
$0.750
|
$2.000
|
$1.350
|
$1.000
|
|
|
WK ZN PAV MRK SHT TERM RMV (Y)(4")
|
LF
|
3,648.000
|
$1.400
|
$1.250
|
$1.000
|
$2.000
|
$1.350
|
$1.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
472.000
|
$0.800
|
$1.100
|
$1.000
|
$1.100
|
$1.150
|
$1.100
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
48.000
|
$5.350
|
$6.050
|
$5.750
|
$6.000
|
$6.300
|
$6.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
2,545.000
|
$0.350
|
$0.480
|
$0.450
|
$0.480
|
$0.500
|
$0.500
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
9,499.000
|
$0.250
|
$0.480
|
$0.450
|
$0.480
|
$0.500
|
$0.500
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
2,318.000
|
$0.320
|
$0.480
|
$0.450
|
$0.480
|
$0.500
|
$0.500
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
10,810.000
|
$0.310
|
$0.480
|
$0.450
|
$0.480
|
$0.500
|
$0.500
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
8.000
|
$200.000
|
$200.000
|
$190.000
|
$200.000
|
$207.000
|
$200.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
3.000
|
$255.000
|
$250.000
|
$230.000
|
$250.000
|
$258.000
|
$250.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
142.000
|
$3.000
|
$3.700
|
$3.500
|
$3.650
|
$3.800
|
$5.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,351.000
|
$3.000
|
$3.600
|
$3.400
|
$3.600
|
$3.750
|
$4.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
14,081.000
|
$0.600
|
$0.600
|
$0.900
|
$1.000
|
$0.500
|
$0.300
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
463.000
|
$0.750
|
$0.600
|
$0.900
|
$2.000
|
$0.500
|
$2.200
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
968.000
|
$2.500
|
$2.000
|
$0.900
|
$5.000
|
$0.500
|
$2.300
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
7.000
|
$75.000
|
$150.000
|
$120.000
|
$300.000
|
$28.000
|
$320.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
4.000
|
$75.000
|
$150.000
|
$200.000
|
$300.000
|
$28.000
|
$320.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
42.000
|
$80.000
|
$100.000
|
$250.000
|
$100.000
|
$100.000
|
$150.000
|
|
Totals: |
$3,122,456.520
|
$3,538,933.210
|
$3,644,518.300
|
$3,676,906.110
|
$3,752,031.990
|
$3,989,943.340
|