LUBBOCK IH0027 (6308-77-001)

Items: 26

County: LUBBOCK
Length: N/A
Highway: IH0027
District: LUBBOCK
Control Number: 6308-77-001
DBE Goal: N/A
Project: RMC - 630877001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $793,161.23
Date: 04/05/2017 (9 years ago)
Contract Number: N/A
Type: ON-CALL GUARDRAIL INSTALLATION
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$793,161.23
$737,215.00
Over/Under Est: -7.05% -$55,946.23
$929,125.00
Over/Under Est: 17.14% $135,963.77
Amt Left: 26.03% $191,910.00
$982,400.00
Over/Under Est: 23.86% $189,238.77
Amt Left: 33.26% $245,185.00
Delta: -5.73% -$53,275.00

Bid Items & Bid Tabulations

26 Total 0 of 26
LUBBOCK  |  IH0027  |  LUBBOCK  |  6308-77-001  |  04/05/2017  |  $793,161.23  |  RMC - 630877001  |  ON-CALL GUARDRAIL INSTL  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
T & L CLEANING SERVICES
VANN/ELLI, INC.
HJC FARMS, INC.
MOBILIZATION (CALLOUT)
EA 14.000 $500.000 $200.000 $1,000.000 $500.000
MOBILIZATION (EMERGENCY)
EA 6.000 $1,500.000 $125.000 $2,000.000 $1,000.000
MTL W-BEAM GD FEN (STEEL POST)
LF 750.000 $26.490 $25.000 $24.500 $22.000
TERMINAL ANCHOR SECTION
EA 25.000 $130.000 $55.000 $600.000 $300.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $904.390 $900.000 $2,300.000 $2,000.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 5.000 $900.430 $1,200.000 $1,200.000 $950.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 50.000 $20.000 $25.000 $110.000 $65.000
REMOVE METAL BEAM GUARD FENCE
LF 750.000 $3.120 $2.000 $3.000 $3.000
REMOVE TERMINAL ANCHOR SECTION
EA 5.000 $182.500 $120.000 $200.000 $150.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 20.000 $19.130 $12.000 $100.000 $100.000
GUARDRAIL END TREATMENT (REMOVE)
EA 150.000 $50.000 $200.000 $200.000 $100.000
GDRAIL END TRT(INST)(WOOD POST)(TY II)
EA 150.000 $2,600.000 $2,500.000 $3,100.000 $3,000.000
GDRAIL END TRT(INSTALL)(HBA POST)
EA 10.000 $3,000.000 $2,600.000 $2,900.000 $3,000.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 10.000 $22.110 $30.000 $15.000 $20.000
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
EA 50.000 $15.930 $2.000 $15.000 $20.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 16,000.000 $14.500 $14.000 $12.000 $20.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 50.000 $19.190 $50.000 $35.000 $20.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 50.000 $16.840 $50.000 $35.000 $20.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 300.000 $18.890 $14.000 $25.000 $20.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 750.000 $42.380 $30.000 $75.000 $60.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 600.000 $59.730 $20.000 $85.000 $75.000
INSTALL BLOCKOUT (TYPE SPECIFIED)
EA 10.000 $10.520 $10.000 $25.000 $20.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 200.000 $18.580 $10.000 $25.000 $25.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 10.000 $56.930 $25.000 $100.000 $200.000
REM & RESET SGT IMPACT HEAD
EA 10.000 $109.810 $50.000 $300.000 $400.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 20.000 $100.000 $10.000 $200.000 $150.000
Totals: $793,161.230 $737,215.000 $929,125.000 $982,400.000