SHELBY CR (0911-39-048)

Items: 37

County: SHELBY
Length: N/A
Highway: CR
District: LUFKIN
Control Number: 0911-39-048
DBE Goal: N/A
Project: BR 1602(394)
Guaranty: N/A
Time: 103 WORKING DAYS
Engineer's Estimate: $479,100.00
Date: 04/05/2017 (9 years ago)
Contract Number: N/A
Type: REPLACE BRIDGE AND APPROACHES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (7)
E
Engineer's Estimate
$479,100.00
$432,714.00
Over/Under Est: -9.68% -$46,386.00
Over/Under Est: -8.72% -$41,781.05
Amt Left: 1.06% $4,604.95
$464,975.64
Over/Under Est: -2.95% -$14,124.36
Amt Left: 7.46% $32,261.64
Delta: -6.32% -$27,656.69
Over/Under Est: -0.74% -$3,536.00
Amt Left: 9.9% $42,850.00
Delta: -2.28% -$10,588.36
Over/Under Est: -0.05% -$242.00
Amt Left: 10.66% $46,144.00
Delta: -0.69% -$3,294.00
Over/Under Est: 5.08% $24,358.74
Amt Left: 16.35% $70,744.74
Delta: -5.14% -$24,600.74
Over/Under Est: 6.98% $33,441.50
Amt Left: 18.45% $79,827.50
Delta: -1.80% -$9,082.76

Bid Items & Bid Tabulations

37 Total 0 of 37
SHELBY  |  CR  |  LUFKIN  |  0911-39-048  |  04/05/2017  |  $479,100.00  |  BR 1602(394)  |  REPLACE BRIDGE AND APPROACHES  |  103 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
STATELINE CONSTRUCTION, LLC
DREWERY CONSTRUCTION COMPANY, INCORPORATED
PIERCE R & B LLC
HARTBEAT CONSTRUCTION
EAST TEXAS BRIDGE, INC.
LONGVIEW BRIDGE AND ROAD, LTD.
HODGES AND SON CONSTRUCTION COMPANY, INC.
PREPARING ROW
STA 4.000 $3,000.000 $3,200.000 $5,000.000 $2,000.000 $2,200.000 $4,000.000 $8,500.000 $5,000.000
EXCAVATION (ROADWAY)
CY 437.000 $15.000 $12.000 $11.500 $20.000 $14.000 $12.000 $15.000 $15.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 206.000 $30.000 $25.000 $24.000 $28.000 $20.000 $15.000 $18.000 $20.000
FURNISHING AND PLACING TOPSOIL (4")
SY 797.000 $5.000 $3.000 $3.300 $4.000 $5.000 $2.000 $2.000 $6.000
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 1,124.000 $1.000 $3.000 $1.050 $2.500 $3.000 $2.550 $2.700 $2.500
CELL FBR MLCH SEED(TEMP)(WARM)
SY 562.000 $1.000 $0.250 $1.050 $2.000 $2.000 $1.950 $0.010 $1.000
CELL FBR MLCH SEED(TEMP)(COOL)
SY 562.000 $1.000 $0.250 $1.050 $2.000 $2.000 $1.950 $0.010 $1.000
VEGETATIVE WATERING
MG 22.500 $40.000 $10.000 $2.000 $65.000 $50.000 $12.000 $25.000 $1.000
SOIL RETENTION BLANKETS (CL 1) (TY C)
SY 123.000 $5.000 $3.000 $2.100 $5.750 $5.000 $5.500 $2.200 $5.000
FL BS (CMP IN PLC)(TYA GR1-2) (6")
SY 862.000 $30.000 $28.000 $22.000 $26.000 $18.000 $20.000 $25.000 $30.000
CEM STABIL BKFL
CY 28.000 $250.000 $325.000 $157.000 $250.000 $175.000 $200.000 $190.000 $250.000
TEMPORARY SPL SHORING
SF 977.000 $25.000 $28.000 $15.000 $32.000 $17.000 $40.000 $15.000 $30.000
DRILL SHAFT (24 IN)
LF 150.000 $180.000 $120.000 $175.000 $160.000 $290.000 $150.000 $205.000 $160.000
CL C CONC (ABUT)
CY 20.400 $1,000.000 $975.000 $980.000 $1,000.000 $750.000 $950.000 $1,200.000 $1,000.000
CL E CONC (SEAL SLAB)
CY 12.000 $400.000 $375.000 $435.000 $375.000 $575.000 $300.000 $450.000 $300.000
REINF CONC SLAB (SLAB BEAM)
SF 1,170.000 $20.000 $18.500 $20.000 $20.000 $18.000 $20.000 $19.000 $20.000
PRESTR CONC SLAB BEAM (5SB15)
LF 222.500 $185.000 $180.000 $175.000 $220.000 $218.000 $200.000 $210.000 $150.000
RIPRAP (STONE PROTECTION)(15 IN)
CY 188.000 $150.000 $140.000 $183.000 $150.000 $165.000 $150.000 $170.000 $160.000
RAIL (TY T631LS)
LF 114.000 $75.000 $52.000 $62.000 $70.000 $57.000 $65.000 $75.000 $60.000
CONC BOX CULV (8 FT X 7 FT)
LF 56.000 $800.000 $700.000 $700.000 $800.000 $1,150.000 $1,150.000 $1,250.000 $700.000
WINGWALL (PW - 1) (HW=11 FT)
EA 2.000 $35,000.000 $29,000.000 $30,000.000 $32,000.000 $32,000.000 $30,000.000 $32,000.000 $50,000.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 2.000 $15,000.000 $8,600.000 $9,000.000 $7,000.000 $11,000.000 $7,500.000 $15,000.000 $12,000.000
MOBILIZATION
LS 1.000 $42,000.000 $41,900.000 $43,000.000 $42,000.000 $39,000.000 $42,000.000 $40,000.000 $50,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $1,500.000 $1,400.000 $2,000.000 $1,500.000 $1,200.000 $2,250.000 $800.000 $2,200.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 104.000 $30.000 $30.000 $31.000 $40.000 $45.000 $30.000 $30.000 $20.000
ROCK FILTER DAMS (REMOVE)
LF 104.000 $10.000 $15.000 $8.400 $12.000 $30.000 $4.000 $8.000 $10.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 937.000 $2.500 $3.000 $2.600 $3.000 $3.000 $3.000 $3.000 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 937.000 $1.000 $1.000 $0.800 $0.970 $1.000 $0.500 $0.800 $1.000
MTL W-BEAM GD FEN (TIM POST)
LF 25.000 $20.000 $25.000 $26.250 $29.000 $55.000 $28.000 $30.000 $26.000
SHORT RADIUS
LF 25.000 $50.000 $45.000 $34.650 $50.000 $65.000 $50.000 $40.000 $50.000
DRIVEWAY TERMINAL ANCHOR SECTION
EA 2.000 $1,200.000 $800.000 $705.000 $825.000 $725.000 $825.000 $700.000 $800.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 3.000 $1,000.000 $1,025.000 $1,025.000 $1,150.000 $1,500.000 $1,200.000 $1,100.000 $1,000.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 150.000 $80.000 $83.000 $54.600 $65.000 $45.000 $65.000 $60.000 $80.000
GUARDRAIL END TREATMENT (INSTALL)
EA 3.000 $2,200.000 $2,500.000 $2,200.000 $2,550.000 $1,900.000 $2,600.000 $2,200.000 $2,400.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 7.000 $40.000 $37.000 $15.750 $24.000 $75.000 $25.000 $20.000 $40.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 5.000 $70.000 $75.000 $47.250 $45.000 $50.000 $45.000 $50.000 $80.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 5.000 $40.000 $44.000 $28.350 $30.000 $50.000 $30.000 $30.000 $40.000
Totals: $479,100.000 $432,714.000 $437,318.950 $464,975.640 $475,564.000 $478,858.000 $503,458.740 $512,541.500