Show Job Controls
Bid Cobra

FANNIN FM0824 (6312-42-001)

Items: 16

County: FANNIN
Length: N/A
Highway: FM0824
District: PARIS
Control Number: 6312-42-001
DBE Goal: N/A
Project: BPM - 631242001
Guaranty: N/A
Time: 27 W
Engineer's Estimate: $173,013.75
Date: 04/20/2017 (9 years ago)
Contract Number: N/A
Type: EROSION REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (7)
E
Engineer's Estimate
$173,013.75
$168,515.00
Over/Under Est: -2.6% -$4,498.75
Over/Under Est: -1.01% -$1,744.75
Amt Left: 1.63% $2,754.00
Over/Under Est: 4.51% $7,800.25
Amt Left: 7.3% $12,299.00
Delta: -5.57% -$9,545.00
Over/Under Est: 9.87% $17,076.25
Amt Left: 12.8% $21,575.00
Delta: -5.13% -$9,276.00
Over/Under Est: 25.83% $44,686.25
Amt Left: 29.19% $49,185.00
Delta: -14.52% -$27,610.00
$228,390.00
Over/Under Est: 32.01% $55,376.25
Amt Left: 35.53% $59,875.00
Delta: -4.91% -$10,690.00
Over/Under Est: 44.2% $76,465.25
Amt Left: 48.05% $80,964.00
Delta: -9.23% -$21,089.00

Bid Items & Bid Tabulations

16 Total 0 of 16
FANNIN  |  FM0824  |  PARIS  |  6312-42-001  |  04/20/2017  |  $173,013.75  |  BPM - 631242001  |  EROSION REPAIR  |  27 W
Item Code
Description
Unit
Quantity
Engineer's Estimate
HARTBEAT CONSTRUCTION
SHIRLEY & SONS CONSTRUCTION CO., INC.
BXB GROUP INCORPORATION
SJ&J CONSTRUCTION, LLC
DRS CONSTRUCTION, INC.
L.C. JORDAN & SON
CHAMPION INFRASTRUCTURE, LLC
PREPARING ROW
AC 0.150 $25,000.000 $17,500.000 $1,000.000 $59,800.000 $5,000.000 $10,000.000 $25,000.000 $4,500.000
REMOVING CONC (RIPRAP)
SY 22.000 $35.000 $50.000 $100.000 $96.000 $30.000 $60.000 $40.000 $73.000
EXCAVATION (CHANNEL)
CY 40.000 $80.000 $32.000 $10.000 $101.000 $22.000 $45.000 $35.000 $85.000
EMBANKMENT (FINAL)(ORD COMP)(TY D)
CY 120.000 $40.000 $27.000 $35.000 $91.000 $28.000 $30.000 $40.000 $42.000
EMBANKMENT (VEHICLE)(ORD COMP)(TY B)
CY 84.000 $30.000 $27.000 $35.000 $76.000 $30.000 $30.000 $40.000 $62.000
RIPRAP (STONE PROTECTION)(15 IN)
CY 522.000 $185.000 $165.000 $167.000 $156.000 $180.000 $275.000 $275.000 $310.000
RIPRAP (MOW STRIP)(4 IN)
CY 18.000 $375.000 $654.000 $660.000 $561.000 $700.000 $700.000 $500.000 $845.000
MOBILIZATION
LS 1.000 $19,223.750 $28,000.000 $30,000.000 $13,750.000 $40,000.000 $20,000.000 $20,000.000 $15,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 2.000 $3,500.000 $2,200.000 $2,000.000 $2,800.000 $4,000.000 $2,000.000 $5,000.000 $3,200.000
MTL W-BEAM GD FEN (STEEL POST)
LF 250.000 $25.000 $26.000 $27.500 $39.000 $38.000 $25.000 $28.000 $32.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,500.000 $2,125.000 $2,090.000 $2,188.000 $1,200.000 $2,000.000 $2,500.000 $1,800.000
REMOVE METAL BEAM GUARD FENCE
LF 370.000 $3.000 $3.000 $7.000 $11.000 $5.000 $4.000 $5.000 $12.000
REMOVE TERMINAL ANCHOR SECTION
EA 4.000 $500.000 $250.000 $200.000 $355.000 $400.000 $300.000 $500.000 $750.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,200.000 $2,600.000 $2,365.000 $3,313.000 $2,300.000 $2,400.000 $2,500.000 $2,900.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 2.000 $15.000 $20.000 $30.000 $33.000 $25.000 $35.000 $100.000 $80.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 6.000 $40.000 $25.000 $30.000 $33.000 $60.000 $35.000 $100.000 $120.000
Totals: $173,013.750 $168,515.000 $171,269.000 $180,814.000 $190,090.000 $217,700.000 $228,390.000 $249,479.000