Show Job Controls
Bid Cobra

PALO PINTO US 281 (0250-02-050)

Items: 63

County: PALO PINTO
Length: N/A
Highway: US 281
District: FORT WORTH
Control Number: 0250-02-050
DBE Goal: N/A
Project: BR 1602(431)
Guaranty: N/A
Time: 234 WORKING DAYS
Engineer's Estimate: $4,695,468.11
Date: 04/05/2017 (9 years ago)
Contract Number: N/A
Type: REHABILITATE BRIDGE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (6)
E
Engineer's Estimate
$4,695,468.11
Over/Under Est: -0.82% -$38,522.56
Over/Under Est: 7.96% $373,739.14
Amt Left: 8.85% $412,261.70
$5,413,939.26
Over/Under Est: 15.3% $718,471.15
Amt Left: 16.26% $756,993.71
Delta: -6.80% -$344,732.01
Over/Under Est: 15.31% $718,775.10
Amt Left: 16.26% $757,297.66
Delta: -0.01% -$303.95
Over/Under Est: 15.79% $741,285.02
Amt Left: 16.75% $779,807.58
Delta: -0.42% -$22,509.92
$7,531,448.47
Over/Under Est: 60.4% $2,835,980.36
Amt Left: 61.73% $2,874,502.92
Delta: -38.53% -$2,094,695.34

Bid Items & Bid Tabulations

63 Total 0 of 63
PALO PINTO  |  US 281  |  FORT WORTH  |  0250-02-050  |  04/05/2017  |  $4,695,468.11  |  BR 1602(431)  |  REHAB BRIDGE  |  234 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HODGES AND SON CONSTRUCTION COMPANY, INC.
ED BELL CONSTRUCTION COMPANY
DCI CONTRACTING, INC.
SCR CIVIL CONSTRUCTION, LLC
RAGLE CONSTRUCTION, INC.
CEKRA INC.
PREPARING ROW
STA 57.150 $1,500.000 $1,400.000 $1,155.000 $3,000.000 $600.000 $9,500.000 $2,800.000
BACKFILL (TY A)
STA 20.790 $200.000 $250.000 $630.000 $247.000 $450.000 $150.000 $172.000
BULLDOZER WORK
HR 8.000 $1,000.000 $10.000 $147.000 $190.000 $350.000 $80.000 $100.000
COMPOST MANUF TOPSOIL (4")
SY 5,891.000 $5.000 $2.500 $3.000 $2.400 $5.250 $2.000 $2.000
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 5,891.000 $1.000 $0.500 $0.500 $0.450 $1.250 $0.340 $0.200
BROADCAST SEED (TEMP) (WARM)
SY 2,945.000 $1.000 $0.400 $0.100 $0.450 $2.500 $0.340 $0.150
BROADCAST SEED (TEMP) (COOL)
SY 2,945.000 $1.000 $0.450 $0.100 $0.450 $2.500 $0.340 $0.150
VEGETATIVE WATERING
MG 412.000 $25.000 $1.000 $25.000 $113.500 $130.000 $15.000 $13.000
D-GR HMA(SQ) TY-D SAC-B PG70-22
TON 871.480 $80.000 $125.000 $115.000 $132.000 $125.000 $110.550 $100.000
PLANE ASPH CONC PAV(0" TO 2")
SY 7,922.520 $3.000 $2.500 $1.500 $2.700 $1.750 $2.800 $2.000
FLOWABLE BACKFILL
CY 10.000 $250.000 $250.000 $420.000 $481.000 $660.000 $365.000 $150.000
DRILL SHAFT (18 IN)
LF 200.000 $60.000 $180.000 $300.000 $161.000 $180.000 $125.000 $80.000
REINF CONC SLAB (HPC)
SF 30,260.000 $15.000 $22.000 $20.000 $29.000 $41.700 $27.000 $35.000
APPROACH SLAB
CY 39.500 $750.000 $1,000.000 $840.000 $867.000 $1,400.000 $500.000 $500.000
CONC STR REPAIR (EPOXY MORTAR)
SF 10.000 $80.000 $400.000 $630.000 $422.000 $550.000 $325.000 $30.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 179.000 $225.000 $300.000 $420.000 $332.000 $325.000 $145.000 $2,000.000
CONC STR REPR(REMOV AND REPL BACKWALL)
CY 20.800 $3,000.000 $2,000.000 $1,750.000 $2,700.000 $3,900.000 $1,700.000 $2,000.000
RIPRAP (STONE COMMON)(DRY)(8 IN)
CY 14.000 $230.000 $160.000 $315.000 $269.000 $100.000 $350.000 $200.000
RIPRAP (STONE PROTECTION)(24 IN)
CY 86.000 $200.000 $200.000 $210.000 $146.000 $125.000 $110.000 $130.000
RIPRAP (MOW STRIP)(4 IN)
CY 77.000 $475.000 $550.000 $735.000 $752.000 $625.000 $450.000 $500.000
ELASTOMERIC BEARING (LAMINATED)
EA 120.000 $900.000 $800.000 $2,520.000 $1,308.000 $2,100.000 $1,300.000 $5,000.000
STR STEEL (MISCELLANEOUS BRIDGE)
LB 43,827.000 $12.000 $10.000 $9.450 $9.000 $7.750 $4.000 $8.000
STR STEEL (SHEAR CONNECTOR)
LB 21,419.000 $4.500 $8.000 $6.300 $8.000 $3.650 $5.000 $6.000
CLEAN & PAINT EXIST STR (SYSTEM III-A)
LS 1.000 $1,900,000.000 $1,400,000.000 $1,700,000.000 $1,663,200.000 $1,400,000.000 $1,260,000.000 $2,800,000.000
RETROFIT RAIL (TY T1W)
LF 2,317.000 $155.000 $110.000 $178.500 $114.000 $179.000 $110.000 $150.000
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
LF 52.000 $90.000 $100.000 $63.000 $95.000 $90.000 $95.000 $200.000
SEALED EXPANSION JOINT (5 IN) (SEJ - A)
LF 52.000 $90.000 $100.000 $126.000 $109.000 $130.000 $95.000 $200.000
REMOV STR (BRIDGE SLAB)
EA 1.000 $30,000.000 $200,000.000 $52,500.000 $241,824.000 $255,000.000 $750,000.000 $200,000.000
ADJUST STL SHOES
EA 8.000 $2,000.000 $1,000.000 $3,150.000 $1,782.000 $3,000.000 $5,600.000 $20,000.000
MOBILIZATION
LS 1.000 $409,570.650 $455,000.000 $484,000.000 $557,832.000 $541,000.000 $540,000.000 $700,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 11.000 $3,500.000 $4,000.000 $11,550.000 $3,180.000 $3,000.000 $15,000.000 $2,500.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 390.000 $30.000 $40.000 $33.650 $25.000 $21.000 $18.950 $25.000
ROCK FILTER DAMS (REMOVE)
LF 390.000 $10.000 $15.000 $11.220 $15.000 $6.000 $10.000 $8.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 224.000 $25.000 $40.000 $28.040 $52.800 $26.000 $28.000 $20.000
CONSTRUCTION EXITS (REMOVE)
SY 224.000 $15.000 $15.000 $11.220 $13.200 $7.800 $10.000 $8.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 5,343.000 $5.000 $6.000 $5.550 $3.500 $3.600 $2.610 $5.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 5,343.000 $1.000 $2.000 $1.120 $0.550 $0.400 $1.000 $2.000
MTL W-BEAM GD FEN (TIM POST)
LF 1,475.000 $25.000 $22.000 $21.870 $29.000 $19.000 $22.000 $25.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,650.000 $1,600.000 $2,240.290 $2,310.000 $2,000.000 $1,750.000 $2,500.000
REMOVE METAL BEAM GUARD FENCE
LF 392.000 $5.000 $3.000 $3.360 $4.000 $3.000 $3.000 $2.500
REMOVE TERMINAL ANCHOR SECTION
EA 4.000 $100.000 $300.000 $280.390 $264.000 $300.000 $200.000 $200.000
GDRAIL END TRT(INST)(WOOD POST)(TY III)
EA 4.000 $2,250.000 $2,000.000 $2,972.080 $3,630.000 $2,500.000 $2,750.000 $2,500.000
ALUMINUM SIGNS (TY A)
SF 184.400 $40.000 $50.000 $26.920 $34.000 $26.000 $26.000 $28.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 11.000 $500.000 $300.000 $504.690 $634.000 $480.000 $480.000 $500.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 6.000 $500.000 $200.000 $543.950 $753.000 $570.000 $570.000 $500.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $750.000 $100.000 $532.730 $640.000 $485.000 $485.000 $600.000
REMOVE SM RD SN SUP&AM
EA 11.000 $150.000 $100.000 $84.120 $132.000 $100.000 $100.000 $90.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 26.000 $25.000 $20.000 $31.400 $9.600 $20.000 $20.000 $20.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 26.000 $25.000 $20.000 $31.400 $9.600 $20.000 $20.000 $20.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BR)
EA 18.000 $30.000 $30.000 $29.160 $36.000 $40.000 $45.000 $30.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2(BR)
EA 12.000 $25.000 $40.000 $29.160 $44.500 $40.000 $45.000 $30.000
PAVEMENT SEALER 4"
LF 26,285.000 $0.250 $0.240 $0.110 $0.150 $0.150 $0.200 $0.150
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 11,796.000 $0.750 $0.500 $0.390 $0.500 $0.330 $0.480 $0.300
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 14,489.000 $0.750 $0.500 $0.390 $0.500 $0.330 $0.480 $0.300
REFL PAV MRKR TY II-A-A
EA 266.000 $10.000 $4.000 $3.590 $4.250 $6.000 $4.000 $4.000
ELIM EXT PAV MRK & MRKS (4")
LF 22,892.000 $1.000 $0.300 $0.340 $0.410 $0.170 $0.250 $0.400
PAV SURF PREP FOR MRK (4")
LF 4,548.000 $0.250 $0.500 $0.110 $0.150 $0.170 $0.250 $0.200
CNC CRACK REPAIR (DISCRETE)(INJECT)
LF 164.000 $100.000 $100.000 $110.000 $241.500 $93.000 $150.000 $400.000
REP STL BRIDGE MEMBER (BENT SWAY BRACE)
EA 6.000 $3,000.000 $12,000.000 $5,250.000 $9,240.000 $4,100.000 $7,000.000 $7,000.000
REP STL BRIDGE MEMBER (BOTTOM CHORD)
EA 7.000 $7,200.000 $12,000.000 $2,100.000 $9,240.000 $1,500.000 $9,000.000 $7,000.000
REP STL BRIDGE MEMBER (ANGLE PLATES)
EA 1.000 $4,500.000 $4,000.000 $4,200.000 $9,240.000 $3,500.000 $12,000.000 $10,000.000
REP STL BRDG MEMB (TRUSS PORTAL BRACE)
EA 2.000 $7,000.000 $30,000.000 $8,400.000 $13,200.000 $7,100.000 $8,000.000 $7,000.000
CARBON FIBER REINF POLYMER PROTECTION
SF 246.000 $50.000 $125.000 $157.500 $56.000 $130.000 $60.000 $100.000
Totals: $4,695,468.110 $4,656,945.550 $5,069,207.258 $5,413,939.264 $5,414,243.210 $5,436,753.140 $7,531,448.470