|
|
PREPARING ROW
|
STA
|
241.890
|
$900.000
|
$500.000
|
$525.000
|
$1,500.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
468.000
|
$16.000
|
$18.000
|
$16.800
|
$20.000
|
|
|
REMOVING STAB BASE & ASPH PAV (0-6")
|
SY
|
1,795.000
|
$17.000
|
$6.000
|
$6.300
|
$12.500
|
|
|
REMOVING STAB BASE AND ASPH PAV (10")
|
SY
|
1,339.000
|
$10.000
|
$7.000
|
$9.450
|
$12.500
|
|
|
REMOVING STAB BASE & ASPH PAV (18")
|
SY
|
5,568.000
|
$11.000
|
$8.000
|
$11.550
|
$12.500
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
241.890
|
$335.000
|
$140.000
|
$210.000
|
$350.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
18,624.000
|
$11.500
|
$7.000
|
$13.850
|
$20.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
241.890
|
$199.000
|
$250.000
|
$75.000
|
$350.000
|
|
|
ROAD GRADER WORK (ORD COMP)
|
STA
|
241.890
|
$220.000
|
$200.000
|
$105.000
|
$350.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
131,671.000
|
$0.150
|
$0.140
|
$0.110
|
$0.250
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
21,501.000
|
$0.140
|
$0.150
|
$0.080
|
$0.250
|
|
|
VEGETATIVE WATERING
|
MG
|
3,870.000
|
$8.000
|
$10.000
|
$0.010
|
$30.000
|
|
|
FL BS (RDWY DEL) (TY D GR 1-2)
|
TON
|
7,436.000
|
$22.000
|
$29.000
|
$21.000
|
$25.000
|
|
|
FL BS (CMP IN PLC)(TY D GR1-2)(12")
|
SY
|
67,012.000
|
$17.000
|
$20.000
|
$19.950
|
$18.000
|
|
|
FL BS (CMP IN PLC)(TY D GR 1-2)(18 )
|
SY
|
7,086.000
|
$32.000
|
$31.000
|
$31.500
|
$26.000
|
|
|
REWORK BS MTL (TY C) (8") (ORD COMP)
|
SY
|
20,376.000
|
$3.000
|
$1.000
|
$3.150
|
$4.500
|
|
|
REWORK BS MTL (TY C) (11") (ORD COMP)
|
SY
|
32,196.000
|
$4.000
|
$1.200
|
$4.200
|
$4.500
|
|
|
CEMENT
|
TON
|
402.700
|
$135.000
|
$135.000
|
$135.000
|
$171.000
|
|
|
CEMENT TREAT (MX EXST MTL & NW BS) (6")
|
SY
|
70,993.000
|
$2.000
|
$1.800
|
$1.530
|
$3.500
|
|
|
SALV, HAUL & STKPL RCL APH PV (4")
|
SY
|
20,376.000
|
$2.750
|
$1.200
|
$3.150
|
$6.500
|
|
|
EMULS ASPH (BS OR SUBGR TRT)(MS-2)
|
GAL
|
14,796.000
|
$3.000
|
$2.800
|
$2.630
|
$6.500
|
|
|
ASPH (CRS-2P)
|
GAL
|
34,755.000
|
$3.000
|
$2.800
|
$2.710
|
$5.500
|
|
|
ASPH (RC-250)
|
GAL
|
34,767.000
|
$3.000
|
$1.800
|
$3.900
|
$5.500
|
|
|
AGGR (TY-B GR-5 OR TY-L GR-5)
|
CY
|
339.000
|
$150.000
|
$90.000
|
$135.000
|
$210.000
|
|
|
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
|
GAL
|
26,643.000
|
$3.000
|
$2.000
|
$3.400
|
$6.500
|
|
|
AGGR (TY-PB GR-4 OR TY-PL GR-4 ( SAC-B)
|
CY
|
583.000
|
$150.000
|
$120.000
|
$189.000
|
$210.000
|
|
|
AGGR (TY-B GR-4 OR TY-L GR-4 SAC-B)
|
CY
|
594.000
|
$150.000
|
$120.000
|
$120.000
|
$210.000
|
|
|
AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B)
|
CY
|
339.000
|
$150.000
|
$120.000
|
$111.000
|
$210.000
|
|
|
SUPERPAVE MIXTURES SP-B PG64-22
|
TON
|
633.000
|
$95.000
|
$80.000
|
$132.000
|
$150.000
|
|
|
SUPERPAVE MIXTURES SP-D PG64-22
|
TON
|
126.000
|
$110.000
|
$100.000
|
$189.000
|
$200.000
|
|
|
CUT & RESTORING PAV
|
SY
|
381.000
|
$110.000
|
$160.000
|
$147.000
|
$150.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
162.000
|
$5.000
|
$16.000
|
$11.550
|
$3.500
|
|
|
TEMPORARY SPL SHORING
|
SF
|
3,612.000
|
$32.000
|
$36.000
|
$25.000
|
$30.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
8.700
|
$650.000
|
$1,100.000
|
$735.000
|
$650.000
|
|
|
RIPRAP (CONC)(FLUME)
|
CY
|
10.500
|
$680.000
|
$750.000
|
$840.000
|
$650.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
292.000
|
$600.000
|
$600.000
|
$630.000
|
$500.000
|
|
|
RAIL (TY T631)
|
LF
|
247.000
|
$60.000
|
$50.000
|
$50.000
|
$185.000
|
|
|
CONC BOX CULV (5 FT X 2 FT)
|
LF
|
100.000
|
$400.000
|
$430.000
|
$315.000
|
$650.000
|
|
|
CONC BOX CULV (10 FT X 10 FT)
|
LF
|
40.000
|
$730.000
|
$900.000
|
$1,575.000
|
$1,200.000
|
|
|
CONC BOX CULV (4 FT X 2 FT)(EXTEND)
|
LF
|
22.000
|
$850.000
|
$580.000
|
$525.000
|
$650.000
|
|
|
CONC BOX CULV (5 FT X 2 FT)(EXTEND)
|
LF
|
60.000
|
$1,120.000
|
$580.000
|
$630.000
|
$650.000
|
|
|
CONC BOX CULV (10 FT X 10 FT)(EXTEND)
|
LF
|
24.000
|
$1,275.000
|
$1,100.000
|
$1,365.000
|
$1,200.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
3,064.000
|
$50.000
|
$48.000
|
$73.500
|
$55.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
56.000
|
$105.000
|
$130.000
|
$105.000
|
$95.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
236.000
|
$90.000
|
$140.000
|
$94.500
|
$105.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
28.000
|
$125.000
|
$220.000
|
$420.000
|
$150.000
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
180.000
|
$160.000
|
$230.000
|
$315.000
|
$250.000
|
|
|
JCTBOX(COMPL)(PJB)(4FTX4FT)
|
EA
|
2.000
|
$8,250.000
|
$3,700.000
|
$5,250.000
|
$5,000.000
|
|
|
INLET (COMPL)(PCU)(5FT)(RIGHT)
|
EA
|
1.000
|
$2,800.000
|
$5,500.000
|
$6,300.000
|
$5,000.000
|
|
|
INLET (COMPL)(TY C)(1 GRATE)
|
EA
|
1.000
|
$3,850.000
|
$3,200.000
|
$3,150.000
|
$5,000.000
|
|
|
INLET (COMPL) (TY C) (2 GRATE)
|
EA
|
1.000
|
$4,500.000
|
$5,300.000
|
$4,200.000
|
$5,000.000
|
|
|
HEADWALL (CH - FW - 45) (DIA= 42 IN)
|
EA
|
2.000
|
$6,250.000
|
$10,000.000
|
$15,750.000
|
$10,000.000
|
|
|
WINGWALL (PW - 1) (HW=13 FT)
|
EA
|
2.000
|
$45,000.000
|
$85,000.000
|
$73,500.000
|
$55,000.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 3 FT)(3:1) (C)
|
EA
|
1.000
|
$6,250.000
|
$6,500.000
|
$11,550.000
|
$8,500.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 4 FT)(3:1) (C)
|
EA
|
1.000
|
$6,650.000
|
$7,800.000
|
$12,600.000
|
$8,500.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(3:1) (C)
|
EA
|
10.000
|
$7,200.000
|
$6,800.000
|
$4,200.000
|
$8,500.000
|
|
|
SET (TY II) (18 IN) (RCP) (3: 1) (C)
|
EA
|
2.000
|
$790.000
|
$850.000
|
$525.000
|
$1,200.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
246.000
|
$805.000
|
$860.000
|
$630.000
|
$1,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
2.000
|
$800.000
|
$950.000
|
$1,050.000
|
$1,500.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
1.000
|
$2,050.000
|
$2,600.000
|
$1,995.000
|
$2,100.000
|
|
|
SET (TY II) (36 IN) (RCP) (3: 1) (C)
|
EA
|
4.000
|
$2,200.000
|
$3,200.000
|
$1,575.000
|
$2,200.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
8.000
|
$1,650.000
|
$2,600.000
|
$4,200.000
|
$1,000.000
|
|
|
REMOV STR (SET)
|
EA
|
2.000
|
$680.000
|
$800.000
|
$630.000
|
$1,500.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
10.000
|
$2,100.000
|
$2,100.000
|
$2,100.000
|
$1,500.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
10.000
|
$1,300.000
|
$2,100.000
|
$1,680.000
|
$1,500.000
|
|
|
REMOV STR (PIPE)
|
LF
|
2,115.000
|
$30.000
|
$18.000
|
$21.000
|
$30.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
30.000
|
$45.000
|
$110.000
|
$105.000
|
$100.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$546,500.000
|
$464,000.000
|
$580,000.000
|
$700,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
11.000
|
$8,250.000
|
$12,000.000
|
$21,000.000
|
$8,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
350.000
|
$28.000
|
$34.000
|
$26.000
|
$30.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
350.000
|
$8.000
|
$7.000
|
$11.000
|
$15.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
600.000
|
$22.000
|
$10.000
|
$19.000
|
$30.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
600.000
|
$7.500
|
$2.000
|
$10.000
|
$15.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,700.000
|
$2.000
|
$3.500
|
$2.100
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,700.000
|
$0.500
|
$0.750
|
$0.630
|
$2.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
780.000
|
$6.500
|
$7.000
|
$6.300
|
$12.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
780.000
|
$0.750
|
$1.500
|
$1.100
|
$8.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
133.000
|
$42.000
|
$75.000
|
$63.000
|
$42.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
1.000
|
$11,500.000
|
$7,400.000
|
$5,250.000
|
$5,500.000
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
300.000
|
$32.000
|
$50.000
|
$31.500
|
$65.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
300.000
|
$18.000
|
$18.000
|
$21.000
|
$20.000
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
300.000
|
$21.000
|
$30.000
|
$15.750
|
$20.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
360.000
|
$30.000
|
$52.000
|
$52.500
|
$35.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
257.000
|
$90.000
|
$130.000
|
$73.500
|
$85.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
1,795.000
|
$60.000
|
$45.000
|
$52.500
|
$55.000
|
|
|
DRIVEWAYS (BASE)
|
SY
|
1,554.000
|
$32.000
|
$26.000
|
$63.000
|
$22.000
|
|
|
DRIVEWAYS (CONC) (HES)
|
SY
|
211.000
|
$192.000
|
$175.000
|
$126.000
|
$115.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
425.000
|
$17.600
|
$20.000
|
$21.000
|
$25.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
6.000
|
$2,150.000
|
$2,300.000
|
$2,520.000
|
$2,850.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$2,520.000
|
$1,200.000
|
$1,365.000
|
$5,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$770.000
|
$1,000.000
|
$945.000
|
$2,500.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL2)
|
EA
|
2.000
|
$5,200.000
|
$10,000.000
|
$7,350.000
|
$12,500.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
57.000
|
$185.000
|
$240.000
|
$241.500
|
$650.000
|
|
|
MAILBOX INSTALL-D (TWW-POST) TY 4
|
EA
|
8.000
|
$280.000
|
$260.000
|
$325.500
|
$650.000
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
9.000
|
$500.000
|
$450.000
|
$656.250
|
$650.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
40.000
|
$440.000
|
$370.000
|
$562.330
|
$650.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
5.000
|
$650.000
|
$450.000
|
$682.040
|
$650.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
1.000
|
$650.000
|
$400.000
|
$815.900
|
$650.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
6.000
|
$93.000
|
$80.000
|
$189.040
|
$50.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND(BI)
|
EA
|
22.000
|
$50.000
|
$50.000
|
$48.310
|
$100.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
20.000
|
$37.000
|
$27.000
|
$24.690
|
$100.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
400.000
|
$0.150
|
$1.050
|
$1.050
|
$6.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
200.000
|
$5.000
|
$3.500
|
$3.150
|
$10.000
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
44.000
|
$5.400
|
$6.500
|
$6.300
|
$15.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
2,400.000
|
$0.580
|
$1.050
|
$1.050
|
$2.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
4,846.000
|
$1.160
|
$0.700
|
$1.580
|
$5.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
|
LF
|
24.000
|
$5.500
|
$5.500
|
$5.250
|
$10.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
43,585.000
|
$0.320
|
$0.270
|
$0.260
|
$0.650
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
|
LF
|
2,800.000
|
$0.450
|
$0.400
|
$0.380
|
$1.000
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
|
LF
|
4,860.000
|
$0.340
|
$0.330
|
$0.320
|
$0.650
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
14,240.000
|
$0.260
|
$0.270
|
$0.260
|
$0.650
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
|
LF
|
2,800.000
|
$0.440
|
$0.400
|
$0.380
|
$1.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
243.000
|
$3.200
|
$3.500
|
$3.150
|
$10.000
|
|
|
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
|
EA
|
6.000
|
$7,580.000
|
$6,600.000
|
$6,532.190
|
$8,500.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
2.000
|
$2,500.000
|
$3,900.000
|
$2,100.000
|
$5,000.000
|
|
|
HIGH FRICTION SURFACE COURSE
|
SY
|
3,067.000
|
$30.000
|
$27.000
|
$30.000
|
$30.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$16,200.000
|
$12,000.000
|
$11,550.000
|
$16,500.000
|
|
Totals: |
$5,972,163.910
|
$5,676,173.140
|
$6,309,375.090
|
$7,647,480.450
|