Bid Cobra

Low bids by LONGVIEW BRIDGE AND ROAD, LTD. (TxDOT)

Contact Information
Phone:
903-663-0264
Address:
PO BOX 9036 LONGVIEW, TX 75608-0000
Fax:
903-663-4967
Low: 68
Lost: 364
Bid: 432
Sub: 1
Win ratio: 16%
Win amount: $869,149,564
Loss amount: $3,495,692,575
Avg win amount: $12,781,611
Avg bid amount: $10,103,801
Control County District Estimate Highway Project Date Added Type Bid Amount
0245-08-054 RUSK TYLER $13,420,245 SH 64 STP 2026(238)HES 01/06/2026 11/01/2025 HAZARD ELIM & SAFETY $13,629,478
0495-07-081 GREGG TYLER $40,248,856 IH 20 BR 2B25(109) 09/05/2025 07/01/2025 BRIDGE REPL $36,971,035
0520-01-026 SMITH TYLER $1,995,932 SH 155 F 2025(942) 08/08/2025 06/02/2025 TRAF SIGNAL IMPRVS $1,969,487
2158-01-019 GREGG TYLER $25,999,390 FM 2275 F 2025(527) 08/07/2025 06/02/2025 WIDEN ROAD - ADD LANES $22,863,768
2553-01-116 ANGELINA LUFKIN $13,188,203 SL 287 F 2B24(381) 06/04/2025 04/01/2025 HWY IMPRV $11,124,512
0096-04-074 GREGG TYLER $3,810,433 US 80 F 2025(622) 04/04/2025 02/02/2025 RESURF ROADWAY $3,427,402
6469-17-001 SMITH TYLER $3,496,043 US0069 RMC - A00210434 04/04/2025 01/05/2025 MILL AND INLAY $3,527,042
6469-55-001 WOOD TYLER $2,195,452 SL0173 RMC - 646955001 09/05/2024 07/26/2024 MILL AND INLAY $2,296,091
0520-02-068 UPSHUR ATLANTA $15,830,728 SH 155 C 520-2-68 05/02/2024 03/21/2024 REHAB EXIST ROADWAY $14,945,725
0085-02-054 BOWIE ATLANTA $24,948,822 US 259 C 85-2-54 02/01/2024 12/21/2023 REHAB EXIST ROADWAY $26,827,890
0248-01-082 TITUS ATLANTA $3,108,760 SH 49 F 2024(645) 01/05/2024 11/24/2023 RESURF ROADWAY $2,881,430
0392-03-053 GREGG TYLER $4,145,544 US 259 C 392-3-53 01/05/2024 11/24/2023 REHAB EXIST ROADWAY $3,567,935
6453-17-001 UPSHUR ATLANTA $228,250 US0271 MMC - 645317001 10/17/2023 11/15/2023 HOT MIX $219,750
0063-10-015 PANOLA ATLANTA $34,951,363 US 59 C 63-10-15 06/01/2023 11/27/2023 CONSTRUCT GRADE SEPARATION $36,905,848
0520-04-026 MARION ATLANTA $44,931,943 SH 155 BR 2023(154) 05/04/2023 11/15/2023 REPLACE BRIDGE AND APPROACHES $53,799,919
0191-03-083 SMITH TYLER $51,794,226 FM 2493 C 191-3-83 04/04/2023 08/22/2024 WIDEN ROAD - ADD LANES $69,493,846
6431-01-001 WOOD TYLER $1,079,180 US0080 MMC - 643101001 03/07/2023 11/15/2023 HOT MIX $1,180,400
0610-02-064 FRANKLIN PARIS $7,568,904 IH 30 STP 2022(803)TP 02/01/2023 11/15/2023 CONSTRUCT REST AREA $8,869,679
0063-11-054 PANOLA ATLANTA $28,911,384 SH 149 F 2023(026) 09/07/2022 11/15/2023 WIDEN EXIST 2-LANE HWY TO 4-LANE DIV... $29,546,263
0176-02-118 ANGELINA LUFKIN $48,176,388 US 59 F 2021(440) 06/02/2022 09/03/2024 HWY IMPRV $63,145,676
0610-07-097 BOWIE ATLANTA $46,568,416 IH 30 IM 0303(125) 06/02/2022 09/03/2024 CONSTUCT ONE-WAY FRONTAGE ROADS $58,800,540
0392-02-097 UPSHUR ATLANTA $1,734,663 US 259 C 392-2-97 02/04/2022 11/15/2023 RESURF EXIST 4-LANE HWY $1,983,306
6395-99-001 WOOD TYLER $357,000 US0080 MMC - 639599001 02/03/2022 11/15/2023 HOT MIX $381,500
0221-05-065 TITUS ATLANTA $22,253,190 US 271 BR 2020(451) 11/04/2021 11/15/2023 REPLACE BRIDGES AND APPROACHES $22,227,359
0610-04-033 MORRIS ATLANTA $29,353,131 IH 30 NH 2022(220) 11/03/2021 11/15/2023 REHAB AND WIDEN EXIST RAMPS $33,388,168
1409-03-020 SHELBY LUFKIN $1,222,603 FM 2261 BR 2021(582) 06/03/2021 11/15/2023 BRIDGE REPL $1,320,205
6377-28-001 WOOD TYLER $280,000 US0080 MMC - 637728001 03/16/2021 11/15/2023 HOT MIX $345,000
0096-06-074 GREGG TYLER $1,140,939 US 80 C 96-6-74 03/04/2021 11/15/2023 INSTL RAISED MEDIAN $1,094,462
0495-06-034 SMITH TYLER $1,375,050 IH 20 C 495-6-34 03/04/2021 11/15/2023 WIDEN ROAD - ADD SHOULDERS $1,495,512
6360-97-001 WOOD TYLER $49,500 US0080 MMC - 636097001 12/08/2020 11/15/2023 HOT MIX COLD LAY MATERIALS ONLY $50,300
2553-01-115 ANGELINA LUFKIN $15,921,009 US 59 NH 2B20(055) 10/01/2020 11/15/2023 CONVERT TO 4 LANE FRWY W/2 LANE NB&S... $19,326,241
0390-05-006 SAN AUGUSTINE LUFKIN $1,491,173 FM 2558 BR 2020(972) 09/03/2020 11/15/2023 REPLACE BRIDGE AND APPROACHES $1,485,267
0063-03-065 PANOLA ATLANTA $8,869,831 US 59 NH 2020(979) 07/09/2020 11/15/2023 REHAB EXIST 4 LANE HWY $8,864,786
0610-07-113 BOWIE ATLANTA $74,732,487 IH 30 NH 2020(455) 05/08/2020 11/15/2023 GR,STR,BASE,SURF & PAV MRK $88,870,749
0063-01-094 HARRISON ATLANTA $2,187,578 FM 1186 STP 2020(439)HES 03/04/2020 11/15/2023 SAFETY TREAT FIXED OBJECTS $1,847,140
6354-34-001 WOOD TYLER $298,175 US0080 MMC - 635434001 02/11/2020 09/26/2024 HOT MIX MATERILAS $326,000
0190-03-084 WOOD TYLER $1,483,985 US 69 NH 2020(065) 10/02/2019 11/15/2023 PLANING, PAVMT REPAIR, OCST, OVRLY,... $1,442,128
1380-01-018 FRANKLIN PARIS $814,565 FM 1448 STP 1902(270)HES 08/07/2019 11/15/2023 HAZARD ELIM & SAFETY $801,629
0919-03-059 HARRISON ATLANTA $369,828 CR BR 2019(351) 08/06/2019 11/15/2023 BRIDGE REPL $398,057
0176-01-081 NACOGDOCHES LUFKIN $77,867,878 US 59 NH 1902(081) 07/09/2019 09/27/2024 CONSTRUCT 4 LANE DIRECT CONNECTION $86,198,369
0911-04-076 POLK LUFKIN $1,593,654 CR BR 2016(774) 07/09/2019 09/27/2024 BRIDGE REPL $1,682,521
1682-01-015 SHELBY LUFKIN $5,795,189 FM 1645 STP 1902(029)HES 06/04/2019 11/15/2023 HWY IMPRV $5,760,486
0889-04-078 SMITH TYLER $805,303 FM 346 STP 2019(734)HES 04/03/2019 11/15/2023 IMPROVE DRAINAGE, UPGRADE GUARD RAIL $799,066
0062-01-035 BOWIE ATLANTA $32,733,661 SH 8 BR 2019(689) 04/02/2019 11/15/2023 REPLACE BRIDGES AND APPROACHES $37,733,611
0336-03-071 ANGELINA LUFKIN $1,217,321 SH 103 STP 2019(635) 03/06/2019 11/15/2023 WIDENING PAVING FOR ADDITIONAL TURNI... $1,665,263
0010-06-042 TITUS ATLANTA $3,219,831 US 67 STP 2019(634)HES 03/05/2019 11/15/2023 SAFETY TREAT FIXED OBJECTS $2,498,030
0910-35-033 WOOD TYLER $382,734 CR BR 1602(656) 03/05/2019 11/15/2023 REPLACE BRIDGE AND APPROACHES $342,388
6341-87-001 HENDERSON TYLER $1,142,863 SH0019 RMC - 634187001 03/05/2019 11/15/2023 MILL & INLAY $1,389,529
2815-01-008 KAUFMAN DALLAS $4,142,849 FM 2757 C 2815-1-8 02/06/2019 11/15/2023 REHAB EXIST PAVMT AND ADD SHOULDERS $3,946,271
6341-13-001 SMITH TYLER $3,143,855 SH0064 RMC - 634113001 02/05/2019 11/15/2023 MILL & INLAY $3,363,242
0064-05-061 SABINE LUFKIN $2,054,935 FM 1 STP 2019(330)HES 12/05/2018 11/15/2023 SAFETY TREAT FIXED OBJECTS $1,954,394
1934-02-006 SMITH TYLER $3,042,382 FM 2015 STP 2019(017) 09/07/2018 11/15/2023 GR,CMT TRT SBGRD,ACP,OCST,STRS,MBGF,... $3,017,503
0191-01-063 SMITH TYLER $16,519,021 US 69 NH 2013(216) 08/08/2018 11/15/2023 GR,STRS,ACP BS&SURF,MBGF,SIG,PV MK $16,738,120
0164-01-071 HENDERSON TYLER $1,128,125 BS 31H C 164-1-71 07/11/2018 11/15/2023 PFC SURF,BRG RAIL,MBGF,PVT MRKG $1,161,999
2654-01-022 SMITH TYLER $3,220,825 FM 2661 SSW 2654-1-22 07/11/2018 11/15/2023 GR, FLX BS, OCST, STRS, PVT MRK $2,792,589
0911-28-041 HOUSTON LUFKIN $635,127 CR BR 1602(208) 06/06/2018 11/15/2023 BRIDGE REPL $584,117
0189-01-011 RED RIVER PARIS $3,324,244 SH 37 STP 2018(979)HES 06/05/2018 11/15/2023 HAZARD ELIM & SAFETY $2,961,890
0495-04-065 SMITH TYLER $14,229,479 IH 20 NH 2018(425) 06/05/2018 11/15/2023 EXCVT,EMBNK,DRN STRS,RTN WL,BRDG WDN... $14,842,183
0843-07-016 HARRISON ATLANTA $2,544,726 FM 2625 CC 843-7-16 08/09/2017 11/15/2023 GR,STR,BASE,SURF $2,284,633
0725-02-019 RAINS PARIS $599,302 FM 275 STP 1702(751)HES 08/08/2017 11/15/2023 WIDEN PAVMT $685,541
0610-06-088 BOWIE ATLANTA $633,257 IH 30 NH 1702(448) 07/12/2017 11/15/2023 CMT TRT BASE, ACP & PVMT MRK $798,693
0221-05-064 TITUS ATLANTA $10,756,737 US 271 BR 1702(392) 06/07/2017 11/15/2023 REPLACE BRIDGES AND APPROACHES $8,911,051
0392-03-047 GREGG TYLER $457,892 US 259 NH 1702(380) 06/07/2017 11/15/2023 ADD RIGHT AND LEFT TURN LANES $475,528
0522-02-037 VAN ZANDT TYLER $6,558,717 SH 243 STP 1702(386) 06/07/2017 11/15/2023 GR, STRS, WDNG, OCST, ACP, PVT MRKG $6,654,770
0910-12-066 VAN ZANDT TYLER $1,400,412 CR BR 2013(723) 06/06/2017 11/15/2023 REPLACE RAILROAD OVERPASS & APPROACH... $1,498,798
0096-04-066 GREGG TYLER $3,122,457 US 80 NH 2017(893) 04/04/2017 11/15/2023 GR,BS,ACP SURF,STRM SWR,C&G,SFTY IMP... $3,538,933
0118-10-060 SAN AUGUSTINE LUFKIN $2,699,286 SH 21 BR 2017(825) 03/07/2017 11/15/2023 REPLACE BRIDGE AND APPROACHES $2,474,845
0910-08-067 ANDERSON TYLER $796,558 CR BR 2015(257) 03/07/2017 11/15/2023 RPLC BRG & APPR, GR, ACP BS & SURF,... $753,676