SMITH IH 20 (0495-06-034)

Items: 77

County: SMITH
Length: N/A
Highway: IH 20
District: TYLER
Control Number: 0495-06-034
DBE Goal: N/A
Project: C 495-6-34
Guaranty: N/A
Time: 54 WORKING DAYS
Engineer's Estimate: $1,375,049.82
Date: 03/04/2021 (5 years ago)
Contract Number: N/A
Type: WIDEN ROAD - ADD SHOULDERS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (5)
E
Engineer's Estimate
$1,375,049.82
$1,495,511.90
Over/Under Est: 8.76% $120,462.08
Over/Under Est: 12.95% $178,016.86
Amt Left: 3.85% $57,554.78
Over/Under Est: 52.37% $720,100.48
Amt Left: 40.1% $599,638.40
Delta: -34.90% -$542,083.62
Over/Under Est: 53.7% $738,383.45
Amt Left: 41.32% $617,921.37
Delta: -0.87% -$18,282.97
$2,366,966.52
Over/Under Est: 72.14% $991,916.70
Amt Left: 58.27% $871,454.62
Delta: -12.00% -$253,533.25

Bid Items & Bid Tabulations

77 Total 0 of 77
SMITH  |  IH 20  |  TYLER  |  0495-06-034  |  03/04/2021  |  $1,375,049.82  |  C 495-6-34  |  WIDEN ROAD - ADD SHOULDERS  |  54 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
LONGVIEW BRIDGE AND ROAD, LTD.
EAST TEXAS BRIDGE, INC.
L. S. EQUIPMENT CO., INC.
TEXAS MATERIALS GROUP, INC.
A. L. HELMCAMP, INC.
PREPARING ROW
STA 22.560 $1,000.000 $1,100.000 $1,500.000 $1,000.000 $1,000.000 $7,000.000
REMOVING CONC (RIPRAP)
SY 311.000 $12.000 $16.500 $12.000 $20.000 $16.000 $50.000
EXCAVATION (ROADWAY)
CY 3,697.000 $8.000 $10.000 $10.000 $25.000 $15.000 $15.000
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
CY 1,012.000 $25.000 $13.500 $16.000 $25.000 $24.000 $26.000
BACKFILL (TY A)
STA 72.050 $300.000 $225.000 $130.000 $350.000 $300.000 $400.000
FURNISHING AND PLACING TOPSOIL (4")
SY 7,539.000 $2.000 $2.150 $1.350 $1.000 $1.750 $2.500
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 8,581.000 $0.200 $0.200 $0.160 $0.500 $0.160 $0.200
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 17,142.000 $0.850 $0.820 $0.700 $0.750 $0.700 $0.750
BONDED FBR MTRX SEED (TEMP)(WARM)
SY 8,581.000 $0.650 $0.720 $0.580 $0.500 $0.700 $0.630
BONDED FBR MTRX SEED (TEMP)(COOL)
SY 8,581.000 $0.650 $0.700 $0.540 $0.500 $0.700 $0.630
VEGETATIVE WATERING
MG 402.000 $11.500 $1.000 $5.000 $1.000 $30.000 $22.000
LIME (HYDRATED LIME (DRY))
TON 17.000 $175.000 $260.000 $250.000 $250.000 $200.000 $250.000
LIME TRT (EXST MATL)(8")
SY 959.000 $3.400 $4.250 $11.000 $4.500 $13.000 $20.000
CEMENT
TON 17.000 $152.000 $205.000 $200.000 $200.000 $375.000 $250.000
CEMENT TREAT(EXIST MATL)(8")
SY 959.000 $3.150 $3.250 $8.000 $4.500 $15.000 $20.000
EMULS ASPH (EROSN CONT)(CSS-1)
GAL 150.000 $3.700 $9.500 $12.000 $5.000 $8.000 $15.000
ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR)
GAL 8,125.000 $3.050 $4.250 $5.000 $5.000 $4.250 $5.000
AGGR (TY-PD GR-3 OR TY-PL GR-3)
CY 193.000 $111.000 $210.000 $160.000 $250.000 $200.000 $250.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 1,000.000 $55.000 $48.000 $50.000 $100.000 $70.000 $80.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 2,758.000 $66.000 $60.000 $65.000 $125.000 $72.000 $85.000
PLANE ASPH CONC PAV (2")
SY 3,911.000 $2.200 $3.850 $4.000 $2.500 $2.750 $2.500
PLANE ASPH CONC PAV (2 1/2")
SY 5,726.000 $3.200 $3.950 $4.250 $3.500 $7.500 $2.500
PLANE ASPH CONC PAV (0"- 2 1/2")
SY 3,667.000 $5.000 $4.100 $4.250 $3.500 $7.500 $2.500
CL C CONC (COLLAR)
EA 4.000 $720.000 $1,500.000 $700.000 $900.000 $2,500.000 $2,500.000
RIPRAP (CONC)(5 IN)
CY 60.000 $480.000 $490.000 $450.000 $800.000 $700.000 $770.000
RIPRAP (MOW STRIP)(4 IN)
CY 127.000 $480.000 $510.000 $450.000 $600.000 $825.000 $830.000
RETROFIT RAIL (TY T131RC)
LF 616.000 $162.000 $265.000 $160.000 $300.000 $180.000 $220.000
RC PIPE (CL III)(24 IN)
LF 6.000 $55.000 $75.000 $75.000 $70.000 $165.000 $190.000
RC PIPE (CL III)(30 IN)
LF 12.000 $98.000 $100.000 $125.000 $90.000 $255.000 $290.000
RC PIPE (CL III)(36 IN)
LF 16.000 $101.000 $120.000 $200.000 $125.000 $300.000 $340.000
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 1.000 $1,500.000 $1,100.000 $900.000 $1,200.000 $1,350.000 $1,500.000
SET (TY II) (30 IN) (RCP) (6: 1) (C)
EA 1.000 $1,800.000 $2,000.000 $2,000.000 $2,400.000 $2,800.000 $3,200.000
SET (TY II) (36 IN) (RCP) (6: 1) (C)
EA 2.000 $4,000.000 $4,500.000 $5,000.000 $6,000.000 $3,900.000 $4,500.000
MOBILIZATION
LS 1.000 $33,000.000 $90,000.000 $70,000.000 $140,000.000 $211,298.000 $220,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 3.000 $20,000.000 $5,500.000 $30,000.000 $5,000.000 $47,073.000 $50,000.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 240.000 $28.000 $27.500 $30.000 $30.000 $30.000 $32.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 120.000 $32.000 $32.000 $35.000 $30.000 $35.000 $38.000
ROCK FILTER DAMS (REMOVE)
LF 360.000 $10.500 $10.000 $9.000 $10.000 $10.000 $10.000
EARTHWORK (EROSN & SEDMT CONT, IN VEH)
CY 100.000 $20.000 $25.000 $25.000 $90.000 $18.250 $25.000
BACKHOE WORK (EROSION & SEDMT CONT)
HR 100.000 $75.000 $75.000 $85.000 $100.000 $96.000 $70.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,650.000 $3.000 $2.600 $3.500 $2.500 $3.150 $3.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,650.000 $1.500 $0.800 $1.000 $1.000 $1.100 $1.700
TRACKHOE WORK (EROSION & SEDMT CONT)
HR 100.000 $95.000 $100.000 $125.000 $100.000 $101.000 $95.000
MTL W-BEAM GD FEN (TIM POST)
LF 375.000 $20.000 $23.000 $20.000 $21.000 $24.000 $21.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,528.000 $1,700.000 $1,600.000 $1,700.000 $1,800.000 $1,700.000
REMOVE METAL BEAM GUARD FENCE
LF 300.000 $2.450 $4.400 $3.000 $6.000 $3.200 $3.000
REMOVE TERMINAL ANCHOR SECTION
EA 4.000 $150.000 $165.000 $150.000 $200.000 $160.000 $150.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,642.000 $2,725.000 $2,600.000 $2,700.000 $3,200.000 $3,000.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 1.000 $410.000 $825.000 $525.000 $1,000.000 $900.000 $850.000
RELOCATE SM RD SN SUP&AM(SIGN ONLY)
EA 1.000 $52.000 $415.000 $525.000 $600.000 $500.000 $530.000
REMOVE SM RD SN SUP&AM
EA 1.000 $115.000 $85.000 $200.000 $100.000 $200.000 $420.000
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
EA 2.000 $55.000 $72.000 $135.000 $75.000 $150.000 $75.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 16.000 $26.000 $50.000 $35.000 $75.000 $38.000 $35.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BR)
EA 8.000 $30.000 $50.000 $35.000 $75.000 $38.000 $35.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 88.000 $0.820 $1.200 $2.000 $1.000 $1.250 $0.600
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 540.000 $0.550 $1.200 $2.000 $1.000 $1.250 $0.600
WK ZN PAV MRK SHT TERM RMV (W)(4")
LF 584.000 $1.450 $1.400 $2.000 $4.000 $1.750 $0.700
WK ZN PAV MRK SHT TERM RMV (Y)(4")
LF 2,425.000 $1.300 $1.400 $2.000 $4.000 $1.650 $0.700
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 2,372.000 $0.880 $1.100 $1.000 $1.500 $1.200 $1.300
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
EA 2.000 $270.000 $330.000 $500.000 $400.000 $525.000 $700.000
REFL PAV MRK TY II (W) 4" (SLD)
LF 632.000 $0.100 $0.720 $0.300 $1.000 $0.350 $0.420
REFL PAV MRK TY II (Y) 4" (SLD)
LF 632.000 $0.100 $0.720 $0.300 $1.000 $0.350 $0.420
PAVEMENT SEALER 4"
LF 1,264.000 $0.200 $0.720 $0.220 $1.000 $0.300 $0.320
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 14,356.000 $0.350 $0.550 $0.380 $0.600 $0.450 $0.600
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 2,336.000 $0.650 $0.880 $0.440 $1.000 $0.550 $0.650
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 9,292.000 $0.400 $0.550 $0.400 $0.600 $0.430 $0.600
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 86.000 $12.000 $16.500 $15.000 $20.000 $16.000 $20.000
PREFAB PAV MRK TY C (W) (18")(YLD TRI)
EA 12.000 $33.000 $66.000 $55.000 $70.000 $59.000 $75.000
REFL PAV MRKR TY I-R
EA 28.000 $7.500 $5.500 $4.000 $5.000 $5.000 $5.500
REFL PAV MRKR TY II-A-A
EA 270.000 $3.150 $4.400 $4.000 $5.000 $4.000 $5.500
REFL PAV MRKR TY II-C-R
EA 120.000 $3.720 $4.400 $4.000 $5.000 $4.000 $5.500
SP MIXES SP-B PG64-22
TON 855.000 $100.000 $116.000 $115.000 $150.000 $142.000 $165.000
SP MIXES SP-C SAC-A PG70-22
TON 3,213.000 $108.000 $107.000 $125.000 $150.000 $162.000 $155.000
TACK COAT
GAL 173.000 $3.600 $3.500 $5.000 $5.000 $3.150 $5.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 280.000 $102.000 $100.000 $150.000 $150.000 $85.000 $200.000
TMA (STATIONARY)
DAY 120.000 $200.000 $200.000 $200.000 $189.000 $326.000 $400.000
TMA (MOBILE OPERATION)
DAY 60.000 $100.000 $200.000 $1.000 $148.000 $326.000 $20.000
Totals: $1,375,049.820 $1,495,511.900 $1,553,066.680 $2,095,150.300 $2,113,433.270 $2,366,966.520