PREPARING ROW
|
AC
|
4.680
|
$30,000.000
|
$15,000.000
|
$6,270.630
|
$15,000.000
|
$10,150.000
|
|
|
PREPARING ROW
|
STA
|
49.000
|
$10,000.000
|
$30,000.000
|
$12,990.000
|
$20,000.000
|
$187,673.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
30,240.000
|
$10.000
|
$8.350
|
$5.180
|
$15.000
|
$49.850
|
|
|
REMOVING CONC (APPR SLAB)
|
SY
|
134.000
|
$15.000
|
$75.000
|
$17.960
|
$50.000
|
$54.500
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
1,009.000
|
$10.000
|
$9.850
|
$1.360
|
$20.000
|
$10.800
|
|
|
REMOVING STAB BASE AND ASPH PAV (6")
|
SY
|
5,848.000
|
$25.000
|
$8.700
|
$6.940
|
$15.000
|
$6.000
|
|
|
REMOVING STAB BASE & ASPH PAV (0-2")
|
SY
|
10,769.000
|
$14.000
|
$4.350
|
$2.640
|
$5.000
|
$2.250
|
|
|
REMOVING STAB BASE & ASPH PAV(15"-16")
|
SY
|
27,152.000
|
$12.000
|
$14.000
|
$8.140
|
$22.000
|
$7.250
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
96,261.000
|
$14.000
|
$15.500
|
$7.630
|
$18.000
|
$18.750
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
91,102.000
|
$10.000
|
$18.000
|
$20.050
|
$22.000
|
$32.100
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
67,348.000
|
$2.000
|
$2.550
|
$1.640
|
$2.250
|
$6.700
|
|
|
FURNISHING AND PLACING TOPSOIL
|
CY
|
7,067.000
|
$35.000
|
$24.000
|
$35.520
|
$20.000
|
$49.000
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
|
SY
|
64,717.000
|
$0.800
|
$0.750
|
$0.600
|
$0.650
|
$0.600
|
|
|
BONDED FBR MTRX SEED (TEMP)(WARM)
|
SY
|
2,631.000
|
$1.000
|
$0.900
|
$0.600
|
$0.650
|
$0.600
|
|
|
BONDED FBR MTRX SEED (TEMP)(COOL)
|
SY
|
2,631.000
|
$1.000
|
$0.850
|
$0.600
|
$0.650
|
$0.600
|
|
|
BOND FBR MTRX SEED(PERM)(RURAL)(CLAY)
|
AC
|
4.680
|
$7,800.000
|
$3,600.000
|
$2,884.550
|
$3,500.000
|
$2,800.000
|
|
|
FERTILIZER
|
TON
|
2.040
|
$1,500.000
|
$1,200.000
|
$1,030.200
|
$1,200.000
|
$1,000.000
|
|
|
VEGETATIVE WATERING
|
MG
|
1,439.600
|
$10.000
|
$45.000
|
$10.000
|
$15.000
|
$5.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY D)
|
SY
|
12,456.000
|
$1.800
|
$1.200
|
$0.810
|
$1.000
|
$0.800
|
|
|
PLANT MATERIAL (SEEDLING)
|
EA
|
2,650.000
|
$100.000
|
$6.600
|
$5.150
|
$7.000
|
$5.000
|
|
|
PLANT MAINTENANCE
|
MO
|
12.000
|
$5,000.000
|
$795.000
|
$618.120
|
$1,000.000
|
$600.000
|
|
|
FL BS (CMP IN PLACE) (TY D GR 1-2)(10")
|
SY
|
32,442.000
|
$22.000
|
$33.450
|
$22.200
|
$45.000
|
$22.300
|
|
|
CEMENT
|
TON
|
956.000
|
$230.000
|
$315.000
|
$239.000
|
$300.000
|
$249.000
|
|
|
CEMENT TREAT (SUBGRADE) (8")
|
SY
|
33,459.000
|
$3.000
|
$2.150
|
$2.780
|
$3.000
|
$5.300
|
|
|
CEMENT TREAT (NEW BASE) (10")
|
SY
|
32,442.000
|
$3.000
|
$3.150
|
$2.940
|
$3.000
|
$7.550
|
|
|
PRIME COAT (MC-30)
|
GAL
|
9,967.000
|
$9.000
|
$6.500
|
$7.400
|
$6.000
|
$16.700
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
18,772.000
|
$8.000
|
$5.150
|
$8.080
|
$5.000
|
$8.950
|
|
|
AGGR(TY-B GR-3 SAC-A)
|
CY
|
287.000
|
$80.000
|
$200.000
|
$232.440
|
$180.000
|
$428.000
|
|
|
AGGR(TY-B GR-4 SAC-A)
|
CY
|
287.000
|
$80.000
|
$200.000
|
$232.440
|
$180.000
|
$160.000
|
|
|
CEM STABIL BKFL
|
CY
|
4,313.000
|
$170.000
|
$232.000
|
$178.000
|
$275.000
|
$126.000
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
263.000
|
$165.000
|
$170.000
|
$85.220
|
$165.000
|
$248.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
681.000
|
$45.000
|
$21.250
|
$33.710
|
$50.000
|
$26.300
|
|
|
TEMPORARY SPL SHORING
|
SF
|
10,339.000
|
$75.000
|
$80.000
|
$97.180
|
$85.000
|
$43.750
|
|
|
FOUNDATON LOADTEST(D4945)(DRILLD SHAFT)
|
EA
|
2.000
|
$70,000.000
|
$20,000.000
|
$55,810.820
|
$30,000.000
|
$16,000.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
188.000
|
$150.000
|
$140.000
|
$163.310
|
$500.000
|
$326.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
984.000
|
$300.000
|
$280.000
|
$599.350
|
$850.000
|
$402.000
|
|
|
DRILL SHAFT (48 IN)
|
LF
|
5,292.000
|
$546.360
|
$620.000
|
$1,106.360
|
$1,300.000
|
$922.000
|
|
|
DRILL SHAFT (54 IN)
|
LF
|
3,816.000
|
$621.520
|
$965.000
|
$1,388.830
|
$1,500.000
|
$1,480.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
100.400
|
$1,200.000
|
$1,250.000
|
$991.210
|
$1,500.000
|
$1,810.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
1,080.000
|
$1,500.000
|
$1,110.000
|
$1,086.040
|
$1,500.000
|
$2,090.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
1,016.600
|
$1,500.000
|
$1,135.000
|
$979.280
|
$1,500.000
|
$1,460.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
230,400.000
|
$25.000
|
$33.000
|
$21.480
|
$29.000
|
$26.800
|
|
|
APPROACH SLAB (HPC)
|
CY
|
194.000
|
$600.000
|
$920.000
|
$641.090
|
$900.000
|
$769.000
|
|
|
RETAINING WALL (TEMP WALL)
|
SF
|
900.000
|
$48.380
|
$105.000
|
$60.080
|
$65.000
|
$45.250
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
28,675.000
|
$200.000
|
$235.000
|
$203.030
|
$265.000
|
$225.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
10.000
|
$300.000
|
$825.000
|
$488.300
|
$1,000.000
|
$620.000
|
|
|
RIPRAP (CONC)(CL C)
|
CY
|
22.800
|
$900.000
|
$780.000
|
$484.360
|
$800.000
|
$725.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(12 IN)
|
CY
|
171.270
|
$225.000
|
$230.000
|
$207.660
|
$200.000
|
$215.000
|
|
|
RIPRAP (STONE PROTECTION)(24 IN)
|
CY
|
10,241.000
|
$225.000
|
$186.000
|
$159.200
|
$200.000
|
$194.000
|
|
|
RIPRAP (CONC)(FLUME)
|
CY
|
0.700
|
$900.000
|
$3,425.000
|
$951.630
|
$7,000.000
|
$1,610.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
154.000
|
$550.000
|
$650.000
|
$464.410
|
$700.000
|
$777.000
|
|
|
RAIL (TY T222)(HPC)
|
LF
|
5,812.000
|
$150.000
|
$130.000
|
$71.490
|
$125.000
|
$74.250
|
|
|
ARMOR JOINT
|
LF
|
157.000
|
$120.000
|
$175.000
|
$61.710
|
$75.000
|
$95.250
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
795.000
|
$150.000
|
$260.000
|
$112.540
|
$200.000
|
$196.000
|
|
|
CONC BOX CULV (4 FT X 3 FT)
|
LF
|
1,308.000
|
$600.000
|
$650.000
|
$431.100
|
$550.000
|
$410.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
1,070.000
|
$60.000
|
$150.000
|
$108.880
|
$90.000
|
$95.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
736.000
|
$120.000
|
$223.000
|
$190.370
|
$180.000
|
$147.000
|
|
|
RC PIPE (CL IV)(24 IN)
|
LF
|
100.000
|
$136.000
|
$310.000
|
$139.920
|
$125.000
|
$166.000
|
|
|
JCTBOX(COMPL)(PJB)(4FTX4FT)
|
EA
|
2.000
|
$7,500.000
|
$12,500.000
|
$6,978.770
|
$15,000.000
|
$10,020.000
|
|
|
INLET (COMPL)(PCO)(3FT)(LEFT)
|
EA
|
1.000
|
$7,200.000
|
$11,500.000
|
$6,213.000
|
$10,000.000
|
$8,280.000
|
|
|
INLET (COMPL)(PCO)(3FT)(RIGHT)
|
EA
|
2.000
|
$7,700.000
|
$11,500.000
|
$6,169.680
|
$10,000.000
|
$8,280.000
|
|
|
INLET (COMPL)(PCO)(4FT)(LEFT)
|
EA
|
4.000
|
$8,900.000
|
$12,500.000
|
$6,893.380
|
$15,000.000
|
$9,010.000
|
|
|
INLET (COMPL)(PSL)(RC)(4FTX4FT)
|
EA
|
1.000
|
$8,000.000
|
$11,600.000
|
$6,302.450
|
$15,000.000
|
$10,920.000
|
|
|
WINGWALL (FW - S) (HW=4 FT)
|
EA
|
2.000
|
$9,500.000
|
$24,000.000
|
$21,694.370
|
$9,000.000
|
$9,380.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
3.000
|
$2,000.000
|
$2,120.000
|
$1,356.190
|
$1,000.000
|
$2,710.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
1.000
|
$2,400.000
|
$3,120.000
|
$1,601.730
|
$1,300.000
|
$3,790.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
3.000
|
$2,100.000
|
$3,120.000
|
$1,969.480
|
$1,300.000
|
$2,950.000
|
|
|
SET (TY II) (36 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$3,500.000
|
$3,920.000
|
$2,153.360
|
$2,000.000
|
$7,340.000
|
|
|
PIPE (PVC) (SCH 80) (4 IN)
|
LF
|
1,188.000
|
$55.000
|
$16.000
|
$27.900
|
$50.000
|
$61.750
|
|
|
PIPE (PVC) (SCH 80) (12 IN)
|
LF
|
86.000
|
$300.000
|
$116.000
|
$82.730
|
$100.000
|
$86.750
|
|
|
REMOV STR (SET)
|
EA
|
12.000
|
$400.000
|
$1,000.000
|
$725.670
|
$1,000.000
|
$966.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
1.000
|
$2,000.000
|
$3,000.000
|
$1,758.250
|
$1,000.000
|
$2,050.000
|
|
|
REMOV STR (PIPE)
|
LF
|
950.000
|
$30.000
|
$27.000
|
$17.830
|
$20.000
|
$33.500
|
|
|
REMOV STR (BRIDGE 1000 FT OR GREATER)
|
EA
|
1.000
|
$1,500,000.000
|
$650,000.000
|
$1,150,000.000
|
$1,000,000.000
|
$6,160,018.860
|
|
|
REMOV STR (DRIVEWAY CULVERT)
|
EA
|
4.000
|
$600.000
|
$3,200.000
|
$447.900
|
$1,000.000
|
$1,980.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$4,095,922.000
|
$5,100,000.000
|
$6,530,637.240
|
$7,500,000.000
|
$9,196,019.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
57.000
|
$11,000.000
|
$4,200.000
|
$8,818.850
|
$40,000.000
|
$1,755.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
365.000
|
$42.000
|
$41.000
|
$34.000
|
$45.000
|
$33.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
365.000
|
$20.000
|
$16.000
|
$10.300
|
$10.000
|
$10.000
|
|
|
TPSD (12 )
|
LF
|
325.000
|
$30.000
|
$52.600
|
$108.690
|
$30.000
|
$70.750
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
524.000
|
$30.000
|
$40.000
|
$31.940
|
$30.000
|
$31.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
524.000
|
$10.000
|
$16.000
|
$10.300
|
$10.000
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
10,761.000
|
$3.000
|
$4.000
|
$3.090
|
$4.000
|
$3.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
10,761.000
|
$1.000
|
$1.320
|
$1.030
|
$0.500
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
250.000
|
$7.500
|
$7.000
|
$6.180
|
$12.000
|
$6.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
250.000
|
$3.000
|
$3.000
|
$0.520
|
$1.000
|
$0.500
|
|
|
CONSTRUCTING DETOURS
|
SY
|
872.000
|
$100.000
|
$50.000
|
$42.060
|
$50.000
|
$31.000
|
|
|
PTB (FRN&INSTL)(SGL SLP)(TY 1) OR (STL)
|
LF
|
6,620.000
|
$53.340
|
$95.000
|
$57.470
|
$100.000
|
$43.250
|
|
|
PTB (MOVE)(SGL SLP)(TY 1) OR (STL)
|
LF
|
4,379.000
|
$6.000
|
$10.000
|
$6.000
|
$10.000
|
$8.050
|
|
|
PTB (REMOVE)(SGL SLP)(TY 1) OR (STL)
|
LF
|
6,620.000
|
$12.000
|
$8.200
|
$19.230
|
$5.000
|
$19.500
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
2,890.000
|
$140.000
|
$95.000
|
$84.240
|
$140.000
|
$95.750
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
1,261.000
|
$30.000
|
$38.750
|
$28.650
|
$55.000
|
$58.250
|
|
|
DRIVEWAYS (ACP)
|
SY
|
897.000
|
$80.000
|
$95.000
|
$139.240
|
$110.000
|
$123.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
8,104.000
|
$0.600
|
$1.500
|
$0.700
|
$1.000
|
$0.800
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
3,075.000
|
$30.000
|
$30.000
|
$24.720
|
$25.000
|
$22.500
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,500.000
|
$2,115.000
|
$1,931.620
|
$2,000.000
|
$1,600.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
6,811.000
|
$3.000
|
$2.700
|
$3.090
|
$3.000
|
$2.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
4.000
|
$335.000
|
$270.000
|
$154.530
|
$300.000
|
$200.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
6.000
|
$3,300.000
|
$3,700.000
|
$2,930.910
|
$3,500.000
|
$2,800.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
2.000
|
$300.000
|
$265.000
|
$257.550
|
$300.000
|
$200.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
6.000
|
$2,500.000
|
$2,650.000
|
$1,222.340
|
$2,600.000
|
$2,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
4.000
|
$1,200.000
|
$660.000
|
$977.880
|
$1,000.000
|
$500.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
2.000
|
$21,957.160
|
$37,000.000
|
$28,147.370
|
$35,000.000
|
$28,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
4.000
|
$13,000.000
|
$13,200.000
|
$7,681.100
|
$12,000.000
|
$10,000.000
|
|
|
CONDT (PVC) (SCH 40) (1 1/4")
|
LF
|
2,911.000
|
$10.000
|
$19.000
|
$9.970
|
$16.000
|
$18.800
|
|
|
CONDT (PVC) (SCH 40) (4")
|
LF
|
7,276.000
|
$27.000
|
$41.000
|
$23.500
|
$45.000
|
$31.250
|
|
|
CONDT (RM) (4")
|
LF
|
11,888.000
|
$80.000
|
$137.000
|
$51.800
|
$100.000
|
$152.000
|
|
|
ELEC CONDR (NO.10) BARE
|
LF
|
2,911.000
|
$2.000
|
$4.000
|
$0.970
|
$3.500
|
$1.600
|
|
|
ELEC CONDR (NO.10) INSULATED
|
LF
|
5,822.000
|
$2.000
|
$4.000
|
$0.970
|
$3.500
|
$1.750
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
18.000
|
$1,000.000
|
$1,500.000
|
$1,273.580
|
$1,000.000
|
$1,740.000
|
|
|
ELC SRV TY D 120/240 060(NS)AL(E)SP(O)
|
EA
|
1.000
|
$7,500.000
|
$9,330.000
|
$4,236.020
|
$9,000.000
|
$9,180.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
104.000
|
$30.000
|
$61.500
|
$35.520
|
$35.000
|
$47.250
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
7.000
|
$750.000
|
$1,150.000
|
$811.790
|
$900.000
|
$792.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
3.000
|
$750.000
|
$1,350.000
|
$862.530
|
$1,000.000
|
$924.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
11.000
|
$120.000
|
$170.000
|
$507.370
|
$150.000
|
$149.000
|
|
|
IN SRSS & AM (RAIL)(130 MPH)(P MOUNT)
|
EA
|
2.000
|
$4,600.000
|
$8,500.000
|
$1,268.430
|
$8,000.000
|
$6,580.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
60.000
|
$20.000
|
$26.400
|
$25.370
|
$30.000
|
$20.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
6.000
|
$25.000
|
$33.000
|
$45.660
|
$30.000
|
$25.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
31.000
|
$45.000
|
$33.000
|
$46.360
|
$30.000
|
$25.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
8.000
|
$90.000
|
$60.000
|
$76.110
|
$60.000
|
$45.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-C
|
EA
|
1,978.000
|
$6.000
|
$5.300
|
$4.120
|
$4.500
|
$4.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
2,785.000
|
$6.000
|
$5.300
|
$4.120
|
$4.500
|
$4.000
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY W
|
EA
|
5,935.000
|
$6.000
|
$4.250
|
$3.300
|
$4.000
|
$3.200
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
|
EA
|
8,355.000
|
$6.000
|
$4.250
|
$3.300
|
$4.000
|
$3.200
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
46.000
|
$14.000
|
$13.200
|
$10.300
|
$12.000
|
$10.000
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
419.000
|
$6.000
|
$8.600
|
$6.700
|
$8.000
|
$6.500
|
|
REFL PAV MRKR TY I-C
|
EA
|
135.000
|
$5.000
|
$6.600
|
$5.150
|
$6.000
|
$5.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
209.000
|
$5.000
|
$6.600
|
$5.150
|
$6.000
|
$5.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
84,416.000
|
$1.000
|
$0.650
|
$0.490
|
$0.550
|
$0.500
|
|
|
TEMP TRAF SIGNALS
|
EA
|
1.000
|
$20,000.000
|
$50,000.000
|
$41,301.340
|
$50,000.000
|
$193,800.000
|
|
|
POST AND CABLE FENCE (NEW INSTALLATION)
|
LF
|
175.000
|
$20.000
|
$27.000
|
$60.880
|
$100.000
|
$19.700
|
|
|
POST & CABLE FENCE (GATE) (NEW INSTAL)
|
EA
|
2.000
|
$20.000
|
$3,300.000
|
$2,536.860
|
$2,000.000
|
$1,500.000
|
|
|
SP MIXES SP-D SAC-A PG70-22
|
TON
|
5,405.000
|
$160.000
|
$199.500
|
$232.440
|
$205.000
|
$205.000
|
|
|
TACK COAT
|
GAL
|
5,217.000
|
$5.000
|
$5.200
|
$1.060
|
$6.000
|
$6.250
|
|
|
TIP TESTING(DRILL SHAFT)
|
EA
|
26.000
|
$2,500.000
|
$5,000.000
|
$5,581.080
|
$5,000.000
|
$3,500.000
|
|
|
TEMP CONSTRUCTION ACCESS
|
LS
|
1.000
|
$1,500,000.000
|
$3,500,000.000
|
$17,054,203.290
|
$15,000,000.000
|
$19,875,015.000
|
|
|
INSTALL FTB
|
LF
|
3,846.000
|
$50.000
|
$65.000
|
$37.710
|
$100.000
|
$48.000
|
|
|
REMOVE FTB
|
LF
|
3,846.000
|
$20.000
|
$10.000
|
$8.510
|
$25.000
|
$18.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$22,000.000
|
$24,000.000
|
$20,762.110
|
$50,000.000
|
$20,760.000
|
|
|
JUNCTION BOX (INSTALL)
|
EA
|
1.000
|
$5,000.000
|
$36,500.000
|
$81,287.480
|
$2,000.000
|
$11,570.000
|
|
MULTIPOLYMER PAV MRK (W)(6")(SLD)
|
LF
|
5,836.000
|
$1.000
|
$3.300
|
$2.580
|
$3.000
|
$2.500
|
|
MULTIPOLYMER PAV MRK (W)(6")(BRK)
|
LF
|
1,270.000
|
$1.000
|
$3.300
|
$2.580
|
$3.000
|
$2.500
|
|
MULTIPOLYMER PAV MRK (W)(6")(DOT)
|
LF
|
210.000
|
$2.000
|
$3.300
|
$2.580
|
$3.000
|
$2.500
|
|
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
|
LF
|
5,860.000
|
$1.000
|
$3.300
|
$2.580
|
$3.000
|
$2.500
|
|
MULTIPOLYMER PAV MRK (BLK)(6")(BRK)
|
LF
|
1,480.000
|
$1.000
|
$3.300
|
$2.580
|
$3.000
|
$2.500
|
|
MULTIYPOLYMER PAV MRK (W) (ARROW)
|
EA
|
2.000
|
$225.000
|
$660.000
|
$515.100
|
$550.000
|
$500.000
|
|
|
PREFORMED CENTERLINE RUMBLE STRIP
|
LF
|
811.000
|
$7.250
|
$8.600
|
$6.700
|
$7.000
|
$6.500
|
|
|
REFL PAV MRK AWT (W) 6" (SLD) (100MIL)
|
LF
|
10,694.000
|
$1.000
|
$1.350
|
$1.030
|
$1.200
|
$1.000
|
|
|
REFL PAV MRK AWT (W) 6" (BRK) (100MIL)
|
LF
|
810.000
|
$1.000
|
$2.650
|
$2.060
|
$2.200
|
$2.000
|
|
|
REFL PAV MRK AWT (Y) 6" (SLD) (100MIL)
|
LF
|
10,395.000
|
$1.000
|
$1.350
|
$1.030
|
$1.200
|
$1.000
|
|
|
REFL PAV MRK AWT (Y) 6" (BRK) (100MIL)
|
LF
|
980.000
|
$1.000
|
$2.650
|
$2.060
|
$2.200
|
$2.000
|
|
|
TMA (STATIONARY)
|
DAY
|
20.000
|
$250.000
|
$330.000
|
$157.300
|
$1,000.000
|
$424.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
150.000
|
$75.000
|
$125.000
|
$68.660
|
$30.000
|
$81.500
|
|
|
INSTALL LED NAVIGATIONAL LIGHTS SYS
|
EA
|
2.000
|
$3,000.000
|
$35,000.000
|
$27,199.210
|
$28,000.000
|
$37,630.000
|
|
Totals: |
$44,931,942.860
|
$53,799,919.420
|
$65,306,372.450
|
$77,904,437.450
|
$91,960,191.910
|