PREPARING ROW
|
STA
|
121.000
|
$1,000.000
|
$20,000.000
|
$9,000.000
|
$9,897.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
59,384.000
|
$10.000
|
$4.000
|
$5.000
|
$5.000
|
|
|
OBLITERATING ABANDONED ROAD
|
STA
|
63.000
|
$1,151.000
|
$1,200.000
|
$1,500.000
|
$2,100.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
163,021.000
|
$6.500
|
$4.500
|
$6.000
|
$5.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY A)
|
CY
|
6,147.000
|
$6.750
|
$15.000
|
$12.000
|
$10.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
60,670.000
|
$8.000
|
$7.500
|
$10.000
|
$10.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
13,105.000
|
$1.000
|
$2.500
|
$2.000
|
$1.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
165,083.000
|
$0.100
|
$0.130
|
$0.150
|
$0.120
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
165,083.000
|
$0.100
|
$0.130
|
$0.150
|
$0.120
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
|
SY
|
82,542.000
|
$0.700
|
$0.950
|
$0.900
|
$1.000
|
|
|
VEGETATIVE WATERING
|
MG
|
13,206.000
|
$10.000
|
$1.000
|
$2.000
|
$10.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY C)
|
SY
|
27,510.000
|
$0.800
|
$1.600
|
$1.500
|
$1.000
|
|
|
CEMENT
|
TON
|
234.000
|
$145.000
|
$180.000
|
$160.000
|
$150.000
|
|
|
CEMENT TREAT (SUBGRADE) (8")
|
SY
|
17,079.000
|
$2.950
|
$2.500
|
$3.000
|
$2.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
3,067.000
|
$4.250
|
$4.500
|
$6.000
|
$4.000
|
|
|
ASPH (TIER II)
|
GAL
|
4,492.000
|
$3.450
|
$4.500
|
$20.000
|
$4.000
|
|
|
AGGR(TY-PB GR-4 SAC-B)
|
CY
|
831.000
|
$150.000
|
$120.000
|
$50.000
|
$140.000
|
|
|
D-GR HMA(SQ) TY-C PG64-22
|
TON
|
118.000
|
$100.000
|
$120.000
|
$150.000
|
$100.000
|
|
|
D-GR HMA(SQ) TY-C SAC-A PG70-22
|
TON
|
118.000
|
$150.000
|
$140.000
|
$150.000
|
$100.000
|
|
|
D-GR HMA(SQ) TY-D PG64-22
|
TON
|
1,555.000
|
$150.000
|
$110.000
|
$130.000
|
$100.000
|
|
|
D-GR HMA TY-D SAC-B PG70-22
|
TON
|
1,464.000
|
$100.000
|
$120.000
|
$130.000
|
$110.000
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
12,240.000
|
$1.770
|
$2.500
|
$2.500
|
$1.500
|
|
|
CONC PVMT (CONT REINF - CRCP) (9")
|
SY
|
13,363.000
|
$45.000
|
$70.000
|
$100.000
|
$75.000
|
|
|
CEM STABIL BKFL
|
CY
|
281.400
|
$67.000
|
$200.000
|
$200.000
|
$65.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
11,204.000
|
$10.000
|
$26.000
|
$100.000
|
$35.000
|
|
|
TEMPORARY SPL SHORING (COFFERDAM)
|
SF
|
17,464.000
|
$35.000
|
$40.000
|
$100.000
|
$77.000
|
|
|
PRESTR CONC PIL (18 IN SQ)
|
LF
|
34,590.000
|
$80.000
|
$90.000
|
$110.000
|
$125.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
107.600
|
$985.000
|
$1,000.000
|
$950.000
|
$1,150.000
|
|
|
CL C CONC (BENT)(HPC)
|
CY
|
2,797.800
|
$900.000
|
$900.000
|
$1,025.000
|
$1,395.000
|
|
|
CL C CONC (FOOTING)(HPC)
|
CY
|
1,033.500
|
$1,000.000
|
$900.000
|
$725.000
|
$950.000
|
|
|
CL C CONC (COLLAR)
|
EA
|
1.000
|
$900.000
|
$1,500.000
|
$1,500.000
|
$1,000.000
|
|
|
CL E CONC (SEAL)
|
CY
|
827.000
|
$400.000
|
$500.000
|
$330.000
|
$550.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
327,060.000
|
$19.000
|
$17.500
|
$20.000
|
$16.000
|
|
|
APPROACH SLAB (HPC)
|
CY
|
116.400
|
$450.000
|
$500.000
|
$575.000
|
$543.000
|
|
|
PRESTR CONC GIRDER (TX46)
|
LF
|
37,619.460
|
$140.000
|
$155.000
|
$165.000
|
$140.000
|
|
|
PRESTR CONC GIRDER (TX62)
|
LF
|
4,842.000
|
$160.000
|
$175.000
|
$185.000
|
$160.000
|
|
|
RIPRAP (STONE PROTECTION)(24 IN)
|
CY
|
18,340.000
|
$135.000
|
$140.000
|
$125.000
|
$150.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
175.000
|
$550.000
|
$550.000
|
$450.000
|
$500.000
|
|
|
RAIL (TY SSTR)(HPC)
|
LF
|
14,264.000
|
$65.000
|
$65.000
|
$65.000
|
$59.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
|
LF
|
1,058.000
|
$90.000
|
$60.000
|
$65.000
|
$90.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
62.000
|
$65.000
|
$50.000
|
$70.000
|
$180.000
|
|
|
HEADWALL (CH - FW - 0) (DIA= 24 IN)
|
EA
|
1.000
|
$4,000.000
|
$4,500.000
|
$3,000.000
|
$3,500.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$1,400.000
|
$800.000
|
$900.000
|
$2,000.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
2.000
|
$975.000
|
$800.000
|
$1,000.000
|
$1,500.000
|
|
|
REMOV STR (PIPE)
|
LF
|
26.000
|
$21.000
|
$15.000
|
$15.000
|
$20.000
|
|
|
REMOV STR (BRIDGE 500 - 999 FT LENGTH)
|
EA
|
1.000
|
$300,000.000
|
$100,000.000
|
$220,000.000
|
$600,000.000
|
|
|
REMOV STR (BRIDGE 1000 FT OR GREATER)
|
EA
|
1.000
|
$500,000.000
|
$150,000.000
|
$415,000.000
|
$1,100,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$3,000,000.000
|
$3,500,000.000
|
$3,900,000.000
|
$4,450,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
81.000
|
$2,000.000
|
$1,250.000
|
$14,000.000
|
$12,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
60.000
|
$29.000
|
$34.000
|
$40.000
|
$40.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
60.000
|
$20.000
|
$20.000
|
$18.000
|
$8.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
18,984.000
|
$2.840
|
$2.650
|
$3.000
|
$2.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
18,984.000
|
$1.070
|
$1.100
|
$1.000
|
$0.500
|
|
|
CONSTRUCTING DETOURS
|
SY
|
3,965.000
|
$40.000
|
$85.000
|
$155.000
|
$34.000
|
|
|
PTB (FRN&INSTL)(F SHAPE)(TY 1) OR (STL)
|
LF
|
3,480.000
|
$75.000
|
$80.000
|
$115.000
|
$39.000
|
|
|
PTB (MOVE)(F SHAPE)(TY 1) OR (STL)
|
LF
|
5,785.000
|
$5.500
|
$9.000
|
$5.000
|
$5.500
|
|
|
PTB (REMOVE)(F SHAPE)(TY 1) OR (STL)
|
LF
|
3,245.000
|
$22.000
|
$12.000
|
$5.000
|
$9.500
|
|
|
DRIVEWAYS (ACP)
|
SY
|
764.000
|
$33.000
|
$36.000
|
$55.000
|
$30.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
5,270.000
|
$21.000
|
$22.000
|
$22.000
|
$19.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,800.000
|
$1,540.000
|
$1,800.000
|
$1,450.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
16,200.000
|
$2.200
|
$2.750
|
$3.000
|
$2.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
6.000
|
$200.000
|
$220.000
|
$220.000
|
$200.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
1.000
|
$280.000
|
$220.000
|
$220.000
|
$250.000
|
|
|
GDRAIL END TRT(INST)(WOOD POST)(TY I)
|
EA
|
5.000
|
$2,500.000
|
$3,025.000
|
$3,000.000
|
$2,300.000
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
4.000
|
$12,000.000
|
$9,500.000
|
$10,000.000
|
$7,500.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
8.000
|
$2,300.000
|
$2,200.000
|
$2,200.000
|
$1,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
4.000
|
$2,500.000
|
$1,100.000
|
$1,200.000
|
$500.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
130.000
|
$30.000
|
$50.000
|
$10.000
|
$18.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$1,000.000
|
$715.000
|
$1,000.000
|
$375.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
2.000
|
$585.000
|
$825.000
|
$900.000
|
$250.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(T)
|
EA
|
3.000
|
$633.000
|
$950.000
|
$1,200.000
|
$300.000
|
|
|
IN SM RD SN SUP&AM (RAIL MOUNT)
|
EA
|
6.000
|
$3,500.000
|
$6,000.000
|
$5,500.000
|
$3,200.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
9.000
|
$95.000
|
$80.000
|
$225.000
|
$75.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
36.000
|
$20.000
|
$22.000
|
$40.000
|
$25.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
192.000
|
$14.000
|
$38.000
|
$40.000
|
$25.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
11,316.000
|
$0.260
|
$0.550
|
$0.550
|
$0.350
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
10,918.000
|
$0.220
|
$0.550
|
$0.550
|
$0.350
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-C
|
EA
|
1,111.000
|
$3.800
|
$3.700
|
$4.000
|
$3.600
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
1,047.000
|
$4.500
|
$3.700
|
$4.000
|
$3.600
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY W
|
EA
|
1,996.000
|
$4.000
|
$2.500
|
$2.500
|
$3.200
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
|
EA
|
1,996.000
|
$4.000
|
$2.500
|
$2.500
|
$3.200
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
2,520.000
|
$1.140
|
$1.100
|
$1.100
|
$1.200
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
12.000
|
$9.000
|
$11.000
|
$12.000
|
$12.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
2,520.000
|
$1.270
|
$1.100
|
$1.100
|
$1.200
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
2,420.000
|
$0.700
|
$1.200
|
$2.000
|
$1.500
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
2,420.000
|
$0.800
|
$1.200
|
$2.000
|
$1.500
|
|
REFL PAV MRK TY II (W) 8" (SLD)
|
LF
|
515.000
|
$0.350
|
$1.100
|
$1.100
|
$0.650
|
|
|
PAVEMENT SEALER 6"
|
LF
|
24,691.000
|
$0.500
|
$0.240
|
$0.240
|
$0.250
|
|
|
PAVEMENT SEALER 24"
|
LF
|
9.000
|
$1.500
|
$2.200
|
$2.200
|
$3.000
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
9.000
|
$15.000
|
$22.000
|
$25.000
|
$16.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
3.000
|
$85.000
|
$220.000
|
$220.000
|
$255.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
3.000
|
$95.000
|
$245.000
|
$250.000
|
$335.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
27.000
|
$4.000
|
$3.850
|
$4.000
|
$5.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
464.000
|
$4.000
|
$3.850
|
$4.000
|
$5.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
3,147.000
|
$1.000
|
$2.200
|
$2.200
|
$1.600
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
24,691.000
|
$1.000
|
$0.220
|
$0.220
|
$0.200
|
|
|
TEMP CONSTRUCTION ACCESS
|
LS
|
1.000
|
$300,000.000
|
$2,400,000.000
|
$1,555,000.000
|
$6,500,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
60.000
|
$100.000
|
$100.000
|
$200.000
|
$200.000
|
|
|
PREFB PV MK W/WNTY TY B (W)(6")(SLD)
|
LF
|
14,220.000
|
$3.700
|
$8.250
|
$8.000
|
$6.000
|
|
|
PREFB PV MK W/WNTY TY B (Y)(6")(SLD)
|
LF
|
4,371.000
|
$3.800
|
$8.250
|
$8.000
|
$6.000
|
|
|
PREFB PV MK W/WNTY TY B(Y)6"(BRK)CNTST
|
LF
|
6,100.000
|
$10.500
|
$10.500
|
$10.000
|
$9.000
|
|
|
REFL PAV MRK AWT (W) 6" (SLD) (100MIL)
|
LF
|
9,985.000
|
$0.520
|
$1.100
|
$1.100
|
$1.000
|
|
|
REFL PAV MRK AWT (W) 6" (BRK) (100MIL)
|
LF
|
530.000
|
$1.100
|
$1.100
|
$1.100
|
$1.000
|
|
|
REFL PAV MRK AWT (Y) 6" (SLD) (100MIL)
|
LF
|
12,690.000
|
$0.600
|
$1.100
|
$1.100
|
$1.000
|
|
|
TMA (STATIONARY)
|
EA
|
1.000
|
$15,000.000
|
$16,000.000
|
$50,000.000
|
$25,000.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
80.000
|
$40.000
|
$27.500
|
$30.000
|
$55.000
|
|
Totals: |
$32,733,660.760
|
$37,733,611.240
|
$42,277,726.860
|
$46,210,745.520
|