Items: 55

County: HENDERSON
Length: N/A
Highway: BS 31H
District: TYLER
Control Number: 0164-01-071
DBE Goal: N/A
Project: C 164-1-71
Guaranty: N/A
Time: 35 WORKING DAYS
Engineer's Estimate: $1,128,125.00
Date: 07/11/2018 (7 years ago)
Contract Number: N/A
Type: PFC SURF,BRG RAIL,MBGF,PVT MRKG
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$1,128,125.00
$1,161,999.49
Over/Under Est: 3% $33,874.49
Over/Under Est: 9.47% $106,825.20
Amt Left: 6.28% $72,950.71
Over/Under Est: 24.68% $278,460.36
Amt Left: 21.05% $244,585.87
Delta: -13.90% -$171,635.16
Over/Under Est: 27.82% $313,836.12
Amt Left: 24.09% $279,961.63
Delta: -2.52% -$35,375.76

Bid Items & Bid Tabulations

55 Total 0 of 55
HENDERSON  |  BS 31H  |  TYLER  |  0164-01-071  |  07/11/2018  |  $1,128,125.00  |  C 164-1-71  |  PFC SURF,BRG RAIL,MBGF,PVT MRKG  |  35 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
LONGVIEW BRIDGE AND ROAD, LTD.
EAST TEXAS BRIDGE, INC.
DREWERY CONSTRUCTION COMPANY, INCORPORATED
OLDCASTLE MATERIALS TEXAS, INC.
REMOVING CONC (FLUME)
SY 8.000 $75.000 $80.000 $25.000 $175.000 $155.000
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
CY 75.000 $30.000 $36.000 $40.000 $80.000 $56.000
BOND FBR MTRX SEED (PERM) (URBAN)(SAND)
SY 2,355.000 $1.000 $1.400 $1.250 $1.500 $0.990
VEGETATIVE WATERING
MG 26.000 $15.000 $10.000 $40.000 $40.000 $50.000
PFC (ASPHALT) PG76-22
TON 345.000 $140.000 $145.000 $150.000 $165.000 $159.650
PFC-F (AGGR) PG76-22 SAC-A
TON 4,581.000 $140.000 $145.000 $150.000 $165.000 $159.650
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 500.000 $50.000 $72.000 $60.000 $75.000 $93.500
PLANE ASPH CONC PAV (0" TO 3/4")
SY 4,432.000 $4.000 $6.000 $3.650 $7.000 $4.250
PLANE ASPH CONC PAV (3/4")
SY 689.000 $4.000 $7.250 $9.000 $10.000 $10.000
RIPRAP (CONC)(FLUME)
CY 4.000 $500.000 $750.000 $800.000 $2,500.000 $1,000.000
RIPRAP (MOW STRIP)(4 IN)
CY 46.000 $500.000 $490.000 $525.000 $500.000 $650.000
CLEANING AND SEALING EXIST JOINTS(CL3)
LF 264.000 $20.000 $42.000 $42.000 $40.000 $39.000
RETROFIT RAIL (TY T131RC)
LF 237.000 $170.000 $225.000 $210.000 $200.000 $170.000
REMOVE STR (RAIL)
LF 69.000 $30.000 $40.000 $40.000 $100.000 $300.000
MOBILIZATION
LS 1.000 $110,000.000 $105,000.000 $110,000.000 $130,000.000 $143,500.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $7,500.000 $3,600.000 $5,000.000 $15,000.000 $35,000.000
EARTHWORK (EROSN & SEDMT CONT, IN VEH)
CY 20.000 $20.000 $65.000 $50.000 $24.000 $54.250
BACKHOE WORK (EROSION & SEDMT CONT)
HR 5.000 $80.000 $250.000 $100.000 $120.000 $0.012
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,220.000 $3.000 $2.500 $3.000 $3.250 $3.250
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,220.000 $1.000 $1.050 $1.000 $1.000 $1.000
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
LF 400.000 $15.000 $16.000 $70.000 $30.000 $18.250
PORT CTB (DES SOURCE)(LOW PROF)(TY 2)
LF 80.000 $15.000 $16.000 $70.000 $10.000 $18.250
PORT CTB (STKPL)(LOW PROF)(TY 1)
LF 400.000 $15.000 $16.000 $25.000 $30.000 $23.000
PORT CTB (STKPL)(LOW PROF)(TY 2)
LF 80.000 $15.000 $16.000 $25.000 $10.000 $21.000
CURB RAMPS (TY 21)
SY 51.000 $550.000 $200.000 $75.000 $300.000 $300.000
MTL W-BEAM GD FEN (TIM POST)
LF 450.000 $24.000 $21.200 $22.500 $21.500 $24.850
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,600.000 $1,880.000 $1,500.000 $1,500.000 $1,870.000
REMOVE METAL BEAM GUARD FENCE
LF 425.000 $3.500 $4.400 $5.500 $2.000 $3.750
REMOVE TERMINAL ANCHOR SECTION
EA 1.000 $350.000 $385.000 $220.000 $210.000 $190.250
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,400.000 $2,800.000 $2,700.000 $2,600.000 $3,435.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $600.000 $440.000 $220.000 $210.000 $374.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 16.000 $35.000 $38.000 $30.000 $26.250 $38.150
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 140.000 $0.300 $3.300 $3.300 $2.100 $2.250
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 588.000 $0.300 $2.200 $2.750 $2.100 $2.250
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 588.000 $0.300 $2.200 $2.750 $2.100 $2.250
WK ZN PAV MRK SHT TERM RMV (W)(4")
LF 3,933.000 $0.800 $1.500 $2.000 $1.000 $1.100
WK ZN PAV MRK SHT TERM RMV (Y)(4")
LF 11,880.000 $0.800 $1.500 $2.000 $1.000 $1.100
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 34.000 $2.000 $1.100 $3.300 $1.050 $1.120
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 2,935.000 $0.850 $0.920 $1.100 $0.880 $0.950
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 372.000 $3.500 $3.500 $3.000 $3.360 $3.550
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 713.000 $5.500 $5.500 $5.500 $5.250 $5.550
REFL PAV MRK TY I (Y)4"(DOT)(100MIL)
LF 34.000 $2.000 $1.100 $3.300 $1.050 $1.150
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 8,740.000 $0.350 $0.480 $0.500 $0.460 $0.500
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 22,041.000 $0.350 $0.480 $0.350 $0.460 $0.500
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 6,780.000 $0.350 $0.480 $0.500 $0.460 $0.500
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 39,212.000 $0.350 $0.480 $0.350 $0.460 $0.500
PREFAB PAV MRK TY C (W) (ARROW)
EA 14.000 $200.000 $190.000 $240.000 $178.500 $188.200
PREFAB PAV MRK TY C (W) (WORD)
EA 14.000 $225.000 $240.000 $350.000 $231.000 $243.550
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 27.000 $35.000 $44.000 $50.000 $42.530 $44.850
REFL PAV MRKR TY I-A
EA 58.000 $3.250 $3.600 $4.150 $3.500 $3.660
REFL PAV MRKR TY I-C
EA 584.000 $3.000 $3.600 $4.150 $3.500 $3.660
REFL PAV MRKR TY II-A-A
EA 826.000 $3.000 $3.300 $4.150 $3.500 $3.660
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 111.000 $105.000 $65.000 $200.000 $250.000 $50.000
TMA (STATIONARY)
DAY 82.000 $250.000 $55.000 $200.000 $500.000 $272.750
TMA (MOBILE OPERATION)
DAY 20.000 $250.000 $55.000 $100.000 $55.000 $55.400
Totals: $1,128,125.000 $1,161,999.490 $1,234,950.200 $1,406,585.360 $1,441,961.120