PANOLA US 59 (0063-10-015)

Items: 188

County: PANOLA
Length: N/A
Highway: US 59
District: ATLANTA
Control Number: 0063-10-015
DBE Goal: N/A
Project: C 63-10-15
Guaranty: N/A
Time: 504 WORKING DAYS
Engineer's Estimate: $34,951,362.52
Date: 06/01/2023 (3 years ago)
Contract Number: N/A
Type: CONSTRUCT GRADE SEPARATION
Mail/Deliver Bids To: N/A
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$34,951,362.52
$36,905,848.43
Over/Under Est: 5.59% $1,954,485.91
$40,957,722.26
Over/Under Est: 17.18% $6,006,359.74
Amt Left: 10.98% $4,051,873.83
Subcontractor Percentage Amount
STRIPING TECHNOLOGY, L.P. 1.59% $585,177.11
ISAACS CONSTRUCTION SERVICES LLC 0.60% $220,821.55
HODGES AND SON CONSTRUCTION COMPANY, INC. 0.46% $169,296.52
MORRIS COUNTY CONTRACTORS, L.L.C. 0.40% $147,214.37
HIGHWAY 1 LLC 0.39% $143,534.01
SOUTHWEST ENVIRONMENT SERVICES LLC 0.35% $128,812.57
TORO BRAVO CONSTRUCTION, LLC 0.33% $121,451.85
PANOLA SIGN & BARRICADE, INC. 0.16% $58,885.75
CAP RIVER LLC 0.13% $47,844.67
KITECO PROPERTY SOLUTIONS INC. 0.11% $40,483.95
STRAIGHT LINE SAWING & SEALING, INC. 0.08% $29,442.87
WEST TEXAS RUMBLE STRIP LLC 0.07% $25,762.51
TORO BRAVO CONSTRUCTION, LLC 0.03% $11,041.08
PENHALL COMPANY 0.02% $7,360.72
SOUTHEAST GRINDING AND GROOVING LLC 0.02% $7,360.72
WEST TEXAS ROCK RESOURCES, LLC 0.02% $7,360.72
A&A TREE SERVICES 0.00% $0.00
Total: 4.76% $1,751,850.97

Bid Items & Bid Tabulations

188 Total 0 of 188
PANOLA  |  US 59  |  ATLANTA  |  0063-10-015  |  06/01/2023  |  $34,951,362.52  |  C 63-10-15  |  CONSTRUCT GRADE SEPARATION  |  504 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
LONGVIEW BRIDGE AND ROAD, LTD.
EAST TEXAS BRIDGE, INC.
PREPARING ROW
STA 91.000 $8,000.000 $10,000.000 $24,000.000
REMOVING CONC (RIPRAP)
SY 59.000 $25.000 $65.000 $30.000
REMOVING CONC (FLUME)
SY 207.000 $40.000 $40.000 $30.000
REMOV STAB BASE & ASPH PAV (8"-20")
SY 46,097.000 $14.000 $4.500 $16.000
EXCAVATION (ROADWAY)
CY 115,672.000 $11.000 $10.600 $10.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 295,155.000 $10.000 $15.000 $13.000
BACKFILL (TY B)
STA 195.400 $500.000 $580.000 $500.000
FURNISHING AND PLACING TOPSOIL (6")
SY 192,361.000 $2.000 $3.350 $2.200
BROADCAST SEED (TEMP) (WARM)
SY 96,180.500 $0.150 $0.110 $0.110
BROADCAST SEED (TEMP) (COOL)
SY 96,180.500 $0.150 $0.110 $0.110
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 192,361.000 $0.600 $0.550 $0.550
VEGETATIVE WATERING
MG 3,084.000 $12.000 $30.000 $12.000
SOIL RETENTION BLANKETS (CL 1) (TY D)
SY 19,859.000 $1.500 $0.860 $1.000
FL BS (CMP IN PLC)(TY D GR 1-2) (6")
SY 95,077.000 $22.000 $24.000 $27.000
CEMENT
TON 3,414.000 $230.000 $320.000 $285.000
CEMENT TREAT (NEW BASE) (6")
SY 94,098.000 $2.750 $2.400 $4.000
CEMENT TREAT (SUBGRADE) (8")
SY 113,732.000 $3.000 $2.480 $4.250
PRIME COAT (MC-30)
GAL 28,011.000 $7.500 $6.600 $7.000
PLANE ASPH CONC PAV(0" TO 2")
SY 2,612.000 $6.000 $5.000 $10.000
CONC PVMT (CONT REINF - CRCP) (8")
SY 54,901.000 $100.000 $87.000 $100.000
CONC PVMT (CONT REINF - CRCP) (13")
SY 26,563.000 $120.000 $134.000 $150.000
CONC PVMT (CONT REINF-CRCP) (HES) (8")
SY 4,000.000 $140.000 $110.000 $150.000
CEM STABIL BKFL
CY 740.000 $250.000 $270.000 $250.000
CUT & RESTORE ASPH PAVING
SY 633.000 $150.000 $230.000 $200.000
FLOWABLE BACKFILL
CY 12.000 $400.000 $700.000 $700.000
TRENCH EXCAVATION PROTECTION
LF 782.000 $15.000 $18.500 $15.000
TEMPORARY SPL SHORING
SF 3,290.000 $65.000 $65.000 $55.000
DRILL SHAFT (24 IN)
LF 32.000 $250.000 $275.000 $250.000
DRILL SHAFT (36 IN)
LF 1,796.000 $275.000 $230.000 $245.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 200.000 $225.000 $226.000 $250.000
CL C CONC (ABUT)(HPC)
CY 112.000 $1,750.000 $1,100.000 $1,300.000
CL C CONC (CAP)(HPC)
CY 74.800 $2,100.000 $1,200.000 $1,300.000
CL C CONC (COLUMN)(HPC)
CY 50.800 $2,000.000 $1,250.000 $1,400.000
REINF CONC SLAB (HPC)
SF 26,460.000 $35.000 $29.000 $26.000
APPROACH SLAB (HPC)
CY 216.000 $900.000 $875.000 $825.000
PRESTR CONC GIRDER (TX46)
LF 3,134.800 $250.000 $240.000 $220.000
RIPRAP (CONC)(4 IN)
CY 433.000 $565.000 $615.000 $650.000
RIPRAP (CONC)(5 IN)
CY 16.000 $555.000 $815.000 $1,200.000
RIPRAP (CONC)(CL B)
CY 7.000 $650.000 $1,050.000 $1,200.000
RIPRAP (STONE COMMON)(DRY)(12 IN)
CY 130.000 $230.000 $240.000 $250.000
RIPRAP (CONC)(FLUME)
CY 684.000 $650.000 $650.000 $650.000
RIPRAP (MOW STRIP)(4 IN)
CY 52.000 $600.000 $635.000 $650.000
RAIL (TY SSTR)(HPC)
LF 1,348.000 $130.000 $90.000 $150.000
ARMOR JOINT
LF 418.000 $110.000 $105.000 $150.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 170.400 $222.000 $265.000 $220.000
CONC BOX CULV (4 FT X 3 FT)
LF 602.000 $400.000 $480.000 $600.000
CONC BOX CULV (4 FT X 4 FT)
LF 434.000 $500.000 $540.000 $700.000
CONC BOX CULV (5 FT X 3 FT)
LF 516.000 $520.000 $625.000 $750.000
RC PIPE (CL III)(12 IN)
LF 648.000 $90.000 $60.000 $50.000
RC PIPE (CL III)(18 IN)
LF 68.000 $60.000 $80.000 $70.000
RC PIPE (CL III)(24 IN)
LF 1,807.000 $50.000 $90.000 $85.000
RC PIPE (CL III)(30 IN)
LF 614.000 $110.000 $130.000 $100.000
RC PIPE (CL III)(48 IN)
LF 235.000 $140.000 $240.000 $250.000
INLET (COMPL)(PSL)(FG)(4FTX4FT-3FTX3FT)
EA 2.000 $7,000.000 $7,500.000 $10,000.000
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
EA 5.000 $8,500.000 $8,500.000 $12,000.000
INLET (COMPL)(PSL)(FG)(5FTX5FT-4FTX4FT)
EA 2.000 $16,000.000 $14,000.000 $16,000.000
INLET (COMPL)(PSL)(FG)(5FTX6FT-4FTX4FT)
EA 1.000 $17,000.000 $13,000.000 $15,000.000
HEADWALL (CH - PW - 0) (DIA= 24 IN)
EA 1.000 $8,000.000 $7,000.000 $5,000.000
HEADWALL (CH - PW - 0) (DIA= 48 IN)
EA 1.000 $12,500.000 $14,500.000 $16,000.000
HEADWALL (CH - PW - S) (DIA= 48 IN)
EA 1.000 $10,000.000 $14,750.000 $22,000.000
WINGWALL (PW - 2) (HW=4 FT)
EA 1.000 $11,000.000 $10,750.000 $5,000.000
WINGWALL (PW - 2) (HW=5 FT)
EA 1.000 $12,000.000 $12,250.000 $9,000.000
WINGWALL (PW - 2) (HW=6 FT)
EA 9.000 $19,000.000 $12,300.000 $10,000.000
WINGWALL (PW - 2) (HW=7 FT)
EA 1.000 $21,000.000 $12,750.000 $16,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 4.000 $850.000 $1,200.000 $900.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 15.000 $1,100.000 $1,400.000 $1,000.000
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 10.000 $1,400.000 $1,700.000 $1,300.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 18.000 $1,300.000 $1,700.000 $1,300.000
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 4.000 $2,000.000 $2,000.000 $1,700.000
ADJUSTING INLET (CAP)
EA 2.000 $2,750.000 $3,000.000 $3,000.000
PIPE (PVC) (SCH 40) (6 IN)
LF 52.000 $120.000 $85.000 $100.000
REMOV STR (INLET)
EA 5.000 $9,000.000 $1,300.000 $1,000.000
REMOV STR (SET)
EA 15.000 $400.000 $700.000 $1,000.000
REMOV STR (HEADWALL)
EA 13.000 $3,600.000 $1,500.000 $1,000.000
REMOV STR (PIPE)
LF 1,852.000 $16.000 $22.000 $20.000
REMOV STR (SMALL FENCE)
LF 91.000 $8.000 $30.000 $20.000
MOBILIZATION
LS 1.000 $3,408,504.120 $3,500,000.000 $4,000,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 33.000 $11,000.000 $5,100.000 $24,000.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 1,023.000 $50.000 $55.000 $60.000
ROCK FILTER DAMS (REMOVE)
LF 1,023.000 $10.000 $11.000 $10.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 2,500.000 $30.000 $33.000 $33.000
CONSTRUCTION EXITS (REMOVE)
SY 2,500.000 $10.000 $9.900 $9.000
CONSTRUCTION PERIMETER FENCE
LF 111.000 $5.250 $5.500 $6.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 6,003.000 $3.500 $3.850 $4.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 6,003.000 $0.700 $0.550 $0.500
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 90.000 $6.000 $6.600 $8.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 90.000 $1.250 $1.100 $1.000
CONSTRUCTING DETOURS
SY 1,215.000 $95.000 $250.000 $250.000
PTB(FRN&INSTL)(SSCB OR CSB)(TY1)OR(STL)
LF 6,850.000 $45.000 $80.000 $100.000
PTB(MOVE)(SSCB OR CSB)(TY1)OR(STL)
LF 11,400.000 $8.000 $9.000 $10.000
PTB(REMOVE)(SSCB OR CSB)(TY1)OR(STL)
LF 6,850.000 $15.000 $15.000 $5.000
DRIVEWAYS (CONC)
SY 1,207.000 $125.000 $120.000 $180.000
INTRSCT, DRVWAYS, & TURNOUT (CONC)
SY 387.000 $125.000 $175.000 $180.000
INTRSCT, DRVWAYS, & TURNOUT (ACP)
SY 878.000 $150.000 $165.000 $110.000
DRIVEWAYS (BASE)
SY 871.000 $50.000 $67.000 $55.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 12,499.000 $1.300 $1.000 $0.750
MTL W-BEAM GD FEN (TIM POST)
LF 837.500 $30.000 $25.000 $25.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,300.000 $1,800.000 $1,900.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,500.000 $1,600.000 $1,500.000
MTL BM GD FEN TRANS (NON - SYM)
EA 1.000 $1,300.000 $1,000.000 $1,000.000
REMOVE CABLE BARRIER
LF 3,070.000 $5.000 $10.000 $5.000
REMOVE CABLE BARRIER TERMINAL SECTION
EA 4.000 $350.000 $2,000.000 $1,000.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,400.000 $3,100.000 $3,200.000
CRASH CUSH ATTEN (REMOVE)
EA 9.000 $1,200.000 $900.000 $1,000.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 9.000 $10,000.000 $11,600.000 $13,000.000
GATE (REMOVE)
EA 1.000 $750.000 $330.000 $1,000.000
WIRE FENCE (TY C)
LF 96.000 $18.000 $60.000 $35.000
GATE (TY 1)
EA 1.000 $2,555.000 $600.000 $3,000.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 7.000 $400.000 $482.000 $350.000
REMOVE RD IL ASM (TRANS-BASE)
EA 6.000 $1,000.000 $2,750.000 $2,800.000
IN RD IL (TY AL) 50T-10 (400W EQ) LED
EA 20.000 $5,900.000 $6,400.000 $6,200.000
CONDT (PVC) (SCH 40) (2")
LF 2,960.000 $10.000 $8.000 $8.000
CONDT (PVC) (SCH 40) (2") (BORE)
LF 1,425.000 $24.000 $26.000 $25.000
ELEC CONDR (NO.8) BARE
LF 4,385.000 $2.000 $2.500 $2.200
ELEC CONDR (NO.8) INSULATED
LF 8,770.000 $3.000 $4.500 $4.500
GROUND BOX TY A (122311)W/APRON
EA 10.000 $1,000.000 $850.000 $800.000
ELC SRV TY A 120/240 100(NS)AL(E)SP(O)
EA 3.000 $5,000.000 $8,000.000 $8,000.000
ALUMINUM SIGNS (TY G)
SF 360.000 $40.000 $40.000 $45.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 11.000 $800.000 $970.000 $800.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 12.000 $1,000.000 $1,035.000 $900.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 4.000 $1,000.000 $1,000.000 $800.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 8.000 $950.000 $1,255.000 $1,200.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 5.000 $1,500.000 $1,265.000 $1,200.000
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
EA 2.000 $2,800.000 $1,945.000 $1,800.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 34.000 $500.000 $645.000 $500.000
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 16.000 $600.000 $675.000 $500.000
RELOCATE SM RD SN SUP&AM TY S80
EA 4.000 $900.000 $910.000 $700.000
REMOVE SM RD SN SUP&AM
EA 28.000 $125.000 $110.000 $125.000
INSTALL LRSS (STRUCT STEEL)
LB 1,678.600 $9.000 $8.800 $12.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 14.000 $48.000 $50.000 $55.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 15.000 $28.000 $28.000 $55.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
EA 40.000 $90.000 $116.000 $140.000
INSTL DEL ASSM (D-DY)SZ 1(YFLX)GND
EA 2.000 $135.000 $110.000 $140.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 42.000 $125.000 $112.000 $140.000
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 140.000 $0.600 $1.100 $1.100
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 5,355.000 $0.600 $1.100 $1.100
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 9,027.000 $0.600 $1.100 $1.100
WK ZN PAV MRK REMOV (REFL) TY I-C
EA 36.000 $5.000 $6.600 $7.000
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 54.000 $8.000 $6.600 $7.000
WK ZN PAV MRK REMOV (TRAF BTN) TY W
EA 115.000 $6.000 $5.500 $6.000
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
EA 230.000 $8.000 $5.500 $6.000
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 4,415.000 $1.000 $1.700 $2.000
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 4,415.000 $1.000 $1.700 $2.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 479.000 $1.500 $1.500 $2.000
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 658.000 $1.500 $1.500 $2.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 5,225.000 $2.300 $1.400 $1.500
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 985.000 $5.000 $4.500 $5.000
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 177.000 $16.000 $17.000 $17.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 11.000 $250.000 $245.000 $250.000
PREFAB PAV MRK TY C (W) (WORD)
EA 11.000 $340.000 $290.000 $300.000
REFL PAV MRKR TY I-C
EA 28.000 $5.000 $5.500 $6.000
REFL PAV MRKR TY II-A-A
EA 167.000 $5.000 $5.500 $6.000
REFL PAV MRKR TY II-C-R
EA 608.000 $11.000 $5.500 $3.000
ELIM EXT PAV MRK & MRKS (4")
LF 1,075.000 $1.000 $1.100 $1.100
ELIM EXT PAV MRK & MRKS (6")
LF 2,670.000 $1.250 $1.400 $1.500
PAV SURF PREP FOR MRK (6")
LF 77,654.000 $0.250 $0.100 $0.100
PAV SURF PREP FOR MRK (8")
LF 9,233.000 $1.000 $0.250 $0.220
PAV SURF PREP FOR MRK (24")
LF 228.000 $3.000 $2.200 $2.200
PAV SURF PREP FOR MRK (ARROW)
EA 11.000 $90.000 $55.000 $60.000
PAV SURF PREP FOR MRK (WORD)
EA 11.000 $90.000 $55.000 $60.000
REMOVING TRAFFIC SIGNALS
EA 1.000 $4,000.000 $6,600.000 $5,000.000
REMOVAL OF TIMBER POLES
EA 2.000 $750.000 $300.000 $1,000.000
D-GR HMA TY-F PG64-22
TON 4,717.000 $130.000 $182.000 $185.000
TACK COAT
GAL 8,589.000 $8.000 $5.500 $6.000
SP MIXES SP-C PG64-22
TON 7,862.000 $140.000 $165.000 $165.000
SP MIXES SP-C PG76-22
TON 2,259.000 $160.000 $176.000 $175.000
SP MIXES SP-C SAC-A PG76-22
TON 6,474.000 $170.000 $166.000 $175.000
TACK COAT
GAL 11,010.000 $7.000 $5.500 $6.000
PERMEABLE CONCRETE EDGE DRAIN
LF 2,661.000 $100.000 $100.000 $100.000
INSTALL FTB
LF 430.000 $75.000 $55.000 $65.000
REMOVE FTB
LF 430.000 $20.000 $15.500 $20.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $30,000.000 $24,000.000 $30,000.000
MULTIPOLYMER PAV MRK (W)(6")(SLD)
LF 17,871.000 $1.250 $2.200 $2.200
MULTIPOLYMER PAV MRK (W)(6")(BRK)
LF 3,939.000 $1.250 $2.200 $2.200
MULTIPOLYMER PAV MRK (W)(8")(SLD)
LF 4,008.000 $2.500 $4.000 $4.000
MULTIPOLYMER PAV MRK (W)(12")(SLD)
LF 285.000 $5.000 $7.700 $8.000
MULTIPOLYMER PAV MRK (W)(24")(SLD)
LF 51.000 $8.000 $16.500 $20.000
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
LF 19,975.000 $1.250 $2.200 $2.200
MULTIPOLYMER PAV MRK (BLK)(6")(BRK)
LF 13,951.000 $1.250 $2.200 $2.200
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
LF 2,294.000 $11.000 $8.500 $8.000
DEAD END ROADWAY BARRICADE
LF 128.000 $125.000 $75.000 $100.000
REFL PAV MRK AWT (W) 6" (SLD) (100MIL)
LF 12,370.000 $0.700 $1.100 $1.100
REFL PAV MRK AWT (W) 6" (BRK) (100MIL)
LF 2,411.000 $1.000 $1.100 $1.100
REFL PAV MRK AWT (W) 6" (DOT) (100MIL)
LF 129.000 $1.200 $1.100 $1.100
REFL PAV MRK AWT (Y) 6" (SLD) (100MIL)
LF 13,572.000 $0.700 $1.100 $1.100
REFL PAV MRK AWT (Y) 6" (BRK) (100MIL)
LF 170.000 $1.000 $1.100 $1.400
TMA (STATIONARY)
DAY 456.000 $122.000 $265.000 $200.000
TMA (MOBILE OPERATION)
DAY 300.000 $600.000 $265.000 $100.000
Totals: $34,951,362.520 $36,905,848.440 $40,957,722.270