Show Job Controls
Bid Cobra

PANOLA SH 149 (0063-11-054)

Items: 190

County: PANOLA
Length: N/A
Highway: SH 149
District: ATLANTA
Control Number: 0063-11-054
DBE Goal: N/A
Project: F 2023(026)
Guaranty: N/A
Time: 205 WORKING DAYS
Engineer's Estimate: $28,911,384.06
Date: 09/07/2022 (3 years ago)
Contract Number: N/A
Type: WIDEN EXISTING 2-LANE HIGHWAY TO 4-LANE DIVIDED
Mail/Deliver Bids To: N/A
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$28,911,384.06
$29,546,263.07
Over/Under Est: 2.2% $634,879.01
$29,582,265.99
Over/Under Est: 2.32% $670,881.93
Amt Left: 0.12% $36,002.92
$34,569,382.01
Over/Under Est: 19.57% $5,657,997.95
Amt Left: 17% $5,023,118.94
Delta: -16.86% -$4,987,116.02
Subcontractor Percentage Amount
FARR FOUNDATION, INC. 2.23% $707,140.95
STRIPING TECHNOLOGY, L.P. 2.13% $675,430.59
MORRIS COUNTY CONTRACTORS, L.L.C. 0.92% $291,735.28
CAP RIVER LLC 0.76% $240,998.71
ISAACS CONSTRUCTION SERVICES LLC 0.58% $183,920.07
TEX OP CONSTRUCTION, LP 0.28% $88,789.00
INTERSTATE BARRICADES & MARKINGS, INC. 0.26% $82,446.93
SOUTHWEST ENVIRONMENT SERVICES LLC 0.23% $72,933.82
KITECO PROPERTY SOLUTIONS INC. 0.16% $50,736.57
PANOLA SIGN & BARRICADE, INC. 0.11% $34,881.39
STRAIGHT LINE SAWING & SEALING, INC. 0.05% $15,855.18
SCOTT DERR PAINTING CO, LLC 0.03% $9,513.11
SOUTHEAST GRINDING AND GROOVING LLC 0.02% $6,342.07
A&A TREE SERVICES 0.01% $3,171.04
Total: 7.77% $2,463,894.71

Bid Items & Bid Tabulations

190 Total 0 of 190
PANOLA  |  SH 149  |  ATLANTA  |  0063-11-054  |  09/07/2022  |  $28,911,384.06  |  F 2023(026)  |  WIDEN EXIST 2-LANE HWY TO 4-LANE DIV...  |  205 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
LONGVIEW BRIDGE AND ROAD, LTD.
EAST TEXAS BRIDGE, INC.
A. L. HELMCAMP, INC.
PREPARING ROW
STA 32.000 $5,000.000 $30,000.000 $49,000.000 $3,500.000
REMOVING CONC (PAV)
SY 2,939.000 $10.000 $12.000 $15.000 $24.000
REMOVING CONC (MEDIANS)
SY 188.000 $15.000 $28.000 $15.000 $43.000
REMOVING CONC (DRIVEWAYS)
SY 2,448.000 $16.000 $18.500 $15.000 $20.000
REMOVING CONC (CURB OR CURB & GUTTER)
LF 2,419.000 $10.000 $8.000 $5.000 $12.000
REMOVING CONCRETE(MOW STRIP)
LF 3,250.000 $10.000 $12.000 $15.000 $9.000
REMOVING STAB BASE AND ASPH PAV (2"-6")
SY 1,809.000 $7.500 $9.250 $8.000 $14.000
REMOVE STAB BASE & ASPH PAV (27")
SY 62,136.000 $12.000 $12.000 $8.000 $25.000
REMOVING STAB BASE & ASPH PAV (4"-22")
SY 6,094.000 $10.000 $9.750 $15.000 $23.000
EXCAVATION (ROADWAY)
CY 61,665.000 $9.000 $12.500 $10.000 $12.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 49,611.000 $7.500 $14.500 $12.000 $11.000
FURNISHING AND PLACING TOPSOIL (6")
SY 170,712.000 $5.000 $3.300 $1.200 $1.300
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 170,712.000 $0.600 $0.620 $0.600 $0.650
BONDED FBR MTRX SEED (TEMP)(WARM)
SY 85,356.000 $1.000 $0.640 $0.580 $0.600
BONDED FBR MTRX SEED (TEMP)(COOL)
SY 85,356.000 $0.750 $0.600 $0.560 $0.600
VEGETATIVE WATERING
MG 2,731.000 $12.000 $11.000 $10.000 $18.000
SOIL RETENTION BLANKETS (CL 1) (TY B)
SY 14,431.000 $1.000 $0.900 $0.800 $1.000
FL BS (CMP IN PLC)(TY E GR 4)(FNAL POS)
CY 6,219.000 $15.000 $30.000 $17.000 $50.000
CEMENT
TON 1,936.000 $225.000 $240.000 $240.000 $270.000
CEMENT TREAT (SUBGRADE) (8")
SY 112,409.000 $2.500 $2.500 $3.500 $5.000
CEMENT TREAT (SUBGRADE)(10")
SY 1,852.000 $3.500 $5.000 $4.500 $8.000
PRIME COAT (MC-30)
GAL 28,503.000 $6.000 $6.500 $7.500 $5.500
CONC PVMT (JOINTED - CPCD) (13")
SY 99,323.000 $110.000 $107.000 $100.000 $136.000
CUT & RESTORE CONC PAVING
SY 402.000 $225.000 $225.000 $400.000 $160.000
FLOWABLE BACKFILL
CY 82.000 $300.000 $245.000 $300.000 $480.000
TRENCH EXCAVATION PROTECTION
LF 1,566.000 $5.000 $20.000 $10.000 $16.000
TEMPORARY SPL SHORING
SF 290.000 $50.000 $75.000 $60.000 $110.000
SOIL NAIL ANCHORS
LF 35,156.000 $30.000 $22.000 $25.000 $17.000
DRILL SHAFT (SIGN MTS) (54 IN)
LF 19.000 $725.000 $965.000 $950.000 $930.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 260.000 $225.000 $204.000 $200.000 $200.000
CL C CONC (RAIL FOUNDATION)
CY 5.000 $475.000 $640.000 $2,000.000 $750.000
CL C CONC (CURB OUTLET) (TY I)
EA 3.000 $1,500.000 $2,020.000 $2,000.000 $1,300.000
CL C CONC (CURB OUTLET) (TY II)
EA 4.000 $2,100.000 $2,150.000 $1,500.000 $840.000
RET WALL (SOIL NAILED)(FASCIA)(HOR SCH)
SF 14,162.000 $75.000 $70.000 $80.000 $48.000
OPAQUE SEALER FINISH
SF 11,143.000 $0.370 $1.000 $2.000 $1.000
RIPRAP (CONC)(4 IN)
CY 2.000 $475.000 $1,250.000 $4,000.000 $750.000
RIPRAP (CONC)(5 IN)
CY 273.000 $550.000 $470.000 $600.000 $800.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 73.000 $200.000 $235.000 $200.000 $160.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 358.000 $150.000 $215.000 $200.000 $220.000
RIPRAP (CONC)(FLUME)
CY 100.900 $600.000 $500.000 $1,000.000 $790.000
RIPRAP (MOW STRIP)(4 IN)
CY 368.000 $475.000 $470.000 $525.000 $800.000
RAIL (TY SSTR)
LF 30.000 $75.000 $170.000 $300.000 $300.000
ARMOR JOINT
LF 296.000 $125.000 $105.000 $95.000 $70.000
CONC BOX CULV (3 FT X 2 FT)
LF 207.000 $275.000 $305.000 $325.000 $430.000
CONC BOX CULV (4 FT X 2 FT)
LF 167.000 $350.000 $350.000 $400.000 $480.000
CONC BOX CULV (6 FT X 4 FT)(EXTEND)
LF 195.000 $825.000 $835.000 $700.000 $960.000
CONC BOX CULV (8 FT X 5 FT)(EXTEND)
LF 404.000 $1,150.000 $1,050.000 $840.000 $1,200.000
RC PIPE (CL III)(18 IN)
LF 587.000 $80.000 $0.000 $0.000 $0.000
RC PIPE (CL III)(24 IN)
LF 1,174.000 $100.000 $0.000 $0.000 $0.000
RC PIPE (CL III)(30 IN)
LF 290.000 $125.000 $115.000 $135.000 $200.000
RC PIPE (CL III)(36 IN)
LF 322.000 $175.000 $162.000 $205.000 $230.000
RC PIPE (CL IV)(36 IN)
LF 216.000 $250.000 $190.000 $280.000 $280.000
INLET (COMPL)(PCU)(3FT)(BOTH)
EA 6.000 $9,000.000 $7,250.000 $10,000.000 $6,800.000
INLET (COMPL)(PCU)(4FT)(BOTH)
EA 2.000 $10,000.000 $10,550.000 $13,000.000 $9,500.000
INLET (COMPL)(MEDIAN)
EA 14.000 $7,500.000 $7,150.000 $7,000.000 $7,900.000
WINGWALL (FW - S) (HW=9 FT)
EA 1.000 $30,000.000 $54,000.000 $28,000.000 $34,000.000
WINGWALL (PW - 1) (HW=8 FT)
EA 1.000 $29,000.000 $42,500.000 $28,000.000 $34,000.000
SET (TY I)(S=3 FT)(HW= 4 FT)(6:1)(C)
EA 1.000 $5,100.000 $10,500.000 $5,000.000 $9,500.000
SET (TY I)(S=3 FT)(HW= 4 FT)(6:1)(P)
EA 1.000 $9,000.000 $10,500.000 $5,000.000 $11,000.000
SET (TY I)(S= 4 FT)(HW= 3 FT)(6:1) (C)
EA 1.000 $12,000.000 $10,000.000 $6,000.000 $9,500.000
SET (TY I)(S= 4 FT)(HW= 4 FT)(6:1) (C)
EA 1.000 $10,500.000 $10,700.000 $6,000.000 $11,000.000
SET (TY II) (18 IN) (RCP) (3: 1) (P)
EA 2.000 $1,150.000 $1,300.000 $600.000 $850.000
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 1.000 $1,250.000 $1,320.000 $800.000 $890.000
SET (TY II) (18 IN) (RCP) (6: 1) (C)
EA 1.000 $1,500.000 $1,500.000 $800.000 $950.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 38.000 $1,100.000 $900.000 $800.000 $950.000
SET (TY II) (24 IN) (RCP) (4: 1) (P)
EA 1.000 $1,800.000 $1,700.000 $1,000.000 $1,000.000
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 1.000 $2,500.000 $1,915.000 $1,200.000 $1,100.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 47.000 $1,750.000 $1,350.000 $1,200.000 $1,100.000
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 1.000 $2,500.000 $2,250.000 $1,500.000 $2,600.000
SET (TY II) (30 IN) (RCP) (6: 1) (C)
EA 1.000 $3,300.000 $2,700.000 $2,000.000 $3,200.000
SET (TY II) (36 IN) (RCP) (6: 1) (C)
EA 4.000 $4,000.000 $3,900.000 $3,500.000 $4,500.000
CLEAN EXIST CULVERTS
EA 6.000 $1,600.000 $2,750.000 $1,500.000 $2,600.000
PIPE (PVC) (SCH 40) (6 IN)
LF 198.000 $175.000 $55.000 $30.000 $220.000
REMOV STR (INLET)
EA 4.000 $1,000.000 $1,100.000 $700.000 $790.000
REMOV STR (SET)
EA 66.000 $400.000 $380.000 $500.000 $790.000
REMOV STR (WINGWALL)
EA 2.000 $1,200.000 $2,750.000 $1,500.000 $1,600.000
REMOV STR (PIPE)
LF 2,211.000 $25.000 $18.000 $12.000 $45.000
REMOV STR (DRAINAGE FLUME)
EA 11.000 $175.000 $350.000 $800.000 $2,600.000
MOBILIZATION
LS 1.000 $2,500,000.000 $2,900,000.000 $3,000,000.000 $3,200,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 20.000 $10,000.000 $3,300.000 $10,000.000 $40,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 350.000 $35.000 $36.000 $40.000 $35.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 299.000 $60.000 $53.000 $55.000 $50.000
ROCK FILTER DAMS (REMOVE)
LF 649.000 $11.000 $10.000 $9.000 $9.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 546.000 $25.000 $30.000 $30.000 $25.000
CONSTRUCTION EXITS (REMOVE)
SY 546.000 $8.000 $10.000 $9.000 $10.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 13,973.000 $2.900 $3.300 $3.600 $3.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 13,973.000 $1.000 $1.000 $0.650 $0.300
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 1,157.000 $7.000 $5.500 $6.000 $6.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,157.000 $1.500 $1.100 $1.000 $1.200
CONC CURB & GUTTER (TY II)
LF 3,565.000 $29.000 $36.000 $40.000 $60.000
DRIVEWAYS (ACP)(TYPE 1)
SY 1,302.000 $50.000 $102.000 $100.000 $132.000
DRIVEWAYS (CONC)(TYPE 1)
SY 2,088.000 $130.000 $81.000 $120.000 $142.000
DRIVEWAYS (ACP) (TYPE 2)
SY 2,009.000 $50.000 $45.000 $50.000 $76.000
DRIVEWAYS (ACP)(TYPE 3)
SY 2,153.000 $115.000 $60.000 $72.000 $121.000
CONC DIRECTIONAL ISLAND
SY 572.000 $200.000 $91.000 $145.000 $158.000
MTL W-BEAM GD FEN (TIM POST)
LF 3,050.000 $35.000 $25.000 $26.000 $22.300
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 5.000 $2,250.000 $1,925.000 $2,000.000 $2,000.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 4.000 $1,500.000 $1,595.000 $1,700.000 $1,400.000
MTL BM GD FEN TRANS (NON - SYM)
EA 2.000 $1,050.000 $1,045.000 $1,100.000 $870.000
REMOVE METAL BEAM GUARD FENCE
LF 2,450.000 $2.500 $3.000 $3.000 $2.100
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $250.000 $165.000 $200.000 $210.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 1.000 $225.000 $165.000 $200.000 $236.000
RM MTL BM GD FEN TRANS (T101)
EA 5.000 $750.000 $165.000 $200.000 $210.000
CABLE BARRIER SYSTEM (TL-4) (20 '-0")
LF 7,035.000 $18.000 $20.500 $22.000 $17.900
CABLE BARRIER TERMINAL SECTION (TL-4)
EA 10.000 $3,200.000 $4,400.000 $4,200.000 $4,000.000
GUARDRAIL END TREATMENT (INSTALL)
EA 7.000 $3,250.000 $3,025.000 $3,000.000 $3,000.000
GUARDRAIL END TREATMENT (REMOVE)
EA 8.000 $250.000 $220.000 $250.000 $236.000
PIPE UNDERDRAINS (TY 8) (6")
LF 1,580.000 $35.000 $35.000 $55.000 $42.000
PIPE UNDERDRAINS (VIDEO INSPECTIONS)
LF 3,897.000 $5.000 $5.500 $7.000 $5.300
MAILBOX INSTALL-S (WC-POST) TY 3
EA 1.000 $250.000 $255.000 $300.000 $273.000
MAILBOX INSTALL-S (RR-POST) TY 4
EA 3.000 $165.000 $310.000 $300.000 $221.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 6.000 $400.000 $310.000 $300.000 $331.000
MAILBOX INSTALL-S (TWG-POST) TY 4
EA 2.000 $250.000 $310.000 $300.000 $294.000
MAILBOX INSTALL-S (TIM-POST) TY 5
EA 1.000 $750.000 $346.000 $400.000 $570.000
IN RD IL (TY SA) 50T-12 (400W EQ) LED
EA 26.000 $5,500.000 $6,400.000 $6,200.000 $6,100.000
CONDT (PVC) (SCH 40) (2")
LF 7,321.000 $9.750 $11.000 $11.000 $10.500
ELEC CONDR (NO.6) BARE
LF 10,701.000 $2.500 $2.200 $2.200 $2.100
ELEC CONDR (NO.6) INSULATED
LF 21,402.000 $2.500 $2.200 $2.200 $2.100
GROUND BOX TY A (122311)W/APRON
EA 15.000 $1,050.000 $1,000.000 $1,000.000 $960.000
ELC SRV TY A 120/240 060(NS)SS(E)PS(U)
EA 1.000 $8,250.000 $10,230.000 $10,000.000 $9,800.000
ELC SRV TY A 120/240 060(NS)SS(E)SP(O)
EA 2.000 $6,450.000 $8,030.000 $8,000.000 $7,700.000
ALUMINUM SIGNS (TY O)
SF 352.000 $40.000 $34.000 $33.000 $32.600
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 6.000 $800.000 $1,060.000 $1,000.000 $970.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 11.000 $750.000 $962.000 $950.000 $890.000
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
EA 5.000 $800.000 $750.000 $750.000 $970.000
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
EA 4.000 $900.000 $972.000 $950.000 $920.000
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 1.000 $1,300.000 $1,675.000 $1,700.000 $1,400.000
IN SM RD SN SUP&AM TYS80(1)SB(U-1EXT)
EA 1.000 $1,350.000 $1,615.000 $1,600.000 $1,600.000
IN SM RD SN SUP&AM TYS80(2)SA(P)
EA 2.000 $1,500.000 $2,140.000 $2,100.000 $2,200.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 71.000 $410.000 $443.000 $450.000 $499.000
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 6.000 $450.000 $579.000 $550.000 $590.000
REMOVE SM RD SN SUP&AM
EA 67.000 $100.000 $95.000 $95.000 $126.000
REMOVE LRSA
EA 1.000 $1,300.000 $2,450.000 $2,500.000 $2,300.000
INS OH SN SUP(40 FT CANT)
EA 1.000 $40,000.000 $66,110.000 $66,000.000 $63,100.000
REMOVE OVERHD SIGN SUP
EA 1.000 $7,750.000 $17,820.000 $18,000.000 $17,000.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 1.000 $25.000 $17.000 $50.000 $31.500
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 39.000 $37.000 $44.000 $50.000 $35.700
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 8.000 $37.000 $36.000 $50.000 $36.800
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 18.000 $100.000 $85.000 $200.000 $94.500
WK ZN PAV MRK NON-REMOV (W)4"(DOT)
LF 75.000 $0.750 $5.500 $5.500 $5.300
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 10,810.000 $0.500 $0.550 $0.550 $0.550
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 1,730.000 $1.000 $1.100 $1.100 $1.100
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 10,860.000 $0.500 $0.550 $0.550 $0.550
WK ZN PAV MRK REMOV (TRAF BTN) TY W
LF 15,836.000 $1.150 $1.100 $1.100 $1.100
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
LF 11,520.000 $1.100 $1.100 $1.100 $1.100
PREFAB PAV MRK TY C (W) (RR XING)
EA 4.000 $700.000 $770.000 $800.000 $740.000
REFL PAV MRKR TY II-A-A
EA 36.000 $5.000 $5.500 $6.000 $5.300
REFL PAV MRKR TY II-C-R
EA 766.000 $4.000 $4.200 $4.000 $3.900
ELIM EXT PAV MRK & MRKS (4")
LF 28,600.000 $0.550 $0.660 $0.660 $0.650
PAV SURF PREP FOR MRK (4")
LF 2,836.000 $0.150 $0.170 $0.170 $0.160
PAV SURF PREP FOR MRK (6")
LF 53,746.000 $0.100 $0.170 $0.170 $0.160
PAV SURF PREP FOR MRK (8")
LF 9,469.000 $0.250 $0.220 $0.220 $0.210
PAV SURF PREP FOR MRK (12")
LF 745.000 $0.500 $1.100 $1.100 $1.100
PAV SURF PREP FOR MRK (24")
LF 424.000 $1.500 $2.200 $2.200 $2.100
PAV SURF PREP FOR MRK (ARROW)
EA 18.000 $50.000 $61.000 $60.000 $57.750
PAV SURF PREP FOR MRK (UTURN ARR)
EA 14.000 $75.000 $61.000 $60.000 $57.750
PAV SURF PREP FOR MRK (WORD)
EA 26.000 $80.000 $61.000 $60.000 $57.750
PAV SURF PREP FOR MRK (RR XING)
EA 4.000 $35.000 $220.000 $220.000 $210.000
PAV SURF PREP FOR MRK (36")(YLD TRI)
EA 68.000 $20.000 $28.000 $30.000 $26.300
REPLACE OF ELECTRICAL SERVICE
EA 1.000 $6,500.000 $5,500.000 $6,000.000 $5,300.000
INSTALL OF ELECTRICAL SERVICE
EA 2.000 $7,500.000 $5,500.000 $6,000.000 $5,300.000
SP MIXES SP-C PG76-22
TON 1,712.000 $170.000 $152.000 $161.000 $190.000
SP MIXES SP-C SAC-A PG76-22
TON 1,011.000 $150.000 $155.000 $161.000 $180.000
SP MIXES SP-D PG64-22
TON 23,911.000 $150.000 $150.000 $155.000 $165.000
TACK COAT
GAL 11,297.000 $4.000 $4.750 $4.000 $5.200
PERMEABLE CONCRETE EDGE DRAIN
LF 2,317.000 $80.000 $70.000 $90.000 $100.000
THERMO PIPE(18")(HDPE)(TY S)(CSB)
LF 75.000 $65.000 $120.000 $100.000 $92.000
THERMOPLASTIC PIPE(24 IN)(PP)(TYPE III)
LF 1,170.000 $100.000 $0.000 $0.000 $0.000
THERMOPLASTIC PIPE(18 IN)(PP)(TYPE III)
LF 732.000 $80.000 $0.000 $0.000 $0.000
INSTALL BRIDGE IDENTIFICATION NUMBERS
EA 6.000 $350.000 $385.000 $2,000.000 $530.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $15,000.000 $19,000.000 $30,000.000 $13,500.000
MULTIPOLYMER PAV MRK (W)(6")(SLD)
LF 23,679.000 $0.500 $0.880 $0.880 $0.850
MULTIPOLYMER PAV MRK (W)(6")(BRK)
LF 5,612.000 $0.550 $0.880 $0.880 $0.850
MULTIPOLYMER PAV MRK (W)(6")(DOT)
LF 513.000 $0.750 $2.860 $2.800 $2.700
MULTIPOLYMER PAV MRK (W)(8")(SLD)
LF 8,479.000 $1.000 $1.650 $1.600 $1.600
MULTIPOLYMER PAV MRK (W)(8")(DOT)
LF 990.000 $1.500 $4.400 $4.500 $4.200
MULTIPOLYMER PAV MRK (W)(12")(SLD)
LF 450.000 $3.250 $3.000 $3.000 $2.900
MULTIPOLYMER PAV MRK (W)(12")(LNDP)
LF 295.000 $3.250 $3.000 $3.000 $2.900
MULTIPOLYMER PAV MRK (W)(24")(SLD)
LF 424.000 $7.000 $5.800 $6.000 $5.500
MULTIPOLYMER PAV MRK (Y)(4")(SLD)
LF 2,836.000 $1.000 $0.610 $0.600 $0.600
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
LF 23,943.000 $0.500 $0.900 $0.880 $0.850
MULTIPOLYMER PAV MRK (BLK)(6")(BRK)
LF 5,612.000 $0.750 $0.900 $0.880 $0.850
MULTIYPOLYMER PAV MRK (W) (ARROW)
EA 18.000 $250.000 $275.000 $300.000 $263.000
MULTIPOLYMER PAV MRK (W) (WORD)
EA 26.000 $300.000 $302.000 $300.000 $289.000
MULTIPOLYMER PAV MRK (W) 36" YLD TRI
EA 68.000 $30.000 $33.000 $35.000 $31.500
MULTIPOLYMER PAV MRK (W)(U-TURN ARROW)
EA 14.000 $150.000 $302.000 $300.000 $289.000
TMA (STATIONARY)
DAY 600.000 $165.000 $250.000 $200.000 $253.000
TMA (MOBILE OPERATION)
DAY 6.000 $250.000 $450.000 $200.000 $1,100.000
1
RC PIPE (CL III)(18 IN)
LF 1,319.000 $80.000 $64.000 $65.000 $55.000
2
RC PIPE (CL III)(24 IN)
LF 2,344.000 $100.000 $87.000 $90.000 $148.000
Totals: $29,251,304.060 $29,546,263.070 $29,582,265.990 $34,569,382.010