Show Job Controls
Bid Cobra

HARRISON FM 2625 (0843-07-016)

Items: 70

County: HARRISON
Length: N/A
Highway: FM 2625
District: ATLANTA
Control Number: 0843-07-016
DBE Goal: N/A
Project: CC 843-7-16
Guaranty: N/A
Time: 124 WORKING DAYS
Engineer's Estimate: $2,544,726.15
Date: 08/09/2017 (8 years ago)
Contract Number: N/A
Type: GR,STR,BASE,SURFACING
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (7)
E
Engineer's Estimate
$2,544,726.15
$2,284,633.31
Over/Under Est: -10.22% -$260,092.84
$2,449,449.99
Over/Under Est: -3.74% -$95,276.16
Amt Left: 7.21% $164,816.68
Over/Under Est: -0.49% -$12,450.42
Amt Left: 10.84% $247,642.42
Delta: -3.38% -$82,825.74
$2,565,815.85
Over/Under Est: 0.83% $21,089.70
Amt Left: 12.31% $281,182.54
Delta: -1.32% -$33,540.12
Over/Under Est: 6.01% $152,944.65
Amt Left: 18.08% $413,037.49
Delta: -5.14% -$131,854.95
Over/Under Est: 25.93% $659,724.00
Amt Left: 40.26% $919,816.84
Delta: -18.79% -$506,779.35
Over/Under Est: 29.8% $758,302.05
Amt Left: 44.58% $1,018,394.89
Delta: -3.08% -$98,578.05

Bid Items & Bid Tabulations

70 Total 0 of 70
HARRISON  |  FM 2625  |  ATLANTA  |  0843-07-016  |  08/09/2017  |  $2,544,726.15  |  CC 843-7-16  |  GR,STR,BASE,SURF  |  124 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
LONGVIEW BRIDGE AND ROAD, LTD.
PIERCE R & B LLC
EAST TEXAS BRIDGE, INC.
3LW CIVIL LLC
HIGHWAY 19 CONSTRUCTION LLC
L. S. EQUIPMENT CO., INC.
HODGES AND SON CONSTRUCTION COMPANY, INC.
PREPARING ROW
STA 23.000 $2,000.000 $1,750.000 $1,700.000 $2,500.000 $1,500.000 $1,500.000 $2,500.000 $7,500.000
REMOVING CONC (DRIVEWAYS)
SY 65.000 $16.000 $50.000 $15.000 $25.000 $10.000 $25.000 $25.000 $20.000
EXCAVATION (ROADWAY)
CY 22,898.000 $6.000 $4.750 $2.500 $5.000 $3.500 $10.000 $9.000 $10.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 57,009.000 $7.000 $4.850 $7.750 $8.000 $6.000 $9.000 $12.000 $10.000
FURNISHING AND PLACING TOPSOIL (4")
SY 31,700.000 $1.000 $1.500 $1.340 $1.000 $0.600 $3.000 $1.500 $4.000
BLOCK SODDING
SY 1,610.000 $6.000 $5.050 $4.780 $5.000 $5.000 $5.000 $4.000 $5.000
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 30,090.000 $0.900 $1.050 $0.600 $1.050 $1.100 $0.940 $0.350 $1.000
BONDED FBR MTRX SEED (TEMP)(COOL)
SY 20,000.000 $0.900 $1.050 $0.690 $1.050 $1.100 $0.950 $0.350 $1.000
VEGETATIVE WATERING
MG 510.000 $10.000 $10.000 $25.000 $8.000 $60.000 $10.000 $1.000 $1.000
SOIL RETENTION BLANKETS (CL 1) (TY D)
SY 8,680.000 $2.700 $1.450 $1.490 $1.500 $1.500 $1.320 $3.000 $2.000
FL BS(CMP IN PLC)(TY D GR 4)(9")
SY 5,207.000 $16.000 $21.250 $23.000 $30.000 $20.250 $23.000 $19.750 $26.000
CEMENT
TON 88.000 $160.000 $190.000 $200.000 $175.000 $161.000 $160.000 $150.000 $200.000
CEMENT TREAT (SUBGRADE) (8")
SY 6,658.000 $3.000 $2.000 $3.500 $4.000 $4.500 $2.000 $5.000 $6.000
SALV, HAUL & STKPL RCL APH PV (2 TO 4")
SY 4,400.000 $3.000 $5.000 $3.700 $2.000 $3.500 $5.000 $7.000 $4.000
PRIME COAT & BLOTTER (MC-30)
GAL 1,265.000 $6.000 $4.250 $6.600 $7.000 $6.000 $7.000 $5.500 $8.000
ASPH (AC-10)
GAL 2,420.000 $3.000 $3.650 $4.400 $9.000 $6.000 $7.000 $5.000 $8.000
AGGR(TY-PB GR-3 SAC-A)
CY 56.000 $125.000 $215.000 $215.000 $400.000 $180.000 $180.000 $250.000 $400.000
AGGR(TY-PB GR-4 SAC-A)
CY 57.000 $105.000 $220.000 $215.000 $400.000 $180.000 $180.000 $250.000 $400.000
ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR)
GAL 2,228.000 $3.500 $4.350 $4.350 $9.500 $6.000 $4.500 $5.000 $8.000
D-GR HMA(SQ) TY-D PG64-22
TON 294.000 $150.000 $125.000 $144.000 $135.000 $200.000 $180.000 $200.000 $200.000
CEM STABIL BKFL
CY 335.000 $150.000 $175.000 $185.000 $200.000 $170.000 $180.000 $250.000 $200.000
DRILL SHAFT (36 IN)
LF 432.000 $200.000 $190.000 $174.000 $170.000 $130.000 $180.000 $175.000 $160.000
CL C CONC (ABUT)
CY 44.000 $1,000.000 $910.000 $900.000 $950.000 $950.000 $785.000 $1,100.000 $1,000.000
CL C CONC (BENT)
CY 74.000 $1,100.000 $900.000 $950.000 $950.000 $950.000 $900.000 $1,100.000 $1,000.000
CL C CONC (COLLAR)
EA 4.000 $1,500.000 $1,650.000 $950.000 $600.000 $500.000 $1,500.000 $600.000 $600.000
REINF CONC SLAB
SF 8,670.000 $16.500 $20.500 $18.000 $20.000 $19.000 $18.000 $25.000 $20.000
APPROACH SLAB
CY 72.000 $800.000 $575.000 $500.000 $500.000 $450.000 $500.000 $750.000 $550.000
PRESTR CONC GIRDER (TX40)
LF 1,014.000 $175.000 $155.000 $152.000 $165.000 $129.000 $148.000 $175.000 $145.000
RIPRAP (CONC)(CL B)
CY 10.000 $500.000 $525.000 $550.000 $600.000 $650.000 $500.000 $500.000 $500.000
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 250.000 $600.000 $455.000 $425.000 $400.000 $350.000 $450.000 $500.000 $450.000
RIPRAP (STONE PROTECTION)(24 IN)
CY 86.000 $135.000 $205.000 $200.000 $180.000 $145.000 $180.000 $500.000 $150.000
RIPRAP (MOW STRIP)(4 IN)
CY 24.000 $550.000 $580.000 $425.000 $425.000 $400.000 $450.000 $350.000 $400.000
RAIL (TY T552)
LF 550.000 $65.000 $90.000 $126.000 $100.000 $140.000 $130.000 $100.000 $80.000
ARMOR JOINT
LF 65.000 $100.000 $40.000 $85.000 $40.000 $65.000 $110.000 $100.000 $100.000
ARMOR JOINT (SEALED)
LF 60.000 $200.000 $55.000 $85.000 $75.000 $85.000 $110.000 $100.000 $100.000
RC PIPE (CL III)(24 IN)
LF 341.000 $60.000 $62.000 $60.000 $55.000 $52.000 $46.000 $50.000 $50.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 4.000 $1,000.000 $615.000 $650.000 $650.000 $700.000 $850.000 $750.000 $1,000.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 12.000 $1,100.000 $915.000 $885.000 $950.000 $1,100.000 $1,075.000 $850.000 $1,000.000
REMOV STR (PIPE)
LF 238.000 $15.000 $20.000 $10.000 $12.000 $10.000 $30.000 $10.000 $20.000
MOBILIZATION
LS 1.000 $260,000.000 $150,000.000 $240,000.000 $160,000.000 $255,000.000 $150,000.000 $250,000.000 $250,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $2,500.000 $2,000.000 $2,725.000 $2,000.000 $10,000.000 $1,500.000 $6,000.000 $12,500.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 100.000 $50.000 $26.000 $22.500 $25.000 $35.000 $22.000 $100.000 $50.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 120.000 $60.000 $38.000 $34.500 $36.000 $45.000 $33.000 $100.000 $50.000
ROCK FILTER DAMS (REMOVE)
LF 220.000 $9.000 $11.000 $9.500 $5.000 $10.000 $9.000 $10.000 $20.000
EARTHWORK (EROSN & SEDMT CONT, IN VEH)
CY 100.000 $35.000 $40.000 $20.000 $40.000 $50.000 $100.000 $100.000 $50.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,100.000 $4.000 $2.900 $2.900 $3.000 $4.000 $3.000 $4.000 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,100.000 $1.000 $0.950 $1.200 $0.500 $1.500 $1.000 $1.000 $1.000
CONSTRUCTING DETOURS
SY 5,641.000 $60.000 $60.000 $57.000 $55.000 $85.000 $64.000 $75.000 $80.000
DRIVEWAYS (CONC)
SY 178.000 $70.000 $85.000 $90.000 $95.000 $60.000 $100.000 $60.000 $60.000
DRIVEWAYS (SURF TREAT)
SY 309.000 $25.000 $48.000 $45.000 $45.000 $20.000 $35.000 $60.000 $50.000
MTL W-BEAM GD FEN (TIM POST)
LF 350.000 $25.000 $18.750 $18.000 $20.000 $20.000 $18.000 $20.000 $20.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,000.000 $1,625.000 $1,550.000 $1,800.000 $1,475.000 $150.000 $1,475.000 $1,500.000
GDRAIL END TRT(INST)(WOOD POST)(TY I)
EA 4.000 $2,500.000 $2,400.000 $1,700.000 $2,400.000 $2,075.000 $2,250.000 $2,075.000 $2,200.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T-EXAL)
EA 2.000 $1,000.000 $1,125.000 $1,000.000 $1,130.000 $1,130.000 $1,028.000 $30.000 $1,000.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 12.000 $500.000 $405.000 $391.000 $405.000 $405.000 $368.000 $50.000 $800.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 2.000 $500.000 $445.000 $450.000 $445.000 $445.000 $405.000 $500.000 $600.000
REMOVE SM RD SN SUP&AM
EA 12.000 $75.000 $115.000 $100.000 $75.000 $115.000 $105.000 $230.000 $200.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 8.000 $20.000 $26.000 $31.900 $20.000 $97.000 $20.000 $30.000 $30.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 4.000 $75.000 $85.000 $95.260 $150.000 $148.000 $100.000 $65.000 $80.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 10.000 $40.000 $32.000 $35.500 $35.000 $119.000 $30.000 $50.000 $30.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 9,704.000 $0.300 $0.330 $0.320 $0.330 $0.350 $0.300 $0.350 $0.400
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 9,704.000 $0.300 $0.330 $0.320 $0.330 $0.350 $0.300 $0.350 $0.400
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 250.000 $1.500 $1.450 $2.000 $2.000 $0.500 $1.000 $1.000 $5.000
PAVEMENT SEALER 4"
LF 1,240.000 $1.000 $0.280 $0.280 $0.280 $0.300 $0.250 $0.350 $0.300
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 81.000 $20.000 $16.500 $16.000 $16.500 $16.500 $15.000 $20.000 $20.000
REFL PAV MRKR TY II-A-A
EA 125.000 $4.000 $5.500 $5.500 $5.500 $6.250 $5.000 $6.000 $6.000
ELIM EXT PAV MRK & MRKS (4")
LF 4,000.000 $0.750 $1.100 $1.050 $1.100 $1.250 $1.000 $1.000 $1.000
PAV SURF PREP FOR MRK (4")
LF 8,829.000 $0.100 $0.110 $0.110 $0.110 $0.150 $0.100 $0.150 $0.200
REFL PAV MRK AWT (W) 4" (SLD) (100MIL)
LF 4,251.000 $0.650 $0.770 $0.750 $0.800 $0.800 $0.700 $0.750 $0.800
REFL PAV MRK AWT (Y) 4" (SLD) (100MIL)
LF 4,578.000 $0.650 $0.770 $0.750 $0.800 $0.800 $0.700 $0.750 $0.800
Totals: $2,544,726.150 $2,284,633.310 $2,449,449.990 $2,532,275.730 $2,565,815.850 $2,697,670.800 $3,204,450.150 $3,303,028.200