Show Job Controls
Bid Cobra

BOWIE IH 30 (0610-06-088)

Items: 50

County: BOWIE
Length: N/A
Highway: IH 30
District: ATLANTA
Control Number: 0610-06-088
DBE Goal: N/A
Project: NH 1702(448)
Guaranty: N/A
Time: 69 WORKING DAYS
Engineer's Estimate: $633,257.20
Date: 07/12/2017 (8 years ago)
Contract Number: N/A
Type: CMT TRT BASE, ACP & PVMT MARKINGS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$633,257.20
$798,693.00
Over/Under Est: 26.12% $165,435.80
Over/Under Est: 26.42% $167,320.30
Amt Left: 0.24% $1,884.50
$940,517.01
Over/Under Est: 48.52% $307,259.81
Amt Left: 17.76% $141,824.01
Delta: -17.48% -$139,939.51
Over/Under Est: 97.29% $616,122.05
Amt Left: 56.43% $450,686.25
Delta: -32.84% -$308,862.24
Over/Under Est: 98.74% $625,261.80
Amt Left: 57.57% $459,826.00
Delta: -0.73% -$9,139.75

Bid Items & Bid Tabulations

50 Total 0 of 50
BOWIE  |  IH 30  |  ATLANTA  |  0610-06-088  |  07/12/2017  |  $633,257.20  |  NH 1702(448)  |  CMT TRT BASE, ACP & PVMT MRK  |  69 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
LONGVIEW BRIDGE AND ROAD, LTD.
STATELINE CONSTRUCTION, LLC
RK HALL, LLC
SAMMY GIST ENTERPRISES, INC.
EAST TEXAS BRIDGE, INC.
REMOVING CONC (DRIVEWAYS)
SY 686.000 $13.000 $18.500 $9.000 $22.500 $40.000 $100.000
REMOVING CONC (CURB AND GUTTER)
LF 73.000 $14.000 $22.000 $35.000 $20.500 $30.000 $100.000
REMOVING CONC (MISC)
SY 21.600 $40.000 $75.000 $75.000 $22.500 $70.000 $100.000
REMOVING STAB BASE AND ASPH PAV (7")
SY 5,267.000 $4.000 $7.500 $6.000 $7.500 $18.250 $20.000
EMBANKMENT (FINAL)(DENS CONT)(TY A)
CY 425.000 $17.000 $18.000 $22.000 $72.000 $50.000 $30.000
BACKFILL (TY A)
STA 26.600 $320.000 $350.000 $1,500.000 $760.000 $200.000 $700.000
BLADING
STA 5.300 $200.000 $250.000 $2,500.000 $220.000 $600.000 $700.000
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 3,700.000 $0.900 $1.150 $3.000 $1.650 $1.750 $2.000
BONDED FBR MTRX SEED (TEMP)(COOL)
SY 2,780.000 $0.400 $1.150 $2.000 $1.650 $1.750 $2.000
VEGETATIVE WATERING
MG 59.000 $14.000 $40.000 $75.000 $120.000 $30.000 $15.000
SOIL RETENTION BLANKETS (CL 1) (TY B)
SY 675.000 $2.000 $1.750 $5.500 $4.130 $4.500 $5.000
CEMENT
TON 160.300 $200.000 $300.000 $155.000 $215.000 $175.000 $300.000
CEMENT TREAT (SUBGRADE)(10")
SY 7,634.000 $3.000 $5.500 $5.750 $9.000 $20.000 $10.000
PRIME COAT & BLOTTER (MC-30)
GAL 1,909.000 $6.000 $5.750 $6.000 $9.000 $15.000 $8.000
SUPERPAVE MIXTURES SP-C SAC-B PG76-22
TON 2,023.000 $110.000 $120.000 $122.000 $132.000 $150.000 $110.000
SUPERPAVE MIXTURES SP-D SAC-B PG76-22
TON 984.000 $110.000 $122.000 $128.000 $145.000 $160.000 $110.000
CL A CONC (CURB OUTLET)(TY II)
EA 4.000 $1,800.000 $2,500.000 $2,500.000 $2,000.000 $2,200.000 $1,500.000
CL C CONC (COLLAR)
EA 2.000 $900.000 $2,000.000 $1,500.000 $1,200.000 $2,200.000 $1,000.000
RIPRAP (MOW STRIP)(4 IN)
CY 23.500 $500.000 $575.000 $450.000 $800.000 $600.000 $1,000.000
RC PIPE (CL III)(24 IN)
LF 12.000 $62.000 $120.000 $95.000 $240.000 $150.000 $100.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 2.000 $850.000 $1,200.000 $875.000 $2,000.000 $1,500.000 $1,000.000
REMOV STR (HEADWALL)
EA 2.000 $1,200.000 $550.000 $2,000.000 $1,500.000 $2,000.000 $1,000.000
MOBILIZATION
LS 1.000 $56,000.000 $70,000.000 $70,000.000 $90,000.000 $175,000.000 $120,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $3,000.000 $3,400.000 $3,500.000 $4,500.000 $7,500.000 $50,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 35.000 $28.000 $45.000 $45.000 $55.000 $55.000 $35.000
ROCK FILTER DAMS (REMOVE)
LF 35.000 $8.000 $17.000 $15.000 $11.000 $11.000 $10.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,870.000 $2.750 $3.250 $3.000 $3.030 $3.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,870.000 $0.650 $1.250 $1.500 $1.100 $1.250 $1.000
CONC CURB & GUTTER (TY II)
LF 32.000 $40.000 $30.000 $85.000 $155.000 $50.000 $100.000
DRIVEWAYS (CONC)
SY 594.000 $60.000 $100.000 $45.000 $100.000 $125.000 $125.000
DRIVEWAYS (ACP)
SY 216.000 $55.000 $60.000 $50.000 $60.000 $80.000 $50.000
TURNOUTS (ACP)
SY 47.000 $50.000 $60.000 $100.000 $60.000 $65.000 $50.000
MTL W-BEAM GD FEN (TIM POST)
LF 225.000 $25.000 $28.000 $27.000 $27.500 $28.000 $25.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,350.000 $1,400.000 $1,350.000 $1,320.000 $1,320.000 $1,400.000
REMOVE METAL BEAM GUARD FENCE
LF 200.000 $3.000 $7.000 $7.000 $6.600 $7.000 $3.000
REMOVE TERMINAL ANCHOR SECTION
EA 4.000 $225.000 $350.000 $400.000 $330.000 $350.000 $250.000
GDRAIL END TRT(INST)(WOOD POST)(TY I)
EA 3.000 $2,300.000 $2,700.000 $2,750.000 $2,722.500 $3,000.000 $2,500.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 1.000 $250.000 $450.000 $500.000 $456.370 $500.000 $500.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 3.000 $600.000 $600.000 $500.000 $585.640 $590.000 $600.000
RELOCATE SM RD SN SUP&AM TY S80
EA 1.000 $300.000 $700.000 $500.000 $676.920 $680.000 $700.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 2.000 $65.000 $75.000 $75.000 $74.800 $80.000 $200.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 7.000 $35.000 $45.000 $42.000 $41.800 $50.000 $50.000
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 90.000 $3.800 $3.750 $15.000 $20.000 $4.000 $20.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 3,276.000 $0.700 $4.000 $1.750 $2.500 $4.000 $2.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 578.000 $0.800 $2.500 $5.000 $2.500 $1.000 $2.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 90.000 $1.250 $1.250 $2.500 $1.090 $1.500 $20.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 5,412.000 $0.300 $0.500 $1.000 $0.440 $1.000 $1.000
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 6,582.000 $0.300 $0.500 $1.000 $0.440 $1.000 $1.000
REFL PAV MRKR TY I-C
EA 12.000 $3.000 $5.000 $6.000 $4.110 $8.000 $5.000
REFL PAV MRKR TY II-A-A
EA 177.000 $2.700 $5.000 $6.000 $4.110 $10.000 $5.000
Totals: $633,257.200 $798,693.000 $800,577.500 $940,517.010 $1,249,379.250 $1,258,519.000