Bid Cobra

Low bids by IOC COMPANY, LLC (TxDOT)

Contact Information
Phone:
956-380-2897
Address:
9312 E CURVE ROAD EDINBURG, TX 78542-0000
Fax:
956-380-4085
Low: 43
Lost: 96
Bid: 139
Sub: 0
Win ratio: 31%
Win amount: $574,032,724
Loss amount: $1,142,175,837
Avg win amount: $13,349,598
Avg bid amount: $12,346,824
Control County District Estimate Highway Project Date Added Type Bid Amount
6491-09-001 HIDALGO PHARR $6,820,553 US0281 RMC - A00217752 06/03/2026 04/01/2026 MILL AND INLAY $6,198,303
0255-06-073 HIDALGO PHARR $73,884,137 US 281 F 2026(590) 05/07/2026 03/02/2026 INTERSTATE DESIGNATION $62,131,044
2094-01-063 HIDALGO PHARR $33,933,191 FM 2220 F 2026(589) 05/06/2026 03/02/2026 WIDEN ROAD - ADD LANES $25,599,271
1426-01-058 CAMERON PHARR $7,236,974 FM 1419 F 2026(505) 04/08/2026 02/02/2026 PREVENT MAINT $7,826,503
0038-07-080 STARR PHARR $2,841,696 US 83 F 2026(220) 01/07/2026 11/01/2025 PREVENT MAINT $2,373,628
0331-03-022 CAMERON PHARR $18,316,364 FM 1421 F 2026(245) 12/02/2025 10/01/2025 REHAB EXIST ROADWAY $14,628,509
0863-01-075 HIDALGO PHARR $14,084,469 FM 493 F 2026(188) 12/02/2025 10/01/2025 OVERLAY $11,224,907
0039-18-122 HIDALGO PHARR $12,098,637 IH 2 C 39-18-122 09/05/2025 07/01/2025 PREVENT MAINT $10,273,483
0255-07-140 HIDALGO PHARR $191,485,572 US 281 F 2025(303) 01/07/2025 11/26/2024 INTERSTATE DESIGNATION $165,009,689
0921-06-359 CAMERON PHARR $5,246,981 VARIOUS BOR 2002(633) 10/02/2024 08/21/2024 TRANSPORT NON-ROADWAY $6,961,346
6471-05-001 HIDALGO PHARR $2,424,239 FM3362 RMC - 647105001 10/02/2024 08/27/2024 ACP OVERLAY $1,893,237
1057-03-051 CAMERON PHARR $13,126,017 FM 510 C 1057-3-51 09/05/2024 07/25/2024 REHAB EXIST ROADWAY $12,411,802
1228-04-015 HIDALGO PHARR $22,884,379 FM 1015 C 1228-4-15 09/05/2024 07/25/2024 REHAB EXIST ROADWAY $20,273,403
0038-06-047 STARR PHARR $38,517,640 US 83 F 2B24(195) 06/05/2024 04/24/2024 WIDEN ROAD - ADD LANES $32,096,791
6443-68-001 CAMERON PHARR $4,407,962 BU0083S RMC - 644368001 04/04/2024 03/01/2024 MILL AND INLAY $3,706,632
6443-66-001 HIDALGO PHARR $5,657,661 IH0002 RMC - 644366001 02/02/2024 12/25/2023 ASPH PAVMT REPAIR $5,590,785
6459-67-001 CAMERON PHARR $3,014,573 BU0077X RMC - 645967001 02/01/2024 12/27/2023 REHAB OF EXIST ROADWAY $3,308,463
0220-05-080 CAMERON PHARR $5,830,777 SH 48 STP 2024(690)HES 01/05/2024 11/24/2023 INSTL RAISED MEDIAN $4,549,749
0038-07-078 STARR PHARR $7,616,090 US 83 F 2024(695) 01/04/2024 11/23/2023 OVERLAY $7,818,780
2831-01-016 HIDALGO PHARR $1,172,279 FM 2812 STP 2B23(059)HES 08/02/2023 11/15/2023 HAZARD ELIM & SAFETY $1,133,776
0038-05-040 ZAPATA PHARR $35,075,173 US 83 F 2023(629) 05/05/2023 11/15/2023 WIDEN ROAD - ADD LANES $33,170,887
6417-08-001 CAMERON PHARR $4,498,790 FM1847 RMC - 641708001 03/07/2023 11/15/2023 MILL AND INLAY $4,139,780
0528-01-121 HIDALGO PHARR $6,258,578 SH 107 C 528-1-121 11/02/2022 11/15/2023 PREVENT MAINT $5,739,476
0255-08-108 HIDALGO PHARR $9,897,572 IH 69C C 255-8-108 04/06/2022 08/22/2024 PREVENT MAINT $9,148,470
6392-11-001 BROOKS PHARR $5,293,487 SH0285 RMC - 639211001 04/06/2022 11/15/2023 MILL AND INLAY $4,664,148
0038-06-045 STARR PHARR $29,012,476 US 83 F 2022(185) 12/02/2021 11/15/2023 WIDEN ROAD - ADD LANES AND SHOULDERS $24,806,299
0684-02-014 CAMERON PHARR $986,990 FM 511 BR 2021(644) 06/04/2021 11/15/2023 BRIDGE REPL $1,147,081
1427-01-040 HIDALGO PHARR $5,649,564 FM 1423 STP 2021(370) 02/05/2021 11/15/2023 PREVENT MAINT $5,388,775
0255-09-094 HIDALGO PHARR $19,245,790 UP 281 NH 2019(045) 09/07/2018 11/15/2023 REHAB ROADWAY $23,982,430
0039-02-066 HIDALGO PHARR $8,319,988 US 83 C 39-2-66 06/06/2018 11/15/2023 OVERLAY $7,654,069
2094-01-038 HIDALGO PHARR $12,823,713 FM 2220 STP 1602(275)MM 06/05/2018 11/15/2023 WIDEN TO 6 LANE $12,292,866
1429-01-033 HIDALGO PHARR $5,288,076 FM 2557 CC 1429-1-33 04/04/2018 11/15/2023 REHAB ROADWAY $4,427,443
0039-17-196 HIDALGO PHARR $1,200,278 IH 2 BR 2018(635) 03/06/2018 11/15/2023 INSTL DEFLECTION WALLS,PAINT AND_SEA... $1,104,702
0173-03-040 KAUFMAN DALLAS $2,154,454 SH 34 STP 2018(536) 02/01/2018 11/15/2023 HMAC OV AND SPOT BASE REPAIR $1,757,484
6296-79-001 HIDALGO PHARR $5,139,906 FM1015 RMC - 629679001 08/09/2017 11/15/2023 ACP OVERLAY WORK $4,485,274
0197-03-073 KAUFMAN DALLAS $2,860,205 US 175 NH 1702(816) 08/08/2017 11/15/2023 BASE REPAIR,LEVEL UP,OVERLAY $2,389,678
0921-02-212 HIDALGO PHARR $780,556 CR BR 2011(281) 08/08/2017 11/15/2023 REPLACE OFF-SYSTEM BRIDGE $1,033,763
0245-05-047 SMITH TYLER $1,960,204 SH 64 STP 2017(910) 03/08/2017 11/15/2023 PLANING, BS RPR, OCST, PFC SURF, PV... $1,789,205
0437-02-016 CALLAHAN ABILENE $2,814,100 US 283 STP 2017(857) 03/08/2017 11/15/2023 RESTOR $1,793,914
0079-05-054 ERATH FORT WORTH $4,775,276 US 67 NH 2017(889) 03/07/2017 11/15/2023 MILL, OVERLAY AND SIGNAL WORK $4,655,724
0963-01-032 DIMMIT LAREDO $5,394,105 FM 190 SSW 963-1-32 02/02/2017 11/15/2023 BRIDGE REPLS,BASE,SURF $4,902,990
0054-06-097 BROWN BROWNWOOD $4,190,222 US 67 NH 2017(369) 01/04/2017 11/15/2023 REHAB EXIST ROADWAY $3,342,056
0921-02-140 HIDALGO PHARR $6,256,194 CS STP 2008(328)MM 01/04/2017 11/15/2023 RECON AND WIDENING $5,206,108