PREPARING ROW
|
STA
|
220.300
|
$5,000.000
|
$5,000.000
|
$12,000.000
|
|
|
PREP ROW (TREE)(LESS THAN 24" DIA)
|
EA
|
82.000
|
$1,200.000
|
$100.000
|
$850.000
|
|
|
PREP ROW (TREE)(GREATER THAN 24" DIA)
|
EA
|
11.000
|
$2,400.000
|
$200.000
|
$2,500.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
1,529.000
|
$50.000
|
$10.000
|
$7.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
748.000
|
$10.000
|
$25.000
|
$30.000
|
|
|
REMOVE CONC (RAIL)
|
LF
|
253.000
|
$18.040
|
$25.000
|
$32.000
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
2,242.000
|
$15.000
|
$10.000
|
$13.000
|
|
|
REMOVE STAB BASE & ASPH PAV (13"-18")
|
SY
|
44,887.000
|
$9.000
|
$5.000
|
$8.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
73,862.000
|
$14.000
|
$5.000
|
$9.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
4,404.000
|
$17.000
|
$7.000
|
$15.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
125,052.000
|
$18.750
|
$5.500
|
$15.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
196,001.000
|
$6.000
|
$1.000
|
$3.250
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
|
SY
|
196,001.000
|
$0.900
|
$0.550
|
$0.550
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
SY
|
98,002.000
|
$0.900
|
$0.450
|
$0.450
|
|
|
VEGETATIVE WATERING
|
MG
|
3,142.000
|
$20.000
|
$28.000
|
$60.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY B)
|
SY
|
13,048.000
|
$1.530
|
$2.250
|
$3.000
|
|
|
SOIL RETENTION BLANKETS (CL 2) (TY H)
|
SY
|
6,641.000
|
$5.260
|
$5.250
|
$6.000
|
|
|
PLANT MATERIAL (1-GAL)
|
EA
|
400.000
|
$6.150
|
$35.000
|
$40.000
|
|
|
PLANT MATERIAL (5-GAL)
|
EA
|
154.000
|
$66.350
|
$65.000
|
$70.000
|
|
|
PLANT MAINTENANCE
|
MO
|
9.000
|
$4,000.000
|
$6,000.000
|
$6,000.000
|
|
|
SPRINKLING (DUST CONTROL)
|
MG
|
1,322.000
|
$5.470
|
$1.000
|
$1.000
|
|
|
PROOF ROLLING
|
HR
|
40.000
|
$75.000
|
$1.000
|
$85.000
|
|
|
FL BS (RDWY DEL)(TY E GR 4)(FNAL POS)
|
CY
|
43,662.000
|
$35.500
|
$25.000
|
$45.000
|
|
|
LIME (HYD, COM OR QK)(SLURRY)
|
TON
|
1,388.000
|
$250.000
|
$215.000
|
$255.000
|
|
|
LIME TRT (SUBGRADE)(6")
|
SY
|
163,248.000
|
$8.000
|
$2.500
|
$2.000
|
|
|
CEMENT
|
TON
|
2,222.000
|
$215.000
|
$200.000
|
$215.000
|
|
|
CEMENT TREAT (NEW BASE) (10")
|
SY
|
157,184.000
|
$3.250
|
$3.500
|
$5.500
|
|
|
SALV, HAUL & STKPL RCL APH PV (4 TO 6")
|
SY
|
66,192.000
|
$1.500
|
$1.000
|
$7.500
|
|
|
PRIME COAT (MC-30)
|
GAL
|
30,955.000
|
$5.000
|
$4.000
|
$4.750
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
55,164.000
|
$1.800
|
$1.000
|
$4.000
|
|
|
CEM STABIL BKFL
|
CY
|
1,120.600
|
$120.000
|
$100.000
|
$140.000
|
|
|
STRUCT EXCAV (SPECIAL)
|
CY
|
252.000
|
$120.000
|
$100.000
|
$70.000
|
|
|
SAND BACKFILL
|
CY
|
359.000
|
$60.000
|
$75.000
|
$360.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
43.000
|
$4.500
|
$1.000
|
$20.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,036.000
|
$25.000
|
$1.000
|
$60.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
454.000
|
$135.000
|
$75.000
|
$70.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
3,979.000
|
$300.000
|
$261.000
|
$30.000
|
|
|
CL B CONC (MISC)
|
CY
|
359.000
|
$700.000
|
$500.000
|
$290.000
|
|
|
CL C CONC (ABUT)
|
CY
|
234.800
|
$1,200.000
|
$1,100.000
|
$1,600.000
|
|
|
CL C CONC (CAP)
|
CY
|
252.200
|
$2,000.000
|
$1,400.000
|
$2,000.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
125.200
|
$2,500.000
|
$1,300.000
|
$1,300.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
220.000
|
$775.000
|
$750.000
|
$600.000
|
|
|
REINF CONC SLAB
|
SF
|
41,250.000
|
$32.000
|
$23.000
|
$25.000
|
|
|
APPROACH SLAB
|
CY
|
597.200
|
$770.000
|
$600.000
|
$600.000
|
|
|
RETAINING WALL (MSE)
|
SF
|
17,689.000
|
$59.000
|
$95.000
|
$125.000
|
|
|
PRESTR CONC GIRDER (TX34)
|
LF
|
5,544.610
|
$240.000
|
$200.000
|
$190.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
2,253.000
|
$590.000
|
$500.000
|
$485.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(8 IN)
|
CY
|
91.000
|
$150.000
|
$185.000
|
$235.000
|
|
|
RIPRAP (STONE PROTECTION)(15 IN)
|
CY
|
570.000
|
$200.000
|
$185.000
|
$270.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
1,629.000
|
$220.000
|
$185.000
|
$260.000
|
|
|
RIPRAP (CONC)(FLUME)
|
CY
|
39.000
|
$800.000
|
$700.000
|
$500.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
337.000
|
$600.000
|
$575.000
|
$505.000
|
|
|
RIPRAP (MOW STRIP)(6 IN)
|
CY
|
51.200
|
$650.000
|
$625.000
|
$525.000
|
|
|
RAIL (TY T223)
|
LF
|
132.000
|
$180.000
|
$225.000
|
$380.000
|
|
|
RAIL (TY SSTR)
|
LF
|
4,031.250
|
$110.000
|
$50.000
|
$60.000
|
|
|
RAIL (TY SSTR) (W/DRAIN SLOTS)
|
LF
|
1,078.000
|
$110.000
|
$53.000
|
$65.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
538.000
|
$196.880
|
$200.000
|
$220.000
|
|
|
CONC BOX CULV (3 FT X 2 FT)
|
LF
|
554.000
|
$450.000
|
$400.000
|
$320.000
|
|
|
CONC BOX CULV (4 FT X 4 FT)
|
LF
|
531.000
|
$470.000
|
$525.000
|
$400.000
|
|
|
CONC BOX CULV (7 FT X 4 FT)
|
LF
|
252.000
|
$850.000
|
$1,000.000
|
$1,000.000
|
|
|
CONC BOX CULV (10 FT X 10 FT)
|
LF
|
200.000
|
$1,800.000
|
$2,000.000
|
$1,500.000
|
|
|
CONC BOX CULV (4 FT X 4 FT)(EXTEND)
|
LF
|
102.000
|
$720.000
|
$650.000
|
$890.000
|
|
|
RC PIPE (CL IV)(18 IN)
|
LF
|
292.000
|
$100.000
|
$115.000
|
$110.000
|
|
|
RC PIPE (CL IV)(24 IN)
|
LF
|
2,186.000
|
$135.000
|
$125.000
|
$140.000
|
|
|
RC PIPE (CL IV)(36 IN)
|
LF
|
85.000
|
$270.000
|
$280.000
|
$250.000
|
|
|
INLET (COMPL)(PSL)(RG)(4FTX4FT)
|
EA
|
1.000
|
$5,280.270
|
$6,000.000
|
$7,000.000
|
|
|
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
8.000
|
$7,000.000
|
$5,250.000
|
$7,000.000
|
|
|
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
1.000
|
$8,700.000
|
$6,900.000
|
$7,000.000
|
|
|
INLET (COMPL)(TY MSE1)
|
EA
|
4.000
|
$5,216.000
|
$5,500.000
|
$11,000.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 24 IN)
|
EA
|
1.000
|
$8,032.510
|
$10,500.000
|
$12,000.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 36 IN)
|
EA
|
1.000
|
$14,500.000
|
$12,500.000
|
$12,000.000
|
|
|
WINGWALL (FW - 0) (HW=5 FT)
|
EA
|
1.000
|
$14,200.000
|
$16,000.000
|
$20,000.000
|
|
|
WINGWALL (FW - 0) (HW=6 FT)
|
EA
|
1.000
|
$18,970.000
|
$27,000.000
|
$31,000.000
|
|
|
WINGWALL (FW - S) (HW=13 FT)
|
EA
|
1.000
|
$91,800.000
|
$45,000.000
|
$90,000.000
|
|
|
WINGWALL (FW - S) (HW=5 FT)
|
EA
|
2.000
|
$22,015.270
|
$17,000.000
|
$34,000.000
|
|
|
WINGWALL (PW - 1) (HW=13 FT)
|
EA
|
1.000
|
$78,000.000
|
$70,000.000
|
$89,000.000
|
|
|
WINGWALL (PW - 1) (HW=5 FT)
|
EA
|
1.000
|
$30,000.000
|
$17,000.000
|
$15,000.000
|
|
|
WINGWALL (PW - 1) (HW=6 FT)
|
EA
|
2.000
|
$27,493.500
|
$28,000.000
|
$22,000.000
|
|
|
WINGWALL (PW - 1) (HW=7 FT)
|
EA
|
2.000
|
$31,000.000
|
$29,000.000
|
$63,000.000
|
|
|
WINGWALL (PW - 1) (HW=8 FT)
|
EA
|
1.000
|
$38,250.000
|
$35,000.000
|
$62,000.000
|
|
|
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(P)
|
EA
|
16.000
|
$10,066.000
|
$12,500.000
|
$5,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
9.000
|
$1,500.000
|
$1,700.000
|
$1,500.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
2.000
|
$3,065.000
|
$2,100.000
|
$1,400.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$2,520.000
|
$2,100.000
|
$1,400.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (P)
|
EA
|
7.000
|
$2,100.000
|
$2,100.000
|
$1,500.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
48.000
|
$1,617.000
|
$2,100.000
|
$1,900.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
5.000
|
$2,362.740
|
$1,500.000
|
$1,700.000
|
|
|
REMOV STR (BOX CULVERT)
|
EA
|
1.000
|
$40,000.000
|
$25,000.000
|
$25,000.000
|
|
|
REMOV STR (SET)
|
EA
|
82.000
|
$921.000
|
$350.000
|
$900.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
5.000
|
$4,500.000
|
$2,500.000
|
$10,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
1,592.000
|
$15.000
|
$15.000
|
$15.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
298.000
|
$50.000
|
$100.000
|
$170.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$168,000.000
|
$10,000.000
|
$150,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$3,349,055.690
|
$3,250,000.000
|
$3,200,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
31.000
|
$8,500.000
|
$1,500.000
|
$7,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
3,877.000
|
$65.000
|
$65.000
|
$65.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 4)
|
LF
|
2,054.000
|
$75.000
|
$80.000
|
$80.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
5,931.000
|
$16.000
|
$30.000
|
$30.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
1,456.000
|
$63.620
|
$27.490
|
$25.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
1,456.000
|
$10.000
|
$9.610
|
$15.000
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
40.000
|
$175.000
|
$75.000
|
$115.000
|
|
|
CONSTRUCTION PERIMETER FENCE
|
LF
|
275.000
|
$5.050
|
$6.000
|
$7.500
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
22,205.000
|
$3.770
|
$4.250
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
22,205.000
|
$1.150
|
$1.350
|
$1.500
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
1,377.000
|
$6.040
|
$5.750
|
$6.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,377.000
|
$1.430
|
$1.350
|
$1.500
|
|
|
CONSTRUCTING DETOURS
|
SY
|
1,446.000
|
$90.000
|
$77.000
|
$95.000
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
6,180.000
|
$40.000
|
$25.000
|
$28.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
14,160.000
|
$4.500
|
$5.000
|
$6.000
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
6,180.000
|
$6.000
|
$10.000
|
$11.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
1,246.000
|
$128.000
|
$100.000
|
$90.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
6,783.000
|
$64.000
|
$58.000
|
$42.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
81,488.000
|
$0.240
|
$0.140
|
$0.300
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
3,288.000
|
$25.000
|
$29.490
|
$30.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
17.000
|
$2,371.730
|
$2,121.490
|
$2,200.000
|
|
|
MTL W-BEAM GD FEN ADJUSTMENT
|
LF
|
1,125.000
|
$22.000
|
$9.490
|
$10.000
|
|
|
SHORT RADIUS
|
LF
|
50.000
|
$280.000
|
$1,263.490
|
$1,265.000
|
|
|
DRIVEWAY TERMINAL ANCHOR SECTION
|
EA
|
2.000
|
$1,147.080
|
$521.490
|
$522.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
4.000
|
$1,581.900
|
$1,949.210
|
$1,950.000
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
LF
|
200.000
|
$32.000
|
$34.490
|
$35.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,125.000
|
$3.560
|
$2.490
|
$3.000
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
2.000
|
$200.000
|
$195.490
|
$196.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
12.000
|
$303.000
|
$249.210
|
$250.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
33.000
|
$3,350.000
|
$3,576.490
|
$3,600.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
19.000
|
$302.500
|
$195.490
|
$200.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
6.000
|
$1,000.000
|
$1,549.210
|
$1,550.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
5.000
|
$1,000.000
|
$549.210
|
$550.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(W)(TL3)
|
EA
|
1.000
|
$31,647.370
|
$64,500.490
|
$69,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
5.000
|
$15,000.000
|
$9,250.490
|
$9,300.000
|
|
|
CHAIN LINK FENCE (INSTALL) (6')
|
LF
|
2,634.000
|
$18.000
|
$32.000
|
$50.000
|
|
|
PIPE UNDERDRAINS (TY 6) (6")
|
LF
|
1,436.000
|
$32.900
|
$60.720
|
$35.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
22.000
|
$535.950
|
$302.490
|
$310.000
|
|
|
MAILBOX INSTALL-D (TWW-POST) TY 4
|
EA
|
3.000
|
$359.700
|
$349.490
|
$350.000
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
3.000
|
$720.000
|
$873.490
|
$875.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
40.000
|
$781.470
|
$749.210
|
$750.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
|
EA
|
22.000
|
$775.000
|
$795.490
|
$800.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
4.000
|
$977.770
|
$875.210
|
$880.000
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
3.000
|
$644.600
|
$573.490
|
$575.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
21.000
|
$109.080
|
$79.490
|
$200.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
124.000
|
$28.000
|
$14.490
|
$15.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
21.000
|
$32.500
|
$14.490
|
$15.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
150.000
|
$40.770
|
$24.490
|
$25.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
61.000
|
$32.880
|
$24.490
|
$25.000
|
|
|
INSTL DEL ASSM (D-DY)SZ 1(YFLX)GND
|
EA
|
6.000
|
$125.000
|
$49.490
|
$50.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
113.000
|
$90.000
|
$69.490
|
$70.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
1,426.000
|
$4.550
|
$0.950
|
$0.950
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
98,228.000
|
$0.600
|
$0.320
|
$0.330
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
98,905.000
|
$0.600
|
$0.320
|
$0.330
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
902.000
|
$3.300
|
$0.880
|
$0.900
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
4,769.000
|
$1.180
|
$0.880
|
$0.900
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
233.000
|
$8.750
|
$10.000
|
$10.000
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
2,944.000
|
$4.900
|
$4.000
|
$4.000
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
13,742.000
|
$0.650
|
$0.660
|
$0.670
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
55,660.000
|
$0.680
|
$0.660
|
$0.670
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
6,053.000
|
$0.720
|
$0.660
|
$0.670
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
59,568.000
|
$0.690
|
$0.660
|
$0.670
|
|
PREFAB PAV MRK TY B (W)(6")(BRK)CNTST
|
LF
|
249.000
|
$9.000
|
$20.000
|
$20.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
16.000
|
$230.000
|
$150.000
|
$150.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
12.000
|
$280.000
|
$250.000
|
$250.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
327.000
|
$4.440
|
$5.000
|
$5.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
773.000
|
$4.400
|
$5.000
|
$5.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
621.000
|
$4.280
|
$5.000
|
$5.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
51,646.000
|
$0.300
|
$0.350
|
$0.400
|
|
|
STRIP MOWING
|
AC
|
388.000
|
$40.000
|
$200.000
|
$100.000
|
|
|
LITTER REMOVAL
|
AC
|
388.000
|
$25.000
|
$100.000
|
$50.000
|
|
|
CLEANING / SWEEPING (SPOT)
|
MI
|
12.600
|
$239.000
|
$500.000
|
$900.000
|
|
|
SP MIXES SP-B SAC-B PG76-22
|
TON
|
21,645.000
|
$135.000
|
$137.000
|
$124.000
|
|
|
SP MIXES SP-C SAC-A PG76-22
|
TON
|
32,107.000
|
$145.000
|
$145.000
|
$126.000
|
|
|
BONDING COURSE
|
GAL
|
18,631.000
|
$4.500
|
$3.000
|
$3.000
|
|
|
INTRLCK ART CONC BLKS (4" MIN)
|
SF
|
12,404.000
|
$8.000
|
$9.070
|
$17.000
|
|
|
GEOGRID BASE REINFORCEMENT (TY II)
|
SY
|
163,248.000
|
$1.280
|
$1.910
|
$1.750
|
|
|
BIRD EXCLUSION METHOD
|
SF
|
60,714.000
|
$3.000
|
$9.900
|
$5.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
3.000
|
$10,000.000
|
$15,000.000
|
$8,500.000
|
|
MULTIPOLYMER PAV MRK (W)(6")(SLD)
|
LF
|
991.000
|
$1.250
|
$6.000
|
$6.000
|
|
MULTIPOLYMER PAV MRK (W)(6")(BRK)
|
LF
|
249.000
|
$1.250
|
$6.000
|
$6.000
|
|
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
|
LF
|
991.000
|
$1.250
|
$6.000
|
$6.000
|
|
MULTIPOLYMER PAV MRK (Y)(6")(BRK)
|
LF
|
139.000
|
$1.250
|
$6.000
|
$6.000
|
|
|
TMA (STATIONARY)
|
DAY
|
133.000
|
$100.000
|
$100.000
|
$55.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
60.000
|
$100.000
|
$150.000
|
$0.010
|
|
Totals: |
$38,517,640.020
|
$32,096,791.070
|
$37,052,201.650
|