Show Job Controls
Bid Cobra

KAUFMAN US 175 (0197-03-073)

Items: 44

County: KAUFMAN
Length: N/A
Highway: US 175
District: DALLAS
Control Number: 0197-03-073
DBE Goal: N/A
Project: NH 1702(816)
Guaranty: N/A
Time: 99 WORKING DAYS
Engineer's Estimate: $2,860,205.13
Date: 08/08/2017 (8 years ago)
Contract Number: N/A
Type: BASE REPAIR,LEVEL UP,OVERLAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (6)
E
Engineer's Estimate
$2,860,205.13
$2,389,678.40
Over/Under Est: -16.45% -$470,526.73
Over/Under Est: -11.77% -$336,592.20
Amt Left: 5.6% $133,934.53
Over/Under Est: 2.87% $82,063.59
Amt Left: 23.12% $552,590.32
Delta: -16.59% -$418,655.79
Over/Under Est: 3.75% $107,376.29
Amt Left: 24.18% $577,903.02
Delta: -0.86% -$25,312.70
Over/Under Est: 8.31% $237,681.01
Amt Left: 29.64% $708,207.74
Delta: -4.39% -$130,304.72
$4,152,189.00
Over/Under Est: 45.17% $1,291,983.87
Amt Left: 73.76% $1,762,510.60
Delta: -34.03% -$1,054,302.86

Bid Items & Bid Tabulations

44 Total 0 of 44
KAUFMAN  |  US 175  |  DALLAS  |  0197-03-073  |  08/08/2017  |  $2,860,205.13  |  NH 1702(816)  |  BASE REPAIR,LEVEL UP,OVERLAY  |  99 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
IOC COMPANY, LLC
OLDCASTLE MATERIALS TEXAS, INC.
AUSTIN BRIDGE & ROAD SERVICES, LP
JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY
PEACHTREE CONSTRUCTION, LTD.
FNH CONSTRUCTION, LLC
OBLITERATING ABANDONED ROAD
STA 2.000 $5,000.000 $5,000.000 $1,850.000 $3,000.000 $12,000.000 $1,700.000 $20,000.000
EXCAVATION (ROADWAY)
CY 56.000 $16.000 $50.000 $30.000 $40.000 $35.000 $55.000 $30.000
BACKFILL (TY A OR B)
STA 217.650 $170.000 $10.000 $182.000 $350.000 $100.000 $320.000 $350.000
BLOCK SODDING
SY 1,000.000 $3.000 $5.000 $3.300 $4.450 $35.000 $7.000 $5.500
FL BS (RDWY DEL) (TY D GR 1-2)
TON 1,458.000 $30.000 $40.000 $17.750 $40.000 $55.000 $42.000 $30.000
FL BS (CMP IN PLC)(TY D GR1-2)(12")
SY 170.000 $40.000 $50.000 $17.000 $38.000 $125.000 $61.000 $40.000
REWORK BS MTL (TY C)(4")(ORD COMP)
SY 23,327.000 $10.000 $1.700 $1.750 $5.320 $18.000 $9.300 $5.000
ASPH (CRS-2P)
GAL 17,847.000 $3.250 $2.000 $2.400 $2.670 $3.100 $2.730 $4.000
ASPH (RC-250)
GAL 17,847.000 $3.250 $2.000 $0.010 $3.630 $3.250 $3.680 $4.000
AGGR (TY-B GR-5 OR TY-L GR-5)
CY 340.000 $90.000 $150.000 $115.000 $150.000 $220.000 $150.000 $250.000
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
GAL 17,847.000 $3.250 $2.500 $2.750 $2.940 $3.230 $2.990 $6.000
AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B)
CY 680.000 $90.000 $150.000 $126.000 $161.000 $150.000 $161.000 $250.000
SUPERPAVE MIXTURES SP-D PG64-22
TON 12,960.000 $65.000 $75.000 $66.000 $84.700 $70.000 $74.000 $83.500
FLEXIBLE PAVEMENT STRUCTURE REPAIR(14")
SY 12,852.000 $60.000 $40.000 $45.000 $43.000 $31.000 $58.000 $99.000
RIPRAP (MOW STRIP)(4 IN)
CY 158.000 $505.000 $325.000 $500.000 $500.000 $750.000 $600.000 $550.000
MOBILIZATION
LS 1.000 $250,000.000 $150,000.000 $222,632.000 $293,400.000 $250,000.000 $250,000.000 $400,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $8,500.000 $2,000.000 $29,000.000 $2,000.000 $15,000.000 $5,500.000 $15,000.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 80.000 $4.000 $4.000 $8.000 $9.250 $50.000 $10.000 $12.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 80.000 $0.500 $2.000 $3.000 $5.000 $30.000 $6.000 $8.000
MTL W-BEAM GD FEN (TIM POST)
LF 6,693.000 $20.000 $17.000 $17.800 $16.600 $16.720 $18.000 $20.000
MTL W-BEAM GD FEN (STEEL POST)
LF 32.000 $27.000 $72.000 $41.000 $72.000 $38.860 $75.000 $95.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 14.000 $1,450.000 $1,500.000 $1,400.000 $1,475.000 $1,459.540 $1,600.000 $1,850.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 3.000 $1,350.000 $1,000.000 $935.000 $977.000 $1,100.190 $1,000.000 $1,850.000
REMOVE METAL BEAM GUARD FENCE
LF 6,725.000 $1.700 $2.000 $3.320 $2.000 $2.000 $2.100 $3.000
REMOVE TERMINAL ANCHOR SECTION
EA 5.000 $150.000 $200.000 $155.000 $200.000 $200.000 $210.000 $500.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 11.000 $20.000 $300.000 $155.000 $300.000 $300.000 $315.000 $500.000
GUARDRAIL END TREATMENT (INSTALL)
EA 27.000 $1,400.000 $2,200.000 $2,184.000 $2,125.000 $2,011.150 $2,300.000 $2,500.000
GUARDRAIL END TREATMENT (REMOVE)
EA 30.000 $250.000 $250.000 $334.833 $250.000 $250.000 $275.000 $500.000
IN SM RD SN SUP&AM (INST SIGN ONLY)
EA 52.000 $215.000 $300.000 $385.000 $357.000 $35.000 $380.000 $500.000
REMOVE SM RD SN SUP&AM (SIGN ONLY)
EA 52.000 $58.000 $50.000 $88.000 $50.000 $25.000 $52.000 $500.000
INSTL DEL ASSM (D-DY)SZ 1(BRF)GF2
EA 106.000 $22.000 $30.000 $35.000 $29.000 $29.000 $30.000 $100.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 419.000 $0.890 $1.000 $1.000 $1.000 $2.000 $1.500 $5.000
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 84.000 $5.900 $6.500 $10.500 $6.500 $6.500 $7.250 $20.000
REF PAV MRK TY I(W)36"(YLD TRI)(090MIL)
EA 24.000 $40.000 $50.000 $52.000 $50.000 $50.000 $55.000 $150.000
PAVEMENT SEALER 4"
LF 2,072.000 $0.070 $0.200 $0.510 $0.200 $0.200 $0.220 $2.000
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 110.000 $0.200 $0.500 $2.100 $0.500 $0.500 $0.550 $1.000
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 63,162.000 $0.250 $0.300 $0.370 $0.300 $0.300 $0.340 $0.500
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 3,530.000 $0.180 $0.320 $0.570 $0.320 $0.320 $0.360 $0.500
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 41,583.000 $0.200 $0.300 $0.370 $0.300 $0.300 $0.340 $0.500
REFL PAV MRKR TY I-C
EA 7.000 $3.250 $10.000 $5.100 $10.000 $10.000 $11.000 $15.000
REFL PAV MRKR TY II-A-A
EA 610.000 $3.180 $3.000 $4.100 $3.000 $3.000 $3.400 $15.000
ELIM EXT PAV MRK & MRKS (4")
LF 2,072.000 $0.300 $1.000 $2.100 $1.000 $1.000 $1.100 $1.000
PAV SURF PREP FOR MRK (4")
LF 2,072.000 $0.190 $0.500 $1.050 $0.500 $0.500 $0.550 $1.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $9,500.000 $6,000.000 $9,000.000 $11,600.000 $6,000.000 $8,500.000 $16,500.000
Totals: $2,860,205.130 $2,389,678.400 $2,523,612.930 $2,942,268.720 $2,967,581.420 $3,097,886.140 $4,152,189.000