Show Job Controls
Bid Cobra

HIDALGO FM 2557 (1429-01-033)

Items: 72

County: HIDALGO
Length: N/A
Highway: FM 2557
District: PHARR
Control Number: 1429-01-033
DBE Goal: N/A
Project: CC 1429-1-33
Guaranty: N/A
Time: 200 WORKING DAYS
Engineer's Estimate: $5,288,076.40
Date: 04/04/2018 (8 years ago)
Contract Number: N/A
Type: REHABILITATE ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$5,288,076.40
$4,427,442.74
Over/Under Est: -16.27% -$860,633.66
$4,919,514.56
Over/Under Est: -6.97% -$368,561.84
Amt Left: 11.11% $492,071.82
$5,192,260.20
Over/Under Est: -1.81% -$95,816.20
Amt Left: 17.27% $764,817.46
Delta: -5.54% -$272,745.64
Over/Under Est: -0.95% -$50,358.72
Amt Left: 18.3% $810,274.94
Delta: -0.88% -$45,457.48
$7,875,306.41
Over/Under Est: 48.93% $2,587,230.01
Amt Left: 77.87% $3,447,863.67
Delta: -50.36% -$2,637,588.73

Bid Items & Bid Tabulations

72 Total 0 of 72
HIDALGO  |  FM 2557  |  PHARR  |  1429-01-033  |  04/04/2018  |  $5,288,076.40  |  CC 1429-1-33  |  REHAB ROADWAY  |  200 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
IOC COMPANY, LLC
FOREMOST PAVING, INC.
EARTHWORKS ENTERPRISE
REIM CONSTRUCTION, INC.
TEXAS SAI, INC.
PREPARING ROW
STA 335.000 $800.000 $75.000 $1,500.000 $170.000 $158.000 $525.000
REMOVING CONC (RIPRAP)
SY 40.000 $11.000 $15.000 $10.000 $10.500 $10.750 $80.000
REMOVING CONC (DRIVEWAYS)
SY 681.000 $8.000 $10.000 $15.000 $4.000 $11.250 $19.000
REMOVING CONC (CURB)
LF 20.000 $3.000 $15.000 $10.000 $12.000 $4.550 $60.000
REMOVING STAB BASE AND ASPH PAV(10")
CY 14,775.000 $2.500 $6.300 $5.000 $5.200 $6.000 $17.000
EXCAVATION (ROADWAY)
CY 2,195.000 $4.000 $3.000 $10.000 $5.400 $2.650 $18.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 5,648.000 $5.000 $3.000 $2.000 $6.000 $5.900 $15.000
BACKFILL (TY B)
STA 335.000 $125.000 $50.000 $150.000 $100.000 $114.000 $310.000
FURNISHING AND PLACING TOPSOIL
CY 50.000 $20.000 $30.000 $20.000 $30.000 $32.500 $60.000
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
AC 32.000 $1,300.000 $1,240.000 $1,250.000 $1,650.000 $1,440.000 $1,240.000
CELL FBR MLCH SEED(TEMP)(WARM)
AC 32.000 $850.000 $785.000 $800.000 $1,520.000 $934.000 $785.000
VEGETATIVE WATERING
MG 1,000.000 $8.000 $15.000 $38.000 $40.000 $22.750 $43.000
SPRINKLING (DUST CONTROL)
MG 1,338.000 $7.000 $1.000 $1.000 $27.000 $22.750 $40.000
FL BS (RDWY DEL)(TY E GR 4)(FNAL POS)
CY 29,455.000 $23.000 $19.450 $16.000 $21.000 $20.250 $38.000
LIME TRT (EXST MATL) (12")
SY 55,225.000 $2.000 $2.000 $2.000 $1.100 $1.900 $3.000
LIME (HYD, COM OR QK)(SLURRY)
TON 1,641.000 $160.000 $132.000 $125.000 $210.000 $157.000 $203.000
CEMENT
TON 994.000 $160.000 $147.000 $145.000 $180.000 $179.000 $201.000
CEMENT TREAT (NEW BASE) (6")
SY 88,738.000 $1.500 $1.000 $1.250 $3.300 $1.250 $2.650
CEMENT TREAT (NEW BASE) (10")
SY 51,645.000 $1.500 $1.250 $1.500 $5.600 $1.900 $3.650
SALV, HAUL & STKPL RCL APH PV (1 1/2")
SY 137,789.000 $1.400 $1.000 $1.000 $0.800 $1.400 $2.500
PRIME COAT (MC-30)
GAL 27,850.000 $3.250 $3.000 $3.000 $2.500 $3.550 $4.500
ASPH (SPG 73-19)
GAL 41,774.000 $3.000 $2.750 $4.000 $3.200 $2.900 $3.500
AGGR (TY-D GR-4P)(SAC-B)
CY 1,160.000 $35.000 $50.000 $35.000 $120.000 $134.000 $125.000
SUPERPAVE MIXTURES SP-D SAC-A PG76-22
TON 23,432.000 $77.000 $67.750 $59.000 $79.000 $86.000 $87.500
PAV JT UNDERSEAL (24")
LF 120.000 $30.000 $20.000 $40.000 $10.000 $45.500 $75.000
RIPRAP (CONC) (CL B) (4")
CY 40.000 $400.000 $350.000 $400.000 $380.000 $342.000 $420.000
RIPRAP (MOW STRIP)(4 IN)
CY 44.000 $375.000 $350.000 $400.000 $390.000 $419.000 $490.000
CLEANING AND SEALING EXIST JOINTS(CL7)
LF 120.000 $40.000 $15.000 $50.000 $85.000 $78.500 $65.000
SEALED EXPANSION JOINT (5 IN) (SEJ - A)
LF 125.000 $115.000 $90.000 $425.000 $120.000 $115.000 $50.000
MOBILIZATION
LS 1.000 $392,000.000 $375,000.000 $439,000.000 $65,000.000 $240,000.000 $769,695.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $3,500.000 $3,000.000 $3,000.000 $5,500.000 $6,000.000 $20,000.000
ROCK FILTER DAMS (INSTALL) (TY 4)
LF 100.000 $35.000 $35.000 $55.000 $75.000 $18.500 $65.000
ROCK FILTER DAMS (REMOVE)
LF 100.000 $10.000 $10.000 $24.000 $20.000 $10.000 $20.000
CONSTRUCTION EXITS (INSTALL) (TY 2)
SY 936.000 $11.000 $10.000 $22.000 $18.000 $18.750 $27.000
CONSTRUCTION EXITS (REMOVE)
SY 936.000 $6.500 $3.000 $13.000 $9.000 $7.900 $8.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 5,750.000 $2.000 $2.000 $2.500 $2.000 $1.700 $3.250
TEMP SEDMT CONT FENCE (REMOVE)
LF 5,750.000 $1.000 $0.500 $1.000 $1.000 $1.000 $0.500
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 2,614.000 $3.000 $4.000 $5.500 $3.000 $2.350 $5.500
BIODEG EROSN CONT LOGS (REMOVE)
LF 2,614.000 $0.750 $0.500 $1.000 $1.000 $1.000 $0.500
CONC CURB (MOUNTABLE)
LF 20.000 $22.000 $50.000 $30.000 $30.000 $13.750 $80.600
DRIVEWAYS (CONC)
SY 732.000 $50.000 $41.000 $65.000 $50.000 $47.750 $60.000
DRIVEWAYS (ACP)
SY 7,895.000 $24.000 $23.000 $20.000 $8.000 $22.500 $30.000
MTL W-BEAM GD FEN (TIM POST)
LF 238.000 $20.000 $26.500 $27.000 $30.500 $29.250 $26.500
MTL THRIE-BEAM GD FEN (TIM POST)
EA 4.000 $1,400.000 $1,480.000 $1,500.000 $1,750.000 $1,630.000 $1,480.000
REMOVE METAL BEAM GUARD FENCE
LF 238.000 $2.000 $2.000 $2.000 $3.500 $2.000 $2.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 4.000 $300.000 $190.000 $190.000 $1,630.000 $228.000 $190.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,200.000 $2,380.000 $2,400.000 $1,870.000 $2,680.000 $2,380.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $176.000 $275.000 $285.000 $590.000 $167.000 $275.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 22.000 $300.000 $235.000 $240.000 $230.000 $244.000 $235.000
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 1.000 $300.000 $275.000 $290.000 $250.000 $278.000 $275.000
CONDT (PVC) (SCH 40) (1")
LF 100.000 $18.000 $26.000 $21.000 $10.000 $23.250 $26.000
ALUMINUM SIGNS (TY A)
SF 17.500 $25.000 $19.250 $20.000 $30.000 $21.250 $19.250
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 3.000 $490.000 $545.000 $550.000 $540.000 $606.000 $545.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 3.000 $650.000 $625.000 $650.000 $615.000 $690.000 $625.000
RELOCATE SM RD SN SUP&AM TY S80
EA 41.000 $350.000 $590.000 $600.000 $455.000 $195.000 $590.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 22.000 $60.000 $50.000 $50.000 $90.000 $55.000 $50.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 30.000 $17.000 $10.000 $10.000 $25.000 $11.500 $10.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 8.000 $30.000 $32.000 $32.000 $31.500 $35.250 $32.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 65,245.000 $0.300 $0.350 $0.480 $0.500 $0.350 $0.350
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 66,884.000 $0.350 $0.350 $0.480 $0.500 $0.350 $0.350
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 8,326.000 $0.500 $0.420 $1.000 $0.650 $1.800 $1.000
REFL PAV MRK TY II (W) 12" (SLD)
LF 300.000 $1.000 $0.750 $2.000 $4.000 $2.400 $0.750
REFL PAV MRK TY II (W) 24" (SLD)
LF 439.000 $2.400 $1.500 $4.000 $2.000 $5.300 $1.500
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 65,245.000 $0.300 $0.320 $0.400 $0.400 $0.350 $0.320
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 8,342.000 $0.300 $0.320 $0.400 $0.400 $0.360 $0.320
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 14,718.000 $0.300 $0.320 $0.400 $0.500 $0.380 $0.320
REFL PAV MRKR TY II-A-A
EA 605.000 $2.900 $3.500 $4.600 $4.100 $3.100 $3.500
ELIM EXT PAV MRK & MRKS (4")
LF 32,624.000 $0.450 $0.300 $0.640 $0.500 $0.700 $0.300
VEH LP DETECT (SAWCUT)
LF 410.000 $9.000 $16.500 $16.000 $30.000 $16.500 $16.500
GEOGRID BASE REINFORCEMENT (TY II)
SY 122,972.000 $1.750 $1.000 $1.240 $1.050 $1.100 $3.120
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $8,800.000 $50.000 $1,500.000 $14,500.000 $4,500.000 $18,000.000
GROUND BOX W/ APRON (ADJUST)
EA 7.000 $325.000 $1,400.000 $600.000 $500.000 $606.000 $1,400.000
Totals: $5,288,076.400 $4,427,442.745 $4,919,514.560 $5,192,260.200 $5,237,717.685 $7,875,306.415