Show Job Controls
Bid Cobra

HIDALGO IH 2 (0039-18-122)

Items: 70

County: HIDALGO
Length: 3.7600 MILES
Highway: IH 2
District: PHARR
Control Number: 0039-18-122
DBE Goal: 0.0%
Project: C 39-18-122
Guaranty: $100,000.00
Time: 180 WORKING DAYS
Engineer's Estimate: $12,098,637.08
Date: 09/05/2025 (9 months ago)
Contract Number: 9253239
Type: PREVENTIVE MAINTENANCE
Project ID: A00129662
Project Description: OVERLAY
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
JESUS NORIEGA
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$12,098,637.08
$10,273,482.71
Over/Under Est: -15.09% -$1,825,154.37
$10,815,550.32
Over/Under Est: -10.61% -$1,283,086.76
Amt Left: 5.28% $542,067.61
$11,951,074.03
Over/Under Est: -1.22% -$147,563.05
Amt Left: 16.33% $1,677,591.32
Delta: -10.50% -$1,135,523.71
Subcontractor Percentage Amount
HIGHWAY BARRICADES AND SERVICES, LLC 5.74% $589,697.91
DEPENDABLE FENCE 1.84% $189,032.08
TEXAS HIGHWAY SYSTEMS, INC. 0.33% $33,902.49
Total: 7.91% $812,632.48

Bid Items & Bid Tabulations

70 Total 0 of 70
HIDALGO  |  IH 2  |  PHARR  |  0039-18-122  |  09/05/2025  |  $12,098,637.08  |  C 39-18-122  |  PREVENT MAINT  |  180 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
IOC COMPANY, LLC
FOREMOST PAVING, INC.
POSILLICO CIVIL, INC.
REMOV CONC (MOWSTRIP)
LF 865.000 $40.000 $15.000 $11.000 $14.000
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
TON 29,369.000 $140.000 $145.000 $137.000 $140.000
STONE-MTRX-ASPH SMA-F SAC-A PG76-22
TON 33,059.000 $140.000 $125.000 $120.000 $140.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
SY 3,893.000 $25.000 $25.000 $67.000 $20.840
PLANE ASPH CONC PAV(2")
SY 547,608.000 $2.500 $1.000 $2.150 $1.220
RIPRAP (MOW STRIP)(4 IN)
CY 126.000 $500.000 $595.000 $484.000 $485.000
MOBILIZATION
LS 1.000 $500,000.000 $140,000.000 $246,000.000 $1,086,461.270
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $5,000.000 $3,600.000 $3,700.000 $15,000.000
TMA (STATIONARY)
DAY 180.000 $100.000 $0.100 $161.000 $68.790
TMA (MOBILE OPERATION)
DAY 180.000 $150.000 $1.000 $0.010 $68.790
BIODEG EROSN CONT LOGS (INSTL) (6")
LF 876.000 $6.000 $3.000 $5.800 $4.720
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 3,264.000 $7.000 $3.000 $5.900 $4.720
BIODEG EROSN CONT LOGS (REMOVE)
LF 4,140.000 $1.000 $0.750 $1.300 $4.720
MTL W-BEAM GD FEN (TIM POST)
LF 1,781.000 $30.000 $28.320 $28.700 $28.320
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 20.000 $2,250.000 $2,084.000 $2,104.900 $2,084.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 6.000 $1,500.000 $1,483.000 $1,497.900 $1,483.000
CONNECTOR PLATE FOR THRIE BEAM
EA 7.000 $1,300.000 $1,186.000 $1,197.900 $1,186.000
REMOVE METAL BEAM GUARD FENCE
LF 1,656.000 $3.000 $4.500 $4.600 $4.500
REMOVE TERMINAL ANCHOR SECTION
EA 6.000 $250.000 $250.000 $252.500 $250.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 18.000 $350.000 $250.000 $252.500 $250.000
GUARDRAIL END TREATMENT (INSTALL)
EA 14.000 $3,400.000 $3,451.000 $3,485.600 $3,451.000
GUARDRAIL END TREATMENT (REMOVE)
EA 14.000 $250.000 $250.000 $252.500 $250.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 4.000 $1,800.000 $1,250.000 $1,262.500 $1,250.000
CRASH CUSH ATTEN (REMOVE)
EA 1.000 $1,200.000 $1,250.000 $1,262.500 $1,250.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 1.000 $10,000.000 $8,450.000 $8,534.500 $8,450.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)SRF
EA 44.000 $120.000 $125.000 $126.300 $125.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BR)
EA 562.000 $25.000 $15.000 $15.200 $15.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 40.000 $35.000 $25.000 $25.300 $25.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB (BI)
EA 175.000 $35.000 $15.000 $15.200 $15.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB (BR)
EA 415.000 $20.000 $15.000 $15.200 $15.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 964.000 $10.000 $10.000 $10.100 $10.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 24,737.000 $1.000 $1.120 $1.100 $0.650
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 4,462.000 $1.000 $1.400 $1.100 $0.650
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 18,890.000 $1.250 $0.880 $0.900 $0.880
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
LF 27,280.000 $4.000 $0.940 $1.000 $0.940
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 6,166.000 $4.000 $1.100 $1.200 $1.100
RE PM TY II (W) 6" (BRK)
LF 12,694.000 $0.350 $0.420 $0.500 $0.420
RE PM TY II (W) 8" (SLD)
LF 3,081.000 $0.600 $0.540 $0.600 $0.540
RE PM TY II (W) 12" (LNDP)
LF 6,230.000 $1.500 $0.780 $0.800 $0.780
RE PM TY II (W) 12" (SLD)
LF 6,902.000 $2.000 $0.780 $0.800 $0.780
RE PM TY II (Y) 6" (SLD)
LF 4,388.000 $0.450 $0.420 $0.500 $0.420
RE PM TY III (W)(6")(SLD)
LF 27,000.000 $2.500 $1.750 $1.800 $1.750
RE PM TY III (W)(6")(BRK)
LF 8,346.000 $3.000 $1.950 $2.000 $1.950
RE PM TY III (W)(8")(SLD)
LF 6,906.000 $3.000 $3.750 $3.800 $3.750
RE PM TY III (W)(12")(SLD)
LF 2,076.000 $6.000 $5.500 $5.600 $5.500
RE PM TY III (W)(12")(DOT)
LF 745.000 $8.000 $5.500 $5.600 $5.500
RE PM TY III (W)(24")(SLD)
LF 807.000 $12.000 $14.000 $14.200 $14.000
RE PM TY III (Y)(6")(SLD)
LF 24,545.000 $2.500 $1.750 $1.800 $1.750
RE PM TY III (Y)(24")(SLD)
LF 2,060.000 $12.000 $14.000 $14.200 $14.000
RE PM TY III (W)(ARROW)
EA 11.000 $280.000 $300.000 $303.000 $300.000
RE PM TY III (W)(DBL ARROW)
EA 3.000 $420.000 $425.000 $429.300 $425.000
RE PM TY III (W)(WORD)
EA 11.000 $320.000 $350.000 $353.500 $350.000
RE PM TY III (W)(NUMBER)
EA 2.000 $210.000 $800.000 $808.000 $800.000
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 35,170.000 $0.650 $0.720 $0.800 $0.720
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 87,357.000 $0.650 $0.680 $0.700 $0.680
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 77,910.000 $0.650 $0.680 $0.700 $0.680
PREFAB PM TY B (W)(6")(BRK)CONTRAST
LF 7,538.000 $8.810 $11.500 $11.700 $11.500
PREFAB PM TY C (W)(ARROW)
EA 31.000 $250.000 $150.000 $151.500 $150.000
PREFAB PM TY C (W)(NUMBER)
EA 15.000 $250.000 $345.000 $348.500 $345.000
PREFAB PM TY C (W)(WORD)
EA 31.000 $270.000 $250.000 $252.500 $250.000
REFL PAV MRKR TY II-C-R
EA 5,025.000 $3.000 $7.500 $7.600 $7.500
ELIM EXT PM & MRKS (4")
LF 59,991.000 $0.650 $0.400 $0.500 $0.400
ELIM EXT PM & MRKS (8")
LF 6,906.000 $1.000 $0.600 $0.700 $0.600
ELIM EXT PM & MRKS (12")
LF 2,821.000 $2.000 $1.000 $1.100 $1.000
ELIM EXT PM & MRKS (24")
LF 2,867.000 $6.000 $3.500 $3.600 $3.500
ELIM EXT PM & MRKS (ARROW)
EA 13.000 $75.000 $95.000 $96.000 $95.000
ELIM EXT PM & MRKS (DBL ARROW)
EA 3.000 $85.000 $150.000 $151.500 $150.000
ELIM EXT PM & MRKS (NUMBER)
EA 2.000 $25.000 $95.000 $96.000 $95.000
ELIM EXT PM & MRKS (WORD)
EA 13.000 $80.000 $95.000 $96.000 $95.000
BONDING COURSE
GAL 38,334.000 $4.500 $3.000 $2.780 $7.090
Totals: $12,098,637.080 $10,273,482.710 $10,815,550.320 $11,951,074.030
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $15,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $25,000.00
Total: $40,000.00