PREPARING ROW
|
STA
|
12.000
|
$1,897.500
|
$8,500.000
|
$8,500.000
|
$22,500.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
145.000
|
$8.860
|
$75.000
|
$80.000
|
$45.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
15.000
|
$12.190
|
$200.000
|
$200.000
|
$65.000
|
|
|
REMOVING CONC (CURB)
|
LF
|
696.000
|
$5.060
|
$15.000
|
$12.000
|
$25.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
2,138.000
|
$10.650
|
$10.000
|
$11.000
|
$12.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY A)
|
CY
|
4,970.000
|
$19.610
|
$20.000
|
$12.500
|
$35.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
9,880.000
|
$1.280
|
$3.750
|
$16.000
|
$10.000
|
|
|
BLOCK SODDING
|
SY
|
700.000
|
$3.730
|
$7.750
|
$12.500
|
$10.000
|
|
|
BROADCAST SEED (PERM) (RURAL) (CLAY)
|
SY
|
9,880.000
|
$0.400
|
$0.350
|
$1.400
|
$1.000
|
|
|
VEGETATIVE WATERING
|
MG
|
178.000
|
$16.760
|
$45.000
|
$225.000
|
$85.000
|
|
|
FL BS (RDWY DEL)(TY E GR 4)(FNAL POS)
|
CY
|
1,692.000
|
$39.000
|
$65.000
|
$73.000
|
$125.000
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
343.000
|
$365.000
|
$210.000
|
$390.000
|
$375.000
|
|
|
LIME TRT (SUBGRADE)(12")
|
SY
|
10,144.000
|
$12.000
|
$4.000
|
$20.000
|
$20.000
|
|
|
CEMENT
|
TON
|
86.000
|
$200.000
|
$215.000
|
$300.000
|
$240.000
|
|
|
CEMENT TREAT (NEW BASE) (6")
|
SY
|
10,144.000
|
$3.000
|
$3.000
|
$7.500
|
$12.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
2,030.000
|
$5.680
|
$5.000
|
$12.100
|
$10.000
|
|
|
CONC PVMT (CONT REINF - CRCP) (11")
|
SY
|
9,687.000
|
$108.000
|
$175.000
|
$127.000
|
$175.000
|
|
|
FULL - DEPTH REPAIR CRCP (10")
|
SY
|
2,620.000
|
$275.000
|
$250.000
|
$450.000
|
$375.000
|
|
|
HALF - DEPTH REPAIR CRCP (10")
|
SY
|
8.000
|
$200.000
|
$1,800.000
|
$1,500.000
|
$2,500.000
|
|
|
CUT & RESTORE CONC PAVING
|
SY
|
17.000
|
$157.490
|
$1,300.000
|
$250.000
|
$600.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
1.850
|
$164.450
|
$1,750.000
|
$800.000
|
$250.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
1,331.000
|
$4.610
|
$1.000
|
$10.000
|
$2.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
18.000
|
$344.000
|
$250.000
|
$525.000
|
$350.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
344.000
|
$330.000
|
$350.000
|
$375.000
|
$250.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
38.300
|
$537.630
|
$1,200.000
|
$450.000
|
$750.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
1.000
|
$566.550
|
$6,000.000
|
$1,000.000
|
$2,500.000
|
|
|
CLEANING AND SEALING JOINTS (CL 5)
|
LF
|
117.000
|
$100.000
|
$50.000
|
$60.000
|
$15.000
|
|
|
INLET(COMPL)(PSL)(SFG)(4FTX4FT-4FTX4FT)
|
EA
|
1.000
|
$9,000.000
|
$15,000.000
|
$7,400.000
|
$12,000.000
|
|
|
INLET (COMPL)(ARMOR CURB SLOT)
|
EA
|
4.000
|
$6,325.000
|
$15,000.000
|
$10,900.000
|
$7,000.000
|
|
|
REMOV STR (INLET)
|
EA
|
1.000
|
$804.320
|
$1,500.000
|
$2,500.000
|
$1,500.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$468,207.500
|
$650,000.000
|
$745,793.630
|
$750,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
11.000
|
$3,000.000
|
$1,500.000
|
$1,000.000
|
$7,500.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
78.000
|
$24.930
|
$65.000
|
$55.000
|
$65.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
78.000
|
$9.450
|
$10.000
|
$37.720
|
$35.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
852.000
|
$3.070
|
$4.000
|
$5.520
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
852.000
|
$0.850
|
$1.250
|
$1.980
|
$3.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
197.000
|
$5.770
|
$8.000
|
$7.460
|
$8.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
197.000
|
$1.400
|
$2.000
|
$2.380
|
$3.000
|
|
|
CONC CURB (TY C1)
|
LF
|
10.000
|
$50.000
|
$200.000
|
$83.500
|
$35.000
|
|
|
CONC CURB TY C (BARRIER)
|
LF
|
1,750.000
|
$44.280
|
$25.000
|
$20.000
|
$35.000
|
|
|
CHAIN LINK FENCE (REMOVE)
|
LF
|
500.000
|
$5.690
|
$10.000
|
$17.000
|
$11.000
|
|
|
GATE (REMOVE)
|
EA
|
2.000
|
$290.950
|
$500.000
|
$6,500.000
|
$1,400.000
|
|
|
CHAIN LINK FENCE (INSTALL) (8')
|
LF
|
1,085.000
|
$50.600
|
$47.310
|
$192.000
|
$165.000
|
|
|
CHAIN LINK GATE(INSTL)(DBL)(8'X15')
|
EA
|
1.000
|
$18,975.000
|
$3,787.000
|
$11,000.000
|
$9,000.000
|
|
|
CHAIN LINK GATE(INSTL)(8'X26')
|
EA
|
1.000
|
$6,325.000
|
$9,843.000
|
$11,000.000
|
$9,000.000
|
|
|
CHAIN LINK GATE(INSTL)(8'X30')
|
EA
|
1.000
|
$12,650.000
|
$11,357.000
|
$8,500.000
|
$28,200.000
|
|
|
CHAIN LINK GATE(INSTL)(DBL)(8'X7')
|
EA
|
2.000
|
$6,325.000
|
$3,068.000
|
$15,000.000
|
$23,000.000
|
|
|
REMOVE RD IL ASM (TRANS-BASE)
|
EA
|
2.000
|
$594.490
|
$556.800
|
$543.500
|
$500.000
|
|
|
IN RD IL (TY SA) 40T-12 (250W EQ) LED
|
EA
|
3.000
|
$8,222.500
|
$5,404.210
|
$5,000.000
|
$6,500.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
1,758.000
|
$21.510
|
$25.110
|
$17.500
|
$13.000
|
|
|
CONDT (PVC) (SCH 40) (4")
|
LF
|
270.000
|
$35.420
|
$37.120
|
$30.000
|
$18.000
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
115.000
|
$18.980
|
$27.290
|
$25.000
|
$17.000
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
192.000
|
$21.890
|
$89.520
|
$35.000
|
$32.000
|
|
|
CONDT (PVC) (SCH 80) (4")
|
LF
|
115.000
|
$37.950
|
$44.760
|
$50.000
|
$37.000
|
|
|
ELEC CONDR (NO.14) INSULATED
|
LF
|
400.000
|
$1.580
|
$1.580
|
$1.250
|
$2.000
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
1,005.000
|
$2.530
|
$2.130
|
$2.100
|
$3.000
|
|
|
ELEC CONDR (NO.4) INSULATED
|
LF
|
4,308.000
|
$2.190
|
$4.040
|
$3.400
|
$3.000
|
|
|
ELEC CONDR (NO.2) INSULATED
|
LF
|
2,220.000
|
$6.640
|
$5.130
|
$5.000
|
$4.000
|
|
|
GROUND BOX TY A (122311)
|
EA
|
5.000
|
$885.500
|
$1,637.640
|
$1,500.000
|
$1,200.000
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
4.000
|
$1,897.500
|
$1,965.170
|
$1,500.000
|
$1,600.000
|
|
|
REMOVE GROUND BOX
|
EA
|
2.000
|
$569.250
|
$382.120
|
$750.000
|
$450.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
4.000
|
$587.470
|
$1,320.220
|
$957.540
|
$1,200.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
|
EA
|
1.000
|
$569.970
|
$1,568.630
|
$1,150.000
|
$1,800.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
26.000
|
$4.630
|
$9.460
|
$5.210
|
$9.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
68.000
|
$4.080
|
$9.460
|
$5.850
|
$9.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
42.000
|
$4.050
|
$9.460
|
$5.790
|
$9.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
4,437.000
|
$0.130
|
$0.320
|
$0.190
|
$1.000
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
3,955.000
|
$0.190
|
$0.650
|
$0.300
|
$2.000
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
443.000
|
$0.610
|
$1.080
|
$0.600
|
$3.000
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
35.000
|
$1.710
|
$2.150
|
$1.560
|
$5.000
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
5.000
|
$20.760
|
$21.510
|
$46.420
|
$25.000
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
2.000
|
$29.830
|
$21.510
|
$108.500
|
$45.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
7.000
|
$26.670
|
$21.510
|
$63.620
|
$45.000
|
|
|
PAV SURF PREP FOR MRK (RPM)
|
EA
|
136.000
|
$2.250
|
$0.540
|
$1.000
|
$1.000
|
|
|
CRACK CLEANING AND SEALING (CRCP)
|
LF
|
190.000
|
$25.000
|
$25.000
|
$25.000
|
$100.000
|
|
|
CNC CRACK REPAIR (DISCRETE)(INJECT)
|
LF
|
100.000
|
$140.000
|
$155.000
|
$200.000
|
$350.000
|
|
|
D-GR HMA TY-D SAC-B PG76-22
|
TON
|
838.000
|
$126.500
|
$200.000
|
$134.000
|
$300.000
|
|
|
FIXED BOLLARD
|
EA
|
13.000
|
$700.000
|
$2,250.000
|
$1,800.000
|
$1,600.000
|
|
|
ITS SYSTEM SUPPORT EQUIPMENT
|
LS
|
1.000
|
$75,900.000
|
$3,275.280
|
$50,000.000
|
$25,000.000
|
|
|
FIBER OPTIC PIGTAIL (12 FIBER)
|
LF
|
460.000
|
$18.980
|
$14.190
|
$320.000
|
$150.000
|
|
|
FIBER OPTIC SPLICE ENCLOSURE
|
EA
|
1.000
|
$4,427.500
|
$2,401.870
|
$2,500.000
|
$1,700.000
|
|
|
FIBER OPTIC CABLE ROAD MARKER
|
EA
|
4.000
|
$379.500
|
$218.350
|
$500.000
|
$180.000
|
|
|
FIBER OPTIC FUSION SPLICE
|
EA
|
3.000
|
$132.830
|
$196.520
|
$1,500.000
|
$60.000
|
|
|
RELOCATE CCTV FIELD EQUIPMENT
|
EA
|
1.000
|
$2,530.000
|
$5,131.270
|
$5,500.000
|
$950.000
|
|
|
CONDUIT (PREPARE)
|
LF
|
315.000
|
$3.800
|
$3.110
|
$5.000
|
$5.000
|
|
|
GROUND BOX (PREPARE)
|
EA
|
1.000
|
$569.250
|
$382.120
|
$1,000.000
|
$1,500.000
|
|
MULTIPOLYMER PAV MRK (W)(6")(SLD)
|
LF
|
3,063.000
|
$6.330
|
$3.010
|
$7.710
|
$4.000
|
|
MULTIPOLYMER PAV MRK (W)(6")(DOT)
|
LF
|
62.000
|
$6.330
|
$5.160
|
$4.100
|
$6.000
|
|
MULTIPOLYMER PAV MRK (W)(8")(SLD)
|
LF
|
3,466.000
|
$1.710
|
$5.810
|
$4.100
|
$6.000
|
|
MULTIPOLYMER PAV MRK (W)(12")(SLD)
|
LF
|
234.000
|
$3.600
|
$7.960
|
$7.960
|
$9.000
|
|
MULTIPOLYMER PAV MRK (W)(24")(SLD)
|
LF
|
35.000
|
$12.830
|
$18.070
|
$8.100
|
$15.000
|
|
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
|
LF
|
1,312.000
|
$2.530
|
$3.010
|
$7.710
|
$4.000
|
|
MULTIPOLYMER PAV MRK (Y)(8")(SLD)
|
LF
|
489.000
|
$1.790
|
$6.880
|
$2.100
|
$7.500
|
|
MULTIPOLYMER PAV MRK (Y)(12")(SLD)
|
LF
|
209.000
|
$3.740
|
$9.030
|
$4.250
|
$7.500
|
|
MULTIYPOLYMER PAV MRK (W) (ARROW)
|
EA
|
5.000
|
$253.000
|
$451.650
|
$325.000
|
$350.000
|
|
MULTIPOLYMER PAV MRK (W) (DBL ARROW)
|
EA
|
2.000
|
$442.750
|
$623.710
|
$401.850
|
$480.000
|
|
MULTIPOLYMER PAV MRK (W) (WORD)
|
EA
|
7.000
|
$379.500
|
$451.650
|
$400.000
|
$380.000
|
|
|
ITS POLE (30 FT)(130 MPH)
|
EA
|
1.000
|
$27,830.000
|
$14,957.100
|
$25,000.000
|
$10,600.000
|
|
|
ITS POLE (30 FT)(REM)
|
EA
|
1.000
|
$1,897.500
|
$556.800
|
$2,500.000
|
$1,100.000
|
|
|
ITS POLE MNT CAB (TY 2)(CONF 1)(REL)
|
EA
|
1.000
|
$2,530.000
|
$1,637.640
|
$10,000.000
|
$1,600.000
|
|
|
ITS GND BOX (POLY) TY 1 (243624)W/APRN
|
EA
|
2.000
|
$4,174.500
|
$7,533.140
|
$8,500.000
|
$6,000.000
|
|
|
ITS GND BOX (POLY) TY 2 (366036)W/APRN
|
EA
|
1.000
|
$6,325.000
|
$14,957.100
|
$7,500.000
|
$9,500.000
|
|
|
SYSTEM INTEGRATION
|
LS
|
1.000
|
$158,125.000
|
$8,188.190
|
$60,000.000
|
$30,000.000
|
|
|
SANITARY SEWER (PVC)(8")(SDR-26)
|
LF
|
1,274.000
|
$139.150
|
$125.000
|
$159.830
|
$140.000
|
|
|
SANITARY SEWER (PVC)(6")(SDR-26)
|
LF
|
22.000
|
$126.500
|
$175.000
|
$173.020
|
$130.000
|
|
|
6" SANITARY SEWER CLEANOUT
|
EA
|
2.000
|
$885.500
|
$3,000.000
|
$1,012.260
|
$2,000.000
|
|
|
SEWER TO EXISTING MANHOLE
|
EA
|
1.000
|
$2,407.980
|
$10,000.000
|
$5,404.610
|
$25,000.000
|
|
|
SANITARY SEWER MANHOLE (4')
|
EA
|
5.000
|
$12,650.000
|
$20,000.000
|
$7,500.000
|
$15,000.000
|
|
|
LED GSA ILL ASSEMBLY(1 FIXTURE)
|
EA
|
7.000
|
$12,270.500
|
$6,004.680
|
$7,500.000
|
$4,600.000
|
|
|
LED GSA ILL ASSEMBLY(2 FIXTURES)
|
EA
|
16.000
|
$14,168.000
|
$6,878.080
|
$8,000.000
|
$6,800.000
|
|
|
LED GSA ILL ASSEMBLY(1 FIXTURE)(REMOVE)
|
EA
|
9.000
|
$1,518.000
|
$600.470
|
$750.000
|
$400.000
|
|
|
PRE-ENGINEERED BUILDING(CANOPY)
|
LS
|
1.000
|
$487,025.000
|
$700,000.000
|
$1,025,632.000
|
$775,000.000
|
|
|
PRE-ENGINEERED BUILDING(CANOPY REPAIR)
|
LS
|
1.000
|
$40,000.000
|
$120,000.000
|
$125,563.000
|
$550,000.000
|
|
|
PRE-ENGINEERED BUILDING(BOOTHS)
|
LS
|
1.000
|
$253,000.000
|
$1,000,000.000
|
$832,156.000
|
$800,000.000
|
|
|
CONCRETE PAVEMENT STITCHING
|
LF
|
1,100.000
|
$50.000
|
$100.000
|
$20.000
|
$60.000
|
|
|
WATER MAIN PIPE (PVC)(2")
|
LF
|
35.000
|
$127.000
|
$100.000
|
$100.630
|
$80.000
|
|
|
VALVE AND BOX (COMPLETE)(2")
|
EA
|
3.000
|
$650.000
|
$3,500.000
|
$4,143.740
|
$3,000.000
|
|
|
WATER SERVICE CONNECTION (2")
|
EA
|
1.000
|
$1,900.000
|
$7,500.000
|
$2,231.700
|
$700.000
|
|
|
DUCTILE IRON WATER FITTINGS W/RESTRAINT
|
TON
|
0.030
|
$5,500.000
|
$100,000.000
|
$5,000.000
|
$12,000.000
|
|
|
METER AND BOX (COMPLETE)(2")
|
EA
|
1.000
|
$1,900.000
|
$6,500.000
|
$3,000.000
|
$4,500.000
|
|
|
HYDROSTATIC TESTING
|
EA
|
1.000
|
$4,500.000
|
$2,000.000
|
$8,500.000
|
$2,500.000
|
|
|
WATER LINE ADJUSTMENT
|
EA
|
3.000
|
$6,400.000
|
$5,500.000
|
$3,500.000
|
$17,000.000
|
|
Totals: |
$5,246,981.262
|
$6,961,346.030
|
$7,936,208.940
|
$8,756,263.500
|