Bid Cobra

PRE-ENGINEERED BUILDING(CANOPY REPAIR)

Engineer's Estimate

Average: $40,000.00
Maximum: $40,000.00
Minimum: $40,000.00

Bid Information

Average Bid: $265,187.67