Show Job Controls
Bid Cobra

HIDALGO UP 281 (0255-09-094)

Items: 150

County: HIDALGO
Length: N/A
Highway: UP 281
District: PHARR
Control Number: 0255-09-094
DBE Goal: N/A
Project: NH 2019(045)
Guaranty: N/A
Time: 440 WORKING DAYS
Engineer's Estimate: $19,245,789.93
Date: 09/07/2018 (7 years ago)
Contract Number: N/A
Type: REHABILITATE ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$19,245,789.93
$23,982,430.46
Over/Under Est: 24.61% $4,736,640.53
$25,914,632.25
Over/Under Est: 34.65% $6,668,842.32
Amt Left: 8.06% $1,932,201.79
Over/Under Est: 40.15% $7,727,066.46
Amt Left: 12.47% $2,990,425.93
Delta: -4.08% -$1,058,224.14
$28,405,918.88
Over/Under Est: 47.6% $9,160,128.95
Amt Left: 18.44% $4,423,488.42
Delta: -5.31% -$1,433,062.49

Bid Items & Bid Tabulations

150 Total 0 of 150
HIDALGO  |  UP 281  |  PHARR  |  0255-09-094  |  09/07/2018  |  $19,245,789.93  |  NH 2019(045)  |  REHAB ROADWAY  |  440 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
IOC COMPANY, LLC
FOREMOST PAVING, INC.
ANDERSON COLUMBIA CO., INC.
TEXAS SAI, INC.
REMOVING CONC (RIPRAP)
SY 240.000 $11.000 $10.000 $18.000 $10.000 $11.000
REMOVING CONC (SIDEWALKS)
SY 1,892.000 $6.000 $7.000 $16.000 $15.000 $6.000
REMOVING CONC (DRIVEWAYS)
SY 3,772.000 $9.000 $10.000 $14.500 $10.000 $7.500
REMOVING CONC (CURB AND GUTTER)
LF 29,502.000 $2.500 $4.000 $2.750 $4.000 $4.000
REMOVE CONC (ABUTMENT BACKWALL)
CY 7.000 $8.000 $1,000.000 $1,200.000 $900.000 $600.000
REMOVING STAB BASE AND ASPH PAV (21")
SY 161,680.000 $4.000 $5.000 $4.650 $6.000 $4.500
RMV STAB BASE & ASPH PV (17")
SY 8,035.000 $4.000 $6.000 $7.500 $5.000 $3.500
EXCAVATION (ROADWAY)
CY 56,855.000 $3.750 $4.800 $9.000 $4.000 $7.500
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 1,800.000 $6.000 $4.250 $2.750 $6.000 $6.000
BACKFILL (TY A)
STA 138.000 $130.000 $59.000 $100.000 $200.000 $120.000
FURNISHING AND PLACING TOPSOIL
CY 100.000 $26.000 $30.000 $25.000 $40.000 $33.000
CELL FBR MLCH SEED(PERM)(URBAN)(CLAY)
SY 52,107.000 $0.300 $0.230 $0.250 $0.220 $0.230
CELL FBR MLCH SEED(TEMP)(WARM)
SY 52,107.000 $0.400 $0.200 $0.250 $0.200 $0.200
VEGETATIVE WATERING
MG 1,000.000 $11.000 $31.000 $33.000 $33.000 $35.000
SOIL RETENTION BLANKETS (CL 1) (TY C)
SY 2,500.000 $1.500 $1.500 $2.500 $2.400 $2.380
SPRINKLING (DUST CONTROL)
MG 1,000.000 $10.000 $1.000 $1.000 $4.000 $10.500
PROOF ROLLING
HR 13.000 $55.000 $65.000 $65.000 $84.000 $75.000
LIME TRT (EXST MATL) (12")
SY 177,851.000 $1.500 $2.000 $3.100 $3.200 $1.700
LIME (HYD, COM, OR QK(SLURRY))
TON 5,319.000 $150.000 $128.000 $132.000 $160.000 $202.000
PRIME COAT (MC-30)
GAL 32,345.000 $3.500 $3.750 $3.500 $3.400 $4.500
D-GR HMA TY-D SAC-B PG64-22
TON 36,873.000 $77.000 $75.000 $67.000 $74.000 $66.000
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
TON 5,846.000 $90.000 $95.000 $92.000 $110.000 $102.000
PLANE ASPH CONC PAV (1.5")
SY 48,057.000 $1.200 $1.000 $1.500 $1.200 $1.700
PLANE ASPH CONC PAV (0" TO 1 1/2")
SY 5,853.000 $1.600 $2.500 $2.600 $1.800 $3.700
CONC PVMT (CONT REINF - CRCP) (12.5")
SY 161,679.000 $54.000 $75.000 $86.750 $87.000 $96.000
CONC PVMT (CONT REINF)(FAST TRK)(15")
SY 8,035.000 $90.000 $95.000 $145.000 $132.000 $124.000
FULL - DEPTH REPAIR CRCP (9")
SY 15.000 $195.000 $475.000 $400.000 $360.000 $580.000
FULL - DEPTH REPAIR CPJR (13")
SY 19.000 $260.000 $500.000 $600.000 $360.000 $400.000
CEM STABIL BKFL
CY 10.000 $60.000 $135.000 $65.000 $65.000 $65.000
STRUCT EXCAV (SPECIAL)
CY 10.000 $37.000 $200.000 $55.000 $56.000 $55.000
APPROACH SLAB
CY 145.000 $495.000 $455.000 $600.000 $425.000 $450.000
RIPRAP (MOW STRIP)(4 IN)
CY 240.000 $400.000 $345.000 $355.000 $322.000 $315.000
ARMOR JOINT
LF 83.000 $85.000 $105.000 $150.000 $100.000 $180.000
RC PIPE (CL III)(18 IN)
LF 8.000 $55.000 $175.000 $53.000 $53.000 $52.500
RC PIPE (CL III)(36 IN)
LF 8.000 $105.000 $250.000 $98.000 $96.000 $95.000
RC PIPE (CL IV) (24 IN) (SPL)
LF 146.000 $49.000 $110.000 $50.000 $50.000 $48.220
SET (TY II) (18 IN) (RCP) (3: 1) (C)
EA 1.000 $650.000 $914.000 $1,000.000 $1,000.000 $985.000
SET (TY II) (18 IN) (RCP) (6: 1) (C)
EA 1.000 $1,300.000 $1,000.000 $1,000.000 $1,000.000 $985.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 2.000 $1,000.000 $1,000.000 $1,300.000 $1,270.000 $1,250.000
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 2.000 $1,300.000 $1,000.000 $1,400.000 $1,370.000 $1,350.000
SET (TY II) (36 IN) (RCP) (3: 1) (C)
EA 1.000 $1,900.000 $1,800.000 $2,900.000 $2,900.000 $2,850.000
CLEAN EXIST CULVERTS
EA 1.000 $1,100.000 $2,000.000 $2,500.000 $2,550.000 $2,500.000
REMOV STR (SET)
EA 1.000 $250.000 $455.000 $700.000 $660.000 $650.000
REMOV STR (PIPE)
LF 8.000 $10.000 $62.000 $25.000 $26.000 $25.000
MOBILIZATION
LS 1.000 $975,000.080 $2,348,048.050 $1,300,000.000 $1,865,000.000 $2,096,988.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 22.000 $5,000.000 $4,000.000 $6,500.000 $2,500.000 $8,000.000
CONSTRUCTION EXITS (INSTALL) (TY 2)
SY 5,850.000 $20.000 $8.000 $17.000 $26.000 $42.000
CONSTRUCTION EXITS (REMOVE)
SY 5,850.000 $10.000 $2.500 $10.000 $6.500 $9.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 150.000 $3.500 $5.000 $3.000 $3.000 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 150.000 $0.880 $1.000 $0.500 $0.500 $0.500
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 7,955.000 $4.000 $8.000 $4.000 $4.000 $4.500
BIODEG EROSN CONT LOGS (REMOVE)
LF 9,055.000 $1.000 $0.750 $0.500 $0.500 $1.000
BIODEG EROSN CONT LOGS (INSTL) (6")
LF 1,100.000 $0.980 $5.870 $3.000 $3.000 $4.000
CONSTRUCTING DETOURS
SY 14,049.000 $30.000 $25.000 $44.000 $49.000 $75.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 2)
LF 4,380.000 $30.000 $17.000 $25.000 $49.000 $21.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 3,795.000 $22.000 $20.000 $10.000 $44.000 $18.000
PORT CTB (MOVE)(SGL SLP)(TY 2)
LF 13,100.000 $5.000 $4.000 $4.000 $6.000 $6.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 29,235.000 $5.000 $4.000 $6.000 $6.000 $6.000
PORT CTB (REMOVE)(SGL SLP)(TY 2)
LF 4,380.000 $5.000 $10.000 $6.000 $14.000 $8.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 3,795.000 $6.500 $10.000 $5.000 $14.000 $6.000
LANDSCAPE PAVERS
SY 5.000 $122.000 $222.000 $150.000 $320.000 $125.000
REMOVE AND RELAY PAVERS
SY 25.000 $55.000 $50.000 $150.000 $260.000 $200.000
CONC CURB (MONO) (TY II)
LF 29,287.000 $7.500 $4.430 $8.500 $7.000 $5.050
DRIVEWAYS (CONC)
SY 3,772.000 $55.000 $52.000 $45.000 $39.000 $38.000
DRIVEWAYS (ACP)
SY 5,404.000 $30.000 $24.000 $34.000 $22.000 $28.000
CONC SIDEWALKS (4")
SY 1,892.000 $45.000 $35.000 $36.000 $42.000 $36.250
MTL W-BEAM GD FEN (TIM POST)
LF 3,260.000 $25.000 $23.980 $22.000 $22.000 $21.500
MTL BEAM GD FEN TRANS (TL2)
EA 7.000 $905.000 $2,085.650 $865.000 $880.000 $860.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 12.000 $1,060.000 $2,310.650 $945.000 $960.000 $940.000
MTL THRIE-BEAM GD FEN (TIM POST)
EA 11.000 $1,600.000 $2,870.610 $1,600.000 $1,600.000 $1,575.000
REMOVE METAL BEAM GUARD FENCE
LF 3,260.000 $3.000 $9.230 $1.500 $1.500 $1.500
REMOVE TERMINAL ANCHOR SECTION
EA 12.000 $200.000 $1,796.420 $175.000 $175.000 $170.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 11.000 $289.000 $1,840.670 $200.000 $200.000 $195.000
GUARDRAIL END TREATMENT (INSTALL)
EA 17.000 $2,700.000 $3,015.150 $2,700.000 $2,730.000 $2,680.000
GUARDRAIL END TREATMENT (REMOVE)
EA 17.000 $213.000 $488.200 $230.000 $235.000 $230.000
CRASH CUSH ATTEN (INSTL)
EA 10.000 $12,000.000 $9,058.790 $8,400.000 $8,570.000 $7,000.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 36.000 $1,500.000 $1,464.600 $1,200.000 $1,200.000 $1,400.000
CRASH CUSH ATTEN (REMOVE)
EA 10.000 $800.000 $732.300 $950.000 $930.000 $600.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 25.000 $250.000 $293.580 $230.000 $230.000 $230.000
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 1.000 $250.000 $424.340 $275.000 $255.000 $270.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 9.000 $580.000 $664.550 $645.000 $590.000 $640.000
REPLACE LUMINAIRE W/LED (250W EQ)
EA 8.000 $800.000 $750.000 $750.000 $850.000 $600.000
CONDT (PVC) (SCH 40) (1")
LF 1,045.000 $22.000 $10.000 $10.000 $11.000 $21.000
CONDT (PVC) (SCH 80) (4") (BORE)
LF 537.000 $65.000 $25.000 $25.000 $28.000 $42.000
ALUMINUM SIGNS (TY A)
SF 68.000 $20.000 $55.080 $25.000 $31.000 $20.500
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 1.000 $550.000 $699.070 $700.000 $740.000 $660.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 4.000 $625.000 $624.680 $850.000 $970.000 $815.000
REMOVE SM RD SN SUP&AM
EA 5.000 $70.000 $82.720 $90.000 $76.000 $85.000
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
EA 11.000 $26.000 $8.590 $30.000 $20.000 $29.000
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
EA 1.000 $60.000 $58.500 $52.000 $76.000 $51.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 33.000 $50.000 $392.660 $10.000 $20.000 $10.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 18.000 $26.000 $35.530 $34.000 $25.000 $34.000
INSTL OM ASSM (OM-2Y)(WC)GND(BI)
EA 4.000 $60.000 $35.470 $57.000 $56.000 $56.000
WK ZN PAV MRK REMOV (W)4"(DOT)
LF 200.000 $1.200 $0.850 $0.900 $1.500 $0.850
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 68,460.000 $0.600 $0.550 $0.600 $0.650 $0.550
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 22,800.000 $1.650 $1.200 $1.200 $1.700 $1.200
WK ZN PAV MRK REMOV (W)12"(SLD)
LF 4,435.000 $2.750 $2.200 $2.250 $2.500 $2.200
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 1,050.000 $6.500 $4.800 $4.800 $5.000 $4.800
WK ZN PAV MRK REMOV (W)(ARROW)
EA 14.000 $118.000 $160.000 $165.000 $250.000 $160.000
WK ZN PAV MRK REMOV (W)(DBL ARROW)
EA 3.000 $390.000 $220.000 $220.000 $460.000 $220.000
WK ZN PAV MRK REMOV (W)(WORD)
EA 13.000 $165.000 $220.000 $220.000 $480.000 $220.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 69,300.000 $0.600 $0.550 $0.600 $0.700 $0.550
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 3,500.000 $0.850 $1.160 $1.000 $1.500 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 3,500.000 $1.100 $1.160 $1.000 $1.500 $1.000
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 1,510.000 $0.750 $1.800 $2.000 $0.600 $1.800
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 10,735.000 $0.750 $1.200 $1.250 $0.800 $1.200
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 2,030.000 $2.500 $3.200 $3.250 $1.500 $3.200
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 675.000 $5.500 $7.800 $7.800 $3.000 $7.800
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 260.000 $2.750 $4.200 $4.250 $2.000 $4.200
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 5,800.000 $0.300 $0.340 $0.350 $0.400 $0.340
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 53,200.000 $0.300 $0.360 $0.400 $0.400 $0.360
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 8,350.000 $0.300 $0.340 $0.350 $0.500 $0.340
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 70,770.000 $0.300 $0.320 $0.330 $0.400 $0.320
PREFAB PAV MRK TY B (W)(4")(BRK)CNTST
LF 8,800.000 $2.000 $5.800 $6.000 $8.000 $5.800
PREFAB PAV MRK TY B (W)(BIKE ARROW)
EA 14.000 $200.000 $80.000 $80.000 $130.000 $80.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 35.000 $195.000 $220.000 $225.000 $215.000 $220.000
PREFAB PAV MRK TY C (W) (DBL ARROW)
EA 4.000 $350.000 $380.000 $400.000 $400.000 $380.000
PREFAB PAV MRK TY C (W) (WORD)
EA 30.000 $245.000 $240.000 $250.000 $310.000 $240.000
PREFAB PAV MRK TY C (W)(BIKE SYMBOL)
EA 14.000 $318.000 $190.000 $200.000 $200.000 $190.000
REFL PAV MRKR TY I-C
EA 860.000 $2.950 $2.800 $3.000 $3.600 $2.800
REFL PAV MRKR TY II-A-A
EA 1,310.000 $3.200 $2.800 $3.000 $3.600 $2.800
REFL PAV MRKR TY II-C-R
EA 450.000 $3.200 $2.800 $3.000 $3.600 $2.800
ELIM EXT PAV MRK & MRKS (4")
LF 75,000.000 $0.400 $0.600 $0.650 $0.400 $0.600
ELIM EXT PAV MRK & MRKS (WORD)
EA 8.000 $50.000 $80.000 $80.000 $25.000 $80.000
ELIM EXT PAV MRK & MRKS (SYMBOL)
EA 4.000 $70.000 $80.000 $80.000 $25.000 $80.000
ELIM EXT PAV MRK & MARKS (BIKE WORD)
EA 4.000 $60.000 $80.000 $80.000 $25.000 $80.000
REMOVING TRAFFIC SIGNALS
EA 3.000 $3,730.000 $2,500.000 $5,000.000 $2,850.000 $1,600.000
TEMP TRAF SIGNALS
EA 12.000 $3,300.000 $4,500.000 $15,000.000 $5,100.000 $3,800.000
VEH SIG SEC (12")LED(GRN)
EA 31.000 $240.000 $250.000 $250.000 $285.000 $270.000
VEH SIG SEC (12")LED(GRN ARW)
EA 9.000 $240.000 $250.000 $250.000 $285.000 $270.000
VEH SIG SEC (12")LED(YEL)
EA 31.000 $230.000 $250.000 $250.000 $285.000 $270.000
VEH SIG SEC (12")LED(YEL ARW)
EA 9.000 $250.000 $250.000 $250.000 $285.000 $270.000
VEH SIG SEC (12")LED(RED)
EA 33.000 $230.000 $250.000 $250.000 $285.000 $270.000
PED SIG SEC (LED)(COUNTDOWN)
EA 20.000 $702.000 $450.000 $500.000 $510.000 $730.000
BACK PLATE (12")(3 SEC)
EA 24.000 $82.000 $75.000 $75.000 $85.000 $95.000
BACK PLATE (12")(4 SEC)
EA 2.000 $97.000 $88.000 $88.000 $100.000 $105.000
BACK PLATE (12")(5 SEC)
EA 7.000 $99.000 $102.000 $105.000 $115.000 $110.000
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
LF 3,883.000 $1.200 $1.900 $2.000 $2.150 $2.100
TRF SIG CBL (TY A)(12 AWG)(5 CONDR)
LF 300.000 $2.040 $2.400 $3.000 $2.700 $2.750
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
LF 135.000 $2.200 $2.600 $5.000 $3.000 $3.200
PED DETECT PUSH BUTTON (APS)
EA 20.000 $850.000 $725.000 $750.000 $825.000 $830.000
PED DETECTOR CONTROLLER UNIT
EA 3.000 $3,800.000 $3,500.000 $3,500.000 $4,000.000 $2,800.000
VEH LP DETECT (SAWCUT)
LF 4,158.000 $9.800 $8.000 $8.000 $9.000 $12.000
REMOVAL OF PEDESTRIAN RAMPS
EA 16.000 $88.000 $428.000 $550.000 $204.000 $200.000
INSTALL OF PEDESTRIAN RAMPS
EA 16.000 $1,500.000 $1,240.440 $650.000 $815.000 $800.000
TREE REMOVAL (18" - 24" DIA)
EA 2.000 $787.000 $824.390 $650.000 $610.000 $600.000
TRANSPLANT PLANT MATERIAL
EA 2.000 $1,000.000 $1,000.000 $1,000.000 $970.000 $950.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 210.000 $75.000 $63.240 $75.000 $53.000 $110.000
TMA (STATIONARY)
EA 2.000 $13,257.000 $7,014.920 $7,500.000 $25,000.000 $508.000
TMA (MOBILE OPERATION)
DAY 100.000 $189.000 $497.160 $325.000 $33.000 $71.000
Totals: $19,245,789.930 $23,982,430.460 $25,914,632.250 $26,972,856.390 $28,405,918.880