WEBB IH 35 (0018-06-136)

Items: 358

County: WEBB
Length: N/A
Highway: IH 35
District: LAREDO
Control Number: 0018-06-136
DBE Goal: N/A
Project: C 18-6-136
Guaranty: N/A
Time: 1112 WORKING DAYS
Engineer's Estimate: $100,875,581.28
Date: 06/04/2020 (6 years ago)
Contract Number: N/A
Type: GRADE,BASE,STRUCT,ACP,SIGN,PAV MRKS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$100,875,581.28
1
$114,884,943.92
Over/Under Est: 13.89% $14,009,362.64
Over/Under Est: 23.8% $24,009,303.24
Amt Left: 8.7% $9,999,940.60
$126,195,649.48
Over/Under Est: 25.1% $25,320,068.20
Amt Left: 9.85% $11,310,705.56
Delta: -1.05% -$1,310,764.96
Over/Under Est: 30.75% $31,016,015.56
Amt Left: 14.8% $17,006,652.92
Delta: -4.51% -$5,695,947.36
Subcontractor Percentage Amount
TRAF-TEX, INC. 5.50% $6,648,528.36
TEXAS MATERIALS GROUP, INC. 3.20% $3,868,234.68
ATS DRILLING, INC. 3.12% $3,771,528.82
GP7 CONSTRUCTION INC. 1.62% $1,958,293.81
FRANK JR REINFORCEMENT LLC 1.52% $1,837,411.47
BEXAR COUNTY CONCRETE, LLC 1.14% $1,378,058.61
TERRA CONSTRUCTION LLC 0.97% $1,172,558.64
FLOVERA CONSTRUCTION SERVICES, LLC 0.86% $1,039,588.07
SCOTT DERR PAINTING CO, LLC 0.55% $664,852.84
ANCORTEX, INC. 0.50% $604,411.67
ANGEL BROTHERS HOLDINGS CORP. 0.50% $604,411.67
E & R WELDING 0.39% $471,441.10
MUNOZ FOUNDATION DRILLING, INC. 0.36% $435,176.40
FLASHER EQUIPMENT COMPANY 0.20% $241,764.67
LAREDO STRIPING, INC. 0.20% $241,764.67
A BROTHERS MILLING, LLC 0.19% $229,676.43
LONE STAR EROSION CONTROL 0.15% $181,323.50
MTAM CORPORATION 0.11% $132,970.57
HIGHWAY PAVEMENT SPECIALTIES, INC. 0.10% $120,882.33
SK CONCRETE SERVICES LLC 0.09% $108,794.10
WILLIAMS ROAD, LLC 0.08% $96,705.87
TEXAS STEEL INDUSTRIAL PLACING, LLC 0.07% $84,617.63
DTSG CONSTRUCTION 0.03% $36,264.70
BUYERS BARRICADES SAN ANTONIO, LLC 0.01% $12,088.23
RODD FRANK HOLDINGS LLC 0.00% $0.00
TEXAS CUTTING & CORING GP, INC. 0.00% $0.00
PENHALL COMPANY 0.00% $0.00
Total: 21.46% $25,941,348.84

Bid Items & Bid Tabulations

358 Total 0 of 358
WEBB  |  IH 35  |  LAREDO  |  0018-06-136  |  06/04/2020  |  $100,875,581.28  |  C 18-6-136  |  GRADE,BASE,STRUCT,ACP,SIGN,PAV MRKS  |  1112 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
WEBBER, LLC
ANDERSON COLUMBIA CO., INC.
PULICE CONSTRUCTION, INC.
THE LANE CONSTRUCTION CORPORATION
PREPARING ROW
STA 202.110 $1,500.000 $34,230.000 $5,350.000 $27,700.000 $46,100.000
PREPARING ROW(TREE)(5" TO 12" DIA)
EA 6.000 $3,500.000 $606.000 $700.000 $1,000.000 $405.000
REMOVING CONC (PAV)
SY 811.000 $20.000 $22.900 $38.000 $30.000 $23.900
REMOVING CONC (RIPRAP)
SY 2,855.000 $10.000 $14.100 $11.000 $15.000 $20.100
REMOVING CONC (FOUNDATIONS)
SY 26.000 $42.000 $396.000 $120.000 $200.000 $63.000
REMOVING CONC (SIDEWALKS)
SY 195.000 $20.000 $12.800 $18.000 $25.000 $10.900
REMOVING CONC (DRIVEWAYS)
SY 16.000 $25.000 $45.000 $62.000 $150.000 $101.000
REMOVING CONC (CURB)
LF 98.000 $7.000 $5.250 $10.000 $24.000 $19.300
REMOVING CONC (CURB AND GUTTER)
LF 1,021.000 $8.000 $6.650 $11.000 $13.000 $24.500
REMOVING CONC (CTB)
LF 3,797.000 $20.000 $12.100 $20.000 $25.000 $17.500
REMOVING CONC (SIDEWALK OR RAMP)
SY 427.000 $25.000 $11.200 $10.000 $25.000 $15.500
REMOVE CONC (RAIL)
LF 511.000 $22.000 $37.500 $32.000 $40.000 $26.400
REMOVING CONC (FLUME)
SY 53.000 $27.000 $12.100 $18.000 $50.000 $86.000
REMOVING STAB BASE & ASPH PAV(12"-27")
SY 79,354.000 $8.500 $4.800 $18.000 $12.000 $13.400
OBLITERATING ABANDONED ROAD
SY 307.000 $7.500 $23.800 $12.000 $30.000 $26.300
EXCAVATION (ROADWAY)
CY 220,894.000 $10.000 $8.450 $16.000 $15.000 $8.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 171,062.000 $7.500 $10.700 $12.000 $18.000 $5.700
BACKFILL (TY B)
STA 14.000 $250.000 $3,320.000 $500.000 $2,250.000 $351.000
FURNISHING AND PLACING TOPSOIL (6")
SY 125,862.000 $1.000 $2.650 $1.640 $5.350 $3.360
BROADCAST SEED (TEMP) (WARM)
SY 62,931.000 $0.250 $0.050 $0.120 $0.140 $0.120
BROADCAST SEED (TEMP) (COOL)
SY 62,931.000 $0.100 $0.050 $0.120 $0.130 $0.120
DRILL SEEDING (PERM) (URBAN) (CLAY)
AC 26.000 $0.100 $436.000 $1,100.000 $674.150 $800.000
VEGETATIVE WATERING
MG 3,089.000 $12.000 $45.000 $44.000 $37.040 $21.200
SPRINKLING (DUST CONTROL)
MG 385.000 $15.000 $70.500 $50.000 $5.340 $34.100
PROOF ROLLING
HR 43.000 $100.000 $336.000 $82.000 $125.000 $150.000
PRIME COAT (MC-30)
GAL 27,580.000 $5.150 $5.300 $5.000 $4.950 $6.000
D-GR HMA(SQ) TY-B PG64-22
TON 4,856.000 $85.000 $119.000 $112.000 $100.000 $134.000
CONC PVMT (CONT REINF - CRCP) (12")
SY 53,569.000 $85.000 $79.000 $90.000 $79.390 $85.000
CONC PVMT (CONT REINF - CRCP) (14")
SY 59,920.000 $65.000 $93.500 $100.000 $92.390 $95.000
CONC PVMT (JOINTED - CPCD) (12")
SY 5,966.000 $75.000 $81.500 $90.000 $91.390 $90.000
CONC PVMT (JOINTED-CPCD)(HES)(12")
SY 1,522.000 $75.000 $111.000 $120.000 $106.390 $105.000
CEM STABIL BKFL
CY 3,108.000 $150.000 $70.500 $50.000 $137.270 $160.000
CUT & RESTORE ASPH PAVING
SY 186.000 $110.000 $64.750 $64.000 $150.000 $67.000
CEMENT STAB BACKFILL (INLET OR MH)
CY 225.000 $70.000 $50.250 $50.000 $297.270 $52.000
TRENCH EXCAVATION PROTECTION
LF 7,140.000 $2.500 $6.400 $6.500 $1.000 $6.600
TEMPORARY SPL SHORING
SF 22,337.000 $12.000 $27.000 $15.000 $30.290 $45.300
DRILL SHAFT (36 IN)
LF 1,664.000 $220.000 $162.000 $210.000 $154.210 $163.000
DRILL SHAFT (42 IN)
LF 4,880.000 $240.000 $187.000 $220.000 $202.350 $248.000
DRILL SHAFT (48 IN)
LF 40.000 $400.000 $635.000 $640.000 $620.000 $316.000
DRILL SHAFT (54 IN)
LF 2,198.000 $375.000 $294.000 $310.000 $304.100 $374.000
DRILL SHAFT (60 IN)
LF 4,490.000 $510.000 $414.000 $400.000 $400.970 $490.000
DRILL SHAFT (78 IN)
LF 1,400.000 $925.000 $659.000 $680.000 $682.770 $830.000
DRILL SHAFT (SIGN MTS) (12 IN)
LF 30.000 $110.000 $164.000 $130.000 $189.500 $79.000
DRILL SHAFT (SIGN MTS) (24 IN)
LF 24.000 $150.000 $251.000 $130.000 $189.500 $159.000
DRILL SHAFT (SIGN MTS) (48 IN)
LF 443.000 $450.000 $656.000 $460.000 $640.000 $630.000
DRILL SHAFT (SIGN MTS) (54 IN)
LF 67.000 $510.000 $717.000 $510.000 $700.000 $610.000
DRILL SHAFT (HIGH MAST POLE) (60 IN)
LF 930.000 $553.000 $820.000 $820.000 $800.000 $550.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 8.000 $220.000 $277.000 $155.000 $270.000 $159.000
CL C CONC (ABUT)
CY 181.000 $850.000 $1,090.000 $1,100.000 $800.000 $1,290.000
CL C CONC (CAP)
CY 2,107.000 $920.000 $850.000 $1,200.000 $1,000.000 $1,160.000
CL C CONC (CAP)(MASS)
CY 2,587.000 $750.000 $717.000 $1,100.000 $1,400.000 $950.000
CL C CONC (COLUMN)
CY 2,070.000 $810.000 $1,010.000 $1,100.000 $1,400.000 $1,250.000
CL C CONC (COLUMN)(MASS)
CY 5,159.000 $700.000 $740.000 $1,100.000 $1,600.000 $900.000
CL C CONC (FOOTING)(MASS)
CY 2,465.000 $600.000 $638.000 $700.000 $360.000 $670.000
CL C CONC (RAIL FOUNDATION)
CY 526.000 $400.000 $367.000 $450.000 $320.000 $405.000
REINF CONC SLAB
SF 415,785.000 $14.500 $21.100 $19.300 $14.000 $19.000
APPROACH SLAB
CY 388.000 $445.000 $561.000 $750.000 $450.000 $450.000
RETAINING WALL (MSE)
SF 69,411.000 $65.000 $59.750 $70.000 $52.000 $71.000
RETAINING WALL (TEMP WALL)
SF 15,416.000 $18.000 $33.750 $46.000 $10.000 $13.500
PRESTR CONC GIRDER (TX54)
LF 32,417.000 $140.000 $141.000 $172.000 $135.000 $158.000
CONCRETE PAINT FINISH
SF 276,868.000 $0.500 $1.000 $0.840 $0.640 $0.830
RIPRAP (CONC)(4 IN)
CY 813.000 $400.000 $513.000 $365.000 $500.000 $498.000
RIPRAP (CONC) (CL B) (4")
CY 38.000 $450.000 $532.000 $800.000 $525.000 $590.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 74.000 $115.000 $350.000 $225.000 $475.000 $117.000
RIPRAP (MOW STRIP)(4 IN)
CY 211.000 $480.000 $574.000 $420.000 $525.000 $530.000
RIPRAP (CONC)(CLB)(TINT)
CY 361.000 $480.000 $663.000 $550.000 $650.000 $640.000
ELASTOMERIC BEARING (EE3)
EA 10.000 $1,390.000 $2,570.000 $1,100.000 $1,344.800 $1,860.000
ELASTOMERIC BEARING (EE5)
EA 4.000 $1,500.000 $2,570.000 $2,100.000 $1,593.280 $2,260.000
ELASTOMERIC BEARING (EE6)
EA 16.000 $1,800.000 $2,570.000 $1,700.000 $1,598.620 $1,890.000
ELASTOMERIC BEARING (E7)
EA 8.000 $3,000.000 $2,570.000 $3,200.000 $2,722.680 $3,530.000
ELASTOMERIC BEARING (E9)
EA 8.000 $2,800.000 $2,570.000 $3,400.000 $3,048.640 $3,760.000
ELASTOMERIC BEARING (F5)
EA 5.000 $1,600.000 $2,570.000 $2,900.000 $2,134.930 $3,190.000
ELASTOMERIC BEARING (F7)
EA 8.000 $3,150.000 $2,570.000 $3,200.000 $2,644.640 $3,530.000
ELASTOMERIC BEARING (F9)
EA 12.000 $2,700.000 $2,570.000 $3,500.000 $3,001.890 $3,710.000
SLIDING ELASTOMERIC BEARING (ES 4)
EA 8.000 $1,500.000 $2,570.000 $2,200.000 $2,140.220 $2,650.000
SLIDING ELASTOMERIC BEARING (ES 6)
EA 8.000 $1,800.000 $2,570.000 $2,400.000 $2,158.920 $2,960.000
HLMR BEARING (F - 900)
EA 10.000 $5,000.000 $5,570.000 $2,400.000 $4,036.150 $7,800.000
HLMR BEARING (E - 500)
EA 16.000 $5,000.000 $5,570.000 $4,000.000 $4,536.150 $3,100.000
HLMR BEARING (E - 900)
EA 16.000 $5,000.000 $5,570.000 $5,000.000 $4,536.150 $4,830.000
HLMR BEARING (GE - 500)
EA 20.000 $5,000.000 $5,570.000 $7,500.000 $4,536.150 $5,000.000
HLMR BEARING (GE - 900)
EA 10.000 $5,000.000 $5,570.000 $7,800.000 $5,536.150 $5,300.000
ELASTOMERIC BEARING(EE4)
EA 4.000 $1,700.000 $2,570.000 $2,000.000 $1,523.020 $2,180.000
STR STEEL (PLATE GIRDER)
LB 12,222,070.000 $1.650 $1.650 $1.750 $1.780 $2.050
RAIL (TY SSTR)
LF 349.000 $96.000 $60.250 $82.000 $87.230 $105.000
RAIL (TY T80HT)
LF 6,866.000 $130.000 $138.000 $200.000 $142.940 $136.000
RAIL (TY T80SS)
LF 26,054.000 $135.000 $72.500 $88.000 $77.520 $90.000
RAIL (HANDRAIL)(TY F)
LF 623.000 $125.000 $88.250 $140.000 $95.000 $92.000
RAIL (TY T80SS) W/DRAIN SLOTS
LF 1,700.000 $100.000 $73.000 $90.000 $79.970 $91.000
RAIL (TY T80TT)
LF 1,320.000 $290.000 $168.000 $320.000 $173.150 $325.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 1,227.000 $120.000 $128.000 $175.000 $116.150 $141.000
SEALED EXPANSION JOINT (5 IN) (SEJ - M)
LF 760.000 $120.000 $120.000 $230.000 $132.420 $136.000
CONC BOX CULV (5 FT X 2 FT)
LF 157.000 $350.000 $286.000 $275.000 $430.000 $295.000
CONC BOX CULV (6 FT X 3 FT)
LF 515.000 $375.000 $371.000 $358.000 $560.000 $383.000
RC PIPE (CL III)(24 IN)
LF 6,051.000 $65.000 $61.500 $60.000 $87.000 $63.000
RC PIPE (CL III)(30 IN)
LF 951.000 $90.000 $98.750 $95.000 $95.000 $102.000
RC PIPE (CL III)(42 IN)
LF 666.000 $210.000 $140.000 $135.000 $155.000 $144.000
RC PIPE (CL IV)(18 IN)
LF 396.000 $65.000 $66.750 $80.000 $90.000 $69.000
RC PIPE (CL IV)(30 IN)
LF 720.000 $130.000 $103.000 $124.000 $120.000 $114.000
MANH (COMPL)(PRM)(48IN)
EA 12.000 $3,000.000 $5,460.000 $5,250.000 $5,225.000 $5,600.000
MANH (COMPL)(PRM)(60IN)
EA 7.000 $4,600.000 $5,720.000 $6,650.000 $7,000.000 $5,900.000
MANH (COMPL)(PRM)(72IN)
EA 1.000 $5,100.000 $10,030.000 $9,650.000 $10,000.000 $10,400.000
JCTBOX(COMPL)(PJB)(3FTX3FT)
EA 11.000 $3,300.000 $5,560.000 $5,350.000 $6,500.000 $5,700.000
JCTBOX(COMPL)(PJB)(8FTX8FT)
EA 4.000 $12,000.000 $10,760.000 $10,350.000 $28,500.000 $11,100.000
INLET (COMPL)(PCO)(5FT)(NONE)
EA 1.000 $3,800.000 $6,180.000 $4,500.000 $6,500.000 $4,830.000
INLET (COMPL)(PCO)(5FT)(RIGHT)
EA 1.000 $5,800.000 $6,980.000 $5,300.000 $6,750.000 $5,600.000
INLET (COMPL)(PCO)(5FT)(BOTH)
EA 5.000 $5,900.000 $7,600.000 $5,900.000 $7,500.000 $6,300.000
INLET (COMPL)(PSL)(FG)(4FTX4FT-3FTX3FT)
EA 9.000 $6,200.000 $4,420.000 $4,250.000 $6,750.000 $4,560.000
INLET(COMPL)(PAZD)(FG)(5FTX5FT-4FTX4FT)
EA 3.000 $5,300.000 $5,060.000 $4,900.000 $10,000.000 $5,200.000
INLET (COMPL)(TY AD)
EA 9.000 $3,300.000 $7,120.000 $7,750.000 $7,500.000 $7,300.000
INLET (COMPL)(TY AZ)
EA 3.000 $3,800.000 $8,620.000 $6,850.000 $7,500.000 $7,300.000
INLET (COMPL)(TY AZR2G)
EA 1.000 $9,500.000 $7,580.000 $7,300.000 $12,000.000 $7,800.000
INLET (COMPL)(TY AZ2G)
EA 5.000 $7,250.000 $8,580.000 $8,250.000 $10,000.000 $8,800.000
INLET (COMP) (TY SIDEWALK BRIDGE)
EA 1.000 $9,000.000 $10,500.000 $8,650.000 $12,500.000 $9,300.000
INLET (COMPL)(RWI)(TY I)
EA 7.000 $3,500.000 $9,660.000 $7,850.000 $6,000.000 $8,400.000
WINGWALL (FW - S) (HW=3 FT)
EA 1.000 $6,900.000 $10,260.000 $9,900.000 $27,750.000 $10,900.000
WINGWALL (PW - 1) (HW=5 FT)
EA 1.000 $10,500.000 $11,910.000 $11,500.000 $27,750.000 $12,600.000
SET (TY I)(S= 6 FT)(HW= 3 FT)(6:1) (C)
EA 1.000 $9,200.000 $9,220.000 $9,000.000 $6,750.000 $9,800.000
SET (TY II) (24 IN) (RCP) (3: 1) (P)
EA 1.000 $1,500.000 $1,510.000 $1,500.000 $2,000.000 $1,560.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 8.000 $1,200.000 $1,510.000 $1,500.000 $2,100.000 $1,560.000
SET (TY II) (24 IN) (RCP) (4: 1) (P)
EA 1.000 $1,300.000 $1,510.000 $1,500.000 $2,200.000 $1,560.000
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 5.000 $1,750.000 $3,640.000 $3,500.000 $3,600.000 $3,750.000
GRATE AND FRAME (BRIDGE DRAIN)
EA 43.000 $2,000.000 $1,930.000 $4,500.000 $2,005.880 $1,970.000
ADJUSTING MANHOLES
EA 4.000 $1,500.000 $1,300.000 $1,250.000 $4,000.000 $1,340.000
ADJUSTING INLETS
EA 5.000 $1,600.000 $1,300.000 $1,250.000 $2,500.000 $1,340.000
ADJUSTING INLET (CAP)
EA 23.000 $1,200.000 $1,300.000 $1,250.000 $2,500.000 $1,340.000
PIPE (PVC) (SCH 40) (6 IN)
LF 1,687.000 $46.000 $55.750 $22.000 $25.630 $23.600
PIPE (PVC) (SCH 40) (8 IN)
LF 646.000 $35.000 $55.750 $54.000 $18.340 $59.000
PIPE (PVC) (SCH 40) (18 IN)
LF 111.000 $70.000 $78.000 $78.000 $55.350 $71.000
REMOV STR (INLET)
EA 16.000 $560.000 $876.000 $880.000 $12,500.000 $910.000
REMOV STR (MANHOLE)
EA 7.000 $550.000 $884.000 $880.000 $1,250.000 $910.000
REMOV STR (SET)
EA 4.000 $670.000 $884.000 $880.000 $350.000 $910.000
REMOV STR (HEADWALL)
EA 4.000 $3,000.000 $884.000 $880.000 $5,000.000 $910.000
REMOV STR (PIPE)
LF 5,376.000 $13.000 $10.700 $11.000 $289.450 $11.000
REMOV STR (BOX CULVERT)
LF 183.000 $100.000 $92.000 $92.000 $110.000 $95.000
REMOVE STR (BOLLARD)
EA 6.000 $159.000 $307.000 $400.000 $169.020 $760.000
REMOV STR (WOOD STR)
EA 1.000 $15,000.000 $1,660.000 $2,400.000 $1,754.570 $3,850.000
MOBILIZATION
LS 1.000 $9,168,883.910 $11,000,000.000 $11,180,000.000 $12,619,564.940 $14,200,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 38.000 $8,000.000 $38,730.000 $48,500.000 $35,000.000 $13,000.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 60.000 $42.000 $35.000 $40.000 $56.090 $36.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 55.000 $40.000 $38.000 $45.000 $64.350 $39.100
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 20.000 $50.000 $70.000 $130.000 $205.330 $72.000
ROCK FILTER DAMS (REMOVE)
LF 135.000 $25.000 $15.000 $23.000 $31.210 $15.400
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 2,726.000 $22.000 $16.000 $22.000 $45.230 $16.500
CONSTRUCTION EXITS (REMOVE)
SY 2,726.000 $11.000 $2.000 $6.000 $11.470 $2.060
TEMP SEDMT CONT FENCE (INSTALL)
LF 27,641.000 $2.500 $2.150 $3.000 $3.480 $2.210
TEMP SEDMT CONT FENCE (REMOVE)
LF 27,641.000 $0.850 $1.000 $0.600 $0.840 $1.030
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 543.000 $12.000 $5.750 $8.000 $10.320 $5.900
BIODEG EROSN CONT LOGS (REMOVE)
LF 853.000 $5.000 $1.500 $1.000 $2.110 $1.540
BIODEG EROSN CONT LOGS (INSTL) (6")
LF 310.000 $5.000 $4.500 $5.500 $11.870 $4.630
CONSTRUCTING DETOURS
SY 23,554.000 $40.000 $67.500 $88.000 $76.330 $119.000
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
LF 21,150.000 $18.000 $7.500 $24.000 $8.360 $7.500
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
LF 2,060.000 $8.600 $8.450 $25.000 $11.690 $8.700
PORT CTB (DES SOURCE)(LOW PROF)(TY 2)
LF 80.000 $21.000 $10.100 $27.000 $22.260 $9.800
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 60,120.000 $4.250 $6.100 $20.000 $4.790 $5.800
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 27,240.000 $6.150 $9.150 $23.000 $5.280 $11.100
PORT CTB (STKPL)(F-SHAPE)(TY 1)
LF 6,000.000 $8.600 $9.150 $23.000 $5.700 $10.300
PORT CTB (STKPL)(LOW PROF)(TY 1)
LF 13,790.000 $6.750 $7.550 $25.000 $6.550 $10.700
PORT CTB (STKPL)(LOW PROF)(TY 2)
LF 80.000 $8.000 $10.300 $26.000 $31.230 $9.900
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 1,110.000 $8.000 $9.150 $30.000 $9.100 $6.800
PORT CTB REMOVE(F-SHAPE OR SNGL SLP)TY1
LF 10,650.000 $8.250 $7.550 $22.000 $9.920 $6.100
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 8,306.000 $60.000 $68.250 $94.000 $85.630 $65.000
PERM CTB (SGL SLOPE) (TY 3) (42 )
LF 1,720.000 $150.000 $220.000 $190.000 $116.330 $415.000
COLORED TEXTURED CONC (4")
SY 2,873.000 $62.000 $82.250 $70.000 $85.000 $74.000
LANDSCAPE PAVERS
SY 370.000 $95.000 $88.500 $95.000 $140.000 $79.000
REMOVE AND RELAY PAVERS
SY 415.000 $85.000 $150.000 $90.000 $175.000 $76.000
CONC CURB (TY I)
LF 301.000 $100.000 $12.500 $42.000 $35.000 $10.800
CONC CURB (MONO) (TY II)
LF 10,556.000 $3.900 $3.000 $15.000 $13.000 $4.490
CONC CURB & GUTTER (TY II)
LF 693.000 $42.000 $25.500 $32.000 $34.000 $24.300
CONC CURB (DOWEL)
LF 238.000 $50.000 $15.000 $16.000 $50.000 $12.600
CONC CURB (TY F1)
LF 303.000 $140.000 $90.000 $89.000 $75.000 $129.000
DRIVEWAYS (CONC)
SY 343.000 $100.000 $71.750 $68.000 $100.000 $74.000
CONC SIDEWALKS (4")
SY 8,599.000 $50.000 $54.000 $68.000 $60.000 $59.000
CURB RAMPS (TY 1)
EA 4.000 $2,184.000 $3,150.000 $1,977.000 $2,750.000 $3,390.000
CURB RAMPS (TY 7)
EA 6.000 $1,720.000 $3,850.000 $2,190.000 $2,800.000 $4,130.000
CURB RAMPS (TY 22)
EA 2.000 $300.000 $4,250.000 $2,290.000 $5,000.000 $4,740.000
TRANSITION ADJUSTMENT
EA 1.000 $400.000 $5,050.000 $415.000 $400.000 $440.000
REMOVE METAL BEAM GUARD FENCE
LF 4,325.000 $1.700 $1.500 $1.600 $1.550 $1.710
REMOVE TERMINAL ANCHOR SECTION
EA 7.000 $175.000 $195.000 $125.000 $120.000 $132.000
REMOVE CABLE BARRIER
LF 2,087.000 $25.000 $3.500 $1.850 $1.800 $1.980
GUARDRAIL END TREATMENT (REMOVE)
EA 8.000 $250.000 $195.000 $440.000 $420.000 $462.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 21.000 $1,400.000 $1,920.000 $3,550.000 $2,000.000 $2,220.000
CRASH CUSH ATTEN (REMOVE)
EA 17.000 $900.000 $749.000 $1,170.000 $920.000 $1,020.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 24.000 $25,000.000 $20,070.000 $23,300.000 $20,660.000 $20,200.000
CRASH CUSH ATTEN (INSTL)(R)(W)(TL3)
EA 2.000 $22,400.000 $20,070.000 $23,100.000 $20,545.000 $20,200.000
CRASH CUSHION ATTEN (INSTALL)(REACT)(N)
EA 9.000 $18,000.000 $20,070.000 $23,400.000 $20,660.000 $20,200.000
CHAIN LINK FENCE (INSTALL) (8')
LF 349.000 $50.000 $27.200 $145.000 $65.000 $72.000
PIPE UNDERDRAINS (TY 8) (6")
LF 600.000 $26.000 $36.000 $12.000 $14.330 $15.100
REMOVE RD IL ASM (U/P)
EA 16.000 $200.000 $318.000 $360.000 $310.000 $359.000
IN RD IL (U/P) (TY 1) (150W EQ) LED
EA 16.000 $975.000 $1,230.000 $980.000 $1,200.000 $970.000
IN RD IL (U/P) (TY 1) (250W EQ) LED
EA 27.000 $1,400.000 $1,640.000 $1,030.000 $1,600.000 $1,010.000
IN RD IL (TY AL) 30T-8 (250W EQ) LED
EA 1.000 $5,000.000 $2,770.000 $5,000.000 $2,700.000 $4,900.000
HI MST IL POLE (150 FT)( 80 MPH)
EA 13.000 $28,000.000 $31,250.000 $29,800.000 $30,500.000 $29,300.000
HI MST IL POLE (175 FT)( 80 MPH)
EA 21.000 $40,000.000 $37,090.000 $36,330.000 $36,200.000 $35,800.000
CONDT (PVC) (SCH 40) (2")
LF 20,178.000 $8.500 $14.300 $13.000 $14.000 $13.000
CONDT (PVC) (SCH 40) (2") (BORE)
LF 3,117.000 $15.000 $40.500 $26.000 $39.500 $26.300
CONDT (PVC) (SCH 40) (3")
LF 14,005.000 $12.500 $25.600 $16.000 $25.000 $15.500
CONDT (PVC) (SCH 80) (2") (BORE)
LF 1,068.000 $27.000 $40.000 $27.000 $39.000 $26.600
CONDT (PVC) (SCH 80) (3") (BORE)
LF 6,195.000 $22.000 $33.750 $39.000 $33.000 $37.900
CONDT (RM) (1")
LF 476.000 $27.000 $28.700 $13.000 $28.000 $12.800
ELEC CONDR (NO.14) INSULATED
LF 17,485.000 $0.850 $1.150 $0.750 $1.100 $0.750
ELEC CONDR (NO.12) BARE
LF 1,749.000 $1.100 $1.600 $1.000 $1.550 $1.020
ELEC CONDR (NO.12) INSULATED
LF 5,662.000 $1.200 $1.600 $1.100 $1.550 $1.080
ELEC CONDR (NO.8) BARE
LF 16,289.000 $1.050 $1.450 $1.150 $1.400 $1.130
ELEC CONDR (NO.8) INSULATED
LF 46,537.000 $1.100 $1.450 $1.200 $1.400 $1.180
ELEC CONDR (NO.6) BARE
LF 9,575.000 $1.350 $1.650 $1.300 $1.600 $1.250
ELEC CONDR (NO.6) INSULATED
LF 14,606.000 $1.500 $1.650 $1.400 $1.600 $1.380
ELEC CONDR (NO.4) BARE
LF 1,755.000 $1.500 $2.150 $1.750 $2.100 $1.740
ELEC CONDR (NO.4) INSULATED
LF 3,510.000 $1.450 $2.150 $2.000 $2.100 $1.900
ELEC CONDR (NO.2) BARE
LF 1,085.000 $2.400 $3.050 $2.200 $3.000 $2.200
ELEC CONDR (NO.2) INSULATED
LF 2,170.000 $2.550 $3.050 $2.400 $3.000 $2.410
GROUND BOX TY A (122311)
EA 24.000 $710.000 $768.000 $650.000 $750.000 $650.000
GROUND BOX TY A (122311)W/APRON
EA 49.000 $850.000 $1,080.000 $860.000 $1,050.000 $850.000
GROUND BOX TY D (162922)
EA 13.000 $950.000 $973.000 $660.000 $950.000 $650.000
GROUND BOX TY D (162922)W/APRON
EA 14.000 $1,080.000 $1,280.000 $910.000 $1,250.000 $900.000
REMOVE GROUND BOX
EA 54.000 $200.000 $154.000 $300.000 $150.000 $302.000
TIMBER POLE (CL 2) 50 FT
EA 1.000 $1,567.650 $6,860.000 $1,340.000 $6,700.000 $1,330.000
REMOVE ELECTRICAL SERVICES
EA 11.000 $410.000 $410.000 $1,250.000 $400.000 $1,230.000
ELC SRV TY A 240/480 100(NS)AL(E)SP(O)
EA 2.000 $6,000.000 $8,090.000 $7,600.000 $7,900.000 $7,500.000
ELC SRV TY A 240/480 100(NS)SS(E)GC(O)
EA 1.000 $7,200.000 $8,910.000 $8,300.000 $8,700.000 $8,200.000
ELC SRV TY A 240/480 125(NS)SS(E)GC(O)
EA 3.000 $7,300.000 $9,530.000 $8,860.000 $9,300.000 $8,700.000
ELC SRV TY D 120/240 060(NS)SS(N)SP(O)
EA 1.000 $4,100.000 $6,660.000 $3,240.000 $6,500.000 $3,190.000
ELC SRV TY T 120/240 000(NS)GS(N)SP(O)
EA 5.000 $5,000.000 $5,940.000 $1,720.000 $5,800.000 $1,690.000
ALUMINUM SIGNS (TY G)
SF 349.800 $35.000 $28.700 $27.000 $37.900 $39.100
ALUMINUM SIGNS (TY O)
SF 3,699.750 $25.000 $28.700 $31.000 $28.000 $39.900
REPLACE EXISTING ALUMINUM SIGNS(TY G)
SF 528.800 $33.000 $28.700 $27.000 $37.900 $39.100
REPLACE EXISTING ALUMINUM SIGNS(TY O)
SF 136.000 $35.000 $44.000 $33.000 $43.000 $54.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 33.000 $460.000 $484.000 $480.000 $673.450 $690.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 13.000 $525.000 $745.000 $740.000 $1,037.870 $1,070.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $595.000 $847.000 $840.000 $1,179.270 $1,220.000
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
EA 1.000 $585.000 $823.000 $820.000 $1,145.740 $1,180.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 5.000 $580.000 $1,010.000 $1,000.000 $1,399.380 $1,440.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 20.000 $750.000 $888.000 $880.000 $1,236.120 $1,280.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 2.000 $875.000 $1,080.000 $1,080.000 $1,508.700 $1,560.000
IN SM RD SN SUP&AM TYS80(2)SB(P-EXAL)
EA 2.000 $1,800.000 $1,760.000 $1,750.000 $2,453.280 $2,530.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 1.000 $355.000 $342.000 $340.000 $476.660 $492.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 1.000 $2,000.000 $2,050.000 $1,700.000 $2,409.550 $2,490.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
EA 8.000 $2,120.000 $2,150.000 $1,750.000 $2,460.570 $2,540.000
IN SM RD SN SUP&AM (RAIL MOUNT)
EA 2.000 $2,920.000 $3,480.000 $2,850.000 $4,001.340 $4,130.000
REMOVE SM RD SN SUP&AM
EA 77.000 $85.000 $68.000 $68.000 $94.750 $98.000
IN SRSS & AM (RAIL)(130 MPH)(P MOUNT)
EA 2.000 $3,700.000 $2,590.000 $2,570.000 $3,609.230 $3,720.000
IN SRSS & AM (RAIL)(130 MPH)(T MOUNT)
EA 7.000 $3,850.000 $2,900.000 $2,880.000 $4,039.240 $4,170.000
IN SRSS & AM (RAIL)(130 MPH)(U MOUNT)
EA 1.000 $5,000.000 $2,780.000 $2,760.000 $3,867.230 $3,990.000
INSTALL LRSS (STRUCT STEEL)
LB 7,828.000 $6.000 $3.950 $4.500 $6.270 $13.300
RELOCATE LRSA
EA 1.000 $7,450.000 $4,300.000 $5,200.000 $7,288.420 $10,200.000
REMOVE LRSA
EA 9.000 $900.000 $902.000 $730.000 $1,020.380 $6,700.000
INS OH SN SUP(30 FT BAL TEE)
EA 2.000 $31,000.000 $23,560.000 $27,000.000 $23,000.000 $26,900.000
INS OH SN SUP(35 FT CANT)
EA 2.000 $20,000.000 $24,080.000 $29,000.000 $23,500.000 $28,300.000
INS OH SN SUP(35 FT CANT)(CIRC TUBE)
EA 1.000 $92,000.000 $80,900.000 $78,000.000 $79,000.000 $78,000.000
INS OH SN SUP(40 FT CANT)
EA 2.000 $23,000.000 $31,250.000 $38,000.000 $30,500.000 $34,900.000
INS OH SN SUP(45 FT BRDG)(CIRC TUBE)
EA 1.000 $78,000.000 $107,600.000 $105,000.000 $105,000.000 $101,000.000
INS OH SN SUP(50 FT COMB)(CIRC TUBE)
EA 1.000 $82,000.000 $110,700.000 $104,000.000 $108,000.000 $100,000.000
INS OH SN SUP(80 FT BRDG)(CIRC TUBE)
EA 3.000 $112,000.000 $159,800.000 $153,000.000 $156,000.000 $148,000.000
REMOVE OVERHD SIGN SUP
EA 4.000 $7,000.000 $4,710.000 $13,300.000 $4,600.000 $13,100.000
REMOVE OVERHD SIGN SUP (SIGN ONLY)
EA 10.000 $800.000 $594.000 $1,760.000 $580.000 $1,740.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 58.000 $20.000 $15.200 $21.000 $29.150 $30.100
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 40.000 $20.000 $15.200 $21.000 $29.150 $30.100
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
EA 8.000 $22.000 $15.200 $21.000 $29.150 $30.100
INSTL OM ASSM (OM-2Y)(WC)GND
EA 2.000 $70.000 $95.250 $52.000 $72.890 $75.000
WK ZN PAV MRK REMOV (REFL) TY II-C-R
EA 1,034.000 $3.500 $3.200 $3.330 $3.200 $3.290
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 10,330.000 $1.000 $0.550 $0.570 $0.550 $0.570
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 63,026.000 $0.850 $0.500 $0.500 $0.480 $0.490
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 2,379.000 $1.450 $1.200 $1.250 $1.200 $1.230
WK ZN PAV MRK REMOV (W)12"(LNDP)
LF 370.000 $3.400 $4.000 $4.000 $4.000 $4.110
WK ZN PAV MRK REMOV (W)(ENTR GORE)
EA 8.000 $785.000 $750.000 $780.000 $750.000 $770.000
WK ZN PAV MRK REMOV (W)(EXIT GORE)
EA 12.000 $785.000 $750.000 $780.000 $750.000 $770.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 60,023.000 $0.800 $0.500 $0.500 $0.480 $0.490
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 1,154.000 $0.750 $0.500 $0.500 $0.500 $0.510
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 19,616.000 $1.100 $0.700 $0.750 $0.700 $0.720
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
LF 947.000 $3.000 $3.000 $3.000 $3.000 $3.090
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 2,788.000 $3.000 $2.750 $3.000 $2.770 $2.850
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 40.000 $7.000 $12.000 $12.000 $12.000 $12.300
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 7.000 $105.000 $149.000 $155.000 $149.000 $153.000
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
EA 2.000 $325.000 $222.000 $230.000 $222.000 $228.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 5.000 $150.000 $157.000 $160.000 $157.000 $162.000
REFL PAV MRK TY I (W)(RR XING)(100MIL)
EA 1.000 $600.000 $700.000 $730.000 $700.000 $720.000
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 7.000 $35.000 $44.000 $45.000 $44.000 $45.300
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 378.000 $3.000 $2.750 $3.000 $2.770 $2.850
REFL PAV MRK TY II (BLACK) 4"(SHADOW)
LF 6,230.000 $0.500 $0.200 $0.210 $0.200 $0.210
PAVEMENT SEALER 4"
LF 62,463.000 $0.150 $0.100 $0.110 $0.110 $0.110
PAVEMENT SEALER 8"
LF 9,456.000 $0.320 $0.400 $0.400 $0.390 $0.400
PAVEMENT SEALER 12"
LF 1,502.000 $0.900 $1.150 $1.220 $1.170 $1.200
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 18,116.000 $0.350 $0.350 $0.370 $0.360 $0.370
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 57,024.000 $0.350 $0.350 $0.370 $0.360 $0.370
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 56,924.000 $0.350 $0.350 $0.370 $0.360 $0.370
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 40.000 $0.750 $5.000 $5.200 $5.000 $5.100
REFL PAV MRKR TY II-C-R
EA 2,247.000 $3.250 $3.350 $3.500 $3.370 $3.470
ELIM EXT PAV MRK & MRKS (4")
LF 93,386.000 $0.350 $0.250 $0.260 $0.250 $0.260
ELIM EXT PAV MRK & MRKS (8")
LF 6,180.000 $0.600 $0.800 $0.800 $0.800 $0.820
ELIM EXT PAV MRK & MRKS (12")
LF 85.000 $1.400 $2.000 $2.000 $2.000 $2.060
ELIM EXT PAV MRK & MRKS (24")
LF 474.000 $3.500 $3.000 $3.000 $3.000 $3.090
ELIM EXT PAV MRK & MRKS (ARROW)
EA 1.000 $50.000 $55.000 $58.000 $55.000 $57.000
ELIM EXT PAV MRK & MRKS (WORD)
EA 2.000 $65.000 $55.000 $58.000 $55.000 $57.000
ELIM EXT PAV MRK & MRKS (JIGGLE)
EA 34.000 $6.000 $10.000 $10.000 $10.000 $10.300
PAV SURF PREP FOR MRK (4")
LF 139,501.000 $0.100 $0.100 $1.000 $0.100 $0.100
PAV SURF PREP FOR MRK (8")
LF 19,616.000 $0.150 $0.250 $0.250 $0.240 $0.250
PAV SURF PREP FOR MRK (12")
LF 3,813.000 $0.400 $1.500 $1.500 $1.500 $1.540
PAV SURF PREP FOR MRK (24")
LF 40.000 $2.500 $5.000 $5.000 $5.000 $5.100
PAV SURF PREP FOR MRK (ARROW)
EA 7.000 $16.000 $50.000 $52.000 $50.000 $51.000
PAV SURF PREP FOR MRK (DBL ARROW)
EA 2.000 $26.000 $100.000 $104.000 $100.000 $103.000
PAV SURF PREP FOR MRK (WORD)
EA 5.000 $21.000 $50.000 $52.000 $50.000 $51.000
PAV SURF PREP FOR MRK (RR XING)
EA 5.000 $60.000 $200.000 $207.000 $200.000 $206.000
PAV SURF PREP FOR MRK (36")(YLD TRI)
EA 7.000 $15.000 $20.000 $21.000 $20.000 $20.600
PAV SURF PREP FOR MRK (RPM)
EA 2,247.000 $0.300 $1.000 $1.000 $1.000 $1.030
REMOVAL OF CONCRETE FOUNDATIONS
EA 88.000 $850.000 $250.000 $1,740.000 $767.800 $53.000
WIDE FLANGE PAVEMENT TERMINALS
LF 44.000 $300.000 $1,060.000 $310.000 $575.290 $1,530.000
D-GR HMA TY-B PG64-22
TON 24,730.000 $80.000 $101.000 $110.000 $100.000 $113.000
SP MIXES SP-B SAC-B PG70-22
TON 28.000 $90.000 $202.000 $310.000 $300.000 $227.000
SP MIXES SP-C SAC-A PG76-22
TON 7.000 $86.000 $303.000 $790.000 $1,000.000 $340.000
BONDING COURSE
GAL 12.000 $4.000 $6.050 $4.000 $10.000 $6.800
MODULAR BRIDGE JOINT SYSTEM (6")
LF 243.000 $2,900.000 $1,340.000 $1,740.000 $1,299.610 $1,850.000
SMOOTH WALL STEEL PIPE(60")(3/4" THICK)
LF 192.000 $315.000 $1,570.000 $550.000 $418.270 $640.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 23.000 $18,000.000 $0.001 $34,280.000 $17,400.000 $17,000.000
FIBER OPTIC CBL (SNGLE-MODE)(6 FIBER)
LF 1,785.000 $1.500 $11.300 $1.650 $11.000 $1.640
FIBER OPTIC CBL (SNGLE-MODE)(72 FIBER)
LF 18,890.000 $5.000 $8.200 $1.500 $8.000 $1.430
FIBER OPTIC PATCH PANEL (6 POSITION)
EA 6.000 $750.000 $1,230.000 $580.000 $1,200.000 $570.000
FIBER OPTIC CABLE ROAD MARKER
EA 12.000 $145.000 $154.000 $208.000 $150.000 $205.000
FO SPLICE ENCLOSURE (TYPE 1)
EA 1.000 $1,750.000 $1,790.000 $1,740.000 $1,750.000 $1,720.000
FIBER OPTIC FUSION SPLICE
EA 14.000 $70.000 $59.500 $33.000 $58.000 $32.500
FIBER OPTIC PATCH PANEL (72 POSITION)
EA 3.000 $900.000 $3,690.000 $1,580.000 $3,600.000 $1,550.000
REMOVE FIBER OPTIC CABLE
LF 9,920.000 $3.000 $2.200 $0.800 $2.150 $0.820
ITS GRND MNT CAB (TY 4) (CONF 1)
EA 1.000 $15,000.000 $13,730.000 $12,000.000 $13,400.000 $11,800.000
ITS GRND MNT CAB (TY 6) (CONF 2)
EA 1.000 $12,000.000 $18,440.000 $12,800.000 $18,000.000 $12,600.000
CCTV FIELD EQUIPMENT (ANALOG)
EA 4.000 $5,000.000 $10,760.000 $9,200.000 $10,500.000 $9,100.000
CCTV FIELD CONTROLLER
EA 1.000 $7,500.000 $66.500 $2,900.000 $65.000 $2,850.000
CCTV MOUNT (POLE)
EA 1.000 $1,000.000 $66.500 $2,340.000 $65.000 $2,310.000
REMOVE CCTV FIELD EQUIPMENT
EA 1.000 $1,900.000 $2,660.000 $1,990.000 $2,600.000 $1,960.000
ITS MULTI-DUCT CND (PVC-40)
LF 11,225.000 $20.000 $31.750 $20.000 $31.000 $19.800
ITS MULTI-DUCT CND (PVC-40)(STL ENCSE)
LF 175.000 $40.000 $292.000 $34.000 $285.000 $33.400
ITS MULTI-DUCT CND (PVC-80)(BORE)
LF 5,560.000 $30.000 $40.000 $56.000 $39.000 $55.000
FIBER OPTIC CABLE ROAD MARKER
EA 7.000 $145.000 $154.000 $208.000 $150.000 $205.000
CONDUIT (PREPARE)
LF 7,015.000 $1.650 $1.950 $1.000 $1.900 $0.970
GROUND BOX (PREPARE)
EA 17.000 $350.000 $297.000 $207.000 $290.000 $205.000
INSTALL DMS (FOUNDATION MTD CABINET)
EA 2.000 $16,000.000 $18,240.000 $17,700.000 $17,800.000 $17,400.000
ITS SYSTEM INTEGRATION
LS 1.000 $21,000.000 $47,540.000 $8,030.000 $46,400.000 $7,900.000
ITS RADIO (INSTALL ONLY)
EA 4.000 $1,121.260 $5,120.000 $1,315.000 $5,000.000 $1,300.000
REMOVE ITS RADIO
EA 4.000 $477.690 $533.000 $235.000 $520.000 $232.000
ITS POLE (30 FT)(90 MPH)
EA 1.000 $7,770.000 $10,190.000 $16,400.000 $9,950.000 $16,200.000
ITS POLE (40 FT)(90 MPH)
EA 2.000 $9,000.000 $7,790.000 $17,200.000 $7,600.000 $16,900.000
ITS POLE (50 FT)(90 MPH)
EA 2.000 $11,000.000 $11,070.000 $18,500.000 $10,800.000 $18,200.000
DEAD END ROADWAY BARRICADE
LF 24.000 $80.000 $125.000 $104.000 $145.770 $150.000
TERMINAL SERVER (INSTALL ONLY)
EA 1.000 $900.000 $717.000 $207.000 $700.000 $205.000
REMOVE RVSD POLE STRUCTURE
EA 1.000 $4,600.000 $1,020.000 $1,800.000 $1,000.000 $3,530.000
LED HI MST IL ASM (6 FIXT)(SYM)(TY S)
EA 4.000 $27,600.000 $28,170.000 $32,000.000 $27,500.000 $31,600.000
LED HI MST IL ASM (6 FIXT) (ASYM)(TY B)
EA 30.000 $21,000.000 $28,580.000 $32,200.000 $27,900.000 $31,700.000
REPLC LED HI MST IL(6 FIXT)(ASYM)(TY B)
EA 11.000 $10,200.000 $11,070.000 $12,330.000 $10,800.000 $12,200.000
REMOVE HIGH MAST LIGHTING (150 FT)
EA 24.000 $6,700.000 $7,270.000 $5,720.000 $7,100.000 $5,600.000
TMA (STATIONARY)
DAY 3,955.000 $180.000 $50.000 $165.000 $214.260 $175.000
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
EA 5.000 $7,000.000 $5,840.000 $2,400.000 $5,700.000 $2,360.000
ITS GND BOX(PCAST) TY 1 (243660)W/APRN
EA 17.000 $5,600.000 $5,640.000 $3,540.000 $5,500.000 $3,490.000
ITS GND BOX(PCAST) TY 2 (366048)W/APRN
EA 7.000 $4,500.000 $10,960.000 $4,530.000 $10,700.000 $4,470.000
ITS RVSD (DATA COLLECT ONLY) SYS
EA 4.000 $9,000.000 $11,990.000 $12,300.000 $11,700.000 $12,200.000
INSTALL OF DIGITAL VIDEO ENCODER
EA 5.000 $600.000 $717.000 $780.000 $700.000 $770.000
INSTALL OF TRANSCEIVER
EA 14.000 $660.000 $717.000 $780.000 $700.000 $770.000
INSTALL OF HARD ETHERNET SWITCH
EA 3.000 $800.000 $717.000 $1,010.000 $700.000 $1,000.000
INSTALL OF ETHERNET SURGE PROTECT
EA 15.000 $850.000 $717.000 $1,010.000 $700.000 $1,000.000
REMOVE EXISTING LANE CONTROL SIG SYS
EA 15.000 $5,000.000 $2,050.000 $470.000 $2,000.000 $461.000
REMOVE DYNAMIC MESSAGE SIGN SYSTEM
EA 1.000 $4,800.000 $9,320.000 $5,200.000 $9,100.000 $5,100.000
DRIVER FEEDBACK SPEED SIGN ASSM (SOLAR)
EA 2.000 $5,000.000 $12,500.000 $52,000.000 $6,100.000 $30,400.000
Totals: $100,875,581.280 $114,884,943.918 $124,884,884.520 $126,195,649.480 $131,891,596.835