Show Job Controls
Bid Cobra

ECTOR IH 20 (0005-13-064)

Items: 410

County: ECTOR
Length: N/A
Highway: IH 20
District: ODESSA
Control Number: 0005-13-064
DBE Goal: N/A
Project: F 2022(634)
Guaranty: N/A
Time: 0 X
Engineer's Estimate: $284,174,507.74
Date: 11/02/2023 (2 years ago)
Contract Number: N/A
Type: WIDEN ROAD - ADD LANES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$284,174,507.74
$260,876,639.92
Over/Under Est: -8.2% -$23,297,867.82
Over/Under Est: -4% -$11,357,261.79
Amt Left: 4.58% $11,940,606.03
$299,992,051.72
Over/Under Est: 5.57% $15,817,543.98
Amt Left: 14.99% $39,115,411.80
Delta: -9.96% -$27,174,805.77
$338,646,883.57
Over/Under Est: 19.17% $54,472,375.83
Amt Left: 29.81% $77,770,243.65
Delta: -12.89% -$38,654,831.85
$346,826,743.95
Over/Under Est: 22.05% $62,652,236.21
Amt Left: 32.95% $85,950,104.03
Delta: -2.42% -$8,179,860.38
Subcontractor Percentage Amount
LONE STAR PAVING COMPANY 11.07% $26,362,098.72
TORO BRAVO CONSTRUCTION, LLC 5.03% $11,978,442.33
WILLIS ELECTRIC CO., LP 4.91% $11,692,674.32
DTM TRUCKING, INC. 3.20% $7,620,480.21
HJC FARMS, INC. 1.29% $3,072,006.08
HARDY HOLE DRILLING 1.13% $2,690,982.07
WEST TEXAS ROCK RESOURCES, LLC 0.75% $1,786,050.05
MICA CORPORATION 0.72% $1,714,608.05
TRP CONSTRUCTION GROUP, LLC 0.66% $1,571,724.04
FC TRAFFIC CONTROL, INC. 0.60% $1,428,840.04
HERNANDEZ OILFIELD TRANSPORTATION LLC 0.31% $738,234.02
SPEEDY PAVING 0.30% $714,420.02
A BROTHERS MILLING, LLC 0.27% $642,978.02
J FORCE TRANSPORTATION LLC 0.23% $547,722.02
THORCON SHOTCRETE AND SHORING LLC 0.21% $500,094.01
J. H. ODEN CONTRACTING COMPANY 0.21% $500,094.01
DK CONTRACTING, LLC 0.19% $452,466.01
SCOTT DERR PAINTING CO, LLC 0.08% $190,512.01
HAWK CONSTRUCTION 0.07% $166,698.00
PRIMATE CONSTRUCTION, LP 0.06% $142,884.00
KELLY EVANS CONSTRUCTION, LLC 0.05% $119,070.00
SURFACE PREPARATION TECHNOLOGIES, LLC 0.03% $71,442.00
FUSION COMMUNICATIONS, LLC 0.03% $71,442.00
FIBERTEX, LLC 0.03% $71,442.00
PEYSON TRANSPORT, LLC 0.00% $0.00
BREDA COMPANY, INC. 0.00% $0.00
Total: 31.43% $74,847,404.03

Bid Items & Bid Tabulations

410 Total 0 of 410
ECTOR  |  IH 20  |  ODESSA  |  0005-13-064  |  11/02/2023  |  $284,174,507.74  |  F 2022(634)  |  WIDEN ROAD - ADD LANES  |  0 X
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
SUNDT CONSTRUCTION, INC.
JAMES CONSTRUCTION GROUP, LLC
WEBBER, LLC
PULICE CONSTRUCTION, INC.
FNF CONSTRUCTION, INC.
PREPARING ROW
AC 1.840 $35,000.000 $100,000.000 $20,000.000 $18,509.380 $52,506.070 $4,500.000
REMOVING CONC (RIPRAP)
SY 8,665.000 $10.000 $15.000 $11.550 $26.000 $42.830 $25.000
REMOVING CONC (MEDIANS)
SY 859.000 $10.000 $15.000 $23.300 $26.000 $42.870 $30.000
REMOVING CONC (DRIVEWAYS)
SY 7,038.000 $20.000 $25.000 $19.330 $28.000 $38.760 $30.000
REMOVING CONC (CURB)
LF 7,311.000 $15.000 $5.000 $7.800 $10.000 $33.670 $20.000
EXCAVATION (ROADWAY)
CY 352,951.000 $25.000 $10.000 $13.510 $5.560 $15.000 $15.000
EXCAVATION (SPECIAL)
CY 38,068.000 $20.000 $12.000 $11.110 $13.070 $34.000 $13.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 727,034.000 $25.000 $14.000 $22.580 $5.360 $38.860 $28.000
BLADING
HR 139.000 $250.000 $155.000 $439.680 $500.000 $504.350 $350.000
DRILL SEEDING (PERM) (URBAN) (SANDY)
SY 277,385.000 $0.400 $0.200 $0.200 $0.200 $0.210 $0.300
DRILL SEED (TEMP)(WARM OR COOL)
SY 277,385.000 $0.300 $0.190 $0.200 $0.190 $0.200 $0.250
PROOF ROLLING
HR 335.000 $150.000 $111.000 $147.490 $200.000 $294.500 $125.000
FL BS (CMP IN PLC)(TY A GR 4) (6")
SY 174,617.000 $20.000 $10.000 $13.040 $10.900 $14.980 $12.000
CEM TRT(PLNT MX) (CL L)(TY A)(GR 4)(6")
SY 380,440.000 $17.500 $12.000 $19.590 $19.840 $25.300 $20.000
PRIME COAT (AE-P)
GAL 29,366.000 $10.000 $5.000 $4.290 $5.000 $4.250 $8.000
FOG SEAL (CSS-1H)
GAL 21,665.000 $10.000 $5.000 $4.040 $5.000 $4.000 $4.500
ASPH (AC-20XP)
GAL 64,995.000 $5.000 $8.000 $4.550 $8.000 $4.500 $5.000
AGGR(TY-PB GR-4 SAC-A)
CY 1,444.000 $175.000 $300.000 $202.000 $300.000 $200.000 $200.000
FLEX PAVEMENT STRUCTURE REPAIR (8"-15")
SY 2,905.000 $90.000 $105.000 $115.610 $85.000 $618.540 $150.000
PLANE ASPH CONC PAV(0" TO 2")
SY 1,620.000 $20.000 $3.000 $2.320 $6.590 $1.890 $3.250
PLANE ASPH CONC PAV (1")
SY 2,565.000 $10.000 $3.250 $2.660 $5.290 $2.420 $3.500
PLANE ASPH CONC PAV (2")
SY 2,068.000 $11.500 $4.000 $2.840 $4.540 $6.000 $3.750
CONC PVMT (CONT REINF - CRCP) (10")
SY 22,573.000 $100.000 $110.000 $110.190 $88.630 $80.000 $150.000
CONC PVMT (CONT REINF - CRCP) (14")
SY 340,679.000 $120.000 $121.350 $109.700 $100.190 $100.000 $173.000
CONC PAV (JOINT REINF) (6")
SY 3,563.000 $79.000 $95.000 $92.880 $80.360 $110.000 $170.000
CONC PVMT (CONT REINF)(FAST TRK)(13")
SY 54,344.000 $135.000 $170.000 $154.320 $110.520 $105.000 $195.000
CEM STABIL BKFL
CY 16,642.000 $125.000 $200.000 $127.510 $185.000 $190.000 $285.000
CEMENT STAB BACKFILL (INLET OR MH)
CY 985.000 $150.000 $200.000 $125.560 $185.000 $205.600 $225.000
TRENCH EXCAVATION PROTECTION
LF 1,926.000 $15.000 $2.000 $15.000 $42.550 $5.770 $506.000
TEMPORARY SPL SHORING
SF 66,816.000 $30.000 $25.000 $35.000 $23.160 $22.400 $38.000
DRILL SHAFT (18 IN)
LF 444.000 $155.000 $212.000 $171.290 $121.290 $261.430 $400.000
DRILL SHAFT (24 IN)
LF 940.000 $250.000 $300.000 $121.370 $290.970 $197.170 $460.000
DRILL SHAFT (36 IN)
LF 3,768.000 $350.000 $350.000 $262.330 $550.000 $337.380 $650.000
DRILL SHAFT (48 IN)
LF 149.000 $500.000 $1,025.000 $441.220 $1,025.000 $1,359.340 $1,350.000
DRILL SHAFT (84 IN)
LF 1,802.000 $1,200.000 $1,250.000 $1,862.250 $1,900.000 $1,500.000 $1,715.000
DRILL SHAFT (NON - REINFORCED) (12 IN)
LF 42.000 $125.000 $177.000 $125.000 $125.200 $80.220 $200.000
DRILL SHAFT (SIGN MTS) (24 IN)
LF 84.000 $275.000 $228.000 $125.000 $185.000 $151.060 $250.000
DRILL SHAFT (SIGN MTS) (48 IN)
LF 490.000 $600.000 $800.000 $1,025.000 $795.000 $648.290 $900.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 128.000 $325.000 $350.000 $350.000 $350.000 $211.000 $425.000
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 96.000 $385.000 $475.000 $475.000 $475.000 $735.000 $600.000
DRILL SHAFT (HIGH MAST POLE) (48")
LF 115.000 $500.000 $1,150.000 $1,150.000 $1,150.000 $1,295.000 $1,300.000
CL A CONC (MISC)
CY 160.000 $1,200.000 $650.000 $1,800.590 $76.010 $810.990 $1,875.000
CL C CONC (ABUT)
CY 415.400 $1,550.000 $1,000.000 $1,785.230 $3,500.000 $1,590.610 $2,785.000
CL C CONC (CAP)
CY 834.200 $1,800.000 $1,600.000 $925.740 $3,250.000 $1,500.000 $2,560.000
CL C CONC (COLUMN)
CY 807.400 $1,850.000 $1,000.000 $1,094.980 $3,600.000 $1,500.000 $2,380.000
CL C CONC (SIGN COLUMN)
CY 673.660 $1,600.000 $930.000 $1,876.700 $3,300.000 $2,000.000 $2,500.000
CL C CONC (COLLAR)
EA 14.000 $1,250.000 $2,000.000 $7,050.910 $4,663.490 $5,353.910 $1,815.000
CL C CONC (MISC)
CY 188.000 $1,750.000 $1,300.000 $536.410 $1,800.000 $800.560 $2,500.000
CL C CONC (SIGN FOOTING)
CY 61.000 $1,500.000 $1,000.000 $1,586.710 $1,433.230 $3,072.890 $2,000.000
REINF CONC SLAB (HPC)
SF 104,784.000 $32.500 $20.000 $25.690 $56.660 $18.500 $35.000
REINF CONC SLAB (SLAB BEAM)(HPC)
SF 14,316.000 $25.000 $16.000 $22.070 $48.920 $28.330 $29.000
APPROACH SLAB (HPC)
CY 889.300 $1,000.000 $750.000 $754.880 $1,855.780 $1,113.810 $1,400.000
RETAINING WALL (MSE)
SF 163,508.000 $65.000 $100.000 $67.990 $125.000 $81.350 $60.000
RETAINING WALL (CAST - IN - PLACE)
SF 23,722.000 $100.000 $80.000 $77.050 $94.480 $90.000 $145.000
PRESTR CONC SLAB BEAM (4SB12)
LF 478.120 $215.000 $265.000 $228.190 $2,000.000 $384.270 $435.000
PRESTR CONC SLAB BEAM (5SB12)
LF 2,390.600 $225.000 $265.000 $230.140 $2,000.000 $353.900 $385.000
PRESTR CONC GIRDER (TX40)
LF 8,594.800 $275.000 $250.000 $202.350 $2,000.000 $200.000 $305.000
PRESTR CONC GIRDER (TX46)
LF 4,256.140 $325.000 $265.000 $201.680 $2,000.000 $245.000 $315.000
RIPRAP (CONC)(4 IN)
CY 598.930 $550.000 $590.000 $542.790 $450.050 $1,196.950 $800.000
RIPRAP (CONC)(5 IN)
CY 28,244.000 $550.000 $480.000 $495.090 $476.460 $799.990 $650.000
RIPRAP (STONE COMMON)(DRY)(18 IN)
CY 136.000 $250.000 $175.000 $155.200 $370.380 $178.880 $200.000
RIPRAP (MOW STRIP)(4 IN)
CY 1,406.000 $550.000 $750.000 $899.170 $694.030 $801.800 $800.000
RAIL (TY SSTR)
LF 8,233.000 $115.000 $120.000 $75.630 $112.000 $135.740 $230.000
RAIL (TY SSTR)(HPC)
LF 256.100 $85.000 $100.000 $147.230 $161.000 $130.400 $375.000
RAIL (TY PR11)
LF 6,912.000 $200.000 $85.000 $129.820 $125.010 $102.610 $150.000
RAIL (TY SSTR) (HPC) (MOD)
LF 1,840.000 $125.000 $115.000 $147.230 $167.000 $111.520 $225.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 951.000 $250.000 $215.000 $189.550 $192.180 $430.280 $250.000
CONC BOX CULV (3 FT X 2 FT)
LF 4,949.000 $325.000 $275.000 $273.900 $245.000 $350.000 $460.000
CONC BOX CULV (4 FT X 2 FT)
LF 3,623.000 $340.000 $325.000 $308.520 $275.250 $475.560 $530.000
CONC BOX CULV (5 FT X 2 FT)
LF 3,921.000 $475.000 $400.000 $403.420 $359.210 $500.000 $690.000
CONC BOX CULV (5 FT X 3 FT)
LF 364.000 $500.000 $475.000 $434.570 $600.740 $707.360 $830.000
CONC BOX CULV (6 FT X 3 FT)
LF 239.000 $600.000 $525.000 $541.650 $482.690 $823.790 $1,055.000
CONC BOX CULV (7 FT X 3 FT)
LF 548.000 $750.000 $650.000 $651.650 $567.260 $1,080.220 $1,070.000
CONC BOX CULV (7 FT X 4 FT)
LF 1,608.000 $650.000 $675.000 $705.910 $649.700 $850.000 $1,100.000
CONC BOX CULV (9 FT X 5 FT)
LF 276.000 $850.000 $850.000 $925.960 $1,149.670 $1,555.320 $1,710.000
CONC BOX CULV (4 FT X 2 FT)(EXTEND)
LF 30.000 $625.000 $600.000 $1,668.980 $820.000 $891.340 $970.000
CONC BOX CULV (5 FT X 2 FT)(EXTEND)
LF 70.000 $700.000 $625.000 $1,019.920 $828.780 $938.480 $1,180.000
CONC BOX CULV (10 FT X 4 FT)
LF 280.000 $1,200.000 $925.000 $954.940 $1,119.810 $1,655.070 $1,655.000
CONC BOX CULV (12 FT X 5 FT)
LF 204.000 $1,500.000 $1,450.000 $1,341.510 $1,467.800 $2,323.870 $2,385.000
RC PIPE (CL III)(12 IN)
LF 220.000 $60.000 $72.000 $0.000 $0.000 $0.000 $140.000
RC PIPE (CL III)(18 IN)
LF 4,511.000 $90.000 $67.000 $0.000 $0.000 $0.000 $180.000
RC PIPE (CL III)(24 IN)
LF 3,458.000 $110.000 $130.000 $165.980 $130.430 $170.600 $210.000
RC PIPE (CL IV)(18 IN)
LF 1,633.000 $125.000 $115.000 $155.510 $99.020 $128.470 $200.000
RC PIPE (CL IV)(24 IN)
LF 2,839.000 $175.000 $145.000 $137.470 $137.270 $192.740 $235.000
RC PIPE (CL V)(24 IN)
LF 208.000 $250.000 $150.000 $195.690 $173.340 $208.680 $300.000
MANH (COMPL)(PRM)(48IN)
EA 1.000 $9,500.000 $5,200.000 $11,951.240 $5,729.190 $11,587.840 $11,800.000
MANH (COMPL)(PRM)(72IN)
EA 1.000 $11,500.000 $8,000.000 $7,978.650 $10,829.380 $18,276.270 $19,600.000
JCTBOX(COMPL)(PJB)(3FTX3FT)
EA 3.000 $7,500.000 $3,400.000 $10,076.110 $6,348.340 $7,380.180 $8,790.000
JCTBOX(COMPL)(PJB)(4FTX4FT)
EA 9.000 $8,500.000 $3,700.000 $11,104.450 $6,862.500 $8,736.310 $9,715.000
INLET (COMPL)(PCO)(3FT)(NONE)
EA 24.000 $6,500.000 $4,700.000 $11,664.850 $6,367.130 $12,092.800 $9,180.000
INLET (COMPL)(PCO)(3FT)(LEFT)
EA 3.000 $9,000.000 $6,200.000 $11,805.560 $7,125.040 $12,342.980 $9,810.000
INLET (COMPL)(PCO)(3FT)(RIGHT)
EA 2.000 $7,500.000 $5,200.000 $12,498.380 $6,989.120 $13,574.610 $10,100.000
INLET (COMPL)(PCO)(4FT)(LEFT)
EA 1.000 $9,000.000 $5,500.000 $13,510.460 $8,473.000 $15,373.940 $11,205.000
INLET (COMPL)(PCU)(3FT)(NONE)
EA 1.000 $10,000.000 $6,000.000 $12,612.030 $6,721.190 $13,776.670 $10,030.000
INLET (COMPL)(PMBD)(4FT)
EA 44.000 $8,000.000 $6,200.000 $11,160.530 $10,106.330 $16,547.810 $12,715.000
INLET (COMPL)(PMBD)(6FT)
EA 9.000 $11,000.000 $6,400.000 $13,737.100 $12,681.090 $14,796.600 $16,015.000
INLET (COMPL)(PSL)(RH)(5FTX6FT)
EA 2.000 $9,500.000 $6,400.000 $14,824.850 $9,622.790 $16,894.220 $13,725.000
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
EA 4.000 $8,000.000 $7,000.000 $8,979.270 $6,238.920 $12,833.700 $10,380.000
INLET (COMPL)(TY MSE1)
EA 23.000 $9,500.000 $8,000.000 $23,601.520 $12,275.200 $20,654.510 $17,830.000
INLET (COMPL)(TY MSE2)
EA 6.000 $11,000.000 $8,800.000 $26,529.600 $13,894.920 $27,522.740 $18,715.000
JCT BOX (COMPL)(SPL)
EA 2.000 $30,000.000 $24,000.000 $74,567.600 $51,964.160 $38,331.930 $135,000.000
INLET (COMP) (TY SIDEWALK BRIDGE)
EA 12.000 $15,000.000 $21,000.000 $13,054.360 $22,816.840 $57,609.950 $47,500.000
MANH (COMPL) (JUNCT BOX)(SPL W/RISER)
EA 1.000 $35,000.000 $24,000.000 $85,754.920 $72,675.200 $52,586.750 $5,500.000
INLET (COMPL)(ARMOR CURB SLOT)
EA 111.000 $7,500.000 $4,200.000 $6,659.160 $6,632.270 $10,000.000 $13,500.000
MANH (BOX CULV)
EA 2.000 $6,500.000 $3,700.000 $11,951.210 $12,082.900 $5,876.190 $12,000.000
INLET (COMPL)(REAR FLUME)(5 FT)
EA 75.000 $7,500.000 $5,200.000 $6,268.680 $9,730.940 $12,186.900 $11,500.000
INLET (COMPL)(REAR FLUME)(10 FT)
EA 3.000 $9,500.000 $8,200.000 $10,268.460 $13,647.220 $16,334.010 $12,000.000
WINGWALL (FW - S) (HW=5 FT)
EA 1.000 $12,000.000 $24,000.000 $31,990.860 $7,600.000 $34,201.340 $13,400.000
WINGWALL (FW - S) (HW=6 FT)
EA 1.000 $15,000.000 $29,000.000 $41,416.640 $10,500.000 $36,533.520 $16,675.000
WINGWALL (FW - S) (HW=7 FT)
EA 2.000 $20,000.000 $48,000.000 $50,533.900 $15,300.000 $33,668.980 $24,470.000
WINGWALL (FW - S) (HW=8 FT)
EA 1.000 $21,000.000 $56,000.000 $59,827.710 $18,500.000 $41,736.100 $27,500.000
WINGWALL (PW - 1) (HW=3 FT)
EA 3.000 $12,000.000 $7,200.000 $30,662.510 $12,670.000 $21,592.360 $7,000.000
WINGWALL (PW - 1) (HW=4 FT)
EA 4.000 $17,500.000 $13,000.000 $39,739.180 $14,230.000 $23,646.770 $13,600.000
WINGWALL (PW - 1) (HW=5 FT)
EA 3.000 $25,000.000 $17,000.000 $40,516.710 $16,450.000 $26,363.250 $15,600.000
WINGWALL (PW - 1) (HW=6 FT)
EA 3.000 $25,000.000 $39,000.000 $50,338.140 $17,960.000 $29,816.860 $26,250.000
WINGWALL (PW - 1) (HW=7 FT)
EA 2.000 $30,000.000 $38,000.000 $51,032.150 $25,300.000 $38,053.460 $30,600.000
WINGWALL (PW - 1) (HW=8 FT)
EA 1.000 $35,000.000 $58,000.000 $53,408.830 $28,930.000 $56,405.310 $38,100.000
WINGWALL (PW - 1) (HW=9 FT)
EA 1.000 $40,000.000 $66,000.000 $54,811.040 $29,500.000 $66,533.450 $54,000.000
WINGWALL (SW - 0) (HW=3 FT)
EA 1.000 $13,500.000 $7,600.000 $33,828.260 $8,900.000 $10,349.910 $8,500.000
WINGWALL (SW - 0) (HW=4 FT)
EA 2.000 $25,000.000 $8,500.000 $33,720.860 $10,300.000 $27,685.380 $11,750.000
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)
EA 1.000 $8,500.000 $3,500.000 $8,391.490 $8,493.000 $10,186.760 $8,500.000
SET (TY I)(S=3 FT)(HW= 3 FT)(6:1)(P)
EA 12.000 $10,000.000 $4,600.000 $11,782.810 $9,300.000 $15,307.280 $11,500.000
SET (TY I)(S= 4 FT)(HW= 3 FT)(3:1) (C)
EA 2.000 $6,000.000 $3,500.000 $8,460.790 $9,100.000 $10,352.710 $8,750.000
SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1) (C)
EA 2.000 $9,000.000 $5,000.000 $9,869.060 $9,500.000 $12,517.670 $17,750.000
SET (TY I)(S= 4 FT)(HW= 5 FT)(4:1) (C)
EA 2.000 $14,500.000 $6,200.000 $13,620.080 $9,714.000 $12,748.600 $24,500.000
SET (TY I)(S= 5 FT)(HW= 3 FT)(6:1) (P)
EA 2.000 $14,000.000 $7,000.000 $19,934.010 $9,200.000 $22,158.980 $14,750.000
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1) (C)
EA 2.000 $14,000.000 $6,800.000 $15,357.410 $9,280.000 $15,885.400 $13,000.000
SET (TY I)(S= 6 FT)(HW= 4 FT)(6:1) (P)
EA 2.000 $16,000.000 $8,000.000 $29,004.950 $9,900.000 $37,159.770 $35,250.000
SET (TY II) (12 IN) (RCP) (6: 1) (P)
EA 14.000 $650.000 $1,250.000 $2,080.100 $4,800.000 $3,265.630 $1,500.000
SET (TY II) (18 IN) (RCP) (3: 1) (C)
EA 13.000 $1,200.000 $1,150.000 $1,881.180 $5,100.000 $2,746.040 $1,700.000
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 32.000 $1,500.000 $1,400.000 $2,486.090 $5,375.000 $2,938.480 $1,800.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 36.000 $1,600.000 $1,550.000 $2,756.750 $5,499.000 $3,604.000 $1,800.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 4.000 $2,200.000 $1,500.000 $2,010.280 $7,100.000 $3,842.960 $2,150.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 10.000 $2,000.000 $1,750.000 $2,563.160 $7,400.000 $4,911.000 $2,500.000
CAST-IN-PLACE TRENCH DRAIN
LF 4,370.000 $450.000 $675.000 $875.950 $290.000 $650.000 $775.000
REMOV STR (INLET)
EA 11.000 $1,000.000 $1,100.000 $1,364.530 $1,370.770 $2,354.930 $2,820.000
REMOV STR (SET)
EA 138.000 $750.000 $550.000 $734.740 $822.390 $910.560 $1,300.000
REMOV STR (HEADWALL)
EA 6.000 $2,600.000 $3,000.000 $2,113.020 $2,055.990 $3,642.230 $1,200.000
REMOV STR (PIPE)
LF 3,512.000 $25.000 $20.000 $20.960 $14.330 $31.170 $70.000
REMOV STR (BOX CULVERT)
LF 3,252.000 $55.000 $40.000 $48.320 $38.540 $67.020 $70.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 4.000 $200,000.000 $50,000.000 $50,000.000 $350,000.000 $59,606.060 $220,000.000
REMOV STR (SMALL FENCE)
LF 4,613.000 $6.500 $3.000 $7.000 $10.200 $7.290 $12.000
MOBILIZATION
LS 1.000 $23,003,268.890 $26,400,000.000 $21,003,646.960 $27,100,000.000 $30,750,833.350 $31,316,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 54.000 $30,000.000 $30,000.000 $42,015.180 $66,720.250 $40,000.000 $59,000.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 1,130.000 $45.000 $40.000 $40.000 $40.000 $50.570 $40.000
ROCK FILTER DAMS (REMOVE)
LF 1,130.000 $17.500 $10.000 $10.000 $10.000 $13.410 $15.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 3,712.000 $30.000 $39.000 $39.000 $39.000 $24.280 $50.000
CONSTRUCTION EXITS (REMOVE)
SY 3,712.000 $11.500 $15.000 $15.000 $15.000 $7.580 $10.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 6,430.000 $5.000 $4.500 $4.450 $4.450 $4.500 $7.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 6,430.000 $1.500 $1.000 $1.000 $1.000 $1.000 $1.500
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 10,305.000 $10.000 $9.000 $9.000 $9.000 $11.580 $15.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 10,305.000 $2.500 $1.000 $1.000 $1.000 $1.870 $2.000
CONSTRUCTING DETOURS
SY 120,015.000 $102.500 $80.000 $88.850 $86.200 $69.890 $90.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 68,660.000 $50.000 $73.000 $39.890 $15.000 $210.000 $100.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 1,880.000 $60.000 $74.000 $59.260 $94.300 $256.350 $50.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 45,320.000 $9.000 $5.250 $4.550 $1.250 $7.020 $10.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 140.000 $11.000 $9.000 $10.830 $32.170 $10.380 $19.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 68,660.000 $15.000 $7.000 $9.840 $10.500 $14.250 $15.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 1,880.000 $15.000 $9.800 $9.990 $22.280 $14.260 $15.000
PTB(FRN&INSTL)(SSCB OR CSB)(TY1)OR(STL)
LF 122,910.000 $50.000 $68.000 $32.280 $68.220 $210.000 $65.000
PTB(MOVE)(SSCB OR CSB)(TY1)OR(STL)
LF 54,990.000 $15.000 $5.250 $8.110 $13.430 $4.000 $7.500
PTB(REMOVE)(SSCB OR CSB)(TY1)OR(STL)
LF 122,910.000 $35.000 $5.900 $6.300 $16.420 $11.590 $5.000
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 24,428.000 $100.000 $70.000 $91.550 $106.270 $120.490 $140.000
PERM CTB (SGL SLOPE) (TY 3) (42 )
LF 46.500 $300.000 $1.000 $317.890 $393.040 $512.720 $485.000
PERM CTB (SGL SLOPE) (TY 4) (42 )
LF 790.000 $250.000 $300.000 $329.510 $321.330 $328.990 $400.000
PERM CTB(SGL SLOPE)(TY 1)(42)(HPC)
LF 1,202.200 $175.000 $75.000 $94.070 $110.630 $160.850 $175.000
LANDSCAPE PAVERS
SY 12,615.000 $85.000 $73.000 $85.990 $54.500 $63.000 $80.000
CONC CURB (MONO) (TY I)
LF 1,508.000 $30.000 $16.500 $4.500 $34.470 $31.970 $20.000
CONC CURB (MONO) (TY II)
LF 32,320.000 $10.000 $13.000 $23.700 $20.140 $17.430 $19.000
CONC CURB & GUTTER (TY I)
LF 230.000 $25.000 $47.000 $41.500 $45.140 $25.000 $35.000
CONC CURB & GUTTER (TY II)
LF 90,041.000 $35.000 $18.000 $55.000 $33.040 $25.000 $25.000
CONC CURB (DOWEL)
LF 3,273.000 $15.000 $20.000 $12.500 $19.470 $16.530 $30.000
CONC CURB (TY III)
LF 180.000 $30.000 $55.000 $75.000 $57.450 $25.000 $35.000
CONC CURB (TY IV)
LF 35.000 $75.000 $94.000 $80.000 $85.290 $18.570 $40.000
DRIVEWAYS (CONC)
SY 4,411.000 $105.000 $90.000 $111.070 $89.000 $200.000 $110.000
DRIVEWAYS (ACP)
SY 12,610.000 $70.000 $85.000 $78.880 $80.230 $45.000 $130.000
CONC SIDEWALKS (4")
SY 2,840.000 $80.000 $80.000 $79.130 $83.850 $113.110 $70.000
CURB RAMPS (TY 1)
EA 10.000 $2,500.000 $1,700.000 $3,890.540 $1,800.000 $4,156.360 $3,000.000
CURB RAMPS (TY 2)
EA 17.000 $3,000.000 $1,800.000 $4,183.520 $2,700.000 $3,501.300 $3,000.000
CURB RAMPS (TY 7)
EA 4.000 $2,200.000 $2,100.000 $4,183.520 $2,200.000 $3,949.120 $3,000.000
CURB RAMPS (TY 10)
EA 6.000 $2,000.000 $1,700.000 $4,183.530 $2,400.000 $4,152.970 $3,000.000
CURB RAMPS (TY 21)
EA 2.000 $2,800.000 $2,000.000 $4,183.560 $3,800.000 $5,333.850 $6,000.000
CURB RAMPS (TY 22)
EA 4.000 $4,500.000 $5,200.000 $6,221.740 $4,500.000 $3,739.100 $6,000.000
RUMBLE STRIPS (SHOULDER) CONCRETE
LF 84,103.000 $1.500 $0.750 $0.850 $1.030 $0.810 $0.750
MTL W-BEAM GD FEN (STEEL POST)
LF 26,180.000 $35.000 $28.000 $31.000 $29.000 $32.290 $30.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 17.000 $2,750.000 $2,400.000 $2,475.000 $2,100.000 $2,578.380 $2,750.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 39.000 $1,500.000 $1,600.000 $1,325.000 $1,575.000 $1,380.350 $1,750.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 550.000 $90.000 $66.000 $84.000 $51.000 $87.510 $80.000
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 12.000 $1,500.000 $1,300.000 $1,250.000 $750.000 $1,302.210 $1,500.000
REMOVE METAL BEAM GUARD FENCE
LF 6,783.000 $3.000 $2.000 $3.000 $1.700 $3.130 $3.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 8.000 $300.000 $205.000 $155.000 $150.000 $161.480 $265.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 13.000 $500.000 $205.000 $250.000 $150.000 $260.440 $265.000
CABLE BARRIER SYSTEM (TL-4)
LF 522.000 $70.000 $21.000 $23.500 $22.000 $24.480 $25.000
CABLE BARRIER TERMINAL SECTION (TL-4)
EA 2.000 $4,500.000 $7,600.000 $4,250.000 $4,600.000 $4,427.530 $8,500.000
REMOVE CABLE BARRIER
LF 25,736.000 $5.000 $13.000 $3.500 $7.320 $3.650 $25.000
REMOVE CABLE BARRIER TERMINAL SECTION
EA 8.000 $1,000.000 $1,600.000 $400.000 $300.000 $416.710 $2,000.000
GUARDRAIL END TREATMENT (INSTALL)
EA 41.000 $3,500.000 $3,400.000 $3,095.000 $3,750.000 $3,224.280 $4,000.000
GUARDRAIL END TREATMENT (REMOVE)
EA 9.000 $350.000 $205.000 $463.000 $525.000 $482.340 $270.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 23.000 $2,000.000 $800.000 $1,600.000 $3,800.000 $1,666.830 $1,055.000
CRASH CUSH ATTEN (REMOVE)
EA 33.000 $900.000 $500.000 $998.000 $2,500.000 $1,039.690 $1,070.000
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
EA 2.000 $25,000.000 $25,000.000 $2,600.000 $35,000.000 $27,086.050 $40,000.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 33.000 $10,000.000 $10,000.000 $7,955.000 $18,500.000 $8,287.290 $20,000.000
CHAIN LINK FENCE (REMOVE)
LF 30.000 $10.000 $39.000 $125.000 $50.000 $15.630 $20.000
MAILBOX INSTALL-S (TWG-POST) TY 1
EA 9.000 $500.000 $310.000 $390.000 $303.940 $406.290 $325.000
RELOCATE RD IL ASM (TRANS-BASE)
EA 3.000 $2,500.000 $3,000.000 $3,000.000 $3,000.000 $3,174.000 $3,500.000
REMOVE RD IL ASM (TRANS-BASE)
EA 6.000 $1,200.000 $750.000 $750.000 $750.000 $956.000 $900.000
IN RD IL (U/P) (TY 1) (150W EQ) LED
EA 24.000 $1,600.000 $3,250.000 $3,250.000 $3,250.000 $1,903.000 $3,750.000
IN RD IL (TY SP) 28S-4 (150W EQ) LED
EA 1.000 $2,800.000 $7,500.000 $7,500.000 $7,500.000 $8,451.000 $8,500.000
IN RD IL (TY SA) 30T-8 (250W EQ) LED
EA 2.000 $4,250.000 $6,000.000 $6,000.000 $6,000.000 $6,001.000 $7,000.000
IN RD IL (TY AL) 40T-10 (250W EQ) LED
EA 11.000 $4,500.000 $8,000.000 $8,000.000 $8,000.000 $6,358.000 $9,000.000
IN RD IL (TY SP) 48S-10-10(400W EQ)LED
EA 80.000 $8,500.000 $10,000.000 $10,000.000 $10,000.000 $11,512.000 $11,500.000
HI MST IL POLE (100 FT)( 80 MPH)
EA 7.000 $35,000.000 $45,000.000 $45,000.000 $45,000.000 $55,342.000 $52,500.000
TEMP RD IL (RD IL ASM)
EA 39.000 $5,500.000 $21,000.000 $21,000.000 $21,000.000 $11,804.000 $25,000.000
CONDT (PVC) (SCH 40) (2")
LF 2,275.000 $20.000 $10.000 $10.000 $10.000 $22.600 $12.000
CONDT (PVC) (SCH 40) (2") (BORE)
LF 405.000 $35.000 $35.000 $35.000 $35.000 $18.300 $40.000
CONDT (PVC) (SCH 40) (3") (CONC ENCSE)
LF 40,000.000 $22.500 $25.000 $30.000 $25.000 $18.000 $30.000
CONDT (PVC) (SCH 40) (3") (STL ENCSE)
LF 14,210.000 $40.000 $45.000 $50.000 $45.000 $83.800 $55.000
CONDT (PVC) (SCH 80) (2")
LF 4,300.000 $25.000 $10.000 $10.000 $10.000 $27.800 $11.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 5,965.000 $35.000 $35.000 $35.000 $35.000 $21.800 $40.000
CONDT (PVC) (SCH 80) (2") (CONC ENCSE)
LF 20,230.000 $30.000 $12.000 $12.000 $12.000 $16.200 $14.000
CONDT (PVC) (SCH 80) (3") (BORE)
LF 1,045.000 $37.500 $40.000 $40.000 $40.000 $37.400 $47.000
CONDT (PVC) (SCH 80) (4")
LF 385.000 $35.000 $40.000 $40.000 $40.000 $22.300 $48.000
CONDT (PVC) (SCH 80) (4") (BORE)
LF 275.000 $45.000 $45.000 $45.000 $45.000 $39.200 $55.000
ELEC CONDR (NO.10) BARE
LF 1,705.000 $2.000 $1.000 $1.000 $1.000 $1.500 $1.250
ELEC CONDR (NO.10) INSULATED
LF 6,720.000 $2.500 $1.000 $1.000 $1.000 $1.530 $1.250
ELEC CONDR (NO.8) BARE
LF 19,293.000 $2.250 $1.500 $1.500 $1.500 $1.840 $1.750
ELEC CONDR (NO.8) INSULATED
LF 162,016.000 $2.500 $1.250 $1.250 $1.250 $2.030 $1.650
ELEC CONDR (NO.6) BARE
LF 11,505.000 $3.000 $1.250 $1.250 $1.250 $2.240 $1.650
ELEC CONDR (NO.6) INSULATED
LF 16,110.000 $3.000 $1.750 $1.750 $1.750 $2.540 $2.000
ELEC CONDR (NO.4) BARE
LF 2,176.000 $3.500 $3.000 $3.000 $3.000 $3.210 $3.500
ELEC CONDR (NO.4) INSULATED
LF 2,502.000 $3.500 $3.000 $3.000 $3.000 $3.420 $3.500
ELEC CONDR (NO.2) BARE
LF 1,175.000 $3.500 $5.000 $5.000 $5.000 $4.980 $6.000
ELEC CONDR (NO.2) INSULATED
LF 2,350.000 $5.000 $5.000 $5.000 $5.000 $4.810 $6.000
GROUND BOX TY A (122311)
EA 18.000 $1,100.000 $1,200.000 $1,200.000 $1,200.000 $1,841.000 $1,350.000
GROUND BOX TY A (122311)W/APRON
EA 59.000 $1,600.000 $1,750.000 $1,750.000 $1,750.000 $2,710.000 $2,000.000
GROUND BOX TY D (162922)
EA 15.000 $1,500.000 $1,800.000 $1,800.000 $1,800.000 $1,925.000 $2,100.000
GROUND BOX TY D (162922)W/APRON
EA 2.000 $1,725.000 $2,250.000 $2,250.000 $2,250.000 $2,936.000 $2,500.000
REMOVE GROUND BOX
EA 16.000 $500.000 $400.000 $400.000 $400.000 $1,183.000 $525.000
REMOVE ELECTRICAL SERVICES
EA 3.000 $650.000 $750.000 $750.000 $750.000 $1,944.000 $900.000
ELC SRV TY A 240/480 100(NS)SS(E)SP(O)
EA 6.000 $11,500.000 $11,000.000 $11,000.000 $11,000.000 $11,970.000 $13,000.000
ELC SRV TY D 120/240 060(NS)SS(E)SP(O)
EA 1.000 $7,600.000 $9,500.000 $9,500.000 $9,500.000 $10,028.000 $11,500.000
ELC SRV TY D 120/240 100(NS)SS(N)SP(O)
EA 8.000 $6,000.000 $8,500.000 $8,500.000 $8,500.000 $9,256.000 $10,000.000
ELC SRV TY T 120/240 000(NS)GS(N)SP(O)
EA 1.000 $8,500.000 $8,500.000 $8,500.000 $8,500.000 $7,879.000 $10,000.000
ALUMINUM SIGNS (TY A)
SF 55.000 $40.000 $35.000 $22.500 $35.000 $23.440 $40.000
ALUMINUM SIGNS (TY G)
SF 941.000 $35.000 $33.000 $29.000 $32.500 $30.210 $38.000
ALUMINUM SIGNS (TY O)
SF 1,911.000 $35.000 $33.000 $40.500 $31.410 $45.200 $38.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 91.000 $800.000 $895.690 $628.000 $825.000 $654.230 $1,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 202.000 $950.000 $983.630 $828.000 $906.000 $862.590 $1,050.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 3.000 $850.000 $1,100.000 $720.000 $972.000 $750.080 $1,150.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 15.000 $1,100.000 $1,425.000 $1,005.000 $1,293.000 $1,046.980 $1,500.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 8.000 $1,200.000 $1,450.000 $1,100.000 $1,329.000 $1,145.950 $1,550.000
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
EA 5.000 $1,200.000 $1,550.000 $1,180.000 $1,414.000 $1,229.290 $1,750.000
REMOVE SM RD SN SUP&AM
EA 171.000 $190.000 $150.000 $85.000 $126.790 $88.550 $190.000
IN SRSS & AM (RAIL)(90 MPH)(P MOUNT)
EA 6.000 $5,000.000 $6,100.000 $2,985.000 $5,589.000 $3,109.690 $6,750.000
IN SRSS & AM (RAIL)(90 MPH)(T MOUNT)
EA 7.000 $5,000.000 $6,400.000 $2,700.000 $5,868.000 $2,812.780 $7,000.000
INSTALL LRSS (STRUCT STEEL)
LB 3,765.000 $10.000 $8.600 $6.100 $8.000 $6.350 $10.000
REMOVE LRSA
EA 12.000 $1,200.000 $1,300.000 $860.000 $1,250.000 $895.920 $1,500.000
INS OH SN SUP(30 FT BAL TEE)
EA 3.000 $60,000.000 $53,300.000 $53,300.000 $53,300.000 $77,605.000 $65,000.000
INS OH SN SUP(30 FT CANT)(SPAN ONLY)
EA 10.000 $20,000.000 $33,000.000 $44,200.000 $44,200.000 $34,768.000 $40,000.000
INS OH SN SUP(35 FT CANT)(SPAN ONLY)
EA 4.000 $25,000.000 $40,000.000 $47,600.000 $47,600.000 $39,039.000 $47,500.000
INS OH SN SUP(80 FT BRDG)(SPAN ONLY)
EA 1.000 $35,000.000 $86,000.000 $67,800.000 $67,800.000 $107,484.000 $100,000.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 104.000 $50.000 $20.000 $38.500 $68.270 $40.110 $23.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
EA 265.000 $30.000 $20.000 $39.000 $26.750 $40.630 $23.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 67.000 $40.000 $25.000 $18.000 $48.270 $18.750 $38.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 268.000 $50.000 $20.000 $41.000 $39.250 $42.710 $23.000
INSTL DEL ASSM (D-DW)SZ 1(BRF)GF2
EA 8.000 $35.000 $20.000 $41.000 $48.000 $42.710 $23.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
EA 30.000 $100.000 $114.000 $88.000 $112.370 $91.680 $120.000
INSTL DEL ASSM (D-DW)SZ 1(WFLX)GND
EA 10.000 $105.000 $115.000 $88.000 $113.440 $91.680 $125.000
WK ZN PAV MRK REMOV (W)6"(BRK)
LF 215,030.000 $1.750 $1.150 $1.100 $1.100 $1.110 $1.400
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 269,110.000 $2.000 $0.820 $0.780 $0.780 $0.790 $1.000
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 224,250.000 $2.000 $0.820 $0.780 $0.780 $0.790 $1.000
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 495.000 $1.100 $2.150 $2.050 $2.050 $2.070 $2.250
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 611.000 $2.500 $2.100 $2.000 $2.000 $2.020 $2.250
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 29,533.000 $1.750 $1.150 $1.100 $1.100 $1.110 $1.250
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 3,961.000 $5.250 $5.200 $5.000 $5.000 $5.050 $6.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 1,183.000 $10.500 $8.800 $8.500 $8.500 $8.590 $10.000
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 255.000 $4.500 $5.000 $4.800 $4.800 $4.850 $5.500
REFL PAV MRK TY II (W) 4" (BRK)
LF 19,995.000 $0.200 $0.200 $0.200 $0.200 $0.200 $0.250
REFL PAV MRK TY II (W) 4" (DOT)
LF 3,721.000 $0.300 $1.350 $1.300 $1.300 $1.310 $1.500
REFL PAV MRK TY II (W) 4" (SLD)
LF 31,240.000 $0.150 $0.200 $0.200 $0.200 $0.200 $0.250
REFL PAV MRK TY II (W) 6" (BRK)
LF 430.000 $0.500 $0.400 $0.350 $0.350 $0.350 $0.400
REFL PAV MRK TY II (W) 6" (DOT)
LF 387.000 $1.500 $1.500 $1.400 $1.400 $1.420 $1.750
REFL PAV MRK TY II (W) 6" (SLD)
LF 33,845.000 $0.500 $0.300 $0.300 $0.300 $0.300 $0.400
REFL PAV MRK TY II (W) 8" (SLD)
LF 19,809.000 $1.250 $0.500 $0.480 $0.480 $0.490 $0.500
REFL PAV MRK TY II (W) 12" (SLD)
LF 7,781.000 $2.000 $1.900 $1.800 $1.800 $1.820 $2.000
REFL PAV MRK TY II (W) 24" (SLD)
LF 1,135.000 $4.500 $3.100 $3.000 $3.000 $3.030 $3.500
REFL PAV MRK TY II (W) (ARROW)
EA 21.000 $85.000 $112.000 $108.000 $108.000 $109.160 $120.000
REFL PAV MRK TY II (W) (DBL ARROW)
EA 6.000 $150.000 $207.000 $200.000 $200.000 $202.160 $225.000
REFL PAV MRK TY II (W) (UTURN ARROW)
EA 7.000 $150.000 $155.000 $150.000 $150.000 $151.620 $175.000
REFL PAV MRK TY II (W) (LNDP ARW)
EA 12.000 $175.000 $186.000 $180.000 $180.000 $181.940 $200.000
REFL PAV MRK TY II (W) (NUMBER)
EA 12.000 $150.000 $186.000 $180.000 $180.000 $181.940 $200.000
REFL PAV MRK TY II (W) (WORD)
EA 30.000 $95.000 $155.000 $150.000 $150.000 $151.620 $175.000
REFL PAV MRK TY II (W) 36" (YLD TRI)
EA 59.000 $40.000 $44.000 $42.000 $42.000 $42.450 $50.000
REFL PAV MRK TY II (Y) 6" (SLD)
LF 63,152.000 $0.500 $0.260 $0.250 $0.250 $0.250 $0.300
REFL PAV MRK TY II (Y) 12" (SLD)
LF 200.000 $1.000 $5.200 $5.000 $5.000 $5.050 $6.000
REFL PAV MRK TY II (Y) (MED NOSE)
EA 11.000 $150.000 $155.000 $150.000 $150.000 $151.620 $175.000
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 17,032.000 $1.050 $0.900 $0.850 $0.850 $0.860 $1.000
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 70,228.000 $1.100 $0.800 $0.750 $0.750 $0.760 $1.000
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 79,120.000 $1.150 $0.800 $0.750 $0.750 $0.760 $1.000
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
LF 2,320.000 $1.500 $4.150 $4.000 $4.000 $4.040 $5.000
REFL PAV MRK TY II (Y)(CURB)
LF 1,129.000 $3.000 $2.100 $2.000 $2.000 $2.020 $2.500
PREFAB PAV MRK TY B (W)(6")(BRK)CNTST
LF 26,584.000 $15.000 $14.500 $14.000 $14.000 $14.150 $15.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 36.000 $300.000 $310.000 $300.000 $300.000 $303.230 $350.000
PREFAB PAV MRK TY C (W) (DBL ARROW)
EA 18.000 $450.000 $507.000 $490.000 $490.000 $495.280 $600.000
PREFAB PAV MRK TY C (W) (UTURN ARROW)
EA 12.000 $500.000 $517.000 $500.000 $500.000 $505.390 $625.000
PREFAB PAV MRK TY C (W) (LNDP ARROW)
EA 27.000 $650.000 $672.000 $650.000 $650.000 $657.010 $775.000
PREFAB PAV MRK TY C (W) (NUMBER)
EA 15.000 $325.000 $465.000 $450.000 $450.000 $454.850 $575.000
PREFAB PAV MRK TY C (W) (WORD)
EA 53.000 $350.000 $414.000 $400.000 $400.000 $404.310 $500.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 97.000 $75.000 $83.000 $80.000 $80.000 $80.860 $95.000
PREFAB PAV MRK TY C (W)(24")(SLD) CNTST
LF 666.000 $15.000 $23.000 $22.000 $22.000 $22.240 $25.000
REFL PAV MRKR TY I-R
EA 68.000 $15.000 $16.000 $15.000 $15.000 $15.160 $17.000
REFL PAV MRKR TY II-A-A
EA 276.000 $8.500 $6.250 $6.000 $6.000 $6.060 $7.000
REFL PAV MRKR TY II-C-R
EA 3,636.000 $6.000 $5.250 $5.000 $5.000 $5.050 $6.000
ELIM EXT PAV MRK & MRKS (4")
LF 94,260.000 $1.000 $0.800 $0.750 $0.750 $0.760 $1.000
PAV SURF PREP FOR MRK (6")
LF 176,973.000 $0.350 $0.200 $0.180 $0.180 $0.180 $0.200
PAV SURF PREP FOR MRK (8")
LF 24,614.000 $0.450 $0.200 $0.180 $0.180 $0.180 $0.200
PAV SURF PREP FOR MRK (12")
LF 3,136.000 $0.750 $1.600 $1.500 $1.500 $1.520 $1.750
PAV SURF PREP FOR MRK (24")
LF 1,828.000 $1.500 $3.100 $3.000 $3.000 $3.030 $3.000
PAV SURF PREP FOR MRK (ARROW)
EA 55.000 $40.000 $62.000 $60.000 $60.000 $60.650 $70.000
PAV SURF PREP FOR MRK (DBL ARROW)
EA 18.000 $50.000 $62.000 $60.000 $60.000 $60.650 $70.000
PAV SURF PREP FOR MRK (UTURN ARR)
EA 12.000 $30.000 $62.000 $60.000 $60.000 $60.650 $70.000
PAV SURF PREP FOR MRK (NUMBER)
EA 15.000 $20.000 $62.000 $60.000 $60.000 $60.650 $70.000
PAV SURF PREP FOR MRK (WORD)
EA 53.000 $45.000 $62.000 $60.000 $60.000 $60.650 $70.000
PAV SURF PREP FOR MRK (36")(YLD TRI)
EA 97.000 $20.000 $21.000 $20.000 $20.000 $20.220 $22.000
PAV SURF PREP FOR MRK (RPM)
EA 2,721.000 $5.000 $1.300 $1.250 $1.250 $1.260 $1.500
INSTALL HWY TRF SIG (ISOLATED)
EA 1.000 $22,500.000 $60,000.000 $60,000.000 $60,000.000 $64,654.000 $70,000.000
REMOVING TRAFFIC SIGNALS
EA 2.000 $5,000.000 $10,000.000 $10,000.000 $10,000.000 $11,903.000 $11,000.000
TEMP TRAF SIGNALS
EA 1.000 $20,000.000 $600,000.000 $600,000.000 $600,000.000 $101,984.000 $800,000.000
VEH SIG SEC (12")LED(GRN)
EA 12.000 $300.000 $325.000 $325.000 $325.000 $330.000 $400.000
VEH SIG SEC (12")LED(GRN ARW)
EA 4.000 $300.000 $325.000 $325.000 $325.000 $330.000 $400.000
VEH SIG SEC (12")LED(YEL)
EA 16.000 $350.000 $325.000 $325.000 $325.000 $330.000 $400.000
VEH SIG SEC (12")LED(YEL ARW)
EA 4.000 $300.000 $325.000 $325.000 $325.000 $330.000 $400.000
VEH SIG SEC (12")LED(RED)
EA 12.000 $300.000 $325.000 $325.000 $325.000 $330.000 $400.000
VEH SIG SEC (12")LED(RED ARW)
EA 8.000 $300.000 $325.000 $325.000 $325.000 $330.000 $400.000
PED SIG SEC (LED)(COUNTDOWN)
EA 16.000 $800.000 $900.000 $900.000 $900.000 $1,080.000 $1,000.000
BACK PLATE (12")(1 SEC)(VENTED)ALUM
EA 4.000 $175.000 $125.000 $125.000 $125.000 $390.000 $150.000
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
EA 12.000 $200.000 $200.000 $200.000 $200.000 $356.000 $250.000
BACKPLATE W/REF BRDR(4 SEC)(VENT)ALUM
EA 4.000 $200.000 $250.000 $250.000 $250.000 $385.000 $300.000
TRF SIG CBL (TY A)(14 AWG)(4 CONDR)
LF 7,520.000 $2.000 $2.250 $2.250 $2.250 $3.030 $2.500
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
LF 260.000 $4.750 $2.500 $2.500 $2.500 $7.470 $3.000
TRF SIG CBL (TY A)(14 AWG)(12 CONDR)
LF 6,715.000 $5.000 $4.000 $4.000 $4.000 $6.330 $5.000
TRF SIG CBL (TY C)(14 AWG)(2 CONDR)
LF 5,885.000 $2.000 $1.750 $1.750 $1.750 $2.530 $2.000
RELOCATE RDSD FLASH BEACON ASSEMBLY
EA 2.000 $6,000.000 $4,500.000 $4,500.000 $4,500.000 $6,118.000 $5,000.000
REMOVE RDSD FLASH BEACON ASSEMBLY
EA 2.000 $930.000 $500.000 $500.000 $500.000 $2,165.000 $575.000
REMOV RDSD FLSH BCN AM (SOLAR PWRD)
EA 3.000 $1,000.000 $500.000 $500.000 $500.000 $2,165.000 $575.000
INS TRF SIG PL AM(S)1 ARM(40')
EA 2.000 $12,500.000 $20,000.000 $20,000.000 $2,000.000 $15,366.000 $22,500.000
INS TRF SIG PL AM(S)1 ARM(40')LUM
EA 4.000 $14,400.000 $23,500.000 $23,500.000 $23,500.000 $18,248.000 $27,500.000
PED POLE ASSEMBLY
EA 6.000 $2,000.000 $3,000.000 $3,000.000 $3,000.000 $3,455.000 $3,500.000
PED DETECT PUSH BUTTON (APS)
EA 14.000 $1,200.000 $900.000 $900.000 $900.000 $1,458.000 $1,000.000
PED DETECTOR CONTROLLER UNIT
EA 1.000 $3,000.000 $4,500.000 $4,500.000 $4,500.000 $2,664.000 $5,000.000
FULL - WIDTH MOWING
CYC 14.000 $5,000.000 $3,000.000 $4,015.000 $6,477.600 $14,171.430 $7,000.000
LITTER REMOVAL
CYC 53.000 $2,800.000 $1,800.000 $6,232.500 $2,935.490 $6,913.590 $3,000.000
DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES)
CYC 53.000 $2,000.000 $1,100.000 $22,314.630 $2,593.930 $7,837.310 $3,000.000
DEBRIS REMOVAL (FRONTAGE ROADS)
CYC 53.000 $1,800.000 $1,100.000 $22,314.630 $3,147.490 $7,837.310 $3,000.000
DEBRIS REMOVAL (ENTRANCE/EXIT RAMPS)
CYC 53.000 $1,200.000 $525.000 $8,367.990 $1,776.590 $7,837.310 $3,000.000
CLEANING / SWEEPING (CENTER MEDIAN)
CYC 53.000 $3,000.000 $1,700.000 $10,800.710 $4,487.340 $5,203.610 $3,750.000
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
CYC 53.000 $4,500.000 $1,700.000 $10,800.710 $3,739.450 $5,203.610 $3,750.000
CLEANING / SWEEPING (FRONTAGE ROAD)
CYC 53.000 $1,500.000 $1,700.000 $10,800.710 $4,039.720 $5,203.610 $3,750.000
CLEANING / SWEEPING(ENTRANCE/EXIT RAMP)
CYC 53.000 $1,500.000 $1,700.000 $5,400.350 $1,869.720 $5,203.610 $3,750.000
ANTI - GRAFFITI COATNG(PERMNENT-TY III)
SF 163,508.000 $2.500 $1.200 $1.170 $1.170 $1.170 $1.250
NO. OF WORKING DAYS
$/D 27,077.000 $1,150.000 $850.000 $1,089.000 $999.000 $1,150.000 $1,150.000
D-GR HMA TY-B PG70-22 (LEVEL-UP)
TON 489.000 $165.000 $236.600 $187.860 $237.200 $186.000 $200.000
D-GR HMA TY-C PG70-22 (LEVEL-UP)
TON 418.000 $125.000 $236.600 $187.860 $237.200 $186.000 $205.000
SP MIXES SP-B SAC-B PG70-22
TON 44,614.000 $165.000 $157.700 $168.670 $159.000 $165.000 $145.000
TACK COAT
GAL 11,555.000 $4.500 $5.000 $4.040 $5.120 $4.000 $8.000
STONE-MTRX-ASPH SMAR-F SAC-A
TON 11,915.000 $165.000 $245.400 $257.550 $236.250 $255.000 $222.000
TOM-C SAC-B
TON 22,180.000 $145.000 $201.200 $219.170 $195.110 $217.000 $200.000
BONDING COURSE
GAL 11,555.000 $6.000 $5.000 $4.040 $5.190 $4.000 $6.000
TIP TESTING(DRILL SHAFT)
EA 6.000 $5,500.000 $4,500.000 $4,000.000 $11,152.700 $4,944.920 $7,000.000
THERMO PIPE(18")(PP)(TY S)(TY II)
LF 410.000 $90.000 $54.000 $0.000 $0.000 $0.000 $110.000
THERMO PIPE(12")(PP)(TY S)(TY II)
LF 448.000 $60.000 $41.000 $0.000 $0.000 $0.000 $115.000
REMOVE ROADWAY ILLUM ASSEMBLY (HPS)
EA 18.000 $700.000 $750.000 $750.000 $750.000 $283.000 $900.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $12,500.000 $20,000.000 $1,163.640 $82,820.210 $17,500.000 $24,000.000
ITS COM CBL (ETHERNET)
LF 150.000 $4.500 $30.000 $30.000 $30.000 $35.880 $35.000
CCTV MOUNT (POLE)
EA 5.000 $1,000.000 $1,950.000 $1,950.000 $1,950.000 $1,410.000 $2,225.000
CCTV FIELD EQUIP (DIGITAL) (INSTL ONLY)
EA 6.000 $2,000.000 $8,700.000 $8,700.000 $8,700.000 $1,133.000 $10,000.000
RELOCATE CCTV FIELD EQUIPMENT
EA 1.000 $1,905.000 $7,700.000 $7,700.000 $7,700.000 $1,699.000 $7,765.000
REMOVE CCTV FIELD EQUIPMENT
EA 1.000 $1,250.000 $4,200.000 $4,200.000 $4,200.000 $850.000 $5,000.000
ITS MULTI-DUCT CND (PVC-40)(CONC ENCSE)
LF 39,940.000 $25.000 $40.000 $45.000 $40.000 $30.300 $50.000
ITS MULTI-DUCT CND (PVC-40)(STL ENCSE)
LF 14,210.000 $60.000 $65.000 $70.000 $65.000 $95.200 $75.000
CONDUIT (PREPARE)
LF 525.000 $2.500 $2.000 $2.000 $2.000 $4.570 $2.250
GROUND BOX (PREPARE)
EA 6.000 $450.000 $500.000 $500.000 $500.000 $554.000 $575.000
INSTALL DMS (FOUNDATION MTD CABINET)
EA 3.000 $15,000.000 $66,000.000 $66,000.000 $66,000.000 $21,268.000 $70,000.000
BBU SYSTEM (EXTERNAL BATT CABINET)
EA 1.000 $8,150.000 $12,500.000 $12,500.000 $12,500.000 $9,931.000 $13,000.000
BBU SYSTEM (STAND-ALONE BATT CABINET)
EA 9.000 $10,000.000 $25,500.000 $25,500.000 $25,500.000 $12,636.000 $30,000.000
ITS RADIO (INSTALL ONLY)
EA 2.000 $2,500.000 $14,500.000 $14,500.000 $14,500.000 $1,699.000 $17,000.000
REMOVE ITS RADIO
EA 1.000 $750.000 $6,750.000 $6,750.000 $6,750.000 $1,133.000 $7,500.000
ITS POLE (30 FT)(90 MPH)
EA 2.000 $15,000.000 $15,000.000 $15,000.000 $15,000.000 $14,824.000 $17,500.000
ITS POLE (60 FT)(90 MPH)
EA 3.000 $25,000.000 $30,000.000 $30,000.000 $30,000.000 $31,412.000 $35,000.000
ITS POLE MNT CAB (TY 1)(CONF 2)
EA 1.000 $5,000.000 $8,500.000 $8,500.000 $8,500.000 $5,745.000 $9,500.000
ITS POLE MNT CAB (TY 2)(CONF 1)
EA 5.000 $6,000.000 $9,000.000 $9,000.000 $9,000.000 $5,176.000 $10,000.000
VIDEO IMAGING AND RAD VEH DETECTION SYS
EA 1.000 $27,850.000 $100,000.000 $100,000.000 $100,000.000 $80,173.000 $125,000.000
MODIFY EXISTING ELECTRICAL SERVICE
EA 1.000 $1,500.000 $7,500.000 $7,500.000 $7,500.000 $5,427.000 $8,500.000
LED HI MST IL ASM (6 FIXT)(ASYM)(TY A)
EA 7.000 $35,000.000 $41,000.000 $41,000.000 $41,000.000 $46,506.000 $47,500.000
TMA (STATIONARY)
DAY 258.000 $250.000 $500.000 $419.000 $432.860 $462.610 $275.000
TMA (MOBILE OPERATION)
HR 352.000 $100.000 $175.000 $138.650 $88.390 $104.090 $75.000
ITS GND BOX(PCAST) TY 1 (243636)
EA 12.000 $5,000.000 $5,000.000 $5,000.000 $5,000.000 $8,557.000 $6,000.000
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
EA 46.000 $5,000.000 $6,500.000 $6,500.000 $6,500.000 $8,645.000 $7,500.000
ITS GND BOX(PCAST) TY 2 (366036)
EA 2.000 $6,000.000 $11,000.000 $11,000.000 $11,000.000 $11,307.000 $12,500.000
ITS GND BOX(PCAST) TY 2 (366036)W/APRN
EA 4.000 $5,500.000 $12,000.000 $12,000.000 $12,000.000 $11,570.000 $13,000.000
CCTV ON HIGH MAST ILLUMINATION ASSEMBLY
EA 1.000 $7,500.000 $51,000.000 $51,000.000 $51,000.000 $28,561.000 $55,000.000
TEMP OVHT VEH WARNING SYS
EA 1.000 $25,000.000 $45,000.000 $45,000.000 $45,000.000 $20,000.000 $50,000.000
ITS RVSD (DATA COLLECT & WWA) SYS
EA 1.000 $75,000.000 $31,750.000 $31,750.000 $31,750.000 $20,733.000 $35,000.000
ITS RVSD (DC & WWA) (REMOVE)
EA 1.000 $5,000.000 $6,750.000 $6,750.000 $6,750.000 $1,148.000 $7,500.000
LED WRONG WAY DRIVER SYSTEM
EA 6.000 $500.000 $8,300.000 $10,000.000 $19,000.000 $98,163.000 $13,500.000
LED WRONG WAY DRIVER SYSTEM (REMOVE)
EA 4.000 $2,000.000 $1,500.000 $3,500.000 $12,000.000 $4,313.000 $9,000.000
OHVED SYSTEM (DUAL-DETECTION) W/REMOTE
EA 1.000 $50,000.000 $101,500.000 $101,500.000 $101,500.000 $85,508.000 $115,000.000
REMOVE HIGH MAST LIGHTING ASSEMBLY
EA 4.000 $7,500.000 $15,000.000 $15,000.000 $15,000.000 $17,562.000 $17,500.000
1
RC PIPE (CL III)(12 IN)
LF 668.000 $60.000 $0.000 $113.330 $84.020 $101.630 $0.000
2
RC PIPE (CL III)(18 IN)
LF 4,921.000 $90.000 $0.000 $168.190 $110.320 $120.740 $0.000
Totals: $284,657,477.740 $260,876,639.920 $272,817,245.997 $299,992,051.746 $338,646,883.592 $346,826,743.950