|
|
PREPARING ROW
|
STA
|
231.000
|
$20,000.000
|
$43,700.000
|
$100.000
|
$45,671.110
|
$33,850.000
|
$58,000.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (2")
|
SY
|
475.000
|
$8.000
|
$5.000
|
$1.250
|
$6.990
|
$2.000
|
$20.000
|
|
|
REMOVING STAB BASE & ASPH PAV (4"-11")
|
SY
|
457.000
|
$3.000
|
$5.000
|
$6.110
|
$7.630
|
$9.800
|
$15.000
|
|
|
REMOVING STAB BASE AND ASPH PAV(6"-9")
|
SY
|
475.000
|
$3.000
|
$5.000
|
$1.660
|
$7.440
|
$3.250
|
$15.000
|
|
|
RMV TRT & UNTRT BASE & ASPH PV(12"-30")
|
SY
|
90,060.000
|
$8.000
|
$5.000
|
$2.110
|
$5.780
|
$3.260
|
$15.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
99,572.000
|
$9.000
|
$6.500
|
$7.630
|
$3.890
|
$5.000
|
$14.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
138,308.000
|
$10.000
|
$6.500
|
$18.020
|
$6.640
|
$13.000
|
$26.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
219,422.000
|
$1.000
|
$0.500
|
$0.580
|
$0.580
|
$1.900
|
$1.890
|
|
|
BLOCK SODDING
|
SY
|
219,422.000
|
$4.000
|
$2.600
|
$2.570
|
$2.570
|
$2.650
|
$2.570
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
SY
|
137,647.000
|
$0.110
|
$0.100
|
$0.080
|
$0.080
|
$0.080
|
$0.080
|
|
|
DRILL SEEDING (TEMP) (COOL)
|
SY
|
137,647.000
|
$0.110
|
$0.100
|
$0.090
|
$0.090
|
$0.090
|
$0.090
|
|
|
VEGETATIVE WATERING
|
MG
|
5,570.000
|
$20.000
|
$20.000
|
$27.690
|
$23.940
|
$24.400
|
$25.940
|
|
|
PROOF ROLLING
|
HR
|
234.000
|
$75.000
|
$50.000
|
$305.000
|
$54.820
|
$91.000
|
$173.750
|
|
|
FLBS (CMP IN PLC)(TY D GR 1-2 OR 5)(8")
|
SY
|
62,717.000
|
$12.000
|
$4.000
|
$11.000
|
$8.980
|
$8.600
|
$10.890
|
|
|
LIME TRT (EXST MATL) (6")
|
SY
|
136,608.000
|
$2.000
|
$2.000
|
$1.160
|
$4.640
|
$2.860
|
$10.000
|
|
|
LIME (HYD, COM, OR QK(SLURRY))
|
TON
|
3,606.000
|
$180.000
|
$175.000
|
$101.000
|
$177.460
|
$165.000
|
$185.000
|
|
|
SALV, HAUL & STKPL RCL APH PV (2 TO 4")
|
SY
|
16,954.000
|
$3.000
|
$5.000
|
$1.970
|
$2.430
|
$1.910
|
$5.000
|
|
|
SALV,HAUL & STKPL RCL APH PV (0 TO 3")
|
SY
|
3,221.000
|
$2.200
|
$5.000
|
$1.800
|
$3.090
|
$1.710
|
$5.000
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
18,815.000
|
$3.800
|
$3.500
|
$3.200
|
$3.200
|
$3.260
|
$3.200
|
|
|
ASPH (A-R TYPE II)
|
GAL
|
8,477.000
|
$5.000
|
$11.250
|
$4.000
|
$4.000
|
$4.080
|
$4.000
|
|
|
AGGR(TY-PB GR-3 SAC-B)
|
CY
|
162.000
|
$85.000
|
$93.500
|
$150.000
|
$150.000
|
$153.000
|
$150.000
|
|
|
TOM (ASPHALT) PG 76-22
|
TON
|
41.000
|
$140.000
|
$138.000
|
$107.000
|
$107.000
|
$109.000
|
$107.000
|
|
|
TOM-C (AGGREGATE) SAC-A
|
TON
|
641.000
|
$120.000
|
$138.000
|
$107.000
|
$107.000
|
$109.000
|
$107.000
|
|
|
PLANE ASPH CONC PAV(0" TO 6")
|
SY
|
536.000
|
$2.500
|
$3.500
|
$9.930
|
$2.000
|
$10.400
|
$4.220
|
|
|
PAV JT UNDERSEAL (18")
|
LF
|
7,721.000
|
$15.000
|
$14.700
|
$2.750
|
$2.750
|
$2.800
|
$8.100
|
|
|
CONC PVMT (CONT REINF - CRCP) (13")
|
SY
|
69,934.000
|
$60.000
|
$40.000
|
$73.930
|
$67.780
|
$76.000
|
$74.000
|
|
|
CEM STABIL BKFL
|
CY
|
1,844.000
|
$85.000
|
$50.000
|
$120.000
|
$97.350
|
$103.000
|
$250.000
|
|
|
CUT & RESTORING PAV
|
SY
|
612.000
|
$60.000
|
$250.000
|
$140.140
|
$87.390
|
$135.000
|
$100.000
|
|
|
CUT & RESTORE CONC PAVING
|
SY
|
840.000
|
$160.000
|
$230.000
|
$162.650
|
$58.260
|
$130.000
|
$200.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
250.000
|
$120.000
|
$225.000
|
$210.000
|
$136.760
|
$102.000
|
$250.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
10,337.000
|
$2.850
|
$0.200
|
$3.400
|
$4.120
|
$3.600
|
$2.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
43,391.000
|
$18.000
|
$5.000
|
$13.620
|
$17.150
|
$15.700
|
$35.000
|
|
|
TEMPORARY SPL SHORING (SOIL NAIL)
|
SF
|
13,859.000
|
$35.000
|
$5.000
|
$25.850
|
$19.150
|
$24.500
|
$40.000
|
|
|
SOIL NAIL ANCHORS
|
LF
|
4,460.000
|
$15.000
|
$20.000
|
$13.780
|
$12.360
|
$15.900
|
$15.870
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
36.000
|
$100.000
|
$100.000
|
$106.480
|
$110.640
|
$110.000
|
$200.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
175.000
|
$170.000
|
$125.000
|
$296.740
|
$189.880
|
$241.000
|
$350.000
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
1,164.000
|
$240.000
|
$175.000
|
$223.810
|
$227.810
|
$238.000
|
$400.000
|
|
|
DRILL SHAFT (48 IN)
|
LF
|
42.000
|
$380.000
|
$460.000
|
$257.860
|
$237.820
|
$460.000
|
$450.000
|
|
|
DRILL SHAFT (54 IN)
|
LF
|
216.000
|
$300.000
|
$250.000
|
$336.040
|
$368.220
|
$357.000
|
$500.000
|
|
|
DRILL SHAFT (60 IN)
|
LF
|
1,530.000
|
$635.000
|
$350.000
|
$312.090
|
$512.560
|
$530.000
|
$650.000
|
|
|
DRILL SHAFT (72 IN)
|
LF
|
480.000
|
$400.000
|
$475.000
|
$554.240
|
$581.850
|
$580.000
|
$700.000
|
|
|
DRILL SHAFT (84 IN)
|
LF
|
800.000
|
$800.000
|
$700.000
|
$793.520
|
$823.770
|
$830.000
|
$1,000.000
|
|
|
DRILL SHAFT (NON - REINFORCED) (12 IN)
|
LF
|
42.000
|
$115.000
|
$140.000
|
$140.000
|
$140.000
|
$140.000
|
$140.000
|
|
|
DRILL SHAFT (SIGN MTS) (30 IN)
|
LF
|
132.000
|
$225.000
|
$240.000
|
$240.000
|
$243.850
|
$240.000
|
$240.000
|
|
|
DRILL SHAFT (SIGN MTS) (42 IN)
|
LF
|
574.000
|
$395.000
|
$350.000
|
$350.000
|
$357.580
|
$350.000
|
$350.000
|
|
|
DRILL SHAFT (SIGN MTS) (48 IN)
|
LF
|
123.000
|
$490.000
|
$420.000
|
$420.000
|
$430.050
|
$420.000
|
$420.000
|
|
|
DRILL SHAFT (SIGN MTS) (54 IN)
|
LF
|
34.000
|
$520.000
|
$500.000
|
$500.000
|
$513.840
|
$500.000
|
$500.000
|
|
|
DRILL SHAFT (HIGH MAST POLE) (54 IN)
|
LF
|
196.000
|
$630.000
|
$490.000
|
$490.000
|
$490.000
|
$140.000
|
$490.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
60.000
|
$215.000
|
$230.000
|
$230.000
|
$230.000
|
$230.000
|
$230.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
13.000
|
$290.000
|
$300.000
|
$300.000
|
$300.000
|
$300.000
|
$300.000
|
|
|
DRILL SHAFT (108 IN)
|
LF
|
1,474.000
|
$1,000.000
|
$1,000.000
|
$1,208.470
|
$1,162.400
|
$1,170.000
|
$1,400.000
|
|
|
DRILL SHAFT (96 IN)
|
LF
|
1,385.000
|
$1,000.000
|
$800.000
|
$999.300
|
$925.200
|
$960.000
|
$1,200.000
|
|
|
DRILL SHAFT (120 IN)
|
LF
|
1,631.000
|
$1,300.000
|
$1,200.000
|
$1,391.320
|
$1,415.530
|
$1,430.000
|
$1,700.000
|
|
|
CL A CONC (MISC)
|
CY
|
50.000
|
$475.000
|
$800.000
|
$600.000
|
$355.340
|
$1,060.000
|
$700.000
|
|
|
CL C CONC (ABUT)
|
CY
|
136.000
|
$896.000
|
$800.000
|
$900.000
|
$803.670
|
$1,000.000
|
$1,200.000
|
|
|
CL C CONC (CAP)
|
CY
|
80.000
|
$900.000
|
$1,300.000
|
$1,180.000
|
$1,045.620
|
$1,480.000
|
$1,700.000
|
|
|
CL C CONC (CAP)(MASS)
|
CY
|
6,361.900
|
$800.000
|
$500.000
|
$900.000
|
$900.630
|
$900.000
|
$930.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
146.000
|
$900.000
|
$900.000
|
$1,130.000
|
$1,074.780
|
$940.000
|
$1,500.000
|
|
|
CL C CONC (COLUMN)(MASS)
|
CY
|
9,480.400
|
$800.000
|
$500.000
|
$700.000
|
$652.400
|
$650.000
|
$930.000
|
|
|
CL C CONC (FOOTING)
|
CY
|
18.800
|
$515.500
|
$1,300.000
|
$675.000
|
$840.780
|
$1,500.000
|
$600.000
|
|
|
CL C CONC (FOOTING)(MASS)
|
CY
|
1,349.300
|
$600.000
|
$400.000
|
$520.000
|
$507.240
|
$540.000
|
$650.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
902.000
|
$400.000
|
$200.000
|
$425.000
|
$315.590
|
$348.000
|
$450.000
|
|
|
CL C CONC (SIGN COLUMN)
|
CY
|
490.600
|
$830.000
|
$1,000.000
|
$1,200.000
|
$1,022.190
|
$1,100.000
|
$1,500.000
|
|
|
CL E CONC (SEAL SLAB)(NON-REINF)
|
CY
|
61.000
|
$320.000
|
$450.000
|
$750.000
|
$306.110
|
$580.000
|
$206.380
|
|
|
CL H CONC (PT CAP)(MASS)
|
CY
|
589.100
|
$1,470.000
|
$1,100.000
|
$1,107.400
|
$1,472.390
|
$1,300.000
|
$1,500.000
|
|
|
CL H CONC (PT COLUMN)(MASS)
|
CY
|
121.300
|
$1,100.000
|
$700.000
|
$888.990
|
$1,516.460
|
$1,120.000
|
$2,100.000
|
|
|
REINF CONC SLAB
|
SF
|
556,471.000
|
$14.500
|
$12.000
|
$14.000
|
$14.910
|
$16.400
|
$17.760
|
|
|
APPROACH SLAB
|
CY
|
236.000
|
$550.000
|
$200.000
|
$440.000
|
$550.450
|
$420.000
|
$382.490
|
|
|
RETAINING WALL (MSE)
|
SF
|
74,098.000
|
$55.000
|
$42.000
|
$58.590
|
$50.930
|
$54.000
|
$50.000
|
|
|
RETAINING WALL (SOIL NAIL)(FACIA)
|
SF
|
2,470.000
|
$50.000
|
$35.000
|
$59.890
|
$61.170
|
$52.000
|
$53.490
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
20,123.000
|
$130.000
|
$115.000
|
$128.470
|
$124.330
|
$132.000
|
$150.000
|
|
|
PRESTR CONC GIRDER (TX62)
|
LF
|
52,787.000
|
$145.000
|
$130.000
|
$130.510
|
$124.190
|
$136.000
|
$144.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
212.400
|
$380.000
|
$400.000
|
$349.250
|
$500.000
|
$406.000
|
$320.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
7,059.000
|
$400.000
|
$400.000
|
$252.740
|
$350.000
|
$287.000
|
$310.000
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
62.500
|
$430.000
|
$400.000
|
$418.190
|
$725.490
|
$433.000
|
$320.000
|
|
|
RIPRAP (CONC)(FLUME)
|
CY
|
9.000
|
$480.000
|
$400.000
|
$532.590
|
$515.950
|
$1,190.000
|
$400.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
892.000
|
$450.000
|
$400.000
|
$359.630
|
$506.370
|
$407.000
|
$400.000
|
|
|
ELASTOMERIC BEARING (SPECIAL)
|
EA
|
20.000
|
$3,000.000
|
$3,000.000
|
$3,197.250
|
$4,277.520
|
$3,070.000
|
$4,435.450
|
|
|
STR STEEL (PLATE GIRDER)
|
LB
|
2,677,000.000
|
$1.500
|
$1.600
|
$1.740
|
$1.660
|
$1.990
|
$1.970
|
|
|
STR STEEL (MISC NON - BRIDGE)
|
LB
|
13,662.000
|
$2.000
|
$7.000
|
$13.210
|
$0.540
|
$2.800
|
$2.390
|
|
|
RAIL (TY SSTR)
|
LF
|
40,175.000
|
$42.000
|
$30.000
|
$39.000
|
$41.020
|
$47.000
|
$45.960
|
|
|
RAIL (TY C402)
|
LF
|
240.000
|
$200.000
|
$200.000
|
$293.260
|
$312.360
|
$164.000
|
$256.750
|
|
|
RAIL (TY SSTR) (W/DRAIN SLOTS)
|
LF
|
10,871.000
|
$45.000
|
$35.000
|
$39.000
|
$38.810
|
$49.000
|
$51.090
|
|
|
RAIL (TY SSTR)(MOD)
|
LF
|
3,747.000
|
$42.000
|
$100.000
|
$103.580
|
$108.090
|
$107.000
|
$168.100
|
|
|
RAIL (TY SSTR)(MOD2)
|
LF
|
246.000
|
$60.000
|
$300.000
|
$84.900
|
$237.930
|
$237.000
|
$177.090
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
1,946.000
|
$89.000
|
$100.000
|
$105.740
|
$127.270
|
$112.000
|
$120.220
|
|
|
SEALED EXPANSION JOINT (5 IN) (SEJ - M)
|
LF
|
38.000
|
$95.000
|
$100.000
|
$115.740
|
$389.620
|
$109.000
|
$120.200
|
|
|
GABION MATTRESSES (GALV)(12 IN)
|
SY
|
115.000
|
$90.000
|
$62.000
|
$193.380
|
$193.380
|
$134.000
|
$230.120
|
|
|
GABION (1.5' X 3')(GALV)
|
CY
|
22.000
|
$625.000
|
$400.000
|
$860.390
|
$860.390
|
$342.000
|
$731.720
|
|
|
CONC BOX CULV (3 FT X 2 FT)
|
LF
|
459.000
|
$190.000
|
$150.000
|
$185.780
|
$148.410
|
$188.000
|
$323.000
|
|
|
CONC BOX CULV (3 FT X 3 FT)
|
LF
|
1,764.000
|
$200.000
|
$160.000
|
$223.590
|
$162.300
|
$191.000
|
$350.000
|
|
|
CONC BOX CULV (4 FT X 3 FT)
|
LF
|
488.000
|
$253.000
|
$180.000
|
$247.870
|
$198.850
|
$217.000
|
$375.000
|
|
|
CONC BOX CULV (5 FT X 2 FT)
|
LF
|
322.000
|
$350.000
|
$250.000
|
$361.310
|
$317.170
|
$354.000
|
$400.000
|
|
|
CONC BOX CULV (6 FT X 3 FT)
|
LF
|
1,935.000
|
$350.000
|
$275.000
|
$315.750
|
$335.670
|
$373.000
|
$600.000
|
|
|
CONC BOX CULV (10 FT X 5 FT)
|
LF
|
498.000
|
$680.000
|
$600.000
|
$707.500
|
$892.860
|
$870.000
|
$1,200.000
|
|
|
CONC BOX CULV (7 FT X 3 FT)(EXTEND)
|
LF
|
15.000
|
$770.000
|
$457.900
|
$1,572.450
|
$998.960
|
$870.000
|
$1,500.000
|
|
|
CONC BOX CULV (10 FT X 10 FT)(EXTEND)
|
LF
|
21.000
|
$1,500.000
|
$772.400
|
$2,108.350
|
$2,217.500
|
$1,380.000
|
$2,000.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
7,346.000
|
$64.000
|
$50.000
|
$49.970
|
$76.780
|
$76.000
|
$100.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
213.000
|
$102.000
|
$75.000
|
$65.570
|
$95.430
|
$89.000
|
$150.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
1,433.000
|
$125.000
|
$70.000
|
$85.120
|
$114.810
|
$145.000
|
$180.000
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
860.000
|
$155.000
|
$90.000
|
$100.580
|
$149.390
|
$157.000
|
$225.000
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
372.000
|
$228.000
|
$150.000
|
$124.050
|
$177.810
|
$211.000
|
$300.000
|
|
|
MANH (COMPL)(PRM)(60IN)
|
EA
|
1.000
|
$4,800.000
|
$4,073.000
|
$3,818.900
|
$4,525.270
|
$4,890.000
|
$7,833.120
|
|
|
MANH (COMPL)(PRM)(72IN)
|
EA
|
1.000
|
$5,540.000
|
$5,204.000
|
$5,778.720
|
$4,865.570
|
$6,500.000
|
$8,187.480
|
|
|
JCTBOX(COMPL)(PJB)(6FTX6FT)
|
EA
|
1.000
|
$9,350.000
|
$4,511.000
|
$7,950.600
|
$5,730.830
|
$9,500.000
|
$9,014.250
|
|
|
JCTBOX(COMPL)(PJB)(8FTX8FT)
|
EA
|
1.000
|
$11,800.000
|
$10,082.000
|
$12,867.980
|
$12,862.070
|
$11,800.000
|
$14,366.680
|
|
|
INLET (COMPL)(PCO)(3FT)(LEFT)
|
EA
|
1.000
|
$4,000.000
|
$4,955.000
|
$4,900.560
|
$4,824.570
|
$5,500.000
|
$4,894.520
|
|
|
INLET (COMPL)(PCO)(3FT)(RIGHT)
|
EA
|
12.000
|
$4,000.000
|
$4,956.000
|
$4,999.120
|
$4,800.510
|
$5,500.000
|
$4,894.520
|
|
|
INLET (COMPL)(PCO)(3FT)(BOTH)
|
EA
|
3.000
|
$4,500.000
|
$6,473.000
|
$5,183.550
|
$5,383.420
|
$6,100.000
|
$5,480.320
|
|
|
INLET (COMPL)(PCO)(4FT)(LEFT)
|
EA
|
1.000
|
$5,000.000
|
$6,067.000
|
$5,504.740
|
$6,427.670
|
$8,400.000
|
$7,123.160
|
|
|
INLET (COMPL)(PCO)(4FT)(RIGHT)
|
EA
|
1.000
|
$5,000.000
|
$6,067.000
|
$5,504.740
|
$5,283.770
|
$7,200.000
|
$5,979.260
|
|
|
INLET (COMPL)(PCO)(4FT)(BOTH)
|
EA
|
1.000
|
$5,450.000
|
$7,883.000
|
$6,545.140
|
$6,759.770
|
$8,800.000
|
$7,461.030
|
|
|
INLET (COMPL)(PCO)(5FT)(BOTH)
|
EA
|
1.000
|
$7,900.000
|
$8,207.000
|
$7,150.380
|
$6,497.370
|
$9,000.000
|
$7,824.200
|
|
|
INLET (COMPL)(PCU)(3FT)(RIGHT)
|
EA
|
7.000
|
$6,350.000
|
$5,265.000
|
$5,369.240
|
$5,070.420
|
$6,100.000
|
$5,165.120
|
|
|
INLET (COMPL)(PCU)(3FT)(BOTH)
|
EA
|
4.000
|
$6,650.000
|
$6,656.000
|
$4,784.890
|
$5,552.230
|
$6,200.000
|
$5,644.320
|
|
|
INLET (COMPL)(PCU)(5FT)(NONE)
|
EA
|
1.000
|
$5,000.000
|
$5,730.000
|
$7,054.320
|
$6,161.170
|
$7,200.000
|
$7,297.510
|
|
|
INLET (COMPL)(PCU)(5FT)(RIGHT)
|
EA
|
6.000
|
$6,750.000
|
$7,870.000
|
$7,254.120
|
$7,009.870
|
$8,000.000
|
$8,144.390
|
|
|
INLET (COMPL)(PCU)(5FT)(BOTH)
|
EA
|
2.000
|
$7,200.000
|
$9,317.000
|
$8,305.990
|
$7,477.270
|
$8,500.000
|
$8,804.050
|
|
|
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
11.000
|
$4,750.000
|
$3,562.000
|
$3,388.830
|
$3,239.660
|
$4,460.000
|
$4,260.210
|
|
|
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
2.000
|
$5,900.000
|
$3,989.000
|
$3,931.350
|
$4,623.670
|
$5,200.000
|
$4,812.390
|
|
|
INLET(COMPL)(PSL)(SFG)(4FTX4FT-4FTX4FT)
|
EA
|
20.000
|
$5,750.000
|
$4,548.000
|
$4,155.740
|
$4,099.010
|
$5,600.000
|
$5,234.680
|
|
|
INLET(COMPL)(PSL)(SFG)(3FTX5FT-3FTX5FT)
|
EA
|
6.000
|
$8,000.000
|
$4,662.000
|
$3,897.340
|
$4,838.120
|
$5,100.000
|
$4,921.750
|
|
|
INLET(COMPL)(PAZD)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
2.000
|
$3,150.000
|
$4,498.000
|
$3,195.200
|
$4,713.700
|
$5,000.000
|
$4,804.910
|
|
|
INLET(COMPL)(PAZD)(FG)(4FTX4FT-3FTX3FT)
|
EA
|
1.000
|
$3,850.000
|
$4,108.000
|
$3,742.660
|
$4,693.370
|
$5,200.000
|
$4,755.790
|
|
|
INLET(COMPL)(PAZD)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
1.000
|
$3,950.000
|
$4,203.000
|
$4,290.580
|
$4,783.570
|
$5,300.000
|
$4,847.930
|
|
|
INLET(COMPL)(PAZD)(FG)(5FTX5FT-4FTX4FT)
|
EA
|
1.000
|
$4,650.000
|
$5,434.000
|
$9,291.150
|
$5,419.070
|
$6,100.000
|
$5,483.420
|
|
|
INLET (COMPL)(RWI)(TY I)
|
EA
|
2.000
|
$8,000.000
|
$8,283.000
|
$6,963.240
|
$16,478.430
|
$7,900.000
|
$12,309.650
|
|
|
INLET (COMPL)(RWI)(TY II)
|
EA
|
20.000
|
$8,000.000
|
$5,027.000
|
$3,949.580
|
$10,106.300
|
$5,500.000
|
$7,600.080
|
|
|
HEADWALL (CH - PW - 0) (DIA= 48 IN)
|
EA
|
1.000
|
$11,225.000
|
$17,009.000
|
$8,757.890
|
$10,681.190
|
$11,000.000
|
$11,762.070
|
|
|
WINGWALL (PW - 1) (HW=16 FT)
|
EA
|
1.000
|
$51,500.000
|
$76,213.000
|
$38,529.330
|
$108,529.490
|
$49,100.000
|
$96,312.010
|
|
|
WINGWALL (PW - 1) (HW=3 FT)
|
EA
|
2.000
|
$7,525.000
|
$8,442.000
|
$7,781.330
|
$5,560.500
|
$8,800.000
|
$7,155.710
|
|
|
WINGWALL (PW - 1) (HW=5 FT)
|
EA
|
1.000
|
$25,000.000
|
$27,772.000
|
$14,467.270
|
$27,043.550
|
$13,800.000
|
$20,324.090
|
|
|
WINGWALL (PW - 1) (HW=6 FT)
|
EA
|
3.000
|
$30,000.000
|
$13,744.000
|
$23,799.840
|
$23,105.090
|
$10,900.000
|
$14,647.470
|
|
|
WINGWALL (PW - 1) (HW=7 FT)
|
EA
|
1.000
|
$31,000.000
|
$12,669.000
|
$27,000.870
|
$14,871.260
|
$10,800.000
|
$11,762.070
|
|
|
WINGWALL (PW - 1) (HW=8 FT)
|
EA
|
2.000
|
$35,000.000
|
$48,548.000
|
$31,054.140
|
$77,004.750
|
$21,700.000
|
$44,939.900
|
|
|
SET (TY I)(S=3 FT)(HW=3FT)(3:1)(C)
|
EA
|
1.000
|
$4,750.000
|
$4,559.000
|
$9,839.760
|
$5,103.070
|
$5,000.000
|
$5,875.690
|
|
|
SET (TY I)(S= 4 FT)(HW= 4 FT)(6:1) (P)
|
EA
|
1.000
|
$11,200.000
|
$8,109.000
|
$14,239.760
|
$8,725.890
|
$8,900.000
|
$8,016.190
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$1,500.000
|
$1,067.000
|
$2,665.250
|
$2,297.270
|
$1,020.000
|
$990.250
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
3.000
|
$1,750.000
|
$1,611.000
|
$3,189.700
|
$2,717.710
|
$1,490.000
|
$1,284.380
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
1.000
|
$2,090.000
|
$1,611.000
|
$3,189.670
|
$2,717.670
|
$1,490.000
|
$1,284.350
|
|
|
SET (TY II) (42 IN) (RCP) (3: 1) (P)
|
EA
|
1.000
|
$3,150.000
|
$6,139.000
|
$11,622.570
|
$8,810.110
|
$6,000.000
|
$2,600.150
|
|
|
GRATE AND FRAME (BRIDGE DRAIN)
|
EA
|
52.000
|
$3,000.000
|
$3,000.000
|
$2,161.860
|
$2,340.740
|
$1,570.000
|
$1,379.900
|
|
|
JACK BOR OR TUN PIPE(24 IN)(RC)(CL III)
|
LF
|
76.000
|
$660.000
|
$1,091.000
|
$1,577.180
|
$855.830
|
$1,080.000
|
$1,047.090
|
|
|
ADJUSTING INLET (CAP)
|
EA
|
5.000
|
$1,700.000
|
$614.000
|
$652.890
|
$3,341.750
|
$2,460.000
|
$3,133.310
|
|
|
PIPE (PVC) (SCH 40) (6 IN)
|
LF
|
3,504.000
|
$45.000
|
$45.000
|
$32.150
|
$33.980
|
$46.200
|
$33.430
|
|
|
REMOV STR (INLET)
|
EA
|
2.000
|
$1,000.000
|
$390.000
|
$434.780
|
$1,690.590
|
$850.000
|
$1,273.960
|
|
|
REMOV STR (SET)
|
EA
|
40.000
|
$500.000
|
$256.000
|
$318.780
|
$422.650
|
$489.000
|
$511.090
|
|
|
REMOV STR (WINGWALL)
|
EA
|
7.000
|
$1,600.000
|
$858.000
|
$863.930
|
$3,742.550
|
$1,160.000
|
$6,768.530
|
|
|
REMOV STR (HEADWALL)
|
EA
|
10.000
|
$1,500.000
|
$858.000
|
$663.250
|
$1,374.670
|
$840.000
|
$6,773.850
|
|
|
REMOV STR (PIPE)
|
LF
|
1,860.000
|
$30.000
|
$14.000
|
$25.900
|
$28.380
|
$19.200
|
$28.340
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
1,859.000
|
$50.000
|
$42.100
|
$33.240
|
$66.630
|
$30.300
|
$27.490
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
3.000
|
$50,000.000
|
$15,000.000
|
$46,642.660
|
$52,322.330
|
$39,900.000
|
$22,857.140
|
|
|
REMOV STR (APPROACH SLAB)
|
EA
|
2.000
|
$9,500.000
|
$2,000.000
|
$6,000.000
|
$3,571.740
|
$3,030.000
|
$22,857.150
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$9,821,900.000
|
$11,043,600.000
|
$10,000,000.000
|
$9,840,000.000
|
$12,250,000.000
|
$13,700,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
38.000
|
$20,000.000
|
$5,000.000
|
$27,854.070
|
$15,335.260
|
$20,000.000
|
$15,022.710
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
430.000
|
$30.000
|
$22.000
|
$24.000
|
$24.000
|
$38.400
|
$24.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
1,705.000
|
$60.000
|
$52.000
|
$61.420
|
$61.420
|
$51.000
|
$61.420
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
2,135.000
|
$8.000
|
$8.000
|
$14.650
|
$14.650
|
$10.000
|
$14.650
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
2,220.000
|
$15.000
|
$22.000
|
$19.440
|
$19.440
|
$15.900
|
$19.440
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
2,220.000
|
$8.000
|
$6.000
|
$7.600
|
$7.600
|
$6.600
|
$7.600
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
19,264.000
|
$2.000
|
$2.000
|
$2.050
|
$2.050
|
$2.880
|
$2.050
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
19,264.000
|
$0.500
|
$0.500
|
$0.390
|
$0.390
|
$0.720
|
$0.390
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
4,148.000
|
$3.000
|
$3.000
|
$2.780
|
$2.780
|
$4.350
|
$2.780
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
4,148.000
|
$1.500
|
$1.000
|
$0.390
|
$0.390
|
$1.370
|
$0.390
|
|
|
CONSTRUCTING DETOURS
|
SY
|
30,327.000
|
$40.000
|
$75.000
|
$46.090
|
$46.360
|
$55.000
|
$75.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
32,430.000
|
$25.000
|
$40.000
|
$10.000
|
$19.750
|
$28.600
|
$60.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
11,460.000
|
$25.000
|
$40.000
|
$28.000
|
$15.090
|
$30.000
|
$60.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
380.000
|
$20.000
|
$40.000
|
$30.000
|
$22.100
|
$35.000
|
$60.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
50,850.000
|
$5.000
|
$4.000
|
$3.610
|
$4.430
|
$4.850
|
$7.110
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
26,580.000
|
$5.000
|
$4.000
|
$4.290
|
$3.680
|
$4.870
|
$10.710
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
520.000
|
$15.000
|
$4.000
|
$6.850
|
$11.560
|
$9.100
|
$9.160
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
32,430.000
|
$7.000
|
$4.000
|
$6.570
|
$7.590
|
$4.750
|
$9.650
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
11,460.000
|
$8.000
|
$4.000
|
$8.030
|
$8.980
|
$8.000
|
$13.750
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
380.000
|
$11.000
|
$4.000
|
$10.580
|
$11.780
|
$10.000
|
$13.740
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
9,674.000
|
$50.000
|
$40.000
|
$57.820
|
$40.730
|
$35.300
|
$61.980
|
|
|
PERM CTB (SGL SLOPE) (TY 3) (42 )
|
LF
|
816.000
|
$170.000
|
$210.000
|
$124.700
|
$203.810
|
$190.000
|
$344.350
|
|
|
CONC CURB (TY I)
|
LF
|
15,514.000
|
$9.000
|
$8.000
|
$9.200
|
$5.700
|
$8.600
|
$2.810
|
|
|
DRIVEWAYS (CONC)
|
SY
|
2,968.000
|
$70.000
|
$60.000
|
$75.200
|
$61.240
|
$69.000
|
$68.760
|
|
|
CONC SIDEWALKS (4")
|
SY
|
5,487.000
|
$45.000
|
$40.000
|
$44.520
|
$42.840
|
$41.200
|
$48.110
|
|
|
CURB RAMPS (TY 1)
|
EA
|
2.000
|
$1,400.000
|
$1,900.000
|
$1,313.650
|
$1,948.460
|
$1,580.000
|
$2,000.000
|
|
|
CURB RAMPS (TY 2)
|
EA
|
9.000
|
$1,700.000
|
$2,000.000
|
$1,515.740
|
$2,087.210
|
$1,680.000
|
$2,000.000
|
|
|
CURB RAMPS (TY 21)
|
EA
|
1.000
|
$2,000.000
|
$2,500.000
|
$1,919.940
|
$2,385.690
|
$2,340.000
|
$2,000.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
11,125.000
|
$20.000
|
$18.190
|
$18.190
|
$18.190
|
$18.000
|
$18.190
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
137.500
|
$25.000
|
$48.800
|
$48.800
|
$48.800
|
$45.000
|
$48.800
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
6.000
|
$1,800.000
|
$2,082.000
|
$1,645.000
|
$1,645.000
|
$1,500.000
|
$1,645.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
11.000
|
$1,200.000
|
$1,226.000
|
$1,226.000
|
$1,226.000
|
$1,050.000
|
$1,226.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
14,112.500
|
$2.000
|
$3.500
|
$1.000
|
$1.000
|
$1.000
|
$1.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
24.000
|
$150.000
|
$247.000
|
$185.000
|
$185.000
|
$135.000
|
$185.000
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
2.000
|
$180.000
|
$232.000
|
$195.000
|
$195.000
|
$135.000
|
$195.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
10.000
|
$240.000
|
$190.000
|
$145.000
|
$145.000
|
$135.000
|
$145.000
|
|
|
CABLE BARRIER SYSTEM (TL-3)
|
LF
|
2,100.000
|
$20.000
|
$11.250
|
$11.250
|
$11.250
|
$11.400
|
$11.250
|
|
|
CABLE BARRIER TERMINAL SECTION (TL-3)
|
EA
|
2.000
|
$7,000.000
|
$2,260.000
|
$2,260.000
|
$2,260.000
|
$2,290.000
|
$2,260.000
|
|
|
REMOVE CABLE BARRIER
|
LF
|
9,297.000
|
$5.000
|
$4.950
|
$2.450
|
$2.450
|
$2.490
|
$2.450
|
|
|
REMOVE CABLE BARRIER TERMINAL SECTION
|
EA
|
10.000
|
$500.000
|
$477.500
|
$415.500
|
$415.500
|
$422.000
|
$415.500
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
9.000
|
$2,700.000
|
$2,437.000
|
$2,437.000
|
$2,437.000
|
$2,450.000
|
$2,437.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
19.000
|
$200.000
|
$326.000
|
$201.000
|
$201.000
|
$115.000
|
$201.000
|
|
|
GDRAIL END TRT(INST)(WOOD POST)(TY II)
|
EA
|
1.000
|
$700.000
|
$2,512.000
|
$2,512.000
|
$2,512.000
|
$2,450.000
|
$2,512.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
28.000
|
$1,200.000
|
$915.000
|
$915.000
|
$915.000
|
$6,400.000
|
$750.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
21.000
|
$700.000
|
$515.000
|
$515.000
|
$515.000
|
$325.000
|
$325.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
22.000
|
$18,000.000
|
$20,330.000
|
$20,330.000
|
$20,330.000
|
$19,200.000
|
$19,220.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(W)(TL3)
|
EA
|
4.000
|
$32,000.000
|
$29,759.250
|
$29,759.250
|
$29,759.250
|
$28,500.000
|
$28,530.000
|
|
|
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
|
EA
|
21.000
|
$15,000.000
|
$19,470.000
|
$19,470.000
|
$19,470.000
|
$18,600.000
|
$18,620.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 4
|
EA
|
1.000
|
$300.000
|
$262.500
|
$128.910
|
$137.810
|
$269.000
|
$617.670
|
|
|
RELOCATE RD IL ASM (CTB MOUNT)
|
EA
|
5.000
|
$1,500.000
|
$2,200.000
|
$2,200.000
|
$2,200.000
|
$2,200.000
|
$2,200.000
|
|
|
REMOVE RD IL ASM (CTB MOUNT)
|
EA
|
2.000
|
$350.000
|
$290.000
|
$290.000
|
$290.000
|
$290.000
|
$290.000
|
|
|
REMOVE RD IL ASM (TRANS-BASE)
|
EA
|
62.000
|
$475.000
|
$2,790.000
|
$290.000
|
$290.000
|
$290.000
|
$290.000
|
|
|
IN RD IL (U/P) (TY 1) (150W EQ) LED
|
EA
|
18.000
|
$1,450.000
|
$1,500.000
|
$1,500.000
|
$1,500.000
|
$1,500.000
|
$1,500.000
|
|
|
IN RD IL (TY SP) 38S-8 (250W EQ) LED
|
EA
|
25.000
|
$4,000.000
|
$3,650.000
|
$3,400.000
|
$3,400.000
|
$3,400.000
|
$3,400.000
|
|
|
IN RD IL (TY SP) 48S-8 (400W EQ) LED
|
EA
|
30.000
|
$5,000.000
|
$4,550.000
|
$4,300.000
|
$4,300.000
|
$4,300.000
|
$4,300.000
|
|
|
IN RD IL (TY SA) 50T-8 (400W EQ) LED
|
EA
|
6.000
|
$3,900.000
|
$3,650.000
|
$3,400.000
|
$3,400.000
|
$3,400.000
|
$3,400.000
|
|
|
HI MST IL POLE (125 FT)( 80 MPH)
|
EA
|
7.000
|
$34,000.000
|
$28,000.000
|
$27,700.000
|
$27,700.000
|
$27,700.000
|
$27,700.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
25,916.000
|
$9.300
|
$10.000
|
$10.000
|
$10.000
|
$10.000
|
$10.000
|
|
|
CONDT (PVC) (SCH 40) (3")
|
LF
|
100.000
|
$19.000
|
$12.000
|
$12.000
|
$12.000
|
$12.000
|
$12.000
|
|
|
CONDT (PVC) (SCH 40) (3") (CONC ENCSE)
|
LF
|
30,040.000
|
$15.000
|
$19.000
|
$19.000
|
$19.000
|
$19.000
|
$19.000
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
64.000
|
$9.000
|
$36.000
|
$36.000
|
$36.000
|
$36.000
|
$36.000
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
1,651.000
|
$25.000
|
$39.000
|
$39.000
|
$39.000
|
$39.000
|
$39.000
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
1,371.000
|
$12.500
|
$17.000
|
$17.000
|
$17.000
|
$17.000
|
$17.000
|
|
|
CONDT (PVC) (SCH 80) (3") (BORE)
|
LF
|
6,042.000
|
$30.000
|
$41.000
|
$41.000
|
$41.000
|
$41.000
|
$41.000
|
|
|
CONDT (RM) (3/4")
|
LF
|
779.000
|
$25.000
|
$41.000
|
$41.000
|
$41.000
|
$41.000
|
$41.000
|
|
|
ELEC CONDR (NO.14) INSULATED
|
LF
|
20,045.000
|
$1.250
|
$0.950
|
$0.950
|
$0.950
|
$0.950
|
$0.950
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
26,136.000
|
$1.100
|
$1.350
|
$1.350
|
$1.350
|
$1.350
|
$1.350
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
61,092.000
|
$1.300
|
$1.290
|
$1.290
|
$1.290
|
$1.290
|
$1.290
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
2,557.000
|
$1.400
|
$1.750
|
$1.750
|
$1.750
|
$1.750
|
$1.750
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
7,125.000
|
$2.000
|
$1.850
|
$1.850
|
$1.850
|
$1.850
|
$1.850
|
|
|
ELEC CONDR (NO.2) INSULATED
|
LF
|
10,010.000
|
$2.500
|
$3.200
|
$3.200
|
$3.200
|
$3.200
|
$3.200
|
|
|
GROUND BOX TY A (122311)
|
EA
|
13.000
|
$775.000
|
$670.000
|
$670.000
|
$670.000
|
$670.000
|
$670.000
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
53.000
|
$900.000
|
$910.000
|
$910.000
|
$910.000
|
$910.000
|
$910.000
|
|
|
GROUND BOX TY D (162922)
|
EA
|
4.000
|
$960.000
|
$840.000
|
$840.000
|
$840.000
|
$840.000
|
$840.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
17.000
|
$1,100.000
|
$1,100.000
|
$1,100.000
|
$1,100.000
|
$1,100.000
|
$1,100.000
|
|
|
REMOVE GROUND BOX
|
EA
|
10.000
|
$165.000
|
$150.000
|
$150.000
|
$150.000
|
$150.000
|
$150.000
|
|
|
ELC SRV TY A 240/480 060(NS)SS(E)SP(O)
|
EA
|
3.000
|
$6,500.000
|
$7,300.000
|
$6,800.000
|
$6,800.000
|
$6,800.000
|
$6,800.000
|
|
|
ELC SRV TY A 240/480 100(NS)SS(E)SP(O)
|
EA
|
4.000
|
$6,500.000
|
$7,600.000
|
$7,100.000
|
$7,100.000
|
$7,100.000
|
$7,100.000
|
|
|
ELC SRV TY D 120/240 060(NS)SS(N)SP(O)
|
EA
|
3.000
|
$4,565.000
|
$6,100.000
|
$5,600.000
|
$5,600.000
|
$5,600.000
|
$5,600.000
|
|
|
ELC SRV TY D 120/240 100(NS)SS(N)SP(O)
|
EA
|
1.000
|
$5,000.000
|
$6,200.000
|
$5,700.000
|
$5,700.000
|
$5,700.000
|
$5,700.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
18.000
|
$26.000
|
$46.000
|
$46.000
|
$46.000
|
$46.000
|
$46.000
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
405.000
|
$25.000
|
$26.000
|
$26.000
|
$26.000
|
$26.000
|
$26.000
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
3,633.500
|
$24.000
|
$24.000
|
$24.000
|
$24.000
|
$24.000
|
$24.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
12.000
|
$475.000
|
$565.620
|
$445.000
|
$565.620
|
$473.000
|
$466.130
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
1.000
|
$620.000
|
$679.160
|
$450.000
|
$679.160
|
$478.000
|
$526.080
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
35.000
|
$580.000
|
$633.790
|
$550.000
|
$633.790
|
$580.000
|
$511.430
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
2.000
|
$700.000
|
$973.110
|
$700.000
|
$973.110
|
$740.000
|
$591.960
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
7.000
|
$660.000
|
$822.860
|
$705.000
|
$822.860
|
$750.000
|
$856.660
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
|
EA
|
1.000
|
$890.000
|
$1,002.690
|
$850.000
|
$1,002.690
|
$900.000
|
$902.670
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
1.000
|
$1,900.000
|
$1,900.000
|
$2,000.000
|
$1,900.000
|
$2,130.000
|
$2,707.410
|
|
|
IN SM RD SN SUP&AM (RAIL MOUNT)
|
EA
|
23.000
|
$2,800.000
|
$3,059.020
|
$2,800.000
|
$3,059.020
|
$2,980.000
|
$8,106.860
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
9.000
|
$410.000
|
$640.000
|
$575.000
|
$590.000
|
$610.000
|
$473.540
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
49.000
|
$87.000
|
$135.930
|
$60.000
|
$85.930
|
$64.000
|
$102.940
|
|
|
REMOVE BRDG MNT CLEARANCE SIGN ASSM
|
EA
|
1.000
|
$730.000
|
$250.000
|
$500.000
|
$250.000
|
$530.000
|
$1,791.230
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
1,749.000
|
$25.000
|
$4.350
|
$4.600
|
$4.350
|
$4.350
|
$4.350
|
|
|
RELOCATE LRSA
|
EA
|
2.000
|
$3,300.000
|
$4,400.000
|
$3,500.000
|
$3,400.000
|
$3,400.000
|
$3,400.000
|
|
|
REMOVE LRSA
|
EA
|
13.000
|
$835.000
|
$1,670.000
|
$1,000.000
|
$670.000
|
$670.000
|
$670.000
|
|
|
INS OH SN SUP(30 FT CANT)
|
EA
|
2.000
|
$18,000.000
|
$19,100.000
|
$19,100.000
|
$19,100.000
|
$19,100.000
|
$19,100.000
|
|
|
INS OH SN SUP(40 FT CANT)
|
EA
|
2.000
|
$20,500.000
|
$22,300.000
|
$22,300.000
|
$22,300.000
|
$22,300.000
|
$22,300.000
|
|
|
INS OH SN SUP(45 FT BRDG)(SPAN ONLY)
|
EA
|
1.000
|
$25,000.000
|
$27,700.000
|
$27,700.000
|
$27,700.000
|
$27,700.000
|
$27,700.000
|
|
|
INS OH SN SUP(60 FT BRDG)(SPAN ONLY)
|
EA
|
1.000
|
$28,000.000
|
$30,400.000
|
$30,400.000
|
$30,400.000
|
$30,400.000
|
$30,400.000
|
|
|
INS OH SN SUP(65 FT BRDG)
|
EA
|
1.000
|
$29,500.000
|
$29,900.000
|
$29,900.000
|
$29,900.000
|
$29,900.000
|
$29,900.000
|
|
|
INS OH SN SUP(70 FT BRDG)
|
EA
|
2.000
|
$37,000.000
|
$31,500.000
|
$31,500.000
|
$31,500.000
|
$31,500.000
|
$31,500.000
|
|
|
INS OH SN SUP(70 FT BRDG)(SPAN ONLY)
|
EA
|
2.000
|
$34,500.000
|
$32,300.000
|
$32,300.000
|
$32,300.000
|
$32,300.000
|
$32,300.000
|
|
|
INS OH SN SUP(105 FT BRDG)
|
EA
|
1.000
|
$50,000.000
|
$55,600.000
|
$55,600.000
|
$55,600.000
|
$56,000.000
|
$55,600.000
|
|
|
INS OH SN SUP(115 FT BRDG)(SPAN ONLY)
|
EA
|
2.000
|
$60,000.000
|
$49,900.000
|
$49,900.000
|
$49,900.000
|
$49,900.000
|
$49,900.000
|
|
|
INS OH SN SUP(120 FT BRDG)
|
EA
|
1.000
|
$65,000.000
|
$74,100.000
|
$74,100.000
|
$74,100.000
|
$74,000.000
|
$74,100.000
|
|
|
INS OH SN SUP(130 FT BRDG)
|
EA
|
1.000
|
$73,000.000
|
$76,500.000
|
$76,500.000
|
$76,500.000
|
$77,000.000
|
$76,500.000
|
|
|
INS OH SN SUP(140 FT BRDG)
|
EA
|
1.000
|
$78,000.000
|
$95,900.000
|
$95,900.000
|
$95,900.000
|
$96,000.000
|
$95,900.000
|
|
|
REMOVE OVERHD SIGN SUP
|
EA
|
6.000
|
$9,550.000
|
$7,100.000
|
$4,600.000
|
$4,600.000
|
$4,600.000
|
$4,600.000
|
|
|
REMOVE OVERHD SIGN SUP (SIGN ONLY)
|
EA
|
3.000
|
$830.000
|
$550.000
|
$550.000
|
$550.000
|
$550.000
|
$550.000
|
|
|
INSTL DEL ASSM (D-DW)SZ 1(FLX)GND
|
EA
|
8.000
|
$70.000
|
$51.500
|
$76.080
|
$51.500
|
$53.000
|
$46.500
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
39.000
|
$75.000
|
$52.500
|
$77.990
|
$52.500
|
$37.200
|
$47.500
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BR)
|
EA
|
97.000
|
$18.900
|
$12.990
|
$67.350
|
$12.990
|
$21.300
|
$15.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BR)
|
EA
|
160.000
|
$18.100
|
$12.990
|
$12.750
|
$12.990
|
$21.300
|
$15.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-C-R
|
EA
|
2,453.000
|
$3.000
|
$2.500
|
$2.500
|
$2.500
|
$2.540
|
$2.020
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
21,978.000
|
$0.700
|
$0.480
|
$0.480
|
$0.480
|
$0.490
|
$0.960
|
|
|
WK ZN PAV MRK REMOV (W)4"(DOT)
|
LF
|
2,627.000
|
$1.000
|
$0.500
|
$0.500
|
$0.500
|
$0.510
|
$2.020
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
152,049.000
|
$0.600
|
$0.440
|
$0.440
|
$0.440
|
$0.450
|
$0.660
|
|
|
WK ZN PAV MRK REMOV (W)6"(BRK)
|
LF
|
2,180.000
|
$3.000
|
$1.000
|
$1.000
|
$1.000
|
$1.020
|
$0.960
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
22,845.000
|
$1.400
|
$1.230
|
$1.230
|
$1.230
|
$1.250
|
$1.260
|
|
|
WK ZN PAV MRK REMOV (W)(ARROW)
|
EA
|
11.000
|
$185.000
|
$150.000
|
$150.000
|
$150.000
|
$152.000
|
$202.020
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
134,969.000
|
$0.600
|
$0.440
|
$0.440
|
$0.440
|
$0.450
|
$0.660
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
3,404.000
|
$1.200
|
$3.000
|
$1.040
|
$1.160
|
$1.100
|
$1.000
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
192.000
|
$1.000
|
$0.500
|
$0.500
|
$0.500
|
$0.510
|
$1.520
|
|
REFL PAV MRK TY I (W)8"(LNDP)(100MIL)
|
LF
|
742.000
|
$0.800
|
$0.700
|
$0.700
|
$0.700
|
$0.710
|
$1.520
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
20,375.000
|
$0.800
|
$0.640
|
$0.640
|
$0.640
|
$0.650
|
$0.760
|
|
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
|
LF
|
238.000
|
$2.650
|
$2.700
|
$2.700
|
$2.700
|
$2.740
|
$2.270
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
3,748.000
|
$2.900
|
$2.340
|
$2.340
|
$2.340
|
$2.380
|
$2.270
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
657.000
|
$6.400
|
$5.000
|
$5.000
|
$5.000
|
$5.100
|
$5.050
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
34.000
|
$135.000
|
$117.000
|
$117.000
|
$117.000
|
$119.000
|
$95.960
|
|
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
|
EA
|
8.000
|
$190.000
|
$143.000
|
$143.000
|
$143.000
|
$145.000
|
$126.260
|
|
REFL PAV MRK TY I (W)(NUMBER)(100MIL)
|
EA
|
5.000
|
$190.000
|
$157.000
|
$157.000
|
$157.000
|
$159.000
|
$95.960
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
32.000
|
$140.000
|
$134.000
|
$134.000
|
$134.000
|
$136.000
|
$126.260
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
1,765.000
|
$5.800
|
$4.480
|
$4.480
|
$4.480
|
$4.550
|
$5.050
|
|
|
PAVEMENT SEALER 4"
|
LF
|
5,417.000
|
$0.120
|
$0.120
|
$0.120
|
$0.120
|
$0.120
|
$0.150
|
|
|
PAVEMENT SEALER 6"
|
LF
|
90,421.000
|
$0.160
|
$0.170
|
$0.170
|
$0.170
|
$0.170
|
$0.180
|
|
|
PAVEMENT SEALER 8"
|
LF
|
9,307.000
|
$0.300
|
$0.400
|
$0.400
|
$0.400
|
$0.410
|
$0.250
|
|
|
PAVEMENT SEALER 12"
|
LF
|
2,120.000
|
$1.100
|
$1.230
|
$1.230
|
$1.230
|
$1.250
|
$1.260
|
|
|
PAVEMENT SEALER 24"
|
LF
|
1,915.000
|
$2.500
|
$2.370
|
$2.370
|
$2.370
|
$2.410
|
$2.530
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
6.000
|
$44.000
|
$63.000
|
$63.000
|
$63.000
|
$64.000
|
$65.660
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
6.000
|
$47.000
|
$67.000
|
$67.000
|
$67.000
|
$68.000
|
$75.760
|
|
|
PAVEMENT SEALER (DBL ARROW)
|
EA
|
3.000
|
$55.000
|
$89.000
|
$89.000
|
$89.000
|
$90.000
|
$95.960
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
7,943.000
|
$0.380
|
$0.340
|
$0.340
|
$0.340
|
$0.350
|
$0.350
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
1,345.000
|
$0.300
|
$0.340
|
$0.670
|
$0.340
|
$0.350
|
$0.350
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
14,760.000
|
$0.560
|
$0.480
|
$0.480
|
$0.480
|
$0.490
|
$0.450
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
3,122.000
|
$0.320
|
$0.340
|
$0.370
|
$0.340
|
$0.350
|
$0.350
|
|
|
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
|
LF
|
68,259.000
|
$0.840
|
$0.940
|
$0.940
|
$0.940
|
$0.950
|
$0.660
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
|
LF
|
5,780.000
|
$0.550
|
$0.630
|
$0.630
|
$0.630
|
$0.640
|
$0.560
|
|
|
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
|
LF
|
70,000.000
|
$0.880
|
$0.940
|
$0.940
|
$0.940
|
$0.950
|
$0.660
|
|
REFL PAV MRKR TY I-R
|
EA
|
56.000
|
$6.200
|
$10.000
|
$10.000
|
$10.000
|
$10.200
|
$10.100
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
2,645.000
|
$3.300
|
$3.130
|
$3.130
|
$3.130
|
$3.180
|
$4.040
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
88,627.000
|
$0.400
|
$0.750
|
$0.270
|
$0.270
|
$0.270
|
$0.450
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
3,640.000
|
$0.350
|
$1.000
|
$5.000
|
$0.500
|
$0.510
|
$0.450
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
6,266.000
|
$1.000
|
$1.000
|
$0.800
|
$0.800
|
$0.810
|
$0.640
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
522.000
|
$1.800
|
$2.000
|
$1.500
|
$1.500
|
$1.520
|
$1.360
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
5.000
|
$55.000
|
$100.000
|
$50.000
|
$50.000
|
$51.000
|
$46.500
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
4.000
|
$60.000
|
$100.000
|
$50.000
|
$50.000
|
$51.000
|
$54.350
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
5,417.000
|
$0.090
|
$0.100
|
$0.100
|
$0.100
|
$0.100
|
$0.020
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
91,440.000
|
$0.100
|
$0.140
|
$0.140
|
$0.140
|
$0.140
|
$0.060
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
9,337.000
|
$0.130
|
$0.200
|
$0.200
|
$0.200
|
$0.200
|
$0.100
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
1,805.000
|
$0.400
|
$0.730
|
$0.730
|
$0.730
|
$0.740
|
$0.200
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
1,952.000
|
$1.100
|
$1.440
|
$0.140
|
$1.440
|
$1.460
|
$0.510
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
6.000
|
$18.000
|
$50.000
|
$50.000
|
$50.000
|
$51.000
|
$1.010
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
6.000
|
$21.000
|
$80.000
|
$80.000
|
$80.000
|
$81.000
|
$2.020
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
3.000
|
$23.000
|
$50.000
|
$50.000
|
$50.000
|
$51.000
|
$1.010
|
|
|
INSTALL HWY TRF SIG (ISOLATED)
|
EA
|
1.000
|
$23,000.000
|
$40,200.000
|
$40,200.000
|
$40,200.000
|
$40,200.000
|
$40,200.000
|
|
|
REMOVING TRAFFIC SIGNALS
|
EA
|
1.000
|
$1,000.000
|
$10,300.000
|
$7,800.000
|
$7,800.000
|
$7,800.000
|
$7,800.000
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
12.000
|
$230.000
|
$250.000
|
$250.000
|
$250.000
|
$250.000
|
$250.000
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
7.000
|
$230.000
|
$250.000
|
$250.000
|
$250.000
|
$250.000
|
$250.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
12.000
|
$240.000
|
$250.000
|
$250.000
|
$250.000
|
$250.000
|
$250.000
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
8.000
|
$230.000
|
$250.000
|
$250.000
|
$250.000
|
$250.000
|
$250.000
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
12.000
|
$240.000
|
$250.000
|
$250.000
|
$250.000
|
$250.000
|
$250.000
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
4.000
|
$230.000
|
$250.000
|
$250.000
|
$250.000
|
$250.000
|
$250.000
|
|
|
PED SIG SEC (LED)(COUNTDOWN)
|
EA
|
12.000
|
$550.000
|
$670.000
|
$670.000
|
$670.000
|
$670.000
|
$670.000
|
|
|
BACKPLATE W/REFL BRDR(4 SEC)
|
EA
|
3.000
|
$90.000
|
$120.000
|
$120.000
|
$120.000
|
$120.000
|
$120.000
|
|
|
BACKPLATE W/REFL BRDR(5 SEC)
|
EA
|
2.000
|
$110.000
|
$140.000
|
$140.000
|
$140.000
|
$140.000
|
$140.000
|
|
|
BACKPLATE W/REFL BRDR(3 SEC)
|
EA
|
11.000
|
$85.000
|
$100.000
|
$100.000
|
$100.000
|
$100.000
|
$100.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
|
LF
|
4,455.000
|
$1.900
|
$1.900
|
$1.900
|
$1.900
|
$1.900
|
$1.900
|
|
|
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
|
LF
|
4,894.000
|
$2.400
|
$2.800
|
$2.800
|
$2.800
|
$2.800
|
$2.800
|
|
|
TRF SIG CBL (TY C)(14 AWG)(2 CONDR)
|
LF
|
4,455.000
|
$1.100
|
$1.350
|
$1.350
|
$1.350
|
$1.350
|
$1.350
|
|
|
INSTALL RDSD FLASH BEACON ASSEMBLY
|
EA
|
4.000
|
$4,800.000
|
$2,500.000
|
$2,500.000
|
$2,500.000
|
$2,500.000
|
$2,500.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(48')
|
EA
|
1.000
|
$9,200.000
|
$9,100.000
|
$9,100.000
|
$9,100.000
|
$9,100.000
|
$9,100.000
|
|
|
PED POLE ASSEMBLY
|
EA
|
2.000
|
$1,800.000
|
$2,200.000
|
$2,200.000
|
$2,200.000
|
$2,200.000
|
$2,200.000
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
12.000
|
$775.000
|
$800.000
|
$800.000
|
$800.000
|
$800.000
|
$800.000
|
|
|
PED DETECTOR CONTROLLER UNIT
|
EA
|
1.000
|
$3,100.000
|
$3,100.000
|
$3,100.000
|
$3,100.000
|
$3,100.000
|
$3,100.000
|
|
|
NGP (MAIN) (6" PLASTIC W/TW) (OPEN CUT)
|
LF
|
280.000
|
$165.000
|
$249.000
|
$179.420
|
$175.000
|
$253.000
|
$249.000
|
|
|
NGP ADJUST GAS FACILITY ACCESS COVER
|
EA
|
10.000
|
$300.000
|
$800.000
|
$1,460.980
|
$1,425.000
|
$810.000
|
$800.000
|
|
|
NGP (GROUT ABANDONED MAIN)(4")
|
LF
|
670.000
|
$12.000
|
$33.000
|
$18.450
|
$18.000
|
$33.500
|
$33.000
|
|
|
NGP (GROUT ABANDONED MAIN)(6")
|
LF
|
25.000
|
$30.000
|
$320.000
|
$410.100
|
$400.000
|
$325.000
|
$320.000
|
|
|
NGP (BORING) (6" PLASTIC W/TW)
|
LF
|
400.000
|
$245.000
|
$110.000
|
$169.170
|
$165.000
|
$112.000
|
$110.000
|
|
|
DUCTILE IRON FITTINGS
|
TON
|
21.280
|
$3,500.000
|
$4,000.000
|
$500.000
|
$8,840.000
|
$2,000.000
|
$8,840.000
|
|
|
TIE-IN (COMPLETE)(8")
|
EA
|
1.000
|
$2,250.000
|
$2,844.000
|
$3,237.950
|
$6,800.000
|
$1,100.000
|
$6,800.000
|
|
|
PIPE WATER MAIN (PVC)(8")
|
LF
|
293.000
|
$60.000
|
$87.200
|
$98.410
|
$42.000
|
$51.000
|
$42.000
|
|
|
TEMPORARY BLOW-OFF(COMPLETE)(2")
|
EA
|
11.000
|
$1,800.000
|
$5,524.000
|
$2,222.130
|
$2,530.000
|
$2,000.000
|
$2,530.000
|
|
|
HYDROSTATIC PRESSURE TEST
|
EA
|
12.000
|
$4,000.000
|
$6,688.000
|
$3,116.270
|
$2,570.000
|
$4,840.000
|
$2,570.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
8,417.000
|
$4.000
|
$3.550
|
$2.120
|
$3.600
|
$3.680
|
$3.600
|
|
|
RELAY SHORT SERVICE (3/4")
|
EA
|
2.000
|
$800.000
|
$2,007.000
|
$1,550.200
|
$1,525.000
|
$1,160.000
|
$1,525.000
|
|
|
ADJUST VALVE BOX
|
EA
|
1.000
|
$400.000
|
$597.000
|
$635.950
|
$336.000
|
$510.000
|
$336.000
|
|
|
RELAY SHORT SERVICE (2")
|
EA
|
1.000
|
$2,200.000
|
$2,307.000
|
$2,317.360
|
$2,630.000
|
$1,780.000
|
$2,630.000
|
|
|
NEW METER BOX
|
EA
|
3.000
|
$500.000
|
$919.000
|
$741.770
|
$309.000
|
$423.000
|
$309.000
|
|
|
GATE VALVE & BOX (COMPLETE)(16")
|
EA
|
2.000
|
$8,000.000
|
$7,045.000
|
$8,248.320
|
$7,128.000
|
$6,800.000
|
$7,128.000
|
|
|
PIPE WATER MAIN (PVC) (12")
|
LF
|
1,613.000
|
$70.000
|
$50.000
|
$113.220
|
$60.000
|
$91.000
|
$60.000
|
|
|
TIE-IN (COMPLETE)(12")
|
EA
|
10.000
|
$2,750.000
|
$4,671.000
|
$3,179.760
|
$6,980.000
|
$1,200.000
|
$6,980.000
|
|
|
FIRE HYDRANT ASSEMBLY
|
EA
|
13.000
|
$4,800.000
|
$4,873.000
|
$5,698.160
|
$5,370.000
|
$4,320.000
|
$5,370.000
|
|
|
CARRIER PIPE (OPEN CUT) (PVC) (12")
|
LF
|
20.000
|
$130.000
|
$107.800
|
$84.650
|
$78.000
|
$66.000
|
$78.000
|
|
|
RELOCATE FIRE HYDRANT
|
EA
|
2.000
|
$3,000.000
|
$6,518.000
|
$6,840.970
|
$6,062.000
|
$3,960.000
|
$6,062.000
|
|
|
RELOC EXIST METER AND EXIST METER BOX
|
EA
|
1.000
|
$375.000
|
$1,093.000
|
$741.770
|
$606.000
|
$840.000
|
$606.000
|
|
|
GATE VALVE AND BOX (COMPLETE) (12")
|
EA
|
13.000
|
$3,200.000
|
$2,654.000
|
$3,322.610
|
$2,448.000
|
$2,870.000
|
$2,448.000
|
|
|
GROUT ABANDONMENT WATER MAIN (12")
|
LF
|
1,138.000
|
$5.000
|
$36.350
|
$4.760
|
$30.000
|
$18.500
|
$30.000
|
|
|
WATER SERVICE LINE BREAKS LEAK REPAIR
|
EA
|
2.000
|
$1,500.000
|
$3,086.000
|
$4,751.120
|
$1,781.000
|
$1,090.000
|
$1,781.000
|
|
|
WATER MAIN BREAKS LEAK REPAIR
|
EA
|
1.000
|
$3,500.000
|
$6,341.000
|
$12,094.710
|
$7,473.000
|
$5,300.000
|
$7,473.000
|
|
|
AIR RELEASE VALVE (COMPLETE)(2")
|
EA
|
6.000
|
$3,200.000
|
$4,118.000
|
$3,666.510
|
$4,115.000
|
$3,810.000
|
$4,115.000
|
|
|
TEMPORARY BLOW-OFF (COMPLETE)(4 IN)
|
EA
|
2.000
|
$3,750.000
|
$11,116.000
|
$6,026.190
|
$7,783.000
|
$5,000.000
|
$7,783.000
|
|
|
CARRIER PIPE (OPEN CUT) (PVC) (24")
|
LF
|
466.000
|
$55.000
|
$249.600
|
$225.390
|
$215.000
|
$174.000
|
$215.000
|
|
|
STEEL CASING (24") (BORE)
|
LF
|
1,225.000
|
$65.000
|
$46.000
|
$66.130
|
$73.000
|
$297.000
|
$73.000
|
|
|
CARRIER PIPE (IN CASING) (PVC) (12")
|
LF
|
1,225.000
|
$30.000
|
$111.150
|
$76.190
|
$75.000
|
$52.000
|
$75.000
|
|
|
TIE-IN (COMPLETE) (24")
|
EA
|
6.000
|
$4,500.000
|
$11,869.000
|
$13,692.530
|
$11,013.000
|
$4,600.000
|
$11,013.000
|
|
|
BUTTERFLY VALVE AND BOX (COMPL) (24")
|
EA
|
12.000
|
$18,000.000
|
$10,000.000
|
$12,401.580
|
$10,026.000
|
$12,000.000
|
$10,026.000
|
|
|
GATE VALVE AND BOX (COMPLETE) (8")
|
EA
|
5.000
|
$2,000.000
|
$2,388.000
|
$2,042.240
|
$1,422.000
|
$1,630.000
|
$1,422.000
|
|
|
PIPE WATER MAIN (PVC) (24")
|
LF
|
6,025.000
|
$131.000
|
$250.000
|
$230.680
|
$153.000
|
$195.000
|
$153.000
|
|
|
CUT-IN TEE (COMPLETE) (24" X 16")
|
EA
|
2.000
|
$2,625.000
|
$13,858.000
|
$15,491.390
|
$15,873.000
|
$10,900.000
|
$15,873.000
|
|
|
GROUT ABANDONMENT WATER MAIN (24")
|
LF
|
5,412.000
|
$9.000
|
$48.900
|
$17.460
|
$40.000
|
$15.200
|
$40.000
|
|
|
WTR (JACK, BORE, OR TUNNEL) (24")
|
LF
|
1,225.000
|
$600.000
|
$500.000
|
$323.800
|
$382.000
|
$312.000
|
$382.000
|
|
|
STEEL CASING (42") (OPEN CUT)
|
LF
|
466.000
|
$375.000
|
$261.900
|
$315.330
|
$254.000
|
$316.000
|
$254.000
|
|
|
SPLIT STEEL CASING (24") (OPEN CUT)
|
LF
|
20.000
|
$425.000
|
$213.950
|
$391.520
|
$206.000
|
$349.000
|
$206.000
|
|
|
STRIP MOWING
|
CYC
|
6.000
|
$3,000.000
|
$2,400.000
|
$5,000.000
|
$3,380.000
|
$5,000.000
|
$2,535.980
|
|
|
LITTER REMOVAL
|
CYC
|
6.000
|
$2,000.000
|
$3,000.000
|
$2,500.000
|
$1,400.000
|
$2,490.000
|
$2,027.130
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
42,445.000
|
$65.000
|
$56.500
|
$54.000
|
$54.000
|
$55.000
|
$54.000
|
|
|
SP MIXES SP-C PG70-22
|
TON
|
1,706.000
|
$110.000
|
$71.000
|
$70.000
|
$70.000
|
$71.000
|
$70.000
|
|
|
SP MIXES SP-C SAC-A PG76-22
|
TON
|
8,967.000
|
$110.000
|
$72.500
|
$75.000
|
$75.000
|
$77.000
|
$75.000
|
|
|
SP MIXES SP-C SAC-B PG76-22
|
TON
|
8,330.000
|
$110.000
|
$67.000
|
$70.000
|
$70.000
|
$71.000
|
$70.000
|
|
|
UNDERSEAL COURSE
|
GAL
|
21,717.000
|
$5.000
|
$3.000
|
$3.200
|
$3.200
|
$3.260
|
$3.200
|
|
|
SOIL DENS.AND RAISING CONC.SLABS(HDPF)
|
LB
|
117,184.000
|
$10.000
|
$4.000
|
$4.040
|
$4.050
|
$4.110
|
$4.090
|
|
|
TIP TESTING(DRILL SHAFT)
|
EA
|
90.000
|
$6,000.000
|
$5,000.000
|
$5,000.000
|
$3,516.660
|
$4,000.000
|
$7,950.000
|
|
|
INSTALL BRIDGE IDENTIFICATION NUMBERS
|
EA
|
11.000
|
$400.000
|
$125.000
|
$420.500
|
$250.000
|
$254.000
|
$500.000
|
|
|
GEOGRID BASE REINFORCEMENT (TY II)
|
SY
|
50,498.000
|
$1.800
|
$1.000
|
$0.850
|
$1.600
|
$1.140
|
$2.150
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
13.000
|
$10,000.000
|
$1,000.000
|
$16,180.860
|
$9,047.740
|
$18,900.000
|
$257.360
|
|
|
FIBER OPTIC CBL (SNGLE-MODE)(12 FIBER)
|
LF
|
390.000
|
$2.750
|
$4.950
|
$4.950
|
$4.950
|
$4.950
|
$4.950
|
|
|
FIBER OPTIC CBL (SNGLE-MODE)(144 FIBER)
|
LF
|
16,905.000
|
$4.000
|
$3.500
|
$3.500
|
$3.500
|
$3.500
|
$3.500
|
|
|
FIBER OPTIC SPLICE ENCLOSURE
|
EA
|
4.000
|
$1,376.000
|
$2,900.000
|
$2,900.000
|
$2,900.000
|
$2,900.000
|
$2,900.000
|
|
|
FIBER OPTIC PATCH PANEL (12 POSITION)
|
EA
|
4.000
|
$1,300.000
|
$2,100.000
|
$2,100.000
|
$2,100.000
|
$2,100.000
|
$2,100.000
|
|
|
FIBER OPTIC PATCH PANEL (144 POSITION)
|
EA
|
1.000
|
$5,400.000
|
$7,200.000
|
$7,200.000
|
$7,200.000
|
$7,200.000
|
$7,200.000
|
|
|
ITS GRND MNT CAB (TY 6) (CONF 2)
|
EA
|
1.000
|
$13,000.000
|
$18,000.000
|
$18,000.000
|
$18,000.000
|
$18,000.000
|
$18,000.000
|
|
|
CCTV FIELD EQUIPMENT (DIGITAL)
|
EA
|
3.000
|
$9,800.000
|
$10,800.000
|
$10,800.000
|
$10,800.000
|
$10,800.000
|
$10,800.000
|
|
|
CONDUIT (PREPARE)
|
LF
|
555.000
|
$1.750
|
$1.750
|
$1.750
|
$1.750
|
$1.750
|
$1.750
|
|
|
MANHOLE (PREPARE)
|
EA
|
3.000
|
$500.000
|
$240.000
|
$240.000
|
$240.000
|
$240.000
|
$240.000
|
|
|
RELOCATE EXISTING OVERHEAD SIGNS
|
EA
|
8.000
|
$750.000
|
$1,300.000
|
$1,300.000
|
$1,300.000
|
$1,300.000
|
$1,300.000
|
|
|
ITS RADIO (SNGL)(5 GHZ)-I-U
|
EA
|
3.000
|
$5,300.000
|
$3,000.000
|
$3,000.000
|
$3,000.000
|
$3,000.000
|
$3,000.000
|
|
|
ITS POLE (50 FT)(REM)
|
EA
|
1.000
|
$1,000.000
|
$4,600.000
|
$2,100.000
|
$2,100.000
|
$2,100.000
|
$2,100.000
|
|
|
ITS POLE (60 FT)(90 MPH)
|
EA
|
2.000
|
$18,000.000
|
$17,500.000
|
$17,500.000
|
$17,500.000
|
$17,500.000
|
$17,500.000
|
|
|
ITS POLE (60 FT)(130 MPH)(W/STIFF)
|
EA
|
1.000
|
$45,000.000
|
$26,100.000
|
$26,100.000
|
$26,100.000
|
$26,100.000
|
$26,100.000
|
|
|
ITS POLE MNT CAB (TY 2)(CONF 1)
|
EA
|
3.000
|
$5,600.000
|
$6,400.000
|
$6,400.000
|
$6,400.000
|
$6,400.000
|
$6,400.000
|
|
|
INS LED WW SGN W/BASIC SOL PWR KIT
|
EA
|
8.000
|
$1,550.000
|
$1,000.000
|
$1,000.000
|
$1,000.000
|
$1,000.000
|
$1,000.000
|
|
|
ETHERNET SWITCH (INSTALL ONLY)
|
EA
|
4.000
|
$400.000
|
$250.000
|
$250.000
|
$250.000
|
$250.000
|
$250.000
|
|
|
TERMINAL SERVER (INSTALL ONLY)
|
EA
|
2.000
|
$400.000
|
$250.000
|
$250.000
|
$250.000
|
$250.000
|
$250.000
|
|
|
INSTALLATION OF BLUETOOTH READER
|
EA
|
2.000
|
$1,750.000
|
$2,300.000
|
$2,300.000
|
$2,300.000
|
$2,300.000
|
$2,300.000
|
|
|
LED HI MST IL ASM (6 FIXT) (ASYM)(TY B)
|
EA
|
7.000
|
$23,000.000
|
$23,400.000
|
$23,400.000
|
$23,400.000
|
$23,400.000
|
$23,400.000
|
|
|
TMA (STATIONARY)
|
DAY
|
2,340.000
|
$170.000
|
$180.000
|
$219.760
|
$204.440
|
$200.000
|
$89.150
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
156.000
|
$200.000
|
$445.000
|
$695.380
|
$531.560
|
$450.000
|
$111.440
|
|
|
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
|
EA
|
33.000
|
$3,500.000
|
$5,600.000
|
$5,600.000
|
$5,600.000
|
$5,600.000
|
$5,600.000
|
|
|
ITS GND BOX(PCAST) TY 2 (366048)W/APRN
|
EA
|
4.000
|
$8,000.000
|
$7,700.000
|
$7,700.000
|
$7,700.000
|
$7,700.000
|
$7,700.000
|
|
|
RVDS(PRESENCE DETECTION ONLY)
|
EA
|
6.000
|
$6,300.000
|
$6,800.000
|
$6,800.000
|
$6,800.000
|
$6,800.000
|
$6,800.000
|
|
|
RVDS(PRESENCE AND ADVANCE DET)
|
EA
|
2.000
|
$6,800.000
|
$6,800.000
|
$6,800.000
|
$6,800.000
|
$6,800.000
|
$6,800.000
|
|
|
ITS RVSD (DATA COLLECT ONLY) SYS
|
EA
|
2.000
|
$8,460.000
|
$11,400.000
|
$11,400.000
|
$11,400.000
|
$11,400.000
|
$11,400.000
|
|
|
TEMPORARY WATER MAIN
|
LS
|
1.000
|
$25,500.000
|
$125,000.000
|
$96,683.610
|
$126,000.000
|
$134,000.000
|
$126,000.000
|
|
|
SAN SWR PRECAST MANHOLE (COMPL)
|
EA
|
3.000
|
$8,500.000
|
$10,202.000
|
$16,538.960
|
$8,565.000
|
$11,900.000
|
$8,565.000
|
|
|
BYPASS PUMPING FOR SMALL DIA SAN SWRS
|
LS
|
1.000
|
$15,000.000
|
$60,464.000
|
$12,412.160
|
$4,980.000
|
$13,100.000
|
$4,980.000
|
|
|
SAN SWR PRECAST MANHOLES (EXTRA DEPTH)
|
LF
|
12.220
|
$700.000
|
$377.000
|
$280.410
|
$614.000
|
$640.000
|
$614.000
|
|
|
EXISTING MANHOLE ADJUSTMENTS
|
EA
|
2.000
|
$4,500.000
|
$4,390.000
|
$2,735.330
|
$3,108.000
|
$9,500.000
|
$3,108.000
|
|
|
GROUT ABANDONMENT SEWER MAIN (8")
|
LF
|
83.000
|
$70.000
|
$34.250
|
$23.280
|
$20.000
|
$31.500
|
$20.000
|
|
Totals: |
$108,044,335.170
|
$100,202,670.590
|
$101,017,903.512
|
$109,515,071.259
|
$114,218,762.490
|
$138,339,711.180
|