PREPARING ROW
|
STA
|
625.000
|
$8,000.000
|
$50,850.000
|
$60,017.250
|
|
|
REMOVING CONC (PAV)
|
SY
|
494,379.000
|
$7.000
|
$3.850
|
$8.130
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
22,791.000
|
$9.000
|
$24.000
|
$61.500
|
|
|
REMOVING CONC (MEDIANS)
|
SY
|
653.000
|
$12.000
|
$50.000
|
$35.500
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
4,097.000
|
$15.000
|
$31.000
|
$27.500
|
|
|
REMOVING CONC (CURB)
|
LF
|
3,027.000
|
$6.000
|
$78.000
|
$21.000
|
|
|
REMOVING CONC (CTB)
|
LF
|
1,128.000
|
$20.000
|
$33.000
|
$42.000
|
|
|
REMOVING STAB BASE AND ASPH PAV(6"-9")
|
SY
|
359,378.000
|
$3.000
|
$4.550
|
$4.580
|
|
|
REMOVE TRT BASE & ASPH PAV (6"-16")
|
SY
|
399,055.000
|
$7.000
|
$6.100
|
$7.790
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
552,759.000
|
$8.000
|
$5.000
|
$10.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
39,036.000
|
$15.000
|
$11.000
|
$43.500
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
724,369.000
|
$10.000
|
$11.000
|
$15.000
|
|
|
EMBANK(FINAL)(DC)(TY E)(CSBE)
|
CY
|
34,164.000
|
$35.000
|
$64.000
|
$70.500
|
|
|
EMB(FNL)(DC)(TYE)(CSBE)(RWALL FND IMPR
|
CY
|
2,000.000
|
$50.000
|
$64.000
|
$86.500
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
9,173.000
|
$36.000
|
$1.100
|
$4.500
|
|
|
BROADCAST SEED (PERM) (RURAL) (CLAY)
|
AC
|
13.000
|
$37.000
|
$934.000
|
$2,200.000
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
AC
|
131.000
|
$37.000
|
$2,230.000
|
$1,800.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
AC
|
118.000
|
$500.000
|
$934.000
|
$990.000
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
AC
|
66.000
|
$460.000
|
$741.000
|
$700.000
|
|
|
DRILL SEEDING (TEMP) (COOL)
|
AC
|
66.000
|
$460.000
|
$735.000
|
$690.000
|
|
|
VEGETATIVE WATERING
|
MG
|
10,713.000
|
$20.000
|
$47.250
|
$60.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
9,173.000
|
$1.000
|
$1.800
|
$2.500
|
|
|
FL BS (CMP IN PLC)(TY E GR 5)(FNL POS)
|
CY
|
144,949.000
|
$65.000
|
$76.750
|
$50.000
|
|
|
LIME TRT (EXST MATL) (6")
|
SY
|
787,502.000
|
$3.000
|
$2.000
|
$2.850
|
|
|
LIME (HYD, COM, OR QK(SLURRY))
|
TON
|
9,535.000
|
$200.000
|
$250.000
|
$420.000
|
|
|
CEMENT
|
TON
|
9,535.000
|
$175.000
|
$215.000
|
$310.000
|
|
|
CEMENT TREAT (SUBGRADE)(6")
|
SY
|
787,502.000
|
$5.000
|
$3.500
|
$1.820
|
|
|
CEM TRT(PLNT MX) (CL N)(TY E)(GR 4)(6")
|
SY
|
907,800.000
|
$10.000
|
$8.000
|
$14.750
|
|
|
ASPHALT STAB BASE (GR 4)(PG 64)
|
TON
|
50,017.000
|
$80.000
|
$140.000
|
$90.000
|
|
|
SALV, HAUL & STKPL RCL APH PV (0 TO 6")
|
SY
|
635,414.000
|
$5.000
|
$2.950
|
$0.990
|
|
|
SALV, HAUL & STKPL RCL ASH PV (12")
|
SY
|
5,360.000
|
$6.000
|
$7.050
|
$6.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
127,501.000
|
$4.500
|
$5.900
|
$6.000
|
|
|
AGGR(TY-PB GR-4 SAC-B)
|
CY
|
4,906.000
|
$95.000
|
$251.000
|
$210.000
|
|
|
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
|
GAL
|
216,775.000
|
$4.000
|
$6.000
|
$10.500
|
|
|
FLEX PAVE STRUCTURE REPAIR (8"-10")
|
SY
|
1,000.000
|
$100.000
|
$75.000
|
$130.000
|
|
|
CONC PVMT (CONT REINF - CRCP) (13")
|
SY
|
879,123.000
|
$98.000
|
$85.000
|
$75.000
|
|
|
CONC PVMT(CRCP)(TRANSITION SLAB)
|
SY
|
680.000
|
$300.000
|
$300.000
|
$220.000
|
|
|
CEM STABIL BKFL
|
CY
|
14,683.000
|
$80.000
|
$64.000
|
$110.000
|
|
|
CUT & RESTORING PAV
|
SY
|
1,734.000
|
$109.000
|
$45.000
|
$180.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
500.000
|
$250.000
|
$170.000
|
$260.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
6,300.000
|
$10.000
|
$1.000
|
$4.500
|
|
|
TEMPORARY SPL SHORING
|
SF
|
57,222.000
|
$20.000
|
$3.500
|
$13.500
|
|
|
FOUNDATON LOADTEST(D4945)(DRILLD SHAFT)
|
EA
|
22.000
|
$35,000.000
|
$5,550.000
|
$43,000.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
1,360.000
|
$150.000
|
$178.000
|
$160.000
|
|
|
DRILL SHAFT (24 IN)
|
LF
|
5,648.000
|
$200.000
|
$180.000
|
$240.000
|
|
|
DRILL SHAFT (30 IN)
|
LF
|
5,383.000
|
$250.000
|
$249.000
|
$300.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
19,061.000
|
$300.000
|
$291.000
|
$340.000
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
288.000
|
$325.000
|
$547.000
|
$540.000
|
|
|
DRILL SHAFT (78 IN)
|
LF
|
1,642.000
|
$700.000
|
$1,050.000
|
$870.000
|
|
|
DRILL SHAFT (NON - REINFORCED) (12 IN)
|
LF
|
56.000
|
$120.000
|
$169.000
|
$130.000
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
52.000
|
$550.000
|
$196.000
|
$230.000
|
|
|
DRILL SHAFT (SIGN MTS) (42 IN)
|
LF
|
1,840.000
|
$400.000
|
$395.000
|
$540.000
|
|
|
DRILL SHAFT (SIGN MTS) (48 IN)
|
LF
|
88.000
|
$550.000
|
$604.000
|
$610.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
1,440.000
|
$200.000
|
$205.000
|
$290.000
|
|
|
CL C CONC (ABUT)
|
CY
|
1,403.700
|
$1,065.000
|
$1,500.000
|
$1,200.000
|
|
|
CL C CONC (CAP)
|
CY
|
744.600
|
$1,390.000
|
$1,500.000
|
$1,800.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
401.700
|
$1,510.000
|
$1,500.000
|
$1,900.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
5.000
|
$500.000
|
$1,500.000
|
$1,500.000
|
|
|
CL C CONC (SIGN COLUMN)
|
CY
|
733.700
|
$1,020.000
|
$1,500.000
|
$1,600.000
|
|
|
CL C CONC (MISC)
|
CY
|
337.900
|
$600.000
|
$1,500.000
|
$1,100.000
|
|
|
CL F CONC (CAP)
|
CY
|
530.500
|
$1,200.000
|
$1,500.000
|
$1,800.000
|
|
|
CL F CONC (COLUMN)
|
CY
|
534.500
|
$1,200.000
|
$1,500.000
|
$1,800.000
|
|
|
CL C CONC (SIGN FOOTING)
|
CY
|
274.400
|
$735.000
|
$1,500.000
|
$1,200.000
|
|
|
REINF CONC SLAB
|
SF
|
217,879.000
|
$24.000
|
$19.000
|
$18.500
|
|
|
REINF CONC SLAB (SLAB BEAM)
|
SF
|
61,800.000
|
$20.000
|
$15.000
|
$20.500
|
|
|
RETAINING WALL (TEMP WALL)
|
SF
|
121,297.000
|
$20.000
|
$20.000
|
$19.450
|
|
|
RETAINING WALL (MSE)(HORIZONTAL SCHEME)
|
SF
|
129,741.000
|
$65.000
|
$98.000
|
$55.000
|
|
|
PRESTR CONC SLAB BEAM (4SB15)
|
LF
|
2,376.000
|
$200.000
|
$185.000
|
$400.000
|
|
|
PRESTR CONC SLAB BEAM (5SB15)
|
LF
|
10,098.000
|
$250.000
|
$185.000
|
$250.000
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
4,152.480
|
$260.000
|
$190.000
|
$270.000
|
|
|
PRESTR CONC GIRDER (TX34)
|
LF
|
3,914.680
|
$180.000
|
$190.000
|
$250.000
|
|
|
PRESTR CONC GIRDER (TX46)
|
LF
|
19,328.860
|
$200.000
|
$190.000
|
$200.000
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
2,551.530
|
$200.000
|
$190.000
|
$280.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
120.000
|
$400.000
|
$469.000
|
$820.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
383.000
|
$550.000
|
$444.000
|
$700.000
|
|
|
RIPRAP (CONC)(CL B)(RR8&RR9)
|
CY
|
622.200
|
$500.000
|
$457.000
|
$640.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
1,386.000
|
$150.000
|
$234.000
|
$230.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
7,170.000
|
$170.000
|
$173.000
|
$240.000
|
|
|
RIPRAP (STONE PROTECTION)(24 IN)
|
CY
|
773.000
|
$150.000
|
$170.000
|
$240.000
|
|
|
RIPRAP (CONC)(FLUME)
|
CY
|
357.000
|
$500.000
|
$504.000
|
$770.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
796.000
|
$500.000
|
$527.000
|
$640.000
|
|
|
RAIL (TY SSTR)
|
LF
|
11,283.100
|
$55.000
|
$55.000
|
$140.000
|
|
|
RAIL (TY SSTR) (W/DRAIN SLOTS)
|
LF
|
8,792.000
|
$60.000
|
$62.000
|
$120.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
3,194.000
|
$190.000
|
$215.000
|
$180.000
|
|
|
CMP (GAL STL 18 IN)
|
LF
|
10.000
|
$75.000
|
$243.000
|
$170.000
|
|
|
CONC BOX CULV (3 FT X 2 FT)
|
LF
|
1,130.000
|
$240.000
|
$320.000
|
$400.000
|
|
|
CONC BOX CULV (3 FT X 3 FT)
|
LF
|
302.000
|
$250.000
|
$360.000
|
$440.000
|
|
|
CONC BOX CULV (4 FT X 2 FT)
|
LF
|
462.000
|
$250.000
|
$350.000
|
$430.000
|
|
|
CONC BOX CULV (4 FT X 3 FT)
|
LF
|
620.000
|
$300.000
|
$390.000
|
$480.000
|
|
|
CONC BOX CULV (5 FT X 2 FT)
|
LF
|
118.000
|
$320.000
|
$430.000
|
$810.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)
|
LF
|
1,244.000
|
$350.000
|
$460.000
|
$620.000
|
|
|
CONC BOX CULV (5 FT X 4 FT)
|
LF
|
104.000
|
$370.000
|
$550.000
|
$660.000
|
|
|
CONC BOX CULV (6 FT X 3 FT)
|
LF
|
1,198.000
|
$600.000
|
$540.000
|
$740.000
|
|
|
CONC BOX CULV (6 FT X 4 FT)
|
LF
|
1,540.000
|
$500.000
|
$540.000
|
$800.000
|
|
|
CONC BOX CULV (6 FT X 5 FT)
|
LF
|
1,208.000
|
$650.000
|
$590.000
|
$870.000
|
|
|
CONC BOX CULV (7 FT X 5 FT)
|
LF
|
1,162.000
|
$650.000
|
$695.000
|
$1,100.000
|
|
|
CONC BOX CULV (8 FT X 4 FT)
|
LF
|
1,020.000
|
$500.000
|
$690.000
|
$1,100.000
|
|
|
CONC BOX CULV (8 FT X 5 FT)
|
LF
|
296.000
|
$600.000
|
$835.000
|
$1,100.000
|
|
|
CONC BOX CULV (9 FT X 5 FT)
|
LF
|
2,516.000
|
$900.000
|
$890.000
|
$1,400.000
|
|
|
CONC BOX CULV (10 FT X 6 FT)
|
LF
|
1,275.000
|
$1,000.000
|
$1,100.000
|
$1,200.000
|
|
|
CONC BOX CULV (10 FT X 8 FT)
|
LF
|
94.000
|
$1,150.000
|
$1,230.000
|
$2,000.000
|
|
|
CONC BOX CULV (10 FT X 10 FT)
|
LF
|
32.000
|
$1,300.000
|
$1,430.000
|
$2,200.000
|
|
|
CONC BOX CULV (11 FT X 8 FT)
|
LF
|
72.000
|
$1,500.000
|
$1,380.000
|
$2,200.000
|
|
|
CONC BOX CULV (8 FT X 3 FT)
|
LF
|
344.000
|
$500.000
|
$660.000
|
$1,000.000
|
|
|
CONC BOX CULV (6 FT X 2 FT)
|
LF
|
66.000
|
$550.000
|
$480.000
|
$660.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
6,432.000
|
$70.000
|
$76.000
|
$84.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
2,693.000
|
$90.000
|
$96.000
|
$110.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
499.000
|
$100.000
|
$125.000
|
$140.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
166.000
|
$150.000
|
$160.000
|
$190.000
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
80.000
|
$190.000
|
$200.000
|
$260.000
|
|
|
RC PIPE (CL V)(18 IN)
|
LF
|
9.000
|
$75.000
|
$350.000
|
$110.000
|
|
|
RC PIPE (CL V)(24 IN)
|
LF
|
63.000
|
$95.000
|
$225.000
|
$140.000
|
|
|
JCTBOX(COMPL)(PJB)(4FTX4FT)
|
EA
|
3.000
|
$6,000.000
|
$5,000.000
|
$11,000.000
|
|
|
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
4.000
|
$4,500.000
|
$5,500.000
|
$12,000.000
|
|
|
INLET (COMPL)(TY AAD)
|
EA
|
20.000
|
$7,500.000
|
$8,500.000
|
$14,000.000
|
|
|
INLET (COMPL)(TY AD)
|
EA
|
9.000
|
$5,500.000
|
$5,000.000
|
$11,000.000
|
|
|
INLET (COMPL)(TY AZR2G)
|
EA
|
36.000
|
$12,000.000
|
$8,500.000
|
$11,000.000
|
|
|
INLET (STG II)(TY AD)
|
EA
|
1.000
|
$11,000.000
|
$5,000.000
|
$11,000.000
|
|
|
SET (TY I)(S=10 FT)(HW=7FT)(3:1)(C)
|
EA
|
9.000
|
$12,000.000
|
$35,000.000
|
$20,000.000
|
|
|
SET (TY I)(S=10 FT)(HW=9FT)(3:1)(C)
|
EA
|
2.000
|
$12,000.000
|
$35,000.000
|
$25,000.000
|
|
|
SET (TY I)(S=11 FT)(HW=9FT)(3:1)(C)
|
EA
|
2.000
|
$12,000.000
|
$50,000.000
|
$34,000.000
|
|
|
SET (TY I)(S=3 FT)(HW=2FT)(4:1)(C)
|
EA
|
8.000
|
$6,500.000
|
$5,000.000
|
$12,000.000
|
|
|
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)
|
EA
|
2.000
|
$7,000.000
|
$5,000.000
|
$13,000.000
|
|
|
SET (TY I)(S=3 FT)(HW= 3 FT)(6:1)(P)
|
EA
|
18.000
|
$8,000.000
|
$5,000.000
|
$5,900.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 2 FT)(6:1) (P)
|
EA
|
1.000
|
$10,000.000
|
$8,000.000
|
$8,000.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 3 FT)(4:1) (C)
|
EA
|
4.000
|
$8,000.000
|
$8,000.000
|
$13,000.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 3 FT)(6:1) (P)
|
EA
|
18.000
|
$11,000.000
|
$8,000.000
|
$9,700.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 4 FT)(6:1) (P)
|
EA
|
2.000
|
$9,000.000
|
$8,000.000
|
$17,000.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1) (C)
|
EA
|
2.000
|
$8,000.000
|
$12,000.000
|
$13,000.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(6:1) (P)
|
EA
|
2.000
|
$9,000.000
|
$12,000.000
|
$15,000.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
8.000
|
$9,300.000
|
$12,000.000
|
$19,000.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 5 FT)(6:1) (P)
|
EA
|
6.000
|
$22,000.000
|
$12,000.000
|
$15,000.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 3 FT)(6:1) (P)
|
EA
|
2.000
|
$22,001.000
|
$15,000.000
|
$15,000.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
8.000
|
$10,000.000
|
$15,000.000
|
$13,000.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 4 FT)(6:1) (P)
|
EA
|
2.000
|
$11,500.000
|
$15,000.000
|
$15,000.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 5 FT)(3:1) (C)
|
EA
|
8.000
|
$8,000.000
|
$15,000.000
|
$20,000.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 6 FT)(4:1) (C)
|
EA
|
4.000
|
$13,500.000
|
$15,000.000
|
$13,000.000
|
|
|
SET (TY I)(S= 7 FT)(HW= 6 FT)(3:1) (C)
|
EA
|
6.000
|
$7,400.000
|
$18,000.000
|
$14,000.000
|
|
|
SET (TY I)(S= 7 FT)(HW= 6 FT)(6:1) (P)
|
EA
|
9.000
|
$13,000.000
|
$18,000.000
|
$17,000.000
|
|
|
SET (TY I)(S= 8 FT)(HW= 4 FT)(6:1) (P)
|
EA
|
10.000
|
$16,000.000
|
$20,000.000
|
$18,000.000
|
|
|
SET (TY I)(S= 8 FT)(HW= 5 FT)(6:1) (P)
|
EA
|
6.000
|
$15,000.000
|
$20,000.000
|
$18,000.000
|
|
|
SET (TY I)(S= 8 FT)(HW= 6 FT)(3:1) (C)
|
EA
|
1.000
|
$16,000.000
|
$20,000.000
|
$16,000.000
|
|
|
SET (TY I)(S= 8 FT)(HW= 6 FT)(4:1) (C)
|
EA
|
1.000
|
$16,000.000
|
$20,000.000
|
$16,000.000
|
|
|
SET (TY I)(S= 9 FT)(HW= 6 FT)(3:1) (C)
|
EA
|
8.000
|
$15,000.000
|
$25,000.000
|
$16,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
24.000
|
$1,500.000
|
$1,250.000
|
$2,300.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (C)
|
EA
|
1.000
|
$1,600.000
|
$1,350.000
|
$2,400.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
70.000
|
$1,650.000
|
$1,350.000
|
$2,400.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
3.000
|
$1,300.000
|
$1,300.000
|
$2,800.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
28.000
|
$1,950.000
|
$1,400.000
|
$3,100.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (P)
|
EA
|
4.000
|
$2,600.000
|
$1,400.000
|
$3,100.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
6.000
|
$2,200.000
|
$1,450.000
|
$3,400.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
48.000
|
$2,500.000
|
$1,450.000
|
$3,400.000
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
12.000
|
$2,500.000
|
$2,100.000
|
$4,200.000
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (P)
|
EA
|
8.000
|
$2,500.000
|
$2,800.000
|
$4,200.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
3.000
|
$2,500.000
|
$3,800.000
|
$4,900.000
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$4,000.000
|
$3,000.000
|
$4,900.000
|
|
|
SET (TY II) (42 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$6,500.000
|
$6,000.000
|
$10,000.000
|
|
|
SET(TY I)(S=9FT)(HW=6FT)(3:1)(C)(MOD)
|
EA
|
8.000
|
$17,000.000
|
$25,000.000
|
$17,000.000
|
|
|
SET(TY I)(S=7FT)(HW=6FT)(3:1)(C)(MOD)
|
EA
|
3.000
|
$8,000.000
|
$18,000.000
|
$17,000.000
|
|
|
JACK BOR OR TUN PIPE(18 IN)(RC)(CL III)
|
LF
|
141.000
|
$1,200.000
|
$1,200.000
|
$1,700.000
|
|
|
ADJUSTING INLET (CAP)
|
EA
|
9.000
|
$2,000.000
|
$5,000.000
|
$2,500.000
|
|
|
REMOV STR (BOX CULVERT)
|
EA
|
9.000
|
$5,000.000
|
$11,000.000
|
$30,000.000
|
|
|
REMOV STR (INLET)
|
EA
|
8.000
|
$650.000
|
$2,500.000
|
$11,000.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
4.000
|
$91,000.000
|
$50,000.000
|
$40,126.110
|
|
|
REMOV STR (PIPE)
|
EA
|
117.000
|
$500.000
|
$3,500.000
|
$1,500.000
|
|
|
REMOV STR (LARGE)
|
EA
|
14.000
|
$1,500.000
|
$50,000.000
|
$4,900.000
|
|
|
REMOV STR (SMALL)
|
EA
|
32.000
|
$800.000
|
$15,000.000
|
$2,200.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$24,367,000.000
|
$36,000,000.000
|
$37,510,784.170
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
60.000
|
$21,000.000
|
$15,000.000
|
$9,700.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
1,050.000
|
$35.000
|
$35.000
|
$39.500
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
1,050.000
|
$13.000
|
$12.000
|
$19.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
3,042.000
|
$30.000
|
$35.000
|
$30.500
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
3,042.000
|
$10.000
|
$11.000
|
$11.500
|
|
|
CONSTRUCTION PERIMETER FENCE
|
LF
|
2,803.000
|
$8.000
|
$5.000
|
$9.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
9,540.000
|
$4.000
|
$4.500
|
$4.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
9,540.000
|
$1.300
|
$1.500
|
$1.500
|
|
|
CONSTRUCTING DETOURS
|
SY
|
312,003.000
|
$85.000
|
$90.000
|
$70.000
|
|
|
CONSTRUCTING DETOURS (TY 2)
|
SY
|
63,970.000
|
$20.000
|
$30.000
|
$20.000
|
|
|
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
|
LF
|
173,670.000
|
$12.000
|
$8.000
|
$8.000
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
|
LF
|
4,660.000
|
$13.000
|
$10.000
|
$13.000
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 2)
|
LF
|
340.000
|
$16.000
|
$10.000
|
$14.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
348,030.000
|
$5.000
|
$5.000
|
$3.560
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
4,540.000
|
$6.000
|
$9.000
|
$4.500
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
260.000
|
$10.000
|
$9.000
|
$4.000
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
173,670.000
|
$10.000
|
$8.000
|
$6.780
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 1)
|
LF
|
4,660.000
|
$12.000
|
$10.000
|
$12.500
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 2)
|
LF
|
340.000
|
$12.000
|
$10.000
|
$14.000
|
|
|
PTB (FRN&INSTL)(SGL SLP)(TY 1) OR (STL)
|
LF
|
2,150.000
|
$50.000
|
$75.000
|
$120.000
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
61,130.000
|
$70.000
|
$73.500
|
$140.000
|
|
|
PERM CTB (SSCB)(TY 1)(MOD)
|
LF
|
1,230.000
|
$390.000
|
$104.000
|
$310.000
|
|
|
CONC CURB (MOUNTABLE)
|
LF
|
40.000
|
$50.000
|
$5.800
|
$60.000
|
|
|
DRIVEWAYS (ACP)(TYPE 1)
|
SY
|
2,710.000
|
$60.000
|
$107.000
|
$57.000
|
|
|
DRIVEWAYS (CONC)(TYPE 1)
|
SY
|
1,243.000
|
$80.000
|
$103.000
|
$130.000
|
|
|
DRIVEWAYS (ACP) (TYPE 2)
|
SY
|
6,989.000
|
$57.000
|
$123.000
|
$70.000
|
|
|
DRIVEWAYS (CONC)(TYPE 2)
|
SY
|
3,136.000
|
$115.000
|
$122.000
|
$125.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
170,060.000
|
$0.500
|
$0.850
|
$0.130
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
6,850.000
|
$25.000
|
$22.400
|
$32.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
37.000
|
$2,000.000
|
$2,080.000
|
$2,400.000
|
|
|
MTL W-BEAM GD FEN ADJUSTMENT
|
LF
|
700.000
|
$10.000
|
$15.800
|
$25.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
13.000
|
$1,400.000
|
$1,710.000
|
$1,600.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
5,583.000
|
$3.000
|
$2.000
|
$4.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
20.000
|
$255.000
|
$175.000
|
$310.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
20.000
|
$240.000
|
$175.000
|
$290.000
|
|
|
CABLE BARRIER SYSTEM (TL-3)
|
LF
|
399.000
|
$17.000
|
$22.000
|
$26.500
|
|
|
CABLE BARRIER TERMINAL SECTION (TL-3)
|
EA
|
1.000
|
$5,000.000
|
$4,500.000
|
$3,900.000
|
|
|
REMOVE CABLE BARRIER
|
LF
|
63,071.000
|
$3.400
|
$0.800
|
$4.500
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
50.000
|
$3,400.000
|
$3,130.000
|
$3,500.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
15.000
|
$260.000
|
$225.000
|
$350.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
105.000
|
$1,200.000
|
$500.000
|
$2,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
47.000
|
$700.000
|
$325.000
|
$1,200.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
56.000
|
$27,000.000
|
$24,500.000
|
$27,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
21.000
|
$10,000.000
|
$8,350.000
|
$10,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(W)(TL3)
|
EA
|
8.000
|
$12,000.000
|
$9,320.000
|
$11,000.000
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 1
|
EA
|
4.000
|
$560.000
|
$691.000
|
$670.000
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
43.000
|
$200.000
|
$265.000
|
$330.000
|
|
|
MAILBOX INSTALL-D (WC-POST) TY 3
|
EA
|
7.000
|
$275.000
|
$328.000
|
$290.000
|
|
|
REMOVE RD IL ASM (TRANS-BASE)
|
EA
|
6.000
|
$276.000
|
$525.000
|
$810.000
|
|
|
IN RD IL (TY SA) 40T-8 (250W EQ) LED
|
EA
|
144.000
|
$4,700.000
|
$4,100.000
|
$5,000.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
32,030.000
|
$15.000
|
$8.450
|
$17.500
|
|
|
CONDT (PVC) (SCH 40) (3") (CONC ENCSE)
|
LF
|
219,440.000
|
$15.000
|
$17.200
|
$16.380
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
5,670.000
|
$14.000
|
$9.250
|
$19.000
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
9,480.000
|
$20.000
|
$14.800
|
$29.000
|
|
|
CONDT (PVC) (SCH 80) (3") (BORE)
|
LF
|
32,820.000
|
$30.000
|
$37.750
|
$37.000
|
|
|
CONDT (RM) (3")
|
LF
|
3,590.000
|
$121.000
|
$54.750
|
$70.000
|
|
|
ELEC CONDR (NO.14) INSULATED
|
LF
|
125,800.000
|
$1.300
|
$1.150
|
$1.110
|
|
|
ELEC CONDR (NO.12) BARE
|
LF
|
40,550.000
|
$1.000
|
$1.200
|
$1.500
|
|
|
ELEC CONDR (NO.12) INSULATED
|
LF
|
97,050.000
|
$1.200
|
$1.250
|
$1.500
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
1,205.000
|
$1.500
|
$1.750
|
$2.000
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
3,255.000
|
$2.000
|
$1.850
|
$2.500
|
|
|
ELEC CONDR (NO.4) BARE
|
LF
|
3,115.000
|
$2.800
|
$2.700
|
$3.000
|
|
|
ELEC CONDR (NO.4) INSULATED
|
LF
|
11,360.000
|
$4.000
|
$2.900
|
$3.500
|
|
|
ELEC CONDR (NO.2) BARE
|
LF
|
3,255.000
|
$4.000
|
$3.850
|
$3.500
|
|
|
ELEC CONDR (NO.2) INSULATED
|
LF
|
7,080.000
|
$5.000
|
$4.000
|
$4.000
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
117.000
|
$1,000.000
|
$929.000
|
$1,300.000
|
|
|
ELC SRV TY A 120/240 060(NS)SS(E)SP(O)
|
EA
|
13.000
|
$7,000.000
|
$8,290.000
|
$8,200.000
|
|
|
ELC SRV TY D 120/240 060(NS)SS(N)SP(O)
|
EA
|
7.000
|
$5,600.000
|
$7,470.000
|
$8,000.000
|
|
|
ELC SRV TY D 120/240 100(NS)SS(N)SP(O)
|
EA
|
6.000
|
$6,000.000
|
$7,600.000
|
$6,500.000
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
657.500
|
$40.000
|
$29.900
|
$36.000
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
4,411.000
|
$40.000
|
$21.700
|
$34.500
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
54.000
|
$650.000
|
$650.000
|
$780.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
9.000
|
$650.000
|
$695.000
|
$810.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
62.000
|
$800.000
|
$725.000
|
$900.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
4.000
|
$1,000.000
|
$900.000
|
$940.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
|
EA
|
11.000
|
$1,000.000
|
$910.000
|
$1,100.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
28.000
|
$900.000
|
$1,030.000
|
$1,100.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
3.000
|
$1,100.000
|
$900.000
|
$1,200.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
5.000
|
$1,000.000
|
$925.000
|
$1,300.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-2EXT)
|
EA
|
6.000
|
$1,100.000
|
$950.000
|
$1,400.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
4.000
|
$1,100.000
|
$975.000
|
$1,300.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
191.000
|
$450.000
|
$650.000
|
$610.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(T)
|
EA
|
60.000
|
$475.000
|
$625.000
|
$640.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
2.000
|
$2,200.000
|
$2,710.000
|
$2,600.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
|
EA
|
10.000
|
$2,400.000
|
$2,750.000
|
$2,500.000
|
|
|
IN SM RD SN SUP&AM (RAIL MOUNT)
|
EA
|
4.000
|
$4,350.000
|
$5,000.000
|
$4,500.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
6.000
|
$650.000
|
$500.000
|
$690.000
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
3.000
|
$1,000.000
|
$700.000
|
$800.000
|
|
|
RELOCATE SM RD SN SUP&AM TY TWT
|
EA
|
4.000
|
$510.000
|
$500.000
|
$620.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
350.000
|
$100.000
|
$75.000
|
$150.000
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
3,728.900
|
$7.500
|
$7.100
|
$7.000
|
|
|
RELOCATE LRSA
|
EA
|
50.000
|
$4,300.000
|
$2,990.000
|
$4,300.000
|
|
|
REMOVE LRSA
|
EA
|
22.000
|
$1,000.000
|
$525.000
|
$1,300.000
|
|
|
INS OH SN SUP(30 FT BAL TEE)
|
EA
|
3.000
|
$35,000.000
|
$59,600.000
|
$41,000.000
|
|
|
INS OH SN SUP(30 FT CANT)(SPAN ONLY)
|
EA
|
15.000
|
$30,000.000
|
$21,840.000
|
$20,796.000
|
|
|
INS OH SN SUP(35 FT CANT)(SPAN ONLY)
|
EA
|
13.000
|
$30,000.000
|
$24,910.000
|
$23,717.000
|
|
|
SIGN WALKWAY (36 IN) WITH HNDRL
|
LF
|
92.000
|
$400.000
|
$515.000
|
$790.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
259.000
|
$34.000
|
$16.200
|
$27.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
36.000
|
$22.000
|
$16.200
|
$25.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
|
EA
|
747.000
|
$24.000
|
$16.800
|
$25.500
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
158.000
|
$94.000
|
$57.000
|
$91.500
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
74.000
|
$25.000
|
$15.200
|
$37.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
54.000
|
$30.000
|
$35.000
|
$37.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
74.000
|
$30.000
|
$35.000
|
$31.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
60.000
|
$33.500
|
$35.000
|
$40.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
|
EA
|
83.000
|
$100.000
|
$50.000
|
$91.500
|
|
|
INSTL DEL ASSM (D-DW)SZ 1(WFLX)GND
|
EA
|
15.000
|
$145.000
|
$51.500
|
$79.500
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
70,480.000
|
$0.450
|
$0.450
|
$0.500
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(DOT)
|
LF
|
1,457.000
|
$0.500
|
$1.500
|
$4.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
629,905.000
|
$0.300
|
$0.450
|
$0.450
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
24,740.000
|
$0.600
|
$0.850
|
$0.900
|
|
|
WK ZN PAV MRK NON-REMOV (W)12"(LNDP)
|
LF
|
78.000
|
$2.500
|
$5.000
|
$3.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)12"(SLD)
|
LF
|
839.000
|
$2.500
|
$5.000
|
$2.500
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
1,110.000
|
$3.500
|
$15.000
|
$6.500
|
|
|
WK ZN PAV MRK NON-REMOV (W)(ARROW)
|
EA
|
6.000
|
$80.000
|
$185.000
|
$90.500
|
|
|
WK ZN PAV MRK NON-REMOV(W)(WORD)
|
EA
|
2.000
|
$90.000
|
$225.000
|
$110.000
|
|
|
WK ZN PAV MRK NON-REMOV(W)36"(YLD TRI)
|
EA
|
92.000
|
$7.000
|
$70.000
|
$14.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
630,333.000
|
$0.300
|
$0.450
|
$0.450
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
1,268.000
|
$8.700
|
$6.000
|
$6.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-C-R
|
EA
|
8,771.000
|
$5.000
|
$6.000
|
$6.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
58,812.000
|
$1.000
|
$0.950
|
$1.500
|
|
|
WK ZN PAV MRK REMOV (W)4"(DOT)
|
LF
|
258.000
|
$2.400
|
$2.000
|
$4.500
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
296,001.000
|
$1.200
|
$0.950
|
$0.950
|
|
|
WK ZN PAV MRK REMOV (W)8"(LNDP)
|
LF
|
291.000
|
$1.200
|
$2.000
|
$2.000
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
22,861.000
|
$1.750
|
$2.000
|
$2.000
|
|
|
WK ZN PAV MRK REMOV (W)12"(LNDP)
|
LF
|
813.000
|
$3.000
|
$2.000
|
$3.000
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
466.000
|
$6.500
|
$10.000
|
$10.000
|
|
|
WK ZN PAV MRK REMOV (W)(ARROW)
|
EA
|
1.000
|
$350.000
|
$400.000
|
$250.000
|
|
|
WK ZN PAV MRK REMOV (W)(WORD)
|
EA
|
1.000
|
$180.000
|
$450.000
|
$280.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
284,240.000
|
$1.100
|
$0.950
|
$0.950
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
16,436.000
|
$1.300
|
$2.250
|
$2.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
2,908.000
|
$1.500
|
$2.700
|
$2.000
|
|
REFL PAV MRK TY I (W)6"(DOT)(090MIL)
|
LF
|
7,273.000
|
$1.000
|
$2.000
|
$2.000
|
|
REFL PAV MRK TY I (W)8"(DOT)(090MIL)
|
LF
|
3,211.000
|
$1.100
|
$2.000
|
$2.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
25,317.000
|
$1.000
|
$1.250
|
$1.000
|
|
REFL PAV MRK TY I (W)12"(LNDP)(090MIL)
|
LF
|
1,871.000
|
$4.000
|
$2.500
|
$3.500
|
|
REFL PAV MRK TY I (W)12"(SLD)(090MIL)
|
LF
|
2,563.000
|
$3.000
|
$5.000
|
$3.000
|
|
REFL PAV MRK TY I (Y)12"(SLD)(090MIL)
|
LF
|
121.000
|
$4.750
|
$5.000
|
$5.500
|
|
RE PV MRK TY I(BLACK)6"(SHADOW)(090MIL)
|
LF
|
64,920.000
|
$1.650
|
$0.750
|
$1.000
|
|
|
PAVEMENT SEALER 6"
|
LF
|
782,110.000
|
$0.200
|
$0.300
|
$0.300
|
|
|
PAVEMENT SEALER 8"
|
LF
|
28,528.000
|
$0.300
|
$0.400
|
$0.550
|
|
|
PAVEMENT SEALER 12"
|
LF
|
4,555.000
|
$0.500
|
$1.500
|
$1.000
|
|
|
REF PROF PAV MRK TY I(W)6"(SLD)(090MIL)
|
LF
|
191,113.000
|
$0.700
|
$1.250
|
$1.250
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(090MIL)
|
LF
|
96,810.000
|
$0.400
|
$0.750
|
$3.000
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
|
LF
|
150,388.000
|
$0.600
|
$0.750
|
$0.750
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
|
LF
|
282,952.000
|
$0.500
|
$0.750
|
$0.750
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
621.000
|
$12.000
|
$15.000
|
$18.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
23.000
|
$230.000
|
$275.000
|
$250.000
|
|
PREFAB PAV MRK TY C (W) (LNDP ARROW)
|
EA
|
5.000
|
$500.000
|
$500.000
|
$490.000
|
|
PREFAB PAV MRK TY C (W) (NUMBER)
|
EA
|
9.000
|
$320.000
|
$350.000
|
$300.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
26.000
|
$280.000
|
$375.000
|
$300.000
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
32.000
|
$45.000
|
$75.000
|
$45.000
|
|
PREFAB PAV MRK TY C(EVAC SYM, BLUE/WHT)
|
EA
|
5.000
|
$275.000
|
$500.000
|
$1,400.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
206.000
|
$8.000
|
$5.000
|
$6.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
674.000
|
$6.100
|
$5.000
|
$7.500
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
6,082.000
|
$5.000
|
$5.000
|
$6.500
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
1,327,879.000
|
$0.550
|
$0.350
|
$0.350
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
29,242.000
|
$0.500
|
$0.500
|
$0.500
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
27,824.000
|
$1.050
|
$0.750
|
$1.500
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
1,756.000
|
$3.300
|
$2.000
|
$2.500
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
1,110.000
|
$3.500
|
$5.000
|
$5.000
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
10.000
|
$60.000
|
$100.000
|
$73.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
2.000
|
$53.000
|
$100.000
|
$83.000
|
|
|
ELIM EXT PAV MRK & MRKS (36")(YLD TRI)
|
EA
|
89.000
|
$60.000
|
$50.000
|
$30.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
782,110.000
|
$0.100
|
$0.250
|
$0.250
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
28,528.000
|
$0.150
|
$0.400
|
$0.400
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
4,555.000
|
$0.350
|
$1.000
|
$0.600
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
182.000
|
$0.800
|
$3.000
|
$3.000
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
28.000
|
$20.000
|
$100.000
|
$27.000
|
|
|
PAV SURF PREP FOR MRK (NUMBER)
|
EA
|
8.000
|
$90.000
|
$100.000
|
$37.500
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
25.000
|
$20.000
|
$100.000
|
$31.500
|
|
|
PAV SURF PREP FOR MRK (36")(YLD TRI)
|
EA
|
32.000
|
$10.000
|
$50.000
|
$15.000
|
|
|
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
|
EA
|
2.000
|
$8,000.000
|
$8,620.000
|
$8,500.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
20.000
|
$7,000.000
|
$10,000.000
|
$2,900.000
|
|
|
LITTER REMOVAL
|
CYC
|
60.000
|
$9,000.000
|
$7,500.000
|
$3,700.000
|
|
|
DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES)
|
CYC
|
60.000
|
$8,000.000
|
$2,900.000
|
$3,300.000
|
|
|
CLEANING / SWEEPING (CENTER MEDIAN)
|
CYC
|
60.000
|
$7,500.000
|
$1,400.000
|
$3,600.000
|
|
|
REPLACE POSTS (TL-3)
|
EA
|
5,250.000
|
$116.000
|
$190.000
|
$140.000
|
|
|
REPLACE POSTS (TL-4)
|
EA
|
1,500.000
|
$120.000
|
$210.000
|
$210.000
|
|
|
CABLE SPLICE / TURNBUCKLE (TL-3)
|
EA
|
15.000
|
$490.000
|
$2,500.000
|
$200.000
|
|
|
CABLE SPLICE / TURNBUCKLE (TL-4)
|
EA
|
15.000
|
$495.000
|
$1,500.000
|
$270.000
|
|
|
REPAIR CONCRETE FOUNDATION (TL-3)
|
EA
|
15.000
|
$500.000
|
$400.000
|
$150.000
|
|
|
REPAIR CONCRETE FOUNDATION (TL-4)
|
EA
|
15.000
|
$505.000
|
$250.000
|
$290.000
|
|
|
REPR OR REPLC CABLE BARR TERM SEC(TL-3)
|
EA
|
45.000
|
$3,500.000
|
$2,500.000
|
$1,800.000
|
|
|
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
|
EA
|
45.000
|
$3,500.000
|
$1,500.000
|
$1,900.000
|
|
|
REPLACE CABLE (TL-3)
|
LF
|
3,000.000
|
$15.000
|
$12.000
|
$7.000
|
|
|
REPLACE CABLE (TL-4)
|
LF
|
3,000.000
|
$16.000
|
$9.000
|
$13.000
|
|
|
NO. OF WORKING DAYS
|
$/D
|
67,974.000
|
$1,675.000
|
$950.000
|
$1,675.000
|
|
|
WIDE FLANGE PAVEMENT TERMINALS
|
LF
|
1,505.000
|
$560.000
|
$602.000
|
$770.000
|
|
|
RUBBILIZING EXISTING CONCRETE PAVEMENT
|
SY
|
33,583.000
|
$2.000
|
$3.600
|
$2.650
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
111,132.000
|
$85.000
|
$105.000
|
$90.000
|
|
|
D-GR HMA TY-D SAC-A PG70-22
|
TON
|
98,959.000
|
$135.000
|
$134.000
|
$90.000
|
|
|
D-GR HMA TY-D PG70-22 (LEVEL-UP)
|
TON
|
386.000
|
$135.000
|
$160.000
|
$290.000
|
|
|
TACK COAT
|
GAL
|
121,992.000
|
$3.750
|
$4.140
|
$6.860
|
|
|
TIP TESTING(DRILL SHAFT)
|
EA
|
22.000
|
$3,400.000
|
$3,330.000
|
$3,250.120
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
8.000
|
$10,200.000
|
$80,300.000
|
$12,000.000
|
|
|
FIBER OPTIC CBL (SNGLE-MODE)(12 FIBER)
|
LF
|
95,740.000
|
$2.300
|
$1.600
|
$5.500
|
|
|
FIBER OPTIC CBL (SNGLE-MODE)(144 FIBER)
|
LF
|
66,175.000
|
$4.000
|
$3.700
|
$4.500
|
|
|
FIBER OPTIC PATCH PANEL (12 POSITION)
|
EA
|
31.000
|
$2,500.000
|
$1,110.000
|
$1,700.000
|
|
|
FIBER OPTIC PATCH PANEL (144 POSITION)
|
EA
|
6.000
|
$4,000.000
|
$2,140.000
|
$4,000.000
|
|
|
FO SPLICE ENCLOSURE (TYPE 1)
|
EA
|
2.000
|
$1,860.000
|
$1,590.000
|
$2,400.000
|
|
|
FIBER OPTIC FUSION SPLICE
|
EA
|
1,116.000
|
$79.000
|
$65.750
|
$97.000
|
|
|
ITS GRND MNT CAB (TY 6) (CONF 2)
|
EA
|
3.000
|
$12,400.000
|
$14,670.000
|
$13,000.000
|
|
|
CCTV FIELD EQUIPMENT (ANALOG)
|
EA
|
12.000
|
$7,650.000
|
$10,100.000
|
$6,800.000
|
|
|
REMOVE CCTV FIELD EQUIPMENT
|
EA
|
3.000
|
$500.000
|
$525.000
|
$1,300.000
|
|
|
ITS MULTI-DUCT CND (PVC-40)(CONC ENCSE)
|
LF
|
108,880.000
|
$20.000
|
$18.800
|
$17.940
|
|
|
ITS MULTI-DUCT CND (PVC-80)(BORE)
|
LF
|
15,470.000
|
$30.000
|
$28.000
|
$45.000
|
|
|
ITS MULTI-DUCT CND (RMC)
|
LF
|
1,810.000
|
$135.000
|
$105.000
|
$120.000
|
|
|
INSTALL DMS (FOUNDATION MTD CABINET)
|
EA
|
3.000
|
$12,000.000
|
$11,810.000
|
$21,000.000
|
|
|
FIBER OPTIC VIDEO DATA TRANSMITTER
|
EA
|
12.000
|
$1,200.000
|
$3,150.000
|
$1,800.000
|
|
|
FIBER OPTIC VIDEO DATA RECEIVER
|
EA
|
12.000
|
$1,200.000
|
$3,150.000
|
$1,800.000
|
|
|
ITS POLE (60 FT)(90 MPH)
|
EA
|
12.000
|
$23,500.000
|
$23,230.000
|
$27,000.000
|
|
|
ITS POLE MNT CAB (TY 2)(CONF 2)
|
EA
|
12.000
|
$10,500.000
|
$7,530.000
|
$8,500.000
|
|
|
ETHERNET SWITCH (INSTALL ONLY)
|
EA
|
3.000
|
$100.000
|
$525.000
|
$550.000
|
|
|
MPEG 4 VIDEO ENCODER (INSTALL ONLY)
|
EA
|
12.000
|
$2,000.000
|
$525.000
|
$500.000
|
|
|
TERMINAL SERVER (INSTALL ONLY)
|
EA
|
6.000
|
$300.000
|
$525.000
|
$390.000
|
|
|
INSTALLATION OF BLUETOOTH READER
|
EA
|
6.000
|
$1,100.000
|
$1,050.000
|
$1,200.000
|
|
|
TMA (STATIONARY)
|
DAY
|
1,000.000
|
$270.000
|
$430.000
|
$290.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
150.000
|
$275.000
|
$796.000
|
$370.000
|
|
|
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
|
EA
|
230.000
|
$4,000.000
|
$4,120.000
|
$4,500.000
|
|
|
ITS GND BOX(PCAST) TY 2 (366036)W/APRN
|
EA
|
5.000
|
$5,000.000
|
$6,520.000
|
$7,200.000
|
|
|
ITS RVSD (DATA COLLECT ONLY) SYS
|
EA
|
6.000
|
$15,100.000
|
$12,400.000
|
$11,000.000
|
|
|
ITS RVSD (DC ONLY) (REMOVE)
|
EA
|
3.000
|
$600.000
|
$263.000
|
$730.000
|
|
|
TEMP CON EQUIP ALERT (1 SYS)
|
DAY
|
3,813.000
|
$125.000
|
$7.750
|
$330.000
|
|
|
TEMPORARY SPEED MONITORING SYSTEM
|
DAY
|
5,084.000
|
$80.000
|
$46.250
|
$13.310
|
|
|
TEMPORARY QUEUE DETECTION SYSTEM
|
DAY
|
2,542.000
|
$450.000
|
$23.200
|
$104.440
|
|
|
INSTALL OF TRANSCEIVER
|
EA
|
15.000
|
$100.000
|
$525.000
|
$500.000
|
|
|
REMOVE DYNAMIC MESSAGE SIGN SYSTEM
|
EA
|
1.000
|
$10,000.000
|
$2,630.000
|
$13,000.000
|
|
|
TEMP INCIDENT DETECT & SURVEIL SYS
|
DAY
|
5,084.000
|
$60.000
|
$52.000
|
$61.500
|
|
Totals: |
$443,597,130.050
|
$429,395,799.870
|
$488,964,288.850
|