Show Job Controls
Bid Cobra

ZAPATA US 83 (0038-05-040)

Items: 161

County: ZAPATA
Length: N/A
Highway: US 83
District: PHARR
Control Number: 0038-05-040
DBE Goal: N/A
Project: F 2023(629)
Guaranty: N/A
Time: 685 WORKING DAYS
Engineer's Estimate: $35,075,172.82
Date: 05/05/2023 (3 years ago)
Contract Number: N/A
Type: WIDEN ROAD - ADD LANES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$35,075,172.82
$33,170,886.97
Over/Under Est: -5.43% -$1,904,285.85
$33,799,070.41
Over/Under Est: -3.64% -$1,276,102.41
Amt Left: 1.89% $628,183.44
$36,145,000.32
Over/Under Est: 3.05% $1,069,827.50
Amt Left: 8.97% $2,974,113.35
Delta: -6.94% -$2,345,929.91
Over/Under Est: 23.29% $8,168,802.88
Amt Left: 30.37% $10,073,088.73
Delta: -19.64% -$7,098,975.38
Subcontractor Percentage Amount
LAREDO STRIPING, INC. 3.74% $1,261,643.84
SOIL TECH ADVANCE INC. 2.31% $779,250.60
HIGHWAY BARRICADES AND SERVICES, LLC 0.75% $253,003.44
TEXAS HIGHWAY SYSTEMS, INC. 0.30% $101,201.38
RIO GRANDE REBAR RODBUSTERS, LLC 0.09% $30,360.41
GULF COAST CONTRACTORS, INC. 0.05% $16,866.90
Total: 7.24% $2,442,326.57

Bid Items & Bid Tabulations

161 Total 0 of 161
ZAPATA  |  US 83  |  PHARR  |  0038-05-040  |  05/05/2023  |  $35,075,172.82  |  F 2023(629)  |  WIDEN ROAD - ADD LANES  |  685 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
IOC COMPANY, LLC
FOREMOST PAVING, INC.
POSILLICO CIVIL, INC.
ANDERSON COLUMBIA CO., INC.
PREPARING ROW
STA 340.000 $2,025.000 $5,000.000 $4,500.000 $7,500.000 $7,000.000
REMOVING CONC (MISC)
SY 3.000 $30.000 $350.000 $180.000 $45.000 $180.000
REMOVE CONC (RAIL)
LF 169.000 $15.000 $30.000 $28.000 $32.000 $28.000
REMOVING CONCRETE(MOW STRIP)
LF 3,173.000 $9.000 $10.000 $10.000 $10.000 $15.000
REMOVING STAB BASE & ASPH PAV (18")
SY 86,841.000 $8.000 $2.500 $3.100 $9.000 $3.000
EXCAVATION (ROADWAY)
CY 80,771.000 $10.000 $2.000 $5.500 $12.000 $6.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 150,405.000 $11.000 $10.000 $7.500 $12.000 $8.000
FURNISHING AND PLACING TOPSOIL
CY 865.000 $25.000 $5.000 $36.000 $6.500 $180.000
DRILL SEEDING (PERM) (RURAL) (SANDY)
AC 104.000 $700.000 $1,200.000 $1,200.000 $1,200.000 $950.000
DRILL SEEDING (TEMP) (WARM)
AC 104.000 $700.000 $1,000.000 $1,000.000 $900.000 $650.000
FERTILIZER
TON 52.000 $1,597.000 $1,550.000 $1,500.000 $900.000 $155.000
VEGETATIVE WATERING
MG 15,651.000 $25.920 $33.000 $15.000 $23.000 $29.000
PROOF ROLLING
HR 580.000 $58.000 $1.000 $90.000 $55.000 $90.000
FL BS (RDWY DEL)(TY E GR 4)(FNAL POS)
CY 70,319.000 $40.000 $25.130 $35.000 $25.000 $50.000
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 11.000 $250.000 $300.000 $0.010 $325.000 $200.000
CEMENT
TON 5,598.000 $200.000 $185.000 $195.000 $210.000 $195.000
CEMENT TREAT (NEW BASE)(12")
SY 210,956.000 $3.000 $2.000 $4.500 $2.250 $4.500
CEMENT TREAT (SUBGRADE)(12")
SY 215,406.000 $2.300 $2.000 $2.650 $3.000 $2.700
PRIME COAT (MC-30)
GAL 42,192.000 $6.000 $4.250 $5.250 $4.500 $5.500
PLAN & TEXT CONC PAV(0" TO 1-1/2")
SY 544.000 $15.000 $1.000 $25.000 $8.000 $25.000
PLANE ASPH CONC PAV(0" TO 6")
SY 84,193.000 $5.000 $1.000 $2.500 $3.000 $4.000
PLANE ASPH CONC PAV (1")
SY 78,991.000 $1.520 $0.550 $1.250 $1.000 $1.500
CEM STABIL BKFL
CY 2,020.000 $92.000 $95.000 $145.000 $250.000 $160.000
CUT & RESTORING PAV
SY 442.000 $82.000 $100.000 $102.000 $60.000 $100.000
STRUCT EXCAV (SPECIAL)
CY 50.000 $66.000 $100.000 $65.000 $55.000 $200.000
TRENCH EXCAVATION PROTECTION
LF 574.000 $3.500 $0.100 $1.000 $9.000 $11.000
TEMPORARY SPL SHORING
SF 387.000 $25.000 $1.000 $1.000 $44.000 $24.000
CL B CONC (MISC)
CY 3.000 $600.000 $1,700.000 $1,500.000 $1,000.000 $1,000.000
CL C CONC (RAIL FOUNDATION)
CY 19.000 $525.000 $1,000.000 $975.000 $1,000.000 $875.000
CL C CONC (RAC-R)
CY 14.000 $2,400.000 $1,000.000 $1,100.000 $2,000.000 $1,000.000
RIPRAP (CONC)(4 IN)
CY 2,282.800 $450.000 $450.000 $490.000 $425.000 $550.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 320.000 $152.560 $175.000 $225.000 $210.000 $260.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 103.000 $200.000 $175.000 $200.000 $215.000 $260.000
RIPRAP (MOW STRIP)(4 IN)
CY 351.100 $525.000 $550.000 $475.000 $375.000 $550.000
RAIL (TY T224)
LF 364.000 $175.000 $200.000 $190.000 $160.000 $175.000
CONC BOX CULV (3 FT X 2 FT)
LF 178.000 $270.000 $350.000 $550.000 $450.000 $370.000
CONC BOX CULV (4 FT X 2 FT)
LF 1,203.000 $300.000 $375.000 $570.000 $400.000 $400.000
CONC BOX CULV (6 FT X 6 FT)
LF 364.000 $1,000.000 $750.000 $720.000 $900.000 $875.000
CONC BOX CULV (8 FT X 4 FT)
LF 130.000 $1,100.000 $910.000 $925.000 $1,100.000 $1,100.000
CONC BOX CULV (8 FT X 5 FT)
LF 158.000 $1,150.000 $975.000 $850.000 $1,200.000 $1,200.000
CONC BOX CULV (8 FT X 6 FT)
LF 134.000 $1,200.000 $1,025.000 $850.000 $1,300.000 $1,400.000
CONC BOX CULV (10 FT X 6 FT)
LF 260.000 $1,250.000 $1,275.000 $950.000 $1,500.000 $2,000.000
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
LF 18.000 $1,100.000 $1,250.000 $1,200.000 $1,400.000 $800.000
CONC BOX CULV (8 FT X 4 FT)(EXTEND)
LF 58.000 $980.000 $1,000.000 $1,150.000 $1,500.000 $900.000
CONC BOX CULV (6 FT X 2 FT)
LF 253.000 $750.000 $600.000 $800.000 $650.000 $620.000
RC PIPE (CL III)(24 IN)
LF 3,866.000 $75.000 $85.000 $100.000 $78.000 $90.000
RC PIPE (CL III)(30 IN)
LF 112.000 $115.000 $140.000 $145.000 $140.000 $116.000
RC PIPE (CL III)(36 IN)
LF 67.000 $153.000 $160.000 $200.000 $190.000 $159.000
RC PIPE (CL III)(24 IN)(SPL)
LF 209.000 $60.000 $90.000 $120.000 $155.000 $115.000
RC PIPE (CL III)(30 IN)(SPL)
LF 101.000 $160.120 $120.000 $165.000 $185.000 $156.000
RC PIPE (CL III)(36 IN)(SPL)
LF 10.000 $140.000 $315.000 $470.000 $355.000 $280.000
RC PIPE (CL V)(30 IN)(SPL)
LF 83.000 $150.000 $120.000 $170.000 $300.000 $290.000
RC PIPE (CL V) (24 IN) (SPL)
LF 58.000 $145.000 $165.000 $140.000 $215.000 $170.000
RC PIPE (CL V) (36 IN) (SPL)
LF 95.000 $160.000 $175.000 $225.000 $375.000 $410.000
INLET (COMPL)(PSL)(FG)(5FTX6FT-4FTX4FT)
EA 1.000 $10,000.000 $5,500.000 $16,000.000 $10,850.000 $12,500.000
INL(CMP)(PAZD-CZ)(FG)(5FTX5FT-4FTX4FT)
EA 1.000 $10,500.000 $5,500.000 $6,300.000 $12,000.000 $11,500.000
HEADWALL (CH - PW - 0) (DIA= 24 IN)
EA 1.000 $7,100.000 $14,000.000 $3,800.000 $8,500.000 $7,800.000
HEADWALL (CH - PW - 0) (DIA= 36 IN)
EA 2.000 $9,000.000 $14,500.000 $12,700.000 $9,000.000 $9,800.000
WINGWALL (FW - S) (HW=5 FT)
EA 1.000 $25,550.000 $16,000.000 $19,600.000 $16,000.000 $22,500.000
WINGWALL (FW - S) (HW=6 FT)
EA 1.000 $16,100.000 $17,000.000 $21,400.000 $18,000.000 $26,000.000
WINGWALL (FW - S) (HW=8 FT)
EA 4.000 $15,000.000 $22,000.000 $42,200.000 $35,000.000 $38,500.000
WINGWALL (PW - 1) (HW=3 FT)
EA 4.000 $11,050.750 $12,000.000 $11,500.000 $15,000.000 $8,500.000
WINGWALL (PW - 1) (HW=4 FT)
EA 4.000 $18,600.000 $12,600.000 $13,200.000 $18,000.000 $9,800.000
WINGWALL (PW - 1) (HW=5 FT)
EA 2.000 $17,750.000 $16,700.000 $29,000.000 $21,000.000 $20,000.000
WINGWALL (PW - 1) (HW=6 FT)
EA 1.000 $24,700.000 $24,000.000 $34,000.000 $30,000.000 $28,500.000
WINGWALL (PW - 1) (HW=7 FT)
EA 4.000 $26,250.000 $25,000.000 $30,000.000 $35,000.000 $36,000.000
WINGWALL (PW - 1) (HW=8 FT)
EA 2.000 $35,000.000 $27,500.000 $56,000.000 $40,000.000 $47,000.000
SET (TY I)(S=3 FT)(HW= 3 FT)(6:1)(C)
EA 3.000 $10,200.000 $10,000.000 $13,500.000 $18,000.000 $14,000.000
SET (TY I)(S= 4 FT)(HW= 3 FT)(4:1) (C)
EA 3.000 $9,575.000 $8,750.000 $9,000.000 $15,000.000 $14,000.000
SET (TY I)(S= 4 FT)(HW= 3 FT)(6:1) (C)
EA 12.000 $12,500.000 $9,750.000 $10,200.000 $16,000.000 $14,000.000
SET (TY I)(S= 4 FT)(HW= 3 FT)(6:1) (P)
EA 10.000 $10,830.000 $10,500.000 $16,400.000 $18,000.000 $12,000.000
SET (TY I)(S= 6 FT)(HW= 3 FT)(6:1) (P)
EA 2.000 $15,000.000 $10,500.000 $9,200.000 $15,000.000 $10,000.000
SET (TY I)(S= 6 FT)(HW= 4 FT)(4:1) (C)
EA 2.000 $12,384.720 $10,500.000 $9,500.000 $18,000.000 $11,000.000
SET (TY I)(S= 8 FT)(HW= 6 FT)(6:1) (C)
EA 2.000 $24,300.000 $25,000.000 $27,000.000 $37,000.000 $26,000.000
SET (TY II) (24 IN) (CMP) (3: 1) (C)
EA 1.000 $2,700.000 $2,750.000 $1,200.000 $3,000.000 $1,200.000
SET (TY II) (24 IN) (HDPE) (6: 1) (P)
EA 1.000 $1,000.000 $2,500.000 $1,400.000 $3,000.000 $800.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 1.000 $1,760.000 $2,400.000 $1,140.000 $3,000.000 $1,400.000
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 4.000 $2,600.000 $1,500.000 $1,400.000 $3,000.000 $1,900.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 170.000 $1,561.000 $1,250.000 $1,400.000 $3,000.000 $1,900.000
SET (TY II) (30 IN) (RCP) (6: 1) (C)
EA 6.000 $4,000.000 $2,000.000 $4,700.000 $3,750.000 $3,500.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 4.000 $2,855.000 $2,200.000 $4,700.000 $3,750.000 $3,400.000
SET (TY II) (36 IN) (RCP) (4: 1) (C)
EA 1.000 $4,587.730 $6,000.000 $5,000.000 $4,500.000 $4,600.000
SET (TY II) (36 IN) (RCP) (6: 1) (C)
EA 3.000 $5,200.000 $6,500.000 $6,600.000 $4,750.000 $4,800.000
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 2.000 $5,400.000 $8,750.000 $6,600.000 $4,750.000 $4,750.000
CLEAN EXIST CULVERTS
EA 19.000 $2,140.000 $1,000.000 $2,500.000 $2,000.000 $3,600.000
REMOV STR (SET)
EA 255.000 $390.000 $175.000 $325.000 $55.000 $390.000
REMOV STR (WINGWALL)
EA 6.000 $1,600.000 $500.000 $3,000.000 $2,250.000 $1,400.000
REMOV STR (HEADWALL)
EA 6.000 $1,885.000 $500.000 $3,000.000 $1,950.000 $1,400.000
REMOV STR (PIPE)
LF 7,201.000 $8.400 $5.000 $15.000 $24.000 $7.000
REMOV STR (BOX CULVERT)
LF 66.000 $40.000 $25.000 $550.000 $89.150 $90.000
MOBILIZATION
LS 1.000 $1,757,000.000 $2,800,000.000 $2,560,000.000 $3,285,909.120 $4,200,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 45.000 $5,000.000 $1,000.000 $6,000.000 $3,000.000 $2,310.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 3,392.000 $36.000 $70.000 $70.000 $70.000 $42.000
ROCK FILTER DAMS (REMOVE)
LF 3,392.000 $12.000 $30.000 $30.000 $30.000 $22.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 1,482.000 $27.500 $31.380 $50.000 $35.000 $40.000
CONSTRUCTION EXITS (INSTALL) (TY 2)
SY 78.000 $29.000 $41.330 $55.000 $77.000 $110.000
CONSTRUCTION EXITS (REMOVE)
SY 1,560.000 $9.000 $12.100 $18.000 $5.350 $22.000
CONSTRUCTION PERIMETER FENCE
LF 1,089.000 $6.190 $5.050 $53.000 $10.000 $6.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 21,461.000 $3.600 $4.550 $5.000 $4.550 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 21,461.000 $1.000 $1.500 $2.000 $1.500 $1.500
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 60.000 $6.000 $12.000 $10.000 $12.000 $13.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 60.000 $2.000 $5.000 $5.000 $5.000 $7.000
CONSTRUCTING DETOURS
SY 2,475.000 $90.000 $55.000 $62.000 $26.250 $90.000
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 14,520.000 $65.000 $10.000 $28.000 $30.000 $36.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 40,200.000 $7.000 $5.000 $11.000 $8.000 $13.000
PORT CTB (STKPL)(F-SHAPE)(TY 1)
LF 4,950.000 $15.000 $10.000 $11.000 $8.000 $13.000
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 14,520.000 $10.450 $5.000 $11.000 $7.000 $13.000
DRIVEWAYS (ACP)
SY 8,466.000 $55.000 $50.000 $55.000 $35.000 $60.000
RUMBLE STRIPS (SHOULDER)
LF 83,360.000 $0.180 $0.190 $0.350 $0.200 $0.150
MTL W-BEAM GD FEN (TIM POST)
LF 8,415.000 $32.000 $43.900 $26.000 $25.500 $30.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 8.000 $2,275.000 $2,000.490 $2,200.000 $2,000.000 $3,400.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 42.000 $1,500.000 $1,721.490 $1,400.000 $1,725.000 $1,380.000
MTL THRIE-BEAM GD FEN (TIM POST)
EA 7.000 $2,650.000 $2,000.490 $2,200.000 $2,000.000 $2,330.000
REMOVE METAL BEAM GUARD FENCE
LF 3,280.000 $2.000 $1.490 $3.000 $1.500 $2.000
REMOVE TERMINAL ANCHOR SECTION
EA 5.000 $215.000 $195.490 $200.000 $196.000 $110.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 8.000 $240.000 $195.490 $200.000 $196.000 $220.000
GUARDRAIL END TREATMENT (INSTALL)
EA 41.000 $3,350.000 $3,121.490 $3,305.000 $3,120.000 $3,300.000
GUARDRAIL END TREATMENT (REMOVE)
EA 20.000 $500.000 $195.490 $200.000 $196.000 $220.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 43.000 $1,350.000 $1,000.000 $1,250.000 $2,000.000 $830.000
CRASH CUSH ATTEN (STKPL)
EA 2.000 $1,315.000 $800.000 $850.000 $2,900.000 $2,200.000
CRASH CUSH ATTEN (REMOVE)
EA 21.000 $1,035.000 $1,000.000 $1,000.000 $500.000 $550.000
CRASH CUSH ATTEN (INSTL)(L)(N)(70)
EA 22.000 $31,095.530 $25,750.490 $27,000.000 $30,000.000 $27,800.000
CHAIN LINK FENCE (INSTALL) (8')
LF 1,727.000 $43.000 $49.490 $50.000 $43.000 $110.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 47.000 $275.000 $549.490 $600.000 $550.000 $630.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 18.000 $920.000 $695.490 $700.000 $700.000 $750.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 14.000 $975.000 $949.490 $1,000.000 $950.000 $1,050.000
REMOVE SM RD SN SUP&AM
EA 19.000 $130.000 $79.490 $90.000 $80.000 $100.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 53.000 $25.000 $9.490 $20.000 $10.000 $22.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
EA 177.000 $110.000 $39.500 $90.000 $40.000 $95.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 216.000 $75.000 $49.500 $90.000 $50.000 $95.000
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 1,618.000 $4.700 $3.850 $4.000 $3.850 $4.000
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 90.000 $0.800 $0.850 $1.200 $0.850 $1.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 96,351.000 $0.700 $0.450 $0.500 $0.450 $0.500
WK ZN PAV MRK REMOV (Y)4"(BRK)
LF 40.000 $0.750 $0.850 $0.900 $0.850 $1.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 103,467.000 $0.500 $0.450 $0.500 $0.450 $2.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 872.000 $1.000 $1.500 $1.300 $1.500 $2.000
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 590.000 $1.000 $1.500 $1.300 $1.500 $2.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 282.000 $1.000 $1.500 $1.300 $1.500 $2.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 11,119.000 $1.560 $0.840 $0.900 $0.840 $1.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 295.000 $9.000 $16.000 $16.000 $16.000 $17.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 48.000 $150.500 $150.000 $150.000 $150.000 $160.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 48.000 $180.000 $250.000 $250.000 $250.000 $280.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 17,440.000 $0.500 $0.440 $0.500 $0.440 $0.500
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 47,200.000 $0.780 $0.440 $0.500 $0.440 $0.500
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 48,038.000 $0.510 $0.430 $0.500 $0.430 $0.500
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
LF 22,560.000 $0.850 $0.580 $0.600 $0.580 $0.700
REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL)
LF 5,660.000 $0.550 $0.580 $0.600 $0.580 $0.700
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
LF 22,560.000 $0.530 $0.580 $0.600 $0.580 $0.700
REFL PAV MRKR TY I-C
EA 906.000 $5.050 $3.850 $4.000 $3.850 $4.000
REFL PAV MRKR TY II-A-A
EA 614.000 $4.750 $3.850 $4.000 $3.850 $4.000
REFL PAV MRKR TY II-C-R
EA 350.000 $5.000 $3.850 $4.000 $3.850 $4.000
ELIM EXT PAV MRK & MRKS (4")
LF 40,320.000 $0.500 $0.500 $0.500 $0.500 $0.550
D-GR HMA TY-B SAC-B PG64-22
TON 13,931.000 $130.000 $130.000 $112.000 $105.000 $155.000
SP MIXES SP-B SAC-B PG76-22
TON 34,640.000 $135.000 $140.000 $112.000 $120.000 $144.000
SP MIXES SP-D SAC-A PG76-22
TON 43,586.000 $135.000 $145.000 $122.000 $120.000 $185.000
BONDING COURSE
GAL 33,855.000 $4.000 $6.000 $4.750 $5.500 $5.000
THERMOPLASTIC PIPE(24 IN)(PP)(TYPE III)
LF 174.000 $60.000 $205.090 $60.000 $90.000 $82.000
GEOGRID BASE REINFORCEMENT (TY II)
SY 215,406.000 $2.000 $1.500 $1.500 $1.200 $2.000
BIRD EXCLUSION METHOD
SF 16,808.000 $6.000 $3.000 $2.000 $2.200 $7.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $8,000.000 $1,000.000 $8,500.000 $15,000.000 $40,000.000
TMA (STATIONARY)
DAY 32.000 $70.000 $10.000 $175.000 $450.000 $330.000
Totals: $35,075,172.820 $33,170,886.970 $33,799,070.410 $36,145,000.320 $43,243,975.700