PREPARING ROW
|
STA
|
340.000
|
$2,025.000
|
$5,000.000
|
$4,500.000
|
$7,500.000
|
$7,000.000
|
|
|
REMOVING CONC (MISC)
|
SY
|
3.000
|
$30.000
|
$350.000
|
$180.000
|
$45.000
|
$180.000
|
|
|
REMOVE CONC (RAIL)
|
LF
|
169.000
|
$15.000
|
$30.000
|
$28.000
|
$32.000
|
$28.000
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
3,173.000
|
$9.000
|
$10.000
|
$10.000
|
$10.000
|
$15.000
|
|
|
REMOVING STAB BASE & ASPH PAV (18")
|
SY
|
86,841.000
|
$8.000
|
$2.500
|
$3.100
|
$9.000
|
$3.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
80,771.000
|
$10.000
|
$2.000
|
$5.500
|
$12.000
|
$6.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
150,405.000
|
$11.000
|
$10.000
|
$7.500
|
$12.000
|
$8.000
|
|
|
FURNISHING AND PLACING TOPSOIL
|
CY
|
865.000
|
$25.000
|
$5.000
|
$36.000
|
$6.500
|
$180.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
AC
|
104.000
|
$700.000
|
$1,200.000
|
$1,200.000
|
$1,200.000
|
$950.000
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
AC
|
104.000
|
$700.000
|
$1,000.000
|
$1,000.000
|
$900.000
|
$650.000
|
|
|
FERTILIZER
|
TON
|
52.000
|
$1,597.000
|
$1,550.000
|
$1,500.000
|
$900.000
|
$155.000
|
|
|
VEGETATIVE WATERING
|
MG
|
15,651.000
|
$25.920
|
$33.000
|
$15.000
|
$23.000
|
$29.000
|
|
|
PROOF ROLLING
|
HR
|
580.000
|
$58.000
|
$1.000
|
$90.000
|
$55.000
|
$90.000
|
|
|
FL BS (RDWY DEL)(TY E GR 4)(FNAL POS)
|
CY
|
70,319.000
|
$40.000
|
$25.130
|
$35.000
|
$25.000
|
$50.000
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
11.000
|
$250.000
|
$300.000
|
$0.010
|
$325.000
|
$200.000
|
|
|
CEMENT
|
TON
|
5,598.000
|
$200.000
|
$185.000
|
$195.000
|
$210.000
|
$195.000
|
|
|
CEMENT TREAT (NEW BASE)(12")
|
SY
|
210,956.000
|
$3.000
|
$2.000
|
$4.500
|
$2.250
|
$4.500
|
|
|
CEMENT TREAT (SUBGRADE)(12")
|
SY
|
215,406.000
|
$2.300
|
$2.000
|
$2.650
|
$3.000
|
$2.700
|
|
|
PRIME COAT (MC-30)
|
GAL
|
42,192.000
|
$6.000
|
$4.250
|
$5.250
|
$4.500
|
$5.500
|
|
|
PLAN & TEXT CONC PAV(0" TO 1-1/2")
|
SY
|
544.000
|
$15.000
|
$1.000
|
$25.000
|
$8.000
|
$25.000
|
|
|
PLANE ASPH CONC PAV(0" TO 6")
|
SY
|
84,193.000
|
$5.000
|
$1.000
|
$2.500
|
$3.000
|
$4.000
|
|
|
PLANE ASPH CONC PAV (1")
|
SY
|
78,991.000
|
$1.520
|
$0.550
|
$1.250
|
$1.000
|
$1.500
|
|
|
CEM STABIL BKFL
|
CY
|
2,020.000
|
$92.000
|
$95.000
|
$145.000
|
$250.000
|
$160.000
|
|
|
CUT & RESTORING PAV
|
SY
|
442.000
|
$82.000
|
$100.000
|
$102.000
|
$60.000
|
$100.000
|
|
|
STRUCT EXCAV (SPECIAL)
|
CY
|
50.000
|
$66.000
|
$100.000
|
$65.000
|
$55.000
|
$200.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
574.000
|
$3.500
|
$0.100
|
$1.000
|
$9.000
|
$11.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
387.000
|
$25.000
|
$1.000
|
$1.000
|
$44.000
|
$24.000
|
|
|
CL B CONC (MISC)
|
CY
|
3.000
|
$600.000
|
$1,700.000
|
$1,500.000
|
$1,000.000
|
$1,000.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
19.000
|
$525.000
|
$1,000.000
|
$975.000
|
$1,000.000
|
$875.000
|
|
|
CL C CONC (RAC-R)
|
CY
|
14.000
|
$2,400.000
|
$1,000.000
|
$1,100.000
|
$2,000.000
|
$1,000.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
2,282.800
|
$450.000
|
$450.000
|
$490.000
|
$425.000
|
$550.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
320.000
|
$152.560
|
$175.000
|
$225.000
|
$210.000
|
$260.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
103.000
|
$200.000
|
$175.000
|
$200.000
|
$215.000
|
$260.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
351.100
|
$525.000
|
$550.000
|
$475.000
|
$375.000
|
$550.000
|
|
|
RAIL (TY T224)
|
LF
|
364.000
|
$175.000
|
$200.000
|
$190.000
|
$160.000
|
$175.000
|
|
|
CONC BOX CULV (3 FT X 2 FT)
|
LF
|
178.000
|
$270.000
|
$350.000
|
$550.000
|
$450.000
|
$370.000
|
|
|
CONC BOX CULV (4 FT X 2 FT)
|
LF
|
1,203.000
|
$300.000
|
$375.000
|
$570.000
|
$400.000
|
$400.000
|
|
|
CONC BOX CULV (6 FT X 6 FT)
|
LF
|
364.000
|
$1,000.000
|
$750.000
|
$720.000
|
$900.000
|
$875.000
|
|
|
CONC BOX CULV (8 FT X 4 FT)
|
LF
|
130.000
|
$1,100.000
|
$910.000
|
$925.000
|
$1,100.000
|
$1,100.000
|
|
|
CONC BOX CULV (8 FT X 5 FT)
|
LF
|
158.000
|
$1,150.000
|
$975.000
|
$850.000
|
$1,200.000
|
$1,200.000
|
|
|
CONC BOX CULV (8 FT X 6 FT)
|
LF
|
134.000
|
$1,200.000
|
$1,025.000
|
$850.000
|
$1,300.000
|
$1,400.000
|
|
|
CONC BOX CULV (10 FT X 6 FT)
|
LF
|
260.000
|
$1,250.000
|
$1,275.000
|
$950.000
|
$1,500.000
|
$2,000.000
|
|
|
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
|
LF
|
18.000
|
$1,100.000
|
$1,250.000
|
$1,200.000
|
$1,400.000
|
$800.000
|
|
|
CONC BOX CULV (8 FT X 4 FT)(EXTEND)
|
LF
|
58.000
|
$980.000
|
$1,000.000
|
$1,150.000
|
$1,500.000
|
$900.000
|
|
|
CONC BOX CULV (6 FT X 2 FT)
|
LF
|
253.000
|
$750.000
|
$600.000
|
$800.000
|
$650.000
|
$620.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
3,866.000
|
$75.000
|
$85.000
|
$100.000
|
$78.000
|
$90.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
112.000
|
$115.000
|
$140.000
|
$145.000
|
$140.000
|
$116.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
67.000
|
$153.000
|
$160.000
|
$200.000
|
$190.000
|
$159.000
|
|
|
RC PIPE (CL III)(24 IN)(SPL)
|
LF
|
209.000
|
$60.000
|
$90.000
|
$120.000
|
$155.000
|
$115.000
|
|
|
RC PIPE (CL III)(30 IN)(SPL)
|
LF
|
101.000
|
$160.120
|
$120.000
|
$165.000
|
$185.000
|
$156.000
|
|
|
RC PIPE (CL III)(36 IN)(SPL)
|
LF
|
10.000
|
$140.000
|
$315.000
|
$470.000
|
$355.000
|
$280.000
|
|
|
RC PIPE (CL V)(30 IN)(SPL)
|
LF
|
83.000
|
$150.000
|
$120.000
|
$170.000
|
$300.000
|
$290.000
|
|
|
RC PIPE (CL V) (24 IN) (SPL)
|
LF
|
58.000
|
$145.000
|
$165.000
|
$140.000
|
$215.000
|
$170.000
|
|
|
RC PIPE (CL V) (36 IN) (SPL)
|
LF
|
95.000
|
$160.000
|
$175.000
|
$225.000
|
$375.000
|
$410.000
|
|
|
INLET (COMPL)(PSL)(FG)(5FTX6FT-4FTX4FT)
|
EA
|
1.000
|
$10,000.000
|
$5,500.000
|
$16,000.000
|
$10,850.000
|
$12,500.000
|
|
|
INL(CMP)(PAZD-CZ)(FG)(5FTX5FT-4FTX4FT)
|
EA
|
1.000
|
$10,500.000
|
$5,500.000
|
$6,300.000
|
$12,000.000
|
$11,500.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 24 IN)
|
EA
|
1.000
|
$7,100.000
|
$14,000.000
|
$3,800.000
|
$8,500.000
|
$7,800.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 36 IN)
|
EA
|
2.000
|
$9,000.000
|
$14,500.000
|
$12,700.000
|
$9,000.000
|
$9,800.000
|
|
|
WINGWALL (FW - S) (HW=5 FT)
|
EA
|
1.000
|
$25,550.000
|
$16,000.000
|
$19,600.000
|
$16,000.000
|
$22,500.000
|
|
|
WINGWALL (FW - S) (HW=6 FT)
|
EA
|
1.000
|
$16,100.000
|
$17,000.000
|
$21,400.000
|
$18,000.000
|
$26,000.000
|
|
|
WINGWALL (FW - S) (HW=8 FT)
|
EA
|
4.000
|
$15,000.000
|
$22,000.000
|
$42,200.000
|
$35,000.000
|
$38,500.000
|
|
|
WINGWALL (PW - 1) (HW=3 FT)
|
EA
|
4.000
|
$11,050.750
|
$12,000.000
|
$11,500.000
|
$15,000.000
|
$8,500.000
|
|
|
WINGWALL (PW - 1) (HW=4 FT)
|
EA
|
4.000
|
$18,600.000
|
$12,600.000
|
$13,200.000
|
$18,000.000
|
$9,800.000
|
|
|
WINGWALL (PW - 1) (HW=5 FT)
|
EA
|
2.000
|
$17,750.000
|
$16,700.000
|
$29,000.000
|
$21,000.000
|
$20,000.000
|
|
|
WINGWALL (PW - 1) (HW=6 FT)
|
EA
|
1.000
|
$24,700.000
|
$24,000.000
|
$34,000.000
|
$30,000.000
|
$28,500.000
|
|
|
WINGWALL (PW - 1) (HW=7 FT)
|
EA
|
4.000
|
$26,250.000
|
$25,000.000
|
$30,000.000
|
$35,000.000
|
$36,000.000
|
|
|
WINGWALL (PW - 1) (HW=8 FT)
|
EA
|
2.000
|
$35,000.000
|
$27,500.000
|
$56,000.000
|
$40,000.000
|
$47,000.000
|
|
|
SET (TY I)(S=3 FT)(HW= 3 FT)(6:1)(C)
|
EA
|
3.000
|
$10,200.000
|
$10,000.000
|
$13,500.000
|
$18,000.000
|
$14,000.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 3 FT)(4:1) (C)
|
EA
|
3.000
|
$9,575.000
|
$8,750.000
|
$9,000.000
|
$15,000.000
|
$14,000.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 3 FT)(6:1) (C)
|
EA
|
12.000
|
$12,500.000
|
$9,750.000
|
$10,200.000
|
$16,000.000
|
$14,000.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 3 FT)(6:1) (P)
|
EA
|
10.000
|
$10,830.000
|
$10,500.000
|
$16,400.000
|
$18,000.000
|
$12,000.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 3 FT)(6:1) (P)
|
EA
|
2.000
|
$15,000.000
|
$10,500.000
|
$9,200.000
|
$15,000.000
|
$10,000.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
2.000
|
$12,384.720
|
$10,500.000
|
$9,500.000
|
$18,000.000
|
$11,000.000
|
|
|
SET (TY I)(S= 8 FT)(HW= 6 FT)(6:1) (C)
|
EA
|
2.000
|
$24,300.000
|
$25,000.000
|
$27,000.000
|
$37,000.000
|
$26,000.000
|
|
|
SET (TY II) (24 IN) (CMP) (3: 1) (C)
|
EA
|
1.000
|
$2,700.000
|
$2,750.000
|
$1,200.000
|
$3,000.000
|
$1,200.000
|
|
|
SET (TY II) (24 IN) (HDPE) (6: 1) (P)
|
EA
|
1.000
|
$1,000.000
|
$2,500.000
|
$1,400.000
|
$3,000.000
|
$800.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$1,760.000
|
$2,400.000
|
$1,140.000
|
$3,000.000
|
$1,400.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
4.000
|
$2,600.000
|
$1,500.000
|
$1,400.000
|
$3,000.000
|
$1,900.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
170.000
|
$1,561.000
|
$1,250.000
|
$1,400.000
|
$3,000.000
|
$1,900.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (C)
|
EA
|
6.000
|
$4,000.000
|
$2,000.000
|
$4,700.000
|
$3,750.000
|
$3,500.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$2,855.000
|
$2,200.000
|
$4,700.000
|
$3,750.000
|
$3,400.000
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$4,587.730
|
$6,000.000
|
$5,000.000
|
$4,500.000
|
$4,600.000
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (C)
|
EA
|
3.000
|
$5,200.000
|
$6,500.000
|
$6,600.000
|
$4,750.000
|
$4,800.000
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$5,400.000
|
$8,750.000
|
$6,600.000
|
$4,750.000
|
$4,750.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
19.000
|
$2,140.000
|
$1,000.000
|
$2,500.000
|
$2,000.000
|
$3,600.000
|
|
|
REMOV STR (SET)
|
EA
|
255.000
|
$390.000
|
$175.000
|
$325.000
|
$55.000
|
$390.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
6.000
|
$1,600.000
|
$500.000
|
$3,000.000
|
$2,250.000
|
$1,400.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
6.000
|
$1,885.000
|
$500.000
|
$3,000.000
|
$1,950.000
|
$1,400.000
|
|
|
REMOV STR (PIPE)
|
LF
|
7,201.000
|
$8.400
|
$5.000
|
$15.000
|
$24.000
|
$7.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
66.000
|
$40.000
|
$25.000
|
$550.000
|
$89.150
|
$90.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,757,000.000
|
$2,800,000.000
|
$2,560,000.000
|
$3,285,909.120
|
$4,200,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
45.000
|
$5,000.000
|
$1,000.000
|
$6,000.000
|
$3,000.000
|
$2,310.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
3,392.000
|
$36.000
|
$70.000
|
$70.000
|
$70.000
|
$42.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
3,392.000
|
$12.000
|
$30.000
|
$30.000
|
$30.000
|
$22.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
1,482.000
|
$27.500
|
$31.380
|
$50.000
|
$35.000
|
$40.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 2)
|
SY
|
78.000
|
$29.000
|
$41.330
|
$55.000
|
$77.000
|
$110.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
1,560.000
|
$9.000
|
$12.100
|
$18.000
|
$5.350
|
$22.000
|
|
|
CONSTRUCTION PERIMETER FENCE
|
LF
|
1,089.000
|
$6.190
|
$5.050
|
$53.000
|
$10.000
|
$6.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
21,461.000
|
$3.600
|
$4.550
|
$5.000
|
$4.550
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
21,461.000
|
$1.000
|
$1.500
|
$2.000
|
$1.500
|
$1.500
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
60.000
|
$6.000
|
$12.000
|
$10.000
|
$12.000
|
$13.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
60.000
|
$2.000
|
$5.000
|
$5.000
|
$5.000
|
$7.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
2,475.000
|
$90.000
|
$55.000
|
$62.000
|
$26.250
|
$90.000
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
14,520.000
|
$65.000
|
$10.000
|
$28.000
|
$30.000
|
$36.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
40,200.000
|
$7.000
|
$5.000
|
$11.000
|
$8.000
|
$13.000
|
|
|
PORT CTB (STKPL)(F-SHAPE)(TY 1)
|
LF
|
4,950.000
|
$15.000
|
$10.000
|
$11.000
|
$8.000
|
$13.000
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
14,520.000
|
$10.450
|
$5.000
|
$11.000
|
$7.000
|
$13.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
8,466.000
|
$55.000
|
$50.000
|
$55.000
|
$35.000
|
$60.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
83,360.000
|
$0.180
|
$0.190
|
$0.350
|
$0.200
|
$0.150
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
8,415.000
|
$32.000
|
$43.900
|
$26.000
|
$25.500
|
$30.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$2,275.000
|
$2,000.490
|
$2,200.000
|
$2,000.000
|
$3,400.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
42.000
|
$1,500.000
|
$1,721.490
|
$1,400.000
|
$1,725.000
|
$1,380.000
|
|
|
MTL THRIE-BEAM GD FEN (TIM POST)
|
EA
|
7.000
|
$2,650.000
|
$2,000.490
|
$2,200.000
|
$2,000.000
|
$2,330.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
3,280.000
|
$2.000
|
$1.490
|
$3.000
|
$1.500
|
$2.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
5.000
|
$215.000
|
$195.490
|
$200.000
|
$196.000
|
$110.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$240.000
|
$195.490
|
$200.000
|
$196.000
|
$220.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
41.000
|
$3,350.000
|
$3,121.490
|
$3,305.000
|
$3,120.000
|
$3,300.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
20.000
|
$500.000
|
$195.490
|
$200.000
|
$196.000
|
$220.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
43.000
|
$1,350.000
|
$1,000.000
|
$1,250.000
|
$2,000.000
|
$830.000
|
|
|
CRASH CUSH ATTEN (STKPL)
|
EA
|
2.000
|
$1,315.000
|
$800.000
|
$850.000
|
$2,900.000
|
$2,200.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
21.000
|
$1,035.000
|
$1,000.000
|
$1,000.000
|
$500.000
|
$550.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(70)
|
EA
|
22.000
|
$31,095.530
|
$25,750.490
|
$27,000.000
|
$30,000.000
|
$27,800.000
|
|
|
CHAIN LINK FENCE (INSTALL) (8')
|
LF
|
1,727.000
|
$43.000
|
$49.490
|
$50.000
|
$43.000
|
$110.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
47.000
|
$275.000
|
$549.490
|
$600.000
|
$550.000
|
$630.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
18.000
|
$920.000
|
$695.490
|
$700.000
|
$700.000
|
$750.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
14.000
|
$975.000
|
$949.490
|
$1,000.000
|
$950.000
|
$1,050.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
19.000
|
$130.000
|
$79.490
|
$90.000
|
$80.000
|
$100.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
53.000
|
$25.000
|
$9.490
|
$20.000
|
$10.000
|
$22.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
|
EA
|
177.000
|
$110.000
|
$39.500
|
$90.000
|
$40.000
|
$95.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
216.000
|
$75.000
|
$49.500
|
$90.000
|
$50.000
|
$95.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
1,618.000
|
$4.700
|
$3.850
|
$4.000
|
$3.850
|
$4.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
90.000
|
$0.800
|
$0.850
|
$1.200
|
$0.850
|
$1.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
96,351.000
|
$0.700
|
$0.450
|
$0.500
|
$0.450
|
$0.500
|
|
|
WK ZN PAV MRK REMOV (Y)4"(BRK)
|
LF
|
40.000
|
$0.750
|
$0.850
|
$0.900
|
$0.850
|
$1.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
103,467.000
|
$0.500
|
$0.450
|
$0.500
|
$0.450
|
$2.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
872.000
|
$1.000
|
$1.500
|
$1.300
|
$1.500
|
$2.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
590.000
|
$1.000
|
$1.500
|
$1.300
|
$1.500
|
$2.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
282.000
|
$1.000
|
$1.500
|
$1.300
|
$1.500
|
$2.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
11,119.000
|
$1.560
|
$0.840
|
$0.900
|
$0.840
|
$1.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
295.000
|
$9.000
|
$16.000
|
$16.000
|
$16.000
|
$17.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
48.000
|
$150.500
|
$150.000
|
$150.000
|
$150.000
|
$160.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
48.000
|
$180.000
|
$250.000
|
$250.000
|
$250.000
|
$280.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
17,440.000
|
$0.500
|
$0.440
|
$0.500
|
$0.440
|
$0.500
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
47,200.000
|
$0.780
|
$0.440
|
$0.500
|
$0.440
|
$0.500
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
48,038.000
|
$0.510
|
$0.430
|
$0.500
|
$0.430
|
$0.500
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
|
LF
|
22,560.000
|
$0.850
|
$0.580
|
$0.600
|
$0.580
|
$0.700
|
|
|
REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL)
|
LF
|
5,660.000
|
$0.550
|
$0.580
|
$0.600
|
$0.580
|
$0.700
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
|
LF
|
22,560.000
|
$0.530
|
$0.580
|
$0.600
|
$0.580
|
$0.700
|
|
REFL PAV MRKR TY I-C
|
EA
|
906.000
|
$5.050
|
$3.850
|
$4.000
|
$3.850
|
$4.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
614.000
|
$4.750
|
$3.850
|
$4.000
|
$3.850
|
$4.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
350.000
|
$5.000
|
$3.850
|
$4.000
|
$3.850
|
$4.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
40,320.000
|
$0.500
|
$0.500
|
$0.500
|
$0.500
|
$0.550
|
|
|
D-GR HMA TY-B SAC-B PG64-22
|
TON
|
13,931.000
|
$130.000
|
$130.000
|
$112.000
|
$105.000
|
$155.000
|
|
|
SP MIXES SP-B SAC-B PG76-22
|
TON
|
34,640.000
|
$135.000
|
$140.000
|
$112.000
|
$120.000
|
$144.000
|
|
|
SP MIXES SP-D SAC-A PG76-22
|
TON
|
43,586.000
|
$135.000
|
$145.000
|
$122.000
|
$120.000
|
$185.000
|
|
|
BONDING COURSE
|
GAL
|
33,855.000
|
$4.000
|
$6.000
|
$4.750
|
$5.500
|
$5.000
|
|
|
THERMOPLASTIC PIPE(24 IN)(PP)(TYPE III)
|
LF
|
174.000
|
$60.000
|
$205.090
|
$60.000
|
$90.000
|
$82.000
|
|
|
GEOGRID BASE REINFORCEMENT (TY II)
|
SY
|
215,406.000
|
$2.000
|
$1.500
|
$1.500
|
$1.200
|
$2.000
|
|
|
BIRD EXCLUSION METHOD
|
SF
|
16,808.000
|
$6.000
|
$3.000
|
$2.000
|
$2.200
|
$7.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$8,000.000
|
$1,000.000
|
$8,500.000
|
$15,000.000
|
$40,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
32.000
|
$70.000
|
$10.000
|
$175.000
|
$450.000
|
$330.000
|
|
Totals: |
$35,075,172.820
|
$33,170,886.970
|
$33,799,070.410
|
$36,145,000.320
|
$43,243,975.700
|