SET (TY I)(S= 8 FT)(HW= 6 FT)(6:1) (C)
Engineer's Estimate
Average:
$16,860.00
Maximum:
$25,000.00
Minimum:
$10,000.00
Bid Information
Average Bid:
$35,385.52
