Bid Cobra

INL(CMP)(PAZD-CZ)(FG)(5FTX5FT-4FTX4FT)

Engineer's Estimate

Average: $8,374.00
Maximum: $10,500.00
Minimum: $5,540.00

Bid Information

Average Bid: $10,827.87