PREPARING ROW
|
STA
|
892.000
|
$725.000
|
$2,500.000
|
$7,500.000
|
|
|
PREPARING ROW (TREE)(10" TO 48" DIA)
|
EA
|
4.000
|
$1,000.000
|
$1,100.000
|
$2,000.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
404.000
|
$6.760
|
$25.000
|
$20.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
1,435.000
|
$13.490
|
$20.000
|
$15.000
|
|
|
RMV STAB BS & ASPH PAV(11.5"-22")
|
SY
|
462,864.000
|
$5.500
|
$10.000
|
$10.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
45,042.000
|
$7.000
|
$18.000
|
$11.500
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
70,727.000
|
$5.620
|
$26.000
|
$18.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
AC
|
153.000
|
$1,075.000
|
$550.000
|
$1,100.000
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
AC
|
153.000
|
$1,045.000
|
$450.000
|
$800.000
|
|
|
PROOF ROLLING
|
HR
|
2,582.000
|
$95.000
|
$100.000
|
$75.000
|
|
|
LIME (HYD, COM, OR QK(SLURRY))
|
TON
|
9,718.000
|
$160.000
|
$210.000
|
$200.000
|
|
|
LIME TRT (SUBGRADE)(6")
|
SY
|
511,167.000
|
$2.700
|
$4.500
|
$3.750
|
|
|
CEM TRT(PLNT MX) (CL N)(TYE)(GR 4)(10")
|
SY
|
501,711.000
|
$11.000
|
$15.800
|
$16.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
145,323.000
|
$3.400
|
$5.000
|
$5.000
|
|
|
PRIME COAT (RC-250)
|
GAL
|
21,301.000
|
$5.000
|
$5.000
|
$5.000
|
|
|
AGGR(TY-PD GR-5 SAC-B)
|
CY
|
609.000
|
$95.000
|
$148.000
|
$145.000
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
1,994.000
|
$70.320
|
$132.000
|
$120.000
|
|
|
SUPERPAVE MIXTURES SP- B SAC-B PG70-22
|
TON
|
113,031.000
|
$84.000
|
$94.000
|
$93.000
|
|
|
CONC PVMT (CONT REINF)(FAST TRK)(12")
|
SY
|
9,065.000
|
$159.770
|
$115.000
|
$130.000
|
|
|
CONC PVMT (JC) (TRANSITION SLAB)
|
SY
|
525.000
|
$130.000
|
$125.000
|
$140.000
|
|
|
STRUCT EXCAV
|
CY
|
378.000
|
$10.130
|
$8.000
|
$8.000
|
|
|
CEM STABIL BKFL
|
CY
|
660.000
|
$69.400
|
$180.000
|
$200.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
3,092.000
|
$15.000
|
$18.000
|
$25.000
|
|
|
DRILL SHAFT (NON - REINFORCED) (12 IN)
|
LF
|
34.000
|
$104.330
|
$64.000
|
$100.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
40.000
|
$196.570
|
$200.000
|
$250.000
|
|
|
CL C CONC (MISC)
|
CY
|
8.000
|
$2,190.000
|
$1,100.000
|
$1,100.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
178.000
|
$310.610
|
$440.000
|
$450.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(12 IN)
|
CY
|
4,074.000
|
$110.000
|
$91.000
|
$100.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
43.000
|
$411.000
|
$450.000
|
$440.000
|
|
|
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
|
LF
|
104.000
|
$427.890
|
$740.000
|
$750.000
|
|
|
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
|
LF
|
71.000
|
$487.610
|
$805.000
|
$800.000
|
|
|
CONC BOX CULV (4 FT X 2 FT)(EXTEND)
|
LF
|
74.000
|
$507.280
|
$790.000
|
$800.000
|
|
|
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
|
LF
|
18.000
|
$504.900
|
$830.000
|
$900.000
|
|
|
CONC BOX CULV (4 FT X 4 FT)(EXTEND)
|
LF
|
54.000
|
$556.410
|
$910.000
|
$1,000.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
|
LF
|
53.000
|
$516.700
|
$850.000
|
$900.000
|
|
|
CONC BOX CULV (5 FT X 4 FT)(EXTEND)
|
LF
|
125.000
|
$503.280
|
$860.000
|
$900.000
|
|
|
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
|
LF
|
108.000
|
$526.570
|
$705.000
|
$750.000
|
|
|
CONC BOX CULV (6 FT X 4 FT)(EXTEND)
|
LF
|
9.000
|
$522.040
|
$1,100.000
|
$1,100.000
|
|
|
CONC BOX CULV (6 FT X 5 FT)(EXTEND)
|
LF
|
16.000
|
$633.460
|
$1,100.000
|
$1,100.000
|
|
|
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
|
LF
|
144.000
|
$631.410
|
$900.000
|
$500.000
|
|
|
CONC BOX CULV (7 FT X 7 FT)(EXTEND)
|
LF
|
16.000
|
$571.410
|
$1,000.000
|
$1,100.000
|
|
|
CONC BOX CULV (8 FT X 6 FT)(EXTEND)
|
LF
|
13.000
|
$656.680
|
$1,150.000
|
$1,100.000
|
|
|
CONC BOX CULV(5'X 6.5')
|
LF
|
24.000
|
$667.480
|
$975.000
|
$1,000.000
|
|
|
CONC BOX CULV (6 FT X 2 FT) (EXTEND)
|
LF
|
41.000
|
$351.780
|
$900.000
|
$950.000
|
|
|
CONC. BOX CULV (6.5 FT X 3 FT) (EXTEND)
|
LF
|
293.000
|
$900.000
|
$810.000
|
$850.000
|
|
|
WINGWALL (PW - 1) (HW=3 FT)
|
EA
|
7.000
|
$7,513.950
|
$7,700.000
|
$8,000.000
|
|
|
WINGWALL (PW - 1) (HW=4 FT)
|
EA
|
15.000
|
$9,290.500
|
$9,500.000
|
$10,000.000
|
|
|
WINGWALL (PW - 1) (HW=5 FT)
|
EA
|
11.000
|
$11,153.220
|
$10,400.000
|
$11,000.000
|
|
|
WINGWALL (PW - 1) (HW=6 FT)
|
EA
|
3.000
|
$14,499.710
|
$12,400.000
|
$13,000.000
|
|
|
WINGWALL (PW - 1) (HW=7 FT)
|
EA
|
2.000
|
$19,520.050
|
$24,750.000
|
$26,000.000
|
|
|
WINGWALL (PW - 1) (HW=8 FT)
|
EA
|
6.000
|
$22,022.520
|
$34,500.000
|
$36,000.000
|
|
|
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)
|
EA
|
11.000
|
$7,222.210
|
$7,200.000
|
$8,000.000
|
|
|
SET (TY I)(S=3 FT)(HW= 4 FT)(4:1)(C)
|
EA
|
7.000
|
$6,464.110
|
$7,280.000
|
$8,000.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 3 FT)(4:1) (C)
|
EA
|
5.000
|
$6,573.340
|
$7,400.000
|
$8,000.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
2.000
|
$8,753.210
|
$8,000.000
|
$8,500.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
2.000
|
$8,334.230
|
$8,300.000
|
$8,600.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 8 FT)(4: 1) (C)
|
EA
|
1.000
|
$15,500.000
|
$12,400.000
|
$13,000.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 3 FT)(4:1) (C)
|
EA
|
1.000
|
$7,742.810
|
$9,200.000
|
$10,000.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
7.000
|
$8,865.230
|
$10,000.000
|
$11,000.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 7 FT)(4:1) (C)
|
EA
|
12.000
|
$8,445.800
|
$6,950.000
|
$8,000.000
|
|
|
SET (TY I)(S= 7 FT)(HW= 8 FT)(4:1) (C)
|
EA
|
1.000
|
$13,526.050
|
$18,400.000
|
$20,000.000
|
|
|
SET (TY I) (S=6.5FT) (HW=4FT) (4:1)(C)
|
EA
|
21.000
|
$12,000.000
|
$13,150.000
|
$14,000.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
83.000
|
$1,146.710
|
$2,700.000
|
$3,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$5,347,195.960
|
$6,800,000.000
|
$7,000,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
49.000
|
$6,000.000
|
$3,000.000
|
$40,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
2,474.000
|
$57.000
|
$43.000
|
$110.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
2,474.000
|
$12.220
|
$20.000
|
$25.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
1,089.000
|
$22.590
|
$20.000
|
$25.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
1,089.000
|
$8.200
|
$12.000
|
$8.000
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
2,755.000
|
$72.280
|
$50.000
|
$60.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
110,201.000
|
$2.410
|
$2.300
|
$2.800
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
110,201.000
|
$0.880
|
$0.800
|
$0.500
|
|
|
CONSTRUCTING DETOURS
|
SY
|
167,989.000
|
$65.000
|
$36.000
|
$32.000
|
|
|
ONE-WAY TRAF CONT (FLAGGER CONT)
|
HR
|
320.000
|
$45.000
|
$120.000
|
$130.000
|
|
|
ONE-WAY TRAF CONT (PILOT CAR)
|
HR
|
490.000
|
$85.000
|
$180.000
|
$180.000
|
|
|
PTB (FRN&INSTL)(SGL SLP)(TY 1) OR (STL)
|
LF
|
20,500.000
|
$35.000
|
$98.000
|
$100.000
|
|
|
PTB (MOVE)(SGL SLP)(TY 1) OR (STL)
|
LF
|
336,200.000
|
$9.000
|
$4.000
|
$5.000
|
|
|
PTB (STKPL)(SGL SLP)(TY 1) OR (STL)
|
LF
|
18,760.000
|
$10.000
|
$16.000
|
$15.000
|
|
|
PTB (REMOVE)(SGL SLP)(TY 1) OR (STL)
|
LF
|
1,740.000
|
$12.000
|
$16.000
|
$15.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
1,468.000
|
$79.600
|
$80.000
|
$80.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
974.000
|
$42.000
|
$68.000
|
$70.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
164,798.000
|
$0.150
|
$0.260
|
$0.150
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
156,924.000
|
$0.180
|
$0.220
|
$0.150
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
850.000
|
$19.850
|
$17.000
|
$29.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
3,050.000
|
$1.540
|
$1.000
|
$2.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
10.000
|
$2,450.000
|
$2,500.000
|
$4,800.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
20.000
|
$156.940
|
$150.000
|
$260.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
391.000
|
$1,750.000
|
$500.000
|
$500.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
35.000
|
$900.000
|
$500.000
|
$200.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
35.000
|
$12,000.000
|
$7,500.000
|
$7,500.000
|
|
|
IN RD IL (TY SA) 40T-8 (250W EQ) LED
|
EA
|
5.000
|
$3,122.270
|
$4,000.000
|
$2,500.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
905.000
|
$13.200
|
$10.000
|
$20.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
940.000
|
$1.100
|
$1.500
|
$2.000
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
1,880.000
|
$1.400
|
$1.500
|
$2.000
|
|
|
ELC SRV TY A 240/480 060(NS)SS(E)PS(U)
|
EA
|
1.000
|
$5,732.000
|
$7,000.000
|
$4,000.000
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
409.000
|
$39.240
|
$26.000
|
$25.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
94.000
|
$458.050
|
$425.000
|
$440.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
9.000
|
$491.540
|
$575.000
|
$600.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T-2EXT)
|
EA
|
1.000
|
$651.050
|
$700.000
|
$750.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
8.000
|
$797.500
|
$800.000
|
$850.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
4.000
|
$742.750
|
$875.000
|
$900.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
2.000
|
$2,243.670
|
$2,000.000
|
$2,200.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
114.000
|
$94.320
|
$60.000
|
$100.000
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
1,207.000
|
$7.500
|
$3.750
|
$9.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
|
EA
|
86.000
|
$51.450
|
$70.000
|
$75.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
32,719.000
|
$0.250
|
$0.400
|
$0.420
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
179,835.000
|
$0.200
|
$0.380
|
$0.400
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
4,807.000
|
$0.600
|
$0.800
|
$0.820
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
66.000
|
$10.000
|
$14.000
|
$15.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
180,286.000
|
$0.200
|
$0.380
|
$0.400
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
1,147.000
|
$0.550
|
$0.350
|
$0.380
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
3,378.000
|
$0.920
|
$0.700
|
$0.750
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
129.000
|
$6.750
|
$5.000
|
$5.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
24.000
|
$103.660
|
$75.000
|
$80.000
|
|
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
|
EA
|
8.000
|
$303.560
|
$525.000
|
$550.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
12.000
|
$117.170
|
$125.000
|
$140.000
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
5,671.000
|
$2.630
|
$1.150
|
$1.200
|
|
|
PAVEMENT SEALER 4"
|
LF
|
355,452.000
|
$0.130
|
$0.150
|
$0.160
|
|
|
PAVEMENT SEALER 8"
|
LF
|
3,378.000
|
$0.310
|
$0.300
|
$0.330
|
|
|
PAVEMENT SEALER 12"
|
LF
|
5,671.000
|
$0.300
|
$0.450
|
$0.480
|
|
|
PAVEMENT SEALER 24"
|
LF
|
129.000
|
$0.690
|
$0.900
|
$0.950
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
24.000
|
$30.310
|
$12.000
|
$14.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
12.000
|
$29.780
|
$15.000
|
$16.000
|
|
|
PAVEMENT SEALER (LNDP ARROW)
|
EA
|
8.000
|
$134.210
|
$60.000
|
$65.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
7,446.000
|
$0.280
|
$0.320
|
$0.340
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
176,480.000
|
$0.260
|
$0.300
|
$0.320
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
13,180.000
|
$0.260
|
$0.320
|
$0.340
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
157,199.000
|
$0.260
|
$0.300
|
$0.320
|
|
REFL PAV MRKR TY I-C
|
EA
|
120.000
|
$3.420
|
$5.000
|
$5.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
5,148.000
|
$2.720
|
$3.000
|
$3.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
85,961.000
|
$0.500
|
$0.450
|
$0.470
|
|
|
FULL - WIDTH MOWING
|
AC
|
155.000
|
$83.240
|
$180.000
|
$150.000
|
|
|
BONDING COURSESE
|
GAL
|
48,450.000
|
$3.190
|
$4.000
|
$4.000
|
|
|
SUPERPAVE MIX BMD SP-C SAC-A PG76-22
|
TON
|
86,633.000
|
$96.000
|
$124.000
|
$115.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
6.000
|
$10,500.000
|
$50,000.000
|
$20,000.000
|
|
|
TMA (STATIONARY)
|
EA
|
5.000
|
$14,000.000
|
$50,000.000
|
$20,000.000
|
|
Totals: |
$59,197,011.940
|
$68,572,893.010
|
$72,885,255.010
|