SAN PATRICIO IH 37 (0074-05-098)

Items: 278

County: SAN PATRICIO
Length: N/A
Highway: IH 37
District: CORPUS CHRISTI
Control Number: 0074-05-098
DBE Goal: N/A
Project: NH 2B20(014)
Guaranty: N/A
Time: 1959 WORKING DAYS
Engineer's Estimate: $88,966,508.20
Date: 05/05/2021 (5 years ago)
Contract Number: N/A
Type: WIDEN FREEWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (6)
E
Engineer's Estimate
$88,966,508.20
1
$83,990,747.09
Over/Under Est: -5.59% -$4,975,761.11
Over/Under Est: 1.02% $908,246.91
Amt Left: 7.01% $5,884,008.02
Over/Under Est: 1.99% $1,771,330.67
Amt Left: 8.03% $6,747,091.78
Delta: -0.96% -$863,083.76
Over/Under Est: 2.93% $2,608,193.75
Amt Left: 9.03% $7,583,954.86
Delta: -0.92% -$836,863.08
Over/Under Est: 13.25% $11,791,235.33
Amt Left: 19.96% $16,766,996.44
Delta: -10.03% -$9,183,041.58
Over/Under Est: 49.07% $43,651,840.54
Amt Left: 57.9% $48,627,601.65
Delta: -31.62% -$31,860,605.21
Subcontractor Percentage Amount
BAY LTD. 9.72% $8,770,411.63
A. H. BECK FOUNDATION CO., INC. 5.86% $5,287,511.54
CREACOM, INC. 5.10% $4,601,759.19
GP7 CONSTRUCTION INC. 2.83% $2,553,525.20
BRAZOS RIVER CONTRACTORS LLC 2.62% $2,364,041.00
TEXAS STEEL INDUSTRIAL PLACING, LLC 2.41% $2,174,556.79
ADCOCK 4 INVESTMENTS, LLC 1.66% $1,497,827.50
MARTIN MARIETTA MATERIALS, INC. 1.18% $1,064,720.75
PANTHER CREEK TRANSPORTATION, INC. 0.94% $848,167.38
HIGHWAY BARRICADES AND SERVICES, LLC 0.79% $712,821.52
LONE STAR EROSION CONTROL 0.63% $568,452.61
FRANK JR REINFORCEMENT LLC 0.52% $469,198.98
4E INFRA CONSTRUCTION LLC 0.45% $406,037.58
DEPENDABLE FENCE 0.37% $333,853.12
A BROTHERS MILLING, LLC 0.24% $216,553.37
AGGREGATE TECHNOLOGIES, INC. 0.16% $144,368.92
SCR CIVIL CONSTRUCTION, LLC 0.14% $126,322.80
SCOTT DERR PAINTING CO, LLC 0.13% $117,299.74
SOIL TECH ADVANCE INC. 0.10% $90,230.57
SK CONCRETE SERVICES LLC 0.10% $90,230.57
MTAM CORPORATION 0.08% $72,184.46
TERRA CONSTRUCTION LLC 0.07% $63,161.40
HIGHWAY PAVEMENT SPECIALTIES, INC. 0.07% $63,161.40
Total: 36.17% $32,636,398.02

Bid Items & Bid Tabulations

278 Total 0 of 278
SAN PATRICIO  |  IH 37  |  CORPUS CHRISTI  |  0074-05-098  |  05/05/2021  |  $88,966,508.20  |  NH 2B20(014)  |  WIDEN FREEWAY  |  1959 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
WEBBER, LLC
WILLIAMS BROTHERS CONSTRUCTION CO., INC.
ZACHRY CONSTRUCTION CORPORATION
JAMES CONSTRUCTION GROUP, LLC
ANDERSON COLUMBIA CO., INC.
W.G. YATES & SONS CONSTRUCTION CO.
PREPARING ROW
STA 118.000 $65,421.000 $67,871.730 $77,000.000 $67,430.340 $75,727.000 $28,000.000 $145,000.000
REMOVING CONC (PAV)
SY 212.000 $15.000 $20.000 $22.000 $25.240 $22.970 $36.000 $14.000
REMOVING CONC (RIPRAP)
SY 5,853.000 $7.000 $9.000 $14.000 $6.710 $4.700 $8.000 $8.000
REMOVING CONC (CTB)
LF 3,964.000 $15.000 $5.000 $6.300 $12.310 $5.090 $20.000 $24.000
REMOVING CONC (CURB OR CURB & GUTTER)
LF 1,771.000 $5.000 $5.000 $6.200 $7.990 $3.230 $8.000 $20.000
REMOVE CONC (RAIL)
LF 930.000 $25.000 $20.000 $10.000 $10.440 $5.340 $32.000 $35.000
REMOVING CONCRETE(MOW STRIP)
LF 2,495.000 $10.000 $8.000 $6.200 $8.590 $3.660 $8.000 $9.000
REMOVING STAB BASE & ASPH PAV(12"-27")
SY 40,410.000 $13.000 $5.380 $18.000 $6.740 $5.320 $15.000 $8.000
EXCAVATION (ROADWAY)
CY 205,637.000 $9.000 $8.000 $5.350 $2.430 $14.930 $14.000 $10.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 122,819.000 $12.000 $8.450 $7.550 $15.000 $29.590 $15.000 $20.000
EMBANKMENT (FINAL) (DENS CONT) (TY C1)
CY 32,072.000 $7.500 $12.590 $18.000 $17.920 $21.130 $28.000 $35.000
EMBANKMENT (FINAL) (DENS CONT) (TY C2)
CY 3,897.000 $35.000 $55.000 $150.000 $132.270 $63.480 $125.000 $160.000
EMBANKMENT (FINAL)(DENS CONT)(TY C3)
CY 21,288.000 $35.000 $13.440 $20.000 $19.300 $20.340 $29.000 $30.000
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 68,543.000 $1.000 $0.120 $0.100 $0.180 $0.210 $0.180 $0.240
FERTILIZER
AC 14.000 $175.000 $413.120 $540.000 $800.000 $412.460 $800.000 $575.000
VEGETATIVE WATERING
MG 20,487.000 $7.000 $6.000 $30.000 $13.450 $18.790 $32.000 $37.000
PROOF ROLLING
HR 80.000 $85.000 $350.000 $85.000 $68.360 $85.540 $100.000 $200.000
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 33,615.000 $60.000 $69.120 $74.000 $75.000 $67.510 $90.000 $100.000
LIME TRT (EXST MATL)(8")
SY 103,942.000 $4.000 $3.170 $7.250 $5.000 $3.790 $4.700 $5.000
LIME (HYD, COM OR QK)(SLURRY)
TON 2,060.000 $180.000 $194.540 $136.000 $240.000 $198.780 $245.000 $265.000
CEMENT
TON 24.000 $160.000 $187.700 $166.000 $151.040 $145.000 $206.000 $205.000
CEMENT TREAT (NEW BASE) (24")
SY 495.000 $20.000 $14.870 $19.000 $75.750 $16.850 $12.000 $15.000
PRIME COAT (MC-30)
GAL 20,832.000 $5.000 $4.330 $4.650 $4.570 $4.800 $4.800 $5.100
ASPH (MULTI OPTION)
GAL 198,119.000 $5.000 $3.750 $2.500 $3.570 $3.750 $5.000 $4.250
AGGR(TY-PB GR-4S OR TY-PB GR-4)(SAC-B)
CY 2,781.000 $155.000 $103.950 $146.000 $231.500 $234.250 $156.000 $250.000
TBWC (MEMBRANE)
GAL 31,428.000 $5.000 $3.470 $3.700 $4.600 $5.330 $4.800 $6.000
TBWC (ASPHALT)
TON 503.000 $700.000 $202.130 $172.000 $1,907.490 $1,922.500 $156.000 $2,050.000
TBWC (AGGREGATE)(TY C)
TON 8,692.000 $200.000 $161.700 $172.000 $156.600 $165.000 $156.000 $180.000
PLANE ASPH CONC PAV (1.5")
SY 14,643.000 $2.000 $0.960 $1.050 $1.050 $1.150 $4.600 $3.750
PLANE ASPH CONC PAV (3")
SY 83,255.000 $2.500 $1.340 $2.100 $1.100 $1.160 $2.200 $4.000
CONC PVMT (JOINTED - CPCD) (6")
SY 1,129.000 $35.000 $80.000 $65.140 $63.650 $59.130 $120.000 $90.000
CEM STABIL BKFL
CY 1,198.000 $100.000 $80.000 $70.000 $14.790 $132.760 $150.000 $175.000
CUT & RESTORE ASPH PAVING
SY 202.000 $90.000 $325.000 $181.000 $58.680 $149.150 $265.000 $450.000
FLOWABLE BACKFILL
CY 945.000 $100.000 $225.000 $164.730 $350.000 $177.790 $225.000 $200.000
TRENCH EXCAVATION PROTECTION
LF 8,726.000 $1.000 $8.000 $6.180 $7.710 $3.120 $8.000 $12.000
TEMPORARY SPL SHORING
SF 16,850.000 $27.000 $35.000 $35.000 $30.000 $13.540 $20.000 $125.000
FOUNDATON LOADTEST(D4945)(DRILLD SHAFT)
EA 2.000 $122,000.000 $61,705.410 $25,000.000 $50,168.890 $45,000.000 $70,000.000 $215,000.000
DRILL SHAFT (18 IN)
LF 363.000 $140.000 $108.000 $100.000 $117.360 $111.120 $125.000 $175.000
DRILL SHAFT (24 IN)
LF 8,832.000 $185.000 $172.000 $150.000 $172.840 $140.600 $145.000 $200.000
DRILL SHAFT (30 IN)
LF 50.000 $245.000 $125.000 $119.350 $119.350 $119.350 $194.000 $210.000
DRILL SHAFT (36 IN)
LF 24,711.000 $220.000 $198.000 $250.000 $190.460 $181.460 $200.000 $230.000
DRILL SHAFT (42 IN)
LF 2,154.000 $300.000 $240.000 $300.000 $236.950 $220.140 $234.000 $315.000
DRILL SHAFT (60 IN)
LF 140.000 $630.000 $505.000 $450.000 $500.140 $457.520 $444.000 $1,100.000
DRILL SHAFT (SIGN MTS) (24 IN)
LF 104.000 $180.000 $102.590 $102.590 $231.750 $141.860 $135.000 $240.000
DRILL SHAFT (SIGN MTS) (36 IN)
LF 200.000 $300.000 $394.610 $394.610 $242.050 $432.000 $450.000 $250.000
DRILL SHAFT (SIGN MTS) (48 IN)
LF 230.000 $350.000 $373.850 $373.850 $422.300 $612.000 $475.000 $440.000
DRILL SHAFT (SIGN MTS) (54 IN)
LF 67.000 $475.000 $508.770 $508.770 $535.600 $562.000 $525.000 $555.000
DRILL SHAFT (HIGH MAST POLE) (60 IN)
LF 968.000 $550.000 $469.710 $469.710 $469.710 $675.000 $565.000 $635.000
DRILL SHAFT (SIGN MTS) (60 IN)
LF 60.000 $325.000 $411.980 $411.980 $612.850 $687.000 $545.000 $635.000
CL A CONC (FLUME)
CY 147.100 $466.000 $729.790 $500.000 $462.430 $494.260 $435.000 $900.000
CL B CONC (MISC)
CY 3.000 $510.000 $2,736.280 $946.290 $1,440.890 $897.450 $1,500.000 $2,000.000
CL C CONC (ABUT)
CY 278.300 $900.000 $892.910 $1,400.000 $972.460 $748.000 $1,200.000 $2,300.000
CL C CONC (CAP)
CY 2,040.500 $1,100.000 $1,021.910 $2,000.000 $1,437.200 $707.760 $1,200.000 $2,200.000
CL C CONC (COLUMN)
CY 1,516.600 $1,000.000 $1,019.820 $1,300.000 $1,050.450 $766.720 $1,400.000 $1,400.000
CL C CONC (COPING)
CY 169.800 $1,100.000 $763.280 $600.000 $643.340 $0.010 $200.000 $1,425.000
CL C CONC (RAIL FOUNDATION)
CY 360.000 $300.000 $600.000 $350.000 $375.000 $445.250 $436.000 $775.000
CL F CONC (CAP)
CY 104.800 $2,200.000 $1,177.710 $900.000 $3,170.970 $937.420 $1,700.000 $1,800.000
CL F CONC (COLUMN)
CY 36.400 $1,100.000 $965.480 $1,000.000 $993.620 $930.500 $1,700.000 $3,000.000
REINF CONC SLAB
SF 504,700.000 $13.750 $16.090 $15.000 $17.840 $17.000 $19.550 $23.000
APPROACH SLAB
CY 366.600 $393.000 $608.070 $250.000 $510.330 $538.220 $600.000 $750.000
RETAINING WALL (MSE)
SF 21,744.000 $70.000 $59.950 $70.000 $63.100 $36.560 $92.000 $90.000
RETAINING WALL (CONC BLOCK)
SF 12,029.000 $27.000 $59.610 $100.000 $84.420 $27.150 $86.000 $130.000
PRESTR CONC SLAB BEAM (4SB15)
LF 3,713.000 $140.000 $127.420 $95.000 $138.630 $167.680 $144.000 $190.000
PRESTR CONC SLAB BEAM (5SB15)
LF 9,159.000 $155.000 $127.190 $95.000 $140.940 $183.070 $150.000 $190.000
PRESTR CONC GIRDER (TX54)
LF 52,364.600 $125.000 $140.130 $110.000 $143.000 $148.690 $162.000 $180.000
PRESTR CONC GIRDER (TX70)
LF 3,668.500 $200.000 $173.920 $160.000 $228.450 $236.100 $187.000 $240.000
RIPRAP (CONC)(4 IN)
CY 310.800 $375.000 $428.670 $500.000 $534.300 $328.000 $415.000 $490.000
RIPRAP (CONC)(5 IN)
CY 2,748.700 $375.000 $418.100 $500.000 $427.570 $355.000 $415.000 $500.000
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 93.000 $435.000 $601.320 $500.000 $550.000 $365.000 $650.000 $540.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 491.000 $62.000 $179.080 $250.000 $224.430 $170.810 $160.000 $200.000
RIPRAP (STONE PROTECTION)(24 IN)
CY 2,400.000 $375.000 $169.760 $225.000 $190.760 $168.210 $190.000 $200.000
RIPRAP (MOW STRIP)(4 IN)
CY 89.900 $500.000 $639.410 $500.000 $549.480 $395.000 $465.000 $490.000
STR STEEL (MISC NON - BRIDGE)
LB 1,109.000 $10.000 $14.370 $10.000 $15.000 $8.000 $15.000 $25.000
RAIL (TY T223)
LF 6,510.200 $77.000 $73.690 $60.000 $93.200 $64.980 $92.000 $93.000
RAIL (TY T631)
LF 75.000 $85.000 $52.200 $100.000 $70.750 $94.400 $72.000 $80.000
RAIL (TY SSTR)
LF 8,804.000 $45.000 $48.400 $40.000 $39.360 $45.990 $50.000 $52.000
RAIL (TY SSTR) (W/DRAIN SLOTS)
LF 2,787.000 $50.000 $44.750 $40.000 $43.720 $49.660 $54.000 $55.000
ARMOR JOINT (SEALED)
LF 232.000 $100.000 $79.040 $50.000 $5.000 $92.450 $104.000 $125.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 2,764.400 $120.000 $113.720 $100.000 $126.000 $87.810 $128.000 $180.000
CMP (GAL STL 24 IN)
LF 136.000 $55.000 $65.000 $81.000 $98.100 $73.390 $65.000 $62.000
CMP AR (GAL STL DES 2)
LF 150.000 $60.000 $65.000 $71.000 $85.580 $69.960 $65.000 $68.000
CONC BOX CULV (5 FT X 2 FT)
LF 66.000 $300.000 $475.000 $315.000 $415.190 $286.260 $475.000 $1,000.000
CONC BOX CULV (7 FT X 4 FT)
LF 48.000 $850.000 $725.000 $515.000 $635.860 $454.130 $725.000 $1,260.000
RC PIPE (CL III)(18 IN)
LF 3,182.000 $120.000 $60.000 $65.000 $58.150 $44.500 $60.000 $105.000
RC PIPE (CL III)(24 IN)
LF 2,371.000 $135.000 $68.000 $77.000 $75.860 $55.820 $68.000 $130.000
RC PIPE (CL III)(30 IN)
LF 916.000 $100.000 $95.000 $95.000 $114.920 $72.160 $94.000 $180.000
RC PIPE (CL III)(36 IN)
LF 1,042.000 $220.000 $120.000 $120.000 $127.370 $92.750 $119.000 $250.000
RC PIPE (CL III)(48 IN)
LF 1,582.000 $350.000 $160.000 $180.000 $212.120 $141.200 $162.000 $390.000
RC PIPE (CL IV)(48 IN)
LF 492.000 $200.000 $215.000 $250.000 $211.290 $175.820 $214.000 $500.000
RC PIPE (CL V)(48 IN)
LF 289.000 $250.000 $260.000 $290.500 $225.660 $228.830 $262.000 $510.000
JCTBOX(COMPL)(PJB)(3FTX3FT)
EA 5.000 $5,000.000 $4,750.000 $3,981.750 $3,264.400 $3,242.570 $5,000.000 $6,500.000
JCTBOX(COMPL)(PJB)(4FTX4FT)
EA 3.000 $5,000.000 $5,135.000 $5,591.970 $7,930.380 $4,132.570 $5,200.000 $8,500.000
JCTBOX(COMPL)(PJB)(6FTX6FT)
EA 5.000 $11,000.000 $8,565.000 $7,668.640 $7,810.970 $7,887.570 $8,600.000 $14,500.000
INLET (COMPL)(PCO)(3FT)(NONE)
EA 1.000 $6,000.000 $15,000.000 $5,321.800 $5,046.260 $8,608.690 $13,500.000 $18,000.000
INLET (COMPL)(PCO)(3FT)(BOTH)
EA 6.000 $6,000.000 $9,750.000 $6,712.610 $5,813.220 $6,353.650 $8,300.000 $15,000.000
INLET (COMPL)(PCO)(4FT)(LEFT)
EA 1.000 $4,500.000 $9,635.000 $6,653.100 $5,732.210 $5,953.690 $8,200.000 $10,000.000
INLET (COMPL)(PCU)(3FT)(NONE)
EA 6.000 $7,000.000 $7,850.000 $4,432.480 $4,182.480 $4,028.650 $6,400.000 $11,750.000
INLET (COMPL)(PCU)(3FT)(BOTH)
EA 30.000 $7,000.000 $9,150.000 $6,034.390 $5,164.130 $5,093.640 $7,700.000 $12,500.000
INLET (COMPL)(PCU)(6FT)(BOTH)
EA 8.000 $9,000.000 $9,865.000 $7,594.080 $6,596.650 $6,963.030 $8,400.000 $17,000.000
INLET (COMPL)(PMBD)(4FT)
EA 23.000 $7,000.000 $7,375.000 $5,876.060 $5,019.200 $4,855.890 $6,000.000 $10,000.000
INLET (COMPL)(POD)(SFG)(4FTX4FT)
EA 5.000 $5,500.000 $5,235.000 $5,927.670 $3,237.860 $3,880.890 $5,400.000 $8,500.000
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
EA 7.000 $7,000.000 $6,250.000 $5,600.950 $5,754.700 $3,558.050 $6,400.000 $6,500.000
INLET(COMPL)(PAZD)(FG)(4FTX4FT-3FTX3FT)
EA 1.000 $7,000.000 $6,350.000 $6,144.430 $5,716.770 $4,068.090 $6,400.000 $11,500.000
MANH (COMPL) (JUNCT BOX)(SPL W/RISER)
EA 10.000 $7,000.000 $8,700.000 $9,264.560 $7,994.350 $7,061.090 $8,700.000 $15,000.000
INLET(COMPL)(CURB)(SPL)
EA 1.000 $7,000.000 $10,300.000 $6,587.320 $7,005.170 $6,841.520 $8,800.000 $10,000.000
INLET(COMPL)(CURB)(SPL2)
EA 3.000 $7,000.000 $8,285.000 $8,974.310 $9,731.870 $5,451.500 $6,800.000 $9,500.000
INLET (COMPL) (DROP) (SPL)
EA 3.000 $4,000.000 $7,150.000 $7,812.780 $11,597.990 $5,511.500 $7,200.000 $10,500.000
HEADWALL (CH - FW - 0) (DIA= 18 IN)
EA 2.000 $1,500.000 $6,355.000 $5,056.320 $2,883.200 $4,748.640 $6,400.000 $7,000.000
HEADWALL (CH - FW - 0) (DIA= 24 IN)
EA 2.000 $1,900.000 $6,850.000 $5,515.120 $4,587.780 $5,016.100 $6,900.000 $9,000.000
HEADWALL (CH - FW - 0) (DIA= 36 IN)
EA 1.000 $2,400.000 $7,850.000 $9,949.340 $10,690.710 $6,866.430 $7,900.000 $15,000.000
WINGWALL (FW - 0) (HW=6 FT)
EA 1.000 $5,000.000 $9,850.000 $12,303.310 $8,645.490 $12,523.020 $9,900.000 $20,000.000
WINGWALL (PW - 1) (HW=4 FT)
EA 2.000 $3,700.000 $11,500.000 $11,264.990 $11,476.950 $11,236.050 $11,500.000 $21,000.000
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1) (C)
EA 2.000 $3,701.000 $8,500.000 $12,177.220 $6,312.130 $6,195.690 $8,500.000 $21,000.000
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 2.000 $1,300.000 $2,350.000 $1,038.810 $968.760 $1,388.110 $2,400.000 $2,300.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 2.000 $2,500.000 $2,850.000 $1,209.490 $3,408.650 $1,438.110 $2,900.000 $2,400.000
SET (TY II) (DES 2) (CMP) (6: 1) (C)
EA 2.000 $2,400.000 $3,855.000 $1,041.060 $5,375.410 $1,833.110 $3,900.000 $3,000.000
REMOV STR (INLET)
EA 5.000 $750.000 $1,250.000 $525.000 $1,127.630 $651.870 $1,000.000 $950.000
REMOV STR (BOX CULVERT)
LF 900.000 $25.000 $90.000 $150.000 $85.450 $35.090 $85.000 $100.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 2.000 $150,000.000 $54,950.500 $40,000.000 $61,013.900 $92,222.990 $85,000.000 $250,000.000
REMOV STR (BRIDGE 1000 FT OR GREATER)
EA 2.000 $1,125,000.000 $1,332,549.460 $500,000.000 $773,702.120 $373,823.980 $1,500,000.000 $2,500,000.000
REMOV STR (RET WALL)
LF 1,614.000 $35.000 $14.970 $20.000 $28.890 $31.960 $100.000 $30.000
MOBILIZATION
LS 1.000 $7,920,000.000 $8,250,000.000 $8,932,492.000 $9,100,000.000 $8,901,969.440 $10,000,000.000 $13,000,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 65.000 $7,500.000 $6,000.000 $15,000.000 $14,889.210 $28,794.300 $40,000.000 $33,500.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 204.000 $33.000 $24.000 $44.000 $24.000 $30.950 $24.000 $40.000
ROCK FILTER DAMS (REMOVE)
LF 144.000 $21.000 $7.000 $15.000 $7.000 $17.000 $7.000 $33.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 1,444.000 $20.000 $14.000 $26.000 $14.000 $34.350 $14.000 $55.000
CONSTRUCTION EXITS (REMOVE)
SY 1,444.000 $14.000 $2.000 $8.450 $2.000 $9.340 $2.000 $35.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 18,154.000 $2.500 $1.850 $2.500 $1.850 $2.860 $2.000 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 18,154.000 $1.000 $0.800 $0.500 $0.800 $0.560 $0.800 $1.300
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 600.000 $5.000 $4.950 $6.300 $4.950 $6.580 $5.000 $7.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 600.000 $1.000 $1.250 $1.000 $1.250 $1.390 $1.250 $2.000
CONSTRUCTING DETOURS
SY 25,427.000 $64.000 $106.370 $74.000 $65.100 $95.000 $92.000 $90.000
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 33,030.000 $43.000 $28.280 $40.000 $25.870 $55.000 $44.000 $70.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 12,260.000 $39.000 $37.110 $40.000 $26.580 $55.000 $44.000 $80.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 160.000 $39.000 $31.820 $40.000 $56.970 $55.000 $44.000 $110.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 63,810.000 $11.000 $2.470 $4.000 $4.040 $5.430 $18.000 $12.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 17,920.000 $11.000 $4.270 $4.000 $3.960 $3.390 $26.000 $16.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 280.000 $11.000 $4.260 $4.000 $4.400 $3.590 $26.000 $55.000
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 33,030.000 $10.000 $8.930 $4.000 $10.730 $8.660 $27.000 $13.000
PTB(FRN&INSTL)(SSCB OR CSB)(TY1)OR(STL)
LF 3,271.000 $35.000 $74.050 $40.000 $68.460 $52.640 $77.000 $95.000
PCTB(FUR & INST)(F-SHP TO LOW PROF)TY T
LF 30.000 $43.000 $406.430 $300.000 $504.860 $281.930 $180.000 $250.000
PORT CTB(MOVE)(F-SHAPE)(TY T)
LF 40.000 $10.000 $7.770 $40.000 $57.750 $20.690 $38.000 $50.000
PCTB MOVE&RESET(F-SHAPE OR SNGL SLPTY1
LF 120.000 $10.000 $4.500 $40.000 $9.630 $8.890 $30.000 $30.000
PERM CONC TRF BARR (SGL SLP) (TY 3 SPL)
LF 310.000 $250.000 $187.560 $300.000 $190.230 $139.850 $285.000 $300.000
PERM CTB (TRAN SSCB TO SSTR) (MOD)
LF 65.000 $200.000 $82.130 $300.000 $215.720 $121.310 $265.000 $275.000
PERM CTB (SSCB)(TY 1)(MOD)
LF 2,913.000 $60.000 $66.810 $50.000 $54.720 $57.240 $185.000 $210.000
CONC CURB & GUTTER (TY I)
LF 8,504.000 $21.000 $19.040 $25.000 $19.630 $21.440 $30.000 $27.000
CONC CURB & GUTTER (VALLEY GUTTER)
LF 1,059.000 $7.000 $26.110 $43.000 $46.630 $29.030 $65.000 $70.000
RUMBLE STRIPS (SHOULDER)
LF 33,038.000 $0.100 $0.500 $1.100 $0.080 $0.150 $0.400 $0.200
MTL W-BEAM GD FEN (TIM POST)
LF 500.000 $30.000 $20.900 $20.900 $20.900 $31.300 $22.000 $23.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $1,438.000 $1,641.500 $2,078.500 $1,641.500 $2,020.000 $2,250.000 $1,750.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 3.000 $965.000 $1,231.000 $1,213.000 $1,213.000 $1,295.000 $1,280.000 $1,300.000
REMOVE METAL BEAM GUARD FENCE
LF 5,644.000 $1.500 $1.000 $3.500 $1.000 $2.000 $1.000 $1.100
GUARDRAIL END TREATMENT (INSTALL)
EA 5.000 $2,660.000 $2,433.000 $2,433.000 $2,433.000 $3,025.000 $2,555.000 $2,600.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 12.000 $810.000 $675.000 $675.000 $675.000 $1,500.000 $2,135.000 $725.000
CRASH CUSH ATTEN (REMOVE)
EA 9.000 $690.000 $675.000 $675.000 $675.000 $750.000 $940.000 $725.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 9.000 $23,400.000 $22,644.000 $22,644.000 $22,644.000 $22,794.000 $25,500.000 $25,000.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 8.000 $8,855.000 $6,900.000 $6,900.000 $6,900.000 $7,450.000 $9,120.000 $7,500.000
REMOVE RD IL ASM (SHOE-BASE)
EA 6.000 $700.000 $681.730 $2,181.730 $681.730 $193.340 $160.000 $550.000
REMOVE RD IL ASM (TRANS-BASE)
EA 28.000 $400.000 $491.090 $1,991.090 $491.090 $193.340 $260.000 $1,300.000
REMOVE RD IL ASM (U/P)
EA 16.000 $300.000 $194.840 $194.840 $194.840 $79.390 $130.000 $225.000
IN RD IL (U/P) (TY 1) (150W EQ) LED
EA 16.000 $1,250.000 $1,128.030 $1,128.030 $1,128.030 $777.490 $1,160.000 $1,300.000
IN RD IL (TY SA) 50T-4 (400W EQ) LED
EA 6.000 $2,500.000 $3,771.550 $4,021.550 $3,771.550 $3,263.120 $3,410.000 $3,750.000
IN RD IL (TY SA) 50T-4-4 (400W EQ) LED
EA 3.000 $2,500.000 $4,526.670 $4,776.670 $4,526.670 $4,025.320 $3,850.000 $4,300.000
HI MST IL POLE (150 FT)(100 MPH)
EA 22.000 $25,000.000 $42,217.320 $42,517.320 $42,217.320 $47,332.610 $41,500.000 $32,000.000
CONDT (PVC) (SCH 40) (2")
LF 20,550.000 $8.500 $6.590 $6.590 $6.590 $9.520 $8.000 $12.000
CONDT (PVC) (SCH 40) (2") (BORE)
LF 2,125.000 $20.000 $13.930 $13.930 $13.930 $15.200 $26.000 $28.000
CONDT (PVC) (SCH 40) (3")
LF 23,300.000 $12.000 $13.360 $13.360 $13.360 $12.560 $16.000 $16.000
CONDT (PVC) (SCH 40) (3") (BORE)
LF 1,160.000 $32.000 $16.560 $16.560 $16.560 $22.520 $36.000 $32.000
CONDT (RM) (3/4")
LF 575.000 $18.000 $16.180 $16.180 $16.180 $11.070 $16.000 $34.000
CONDT (RM) (2")
LF 1,005.000 $24.000 $20.550 $20.550 $20.550 $32.520 $34.000 $29.000
CONDT (RM) (3")
LF 6,405.000 $31.000 $35.590 $35.590 $35.590 $19.340 $100.000 $62.000
ELEC CONDR (NO.12) INSULATED
LF 2,850.000 $1.000 $0.900 $0.900 $0.900 $1.280 $1.000 $1.000
ELEC CONDR (NO.8) INSULATED
LF 18,760.000 $1.000 $1.420 $1.420 $1.420 $1.380 $1.100 $1.500
ELEC CONDR (NO.6) BARE
LF 30,865.000 $1.250 $1.590 $1.590 $1.590 $1.580 $1.300 $1.600
ELEC CONDR (NO.6) INSULATED
LF 14,040.000 $1.350 $1.910 $1.910 $1.910 $1.800 $1.400 $1.950
ELEC CONDR (NO.4) INSULATED
LF 20,235.000 $1.500 $2.550 $2.550 $2.550 $2.180 $1.700 $1.850
ELEC CONDR (NO.2) BARE
LF 345.000 $2.000 $3.350 $3.350 $3.350 $2.990 $2.000 $2.250
ELEC CONDR (NO.2) INSULATED
LF 5,805.000 $2.250 $3.760 $3.760 $3.760 $3.810 $2.200 $2.550
ELEC CONDR (NO.1/0) INSULATED
LF 38,765.000 $3.000 $4.900 $4.900 $4.900 $4.430 $3.300 $4.800
ELEC CONDR (NO.3/0) BARE
LF 1,805.000 $2.500 $5.790 $5.790 $5.790 $5.160 $4.000 $5.100
ELEC CONDR (NO.3/0) INSULATED
LF 5,415.000 $2.750 $7.260 $7.260 $7.260 $6.590 $4.400 $6.000
GROUND BOX TY A (122311)W/APRON
EA 75.000 $900.000 $784.340 $784.340 $784.340 $607.070 $820.000 $650.000
ELC SRV TY A 240/480 100(NS)SS(E)GC(O)
EA 2.000 $5,000.000 $9,131.350 $9,631.340 $9,131.340 $8,625.000 $5,350.000 $8,500.000
ELC SRV TY A 240/480 150(NS)SS(E)GC(O)
EA 1.000 $5,000.000 $11,659.090 $12,159.090 $11,659.090 $10,170.870 $5,670.240 $9,750.000
ELC SRV TY A 240/480 200(SS)SS(E)GC(O)
EA 2.000 $5,000.000 $12,369.420 $12,869.410 $12,369.410 $10,044.370 $7,080.000 $11,000.000
ALUMINUM SIGNS (TY G)
SF 475.750 $25.000 $28.280 $28.280 $25.750 $27.390 $24.000 $27.000
ALUMINUM SIGNS (TY O)
SF 1,715.250 $25.000 $22.800 $22.800 $22.660 $24.710 $28.000 $24.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 56.000 $500.000 $625.000 $605.000 $643.750 $771.240 $630.000 $675.000
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 2.000 $800.000 $850.000 $690.000 $875.500 $880.620 $810.000 $910.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 39.000 $600.000 $615.000 $760.000 $633.450 $825.130 $790.000 $660.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 7.000 $800.000 $950.000 $950.000 $978.500 $836.170 $1,020.000 $1,015.000
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 3.000 $800.000 $705.000 $1,230.000 $726.150 $989.000 $1,210.000 $755.000
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
EA 7.000 $1,400.000 $1,775.000 $1,725.000 $1,828.250 $2,139.950 $1,940.000 $1,900.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 6.000 $1,850.000 $1,550.000 $2,000.000 $1,596.500 $760.000 $1,890.000 $1,700.000
REMOVE SM RD SN SUP&AM
EA 111.000 $85.000 $55.000 $110.000 $56.650 $100.000 $68.000 $60.000
REMOVE BRDG MNT CLEARANCE SIGN ASSM
EA 6.000 $700.000 $325.000 $650.000 $334.750 $925.000 $210.000 $350.000
IN SRSS & AM (RAIL)(130 MPH)(P MOUNT)
EA 2.000 $4,100.000 $2,500.000 $3,500.000 $2,575.000 $3,500.000 $6,300.000 $2,700.000
IN SRSS & AM (RAIL)(130 MPH)(U-BM MNT)
EA 6.000 $7,500.000 $3,200.000 $3,500.000 $3,296.000 $3,500.000 $260.000 $3,425.000
INSTALL LRSS (STRUCT STEEL)
LB 3,850.000 $12.000 $4.250 $4.570 $4.380 $6.750 $5.000 $4.600
RELOCATE LRSA
EA 1.000 $3,600.000 $3,000.000 $2,879.250 $3,090.000 $5,135.500 $1,300.000 $3,200.000
REMOVE LRSA
EA 1.000 $1,100.000 $1,000.000 $2,447.300 $1,030.000 $1,823.240 $310.000 $1,075.000
INS OH SN SUP(30 FT BAL TEE)
EA 1.000 $29,500.000 $31,149.240 $31,149.240 $28,325.000 $29,474.850 $30,300.000 $30,000.000
INS OH SN SUP(35 FT CANT)
EA 1.000 $18,000.000 $25,017.390 $25,017.390 $28,840.000 $24,966.950 $24,444.000 $30,000.000
INS OH SN SUP(40 FT CANT)
EA 2.000 $22,000.000 $30,131.750 $30,131.750 $29,870.000 $29,621.970 $29,330.000 $31,000.000
INS OH SN SUP(80 FT BRDG)
EA 1.000 $25,000.000 $47,418.510 $47,418.510 $28,325.000 $47,013.770 $47,360.000 $30,000.000
INS OH SN SUP(90 FT BRDG)
EA 1.000 $30,000.000 $51,406.580 $51,406.580 $41,200.000 $55,094.360 $53,400.000 $43,000.000
INS OH SN SUP(160 FT BRDG)
EA 1.000 $75,000.000 $148,484.240 $148,484.240 $97,850.000 $133,672.840 $144,200.000 $102,000.000
REMOVE OVERHD SIGN SUP
EA 6.000 $6,500.000 $4,226.770 $6,726.770 $7,107.000 $16,339.080 $7,880.000 $7,400.000
INSTL DEL ASSM (D-SW)SZ 2(WC)GND
EA 22.000 $100.000 $80.000 $100.000 $82.400 $63.960 $84.000 $86.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 111.000 $19.000 $20.000 $50.000 $20.600 $16.300 $19.000 $22.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 18.000 $21.000 $21.000 $25.000 $21.630 $16.830 $19.000 $23.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 7.000 $27.000 $21.000 $30.000 $21.630 $17.490 $19.000 $23.000
INSTL DEL ASSM (D-SY)SZ 2(WC)GND
EA 16.000 $110.000 $103.000 $125.000 $106.090 $63.960 $84.000 $110.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 62.000 $18.000 $21.000 $25.000 $21.630 $16.300 $13.000 $23.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
EA 98.000 $21.000 $16.000 $20.000 $16.480 $16.830 $15.000 $18.000
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
EA 15.000 $25.000 $21.000 $15.000 $21.630 $17.490 $19.000 $23.000
INSTL DEL ASSM (D-DW)SZ 2(WC)GND
EA 25.000 $96.430 $110.000 $100.000 $113.300 $56.070 $74.000 $118.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 500.000 $1.000 $2.000 $0.180 $0.180 $0.180 $1.300 $0.200
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 500.000 $1.000 $2.000 $0.180 $0.180 $0.180 $1.300 $0.200
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 500.000 $1.000 $2.000 $0.180 $0.180 $0.180 $1.300 $0.200
WK ZN PAV MRK REMOV (REFL) TY I-C
EA 3,916.600 $3.500 $3.300 $6.320 $6.320 $6.320 $4.200 $6.750
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 39,170.000 $0.500 $0.600 $0.190 $0.190 $0.190 $0.700 $0.200
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 171,028.000 $0.500 $0.550 $0.200 $0.200 $0.200 $0.500 $0.210
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 19,342.000 $1.000 $1.400 $0.380 $0.380 $0.380 $1.000 $0.410
WK ZN PAV MRK REMOV (W)12"(LNDP)
LF 339.000 $2.500 $3.000 $0.570 $0.570 $0.570 $2.600 $0.610
WK ZN PAV MRK REMOV (W)12"(SLD)
LF 1,462.000 $2.500 $3.000 $1.390 $1.390 $1.390 $3.150 $1.500
WK ZN PAV MRK REMOV (W)(ARROW)
EA 2.000 $200.000 $200.000 $85.000 $85.000 $85.000 $315.000 $91.000
WK ZN PAV MRK REMOV (W)(WORD)
EA 2.000 $250.000 $200.000 $85.000 $85.000 $85.000 $360.000 $91.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 125,742.000 $0.500 $0.550 $0.200 $0.200 $0.200 $0.600 $0.210
REFL PAV MRK TY I (W)4"(DOT)(090MIL)
LF 224.000 $0.500 $1.200 $0.950 $0.950 $0.950 $3.000 $1.050
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 10,954.000 $1.200 $0.840 $1.030 $1.030 $1.030 $2.000 $1.100
REFL PAV MRK TY I (W)12"(LNDP)(090MIL)
LF 765.000 $1.800 $3.000 $1.550 $1.550 $1.550 $3.150 $1.650
REFL PAV MRK TY I (W)12"(SLD)(090MIL)
LF 4,692.000 $1.800 $2.770 $2.240 $2.240 $2.230 $2.600 $2.400
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 11.200 $5.000 $10.000 $4.700 $4.700 $4.700 $15.000 $5.000
REF PAV MRK TY I(W)36"(YLD TRI)(090MIL)
EA 7.000 $32.000 $44.000 $26.000 $26.000 $26.000 $26.000 $228.000
PAVEMENT SEALER 4"
LF 127,113.000 $0.250 $0.220 $0.090 $0.090 $0.090 $0.260 $0.100
PAVEMENT SEALER 8"
LF 10,954.000 $0.500 $0.470 $0.180 $0.180 $0.180 $0.500 $0.190
PAVEMENT SEALER 12"
LF 5,457.000 $1.000 $1.320 $0.700 $0.700 $0.700 $1.000 $0.750
PAVEMENT SEALER 24"
LF 11.000 $4.000 $5.000 $1.100 $1.100 $1.100 $4.200 $1.200
PAVEMENT SEALER (ARROW)
EA 12.000 $12.000 $63.000 $40.000 $40.000 $40.000 $21.000 $43.000
PAVEMENT SEALER (WORD)
EA 8.000 $15.000 $67.000 $40.000 $40.000 $40.000 $26.000 $43.000
PAVEMENT SEALER (YLD TRI)
EA 7.000 $5.000 $26.000 $6.480 $6.480 $6.480 $5.500 $7.000
PAVEMENT SEALER (NUMBER)
EA 3.000 $20.000 $150.000 $83.000 $83.000 $83.000 $21.000 $90.000
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 15,065.000 $0.450 $0.450 $0.550 $0.550 $0.550 $0.500 $0.600
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 64,730.000 $0.400 $0.420 $0.550 $0.550 $0.550 $0.420 $0.600
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 47,094.000 $0.400 $0.420 $0.550 $0.550 $0.550 $0.400 $0.600
PREFAB PAV MRK TY C (W) (ARROW)
EA 12.000 $185.000 $210.000 $212.000 $212.000 $212.000 $195.000 $226.000
PREFAB PAV MRK TY C (W) (NUMBER)
EA 3.000 $125.000 $250.000 $318.000 $318.000 $318.000 $130.000 $340.000
PREFAB PAV MRK TY C (W) (WORD)
EA 8.000 $225.000 $221.000 $265.000 $265.000 $265.000 $235.000 $285.000
REFL PAV MRKR TY II-A-A
EA 52.000 $4.000 $5.000 $6.070 $6.070 $6.070 $4.200 $6.500
REFL PAV MRKR TY II-C-R
EA 1,366.000 $3.750 $3.770 $6.330 $6.330 $6.330 $4.000 $6.750
ELIM EXT PAV MRK & MRKS (4")
LF 99,638.000 $0.350 $0.530 $1.100 $0.520 $0.520 $0.400 $0.550
ELIM EXT PAV MRK & MRKS (8")
LF 5,240.000 $0.800 $1.000 $1.100 $1.010 $1.010 $0.850 $1.100
ELIM EXT PAV MRK & MRKS (NUMBER)
EA 3.000 $22.000 $79.000 $54.000 $942.370 $942.370 $21.000 $1,000.000
ELIM EXT PAV MRK & MRKS (WORD)
EA 2.000 $55.000 $55.000 $108.000 $1,364.590 $1,364.600 $52.000 $1,500.000
ELIM EXT PAV MRK & MRKS (SYMBOL)
EA 3.000 $175.000 $200.000 $54.000 $914.390 $914.390 $78.000 $1,000.000
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
EA 2.000 $7,000.000 $8,074.720 $8,074.720 $8,074.720 $5,066.730 $5,670.000 $7,500.000
REMOV RDSD FLSH BCN AM (SOLAR PWRD)
EA 2.000 $625.000 $535.290 $835.280 $535.280 $364.650 $735.000 $480.000
CARBON FIBER REINF POLYMER PROTECTION
SF 2,267.200 $775.000 $49.760 $50.000 $34.100 $49.760 $39.000 $100.000
D-GR HMA TY-B SAC-B PG70-22
TON 28,702.000 $95.000 $98.180 $123.000 $115.000 $110.630 $105.000 $115.000
D-GR HMA TY-D SAC-B PG70-22
TON 18,970.000 $105.000 $103.950 $145.000 $130.000 $122.380 $127.000 $128.000
TACK COAT
GAL 23,214.000 $4.000 $3.470 $3.700 $7.000 $6.350 $4.000 $6.600
WICK DRAINS
LF 24,000.000 $5.000 $12.680 $20.000 $15.000 $15.060 $26.000 $17.000
BAT HOUSE (LARGE)
EA 12.000 $125.000 $3,171.050 $5,000.000 $6,587.130 $3,441.220 $4,725.000 $6,000.000
BARRIER GATE
EA 1.000 $25,500.000 $20,000.000 $30,485.000 $40,999.000 $22,000.000 $23,100.000 $32,500.000
BIRD EXCLUSION METHOD
SF 941,263.000 $3.400 $0.100 $0.500 $2.000 $1.120 $2.300 $0.600
SETTLEMENT GAUGE
EA 15.000 $10,000.000 $4,658.950 $8,700.000 $1,465.750 $11,200.000 $7,270.000 $3,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $10,000.000 $16,805.810 $1,000.000 $16,508.130 $15,600.000 $40,800.000 $20,000.000
INSTALL DMS (POLE MTD CABINET)
EA 1.000 $15,500.000 $12,943.200 $12,943.200 $12,943.200 $27,377.000 $4,880.000 $9,800.000
ITS POLE (50 FT)(130 MPH)(W/STIFF)
EA 2.000 $3,500.000 $12,235.460 $12,235.460 $12,235.460 $11,207.540 $10,750.000 $22,500.000
ITS POLE MNT CAB (TY 2)(CONF 1)
EA 3.000 $4,410.000 $5,648.200 $5,648.200 $5,648.200 $4,368.990 $4,700.000 $6,000.000
LED HI MST IL ASM (6 FIXT)(SYM)(TY S)
EA 2.000 $27,500.000 $24,565.640 $24,565.640 $24,565.640 $20,062.660 $24,150.000 $26,000.000
LED HI MST IL AM(6 FIXT)ASYM(TY A)SHLD
EA 20.000 $28,000.000 $24,702.380 $24,702.380 $24,702.380 $22,227.230 $24,880.000 $28,000.000
REMOVE HIGH MAST LIGHTING (150 FT)
EA 4.000 $5,000.000 $5,398.500 $7,898.500 $5,398.500 $4,267.990 $8,920.000 $7,500.000
TMA (STATIONARY)
DAY 90.000 $200.000 $246.810 $196.000 $204.440 $482.000 $172.000 $525.000
TMA (MOBILE OPERATION)
HR 1,728.000 $35.000 $108.250 $443.000 $319.440 $71.900 $63.000 $55.000
ITS GND BOX(PCAST) TY 1 (243636)
EA 21.000 $3,500.000 $3,958.920 $3,958.920 $3,958.920 $4,150.000 $5,880.000 $3,500.000
Totals: $88,966,508.200 $83,990,747.166 $89,874,755.112 $90,737,838.930 $91,574,702.002 $100,757,743.530 $132,618,348.740