POTTER IH 40 (0090-05-107)

Items: 112

County: POTTER
Length: N/A
Highway: IH 40
District: AMARILLO
Control Number: 0090-05-107
DBE Goal: 550.0%
Project: BR 2024(779)
Guaranty: N/A
Time: 182 WORKING DAYS
Engineer's Estimate: $9,565,794.00
Date: 03/05/2024 (2 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
JOE CHAPPELL
CC SYSOMBATH
KENNETH PETR
DARRELL CALDWELL
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$9,565,794.00
$10,246,889.59
Over/Under Est: 7.12% $681,095.59
Over/Under Est: 11.33% $1,084,253.20
Amt Left: 3.93% $403,157.61
Over/Under Est: 20.9% $1,999,397.51
Amt Left: 12.87% $1,318,301.92
Delta: -8.59% -$915,144.31
$11,687,192.95
Over/Under Est: 22.18% $2,121,398.95
Amt Left: 14.06% $1,440,303.36
Delta: -1.05% -$122,001.44
Subcontractor Percentage Amount
L A FULLER & SONS CONSTRUCTION, LTD. 10.26% $1,095,200.93
SQUARE CONTRACTING INC 8.30% $885,981.26
LINDAMOOD, INC. 1.59% $169,724.12
TORO BRAVO CONSTRUCTION, LLC 0.72% $76,856.21
CROSSBAR LOGISTICS LLC 0.33% $35,225.76
APOLLO CONSTRUCTORS, INC. 0.32% $34,158.31
TRP CONSTRUCTION GROUP, LLC 0.30% $32,023.42
DK CONTRACTING, LLC 0.26% $27,753.63
MARRS ELECTRIC LLC 0.17% $18,146.60
PENHALL COMPANY 0.11% $11,741.92
Total: 22.36% $2,386,812.16

Bid Items & Bid Tabulations

112 Total 0 of 112
POTTER  |  IH 40  |  AMARILLO  |  0090-05-107  |  03/05/2024  |  $9,565,794.00  |  BR 2024(779)  |  BRIDGE REPL  |  182 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ALTUS CONSTRUCTION LLC
COPPELL CONSTRUCTION CO., INC.
L A FULLER & SONS CONSTRUCTION, LTD.
GILVIN-TERRILL, LTD.
REMOVING CONC (RIPRAP)
SY 900.000 $32.000 $29.600 $25.000 $27.250 $20.000
REMOVING CONCRETE(MOW STRIP)
LF 1,452.000 $10.000 $21.110 $15.000 $21.850 $10.000
REMOVING STAB BASE & ASPH PAV(15"-20")
SY 697.000 $18.000 $10.160 $18.500 $40.360 $25.000
EXCAVATION (ROADWAY)
CY 3,453.000 $10.000 $17.080 $27.000 $43.910 $10.000
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 15,770.000 $22.000 $9.050 $48.000 $38.590 $75.000
BLADING
HR 8.000 $250.000 $153.900 $290.000 $146.440 $310.000
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 27,860.000 $0.700 $0.630 $0.600 $0.880 $0.700
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 3,299.000 $4.000 $3.680 $3.500 $1.840 $3.500
FL BS (CMP IN PLC)(TY A OR B GR4)(12")
SY 2,202.000 $25.000 $35.830 $52.000 $35.040 $60.000
PLAN & TEXT ASPH CONC PAV(0" TO 2")
SY 6,250.000 $5.000 $7.430 $1.750 $4.820 $5.000
CEM STABIL BKFL
CY 625.000 $450.000 $177.030 $235.000 $225.800 $500.000
TRENCH EXCAVATION PROTECTION
LF 218.000 $12.000 $9.870 $30.000 $7.120 $50.000
TEMPORARY SPL SHORING
SF 6,309.000 $50.000 $65.270 $67.000 $53.490 $60.000
DRILL SHAFT (18 IN)
LF 250.000 $275.000 $431.850 $102.000 $260.030 $150.000
DRILL SHAFT (24 IN)
LF 12.000 $300.000 $571.960 $395.000 $410.120 $300.000
DRILL SHAFT (36 IN)
LF 1,397.000 $500.000 $524.880 $250.000 $310.700 $300.000
DRILL SHAFT (48 IN)
LF 517.000 $600.000 $699.900 $450.000 $438.020 $500.000
CL B CONC (FLUME)
CY 19.000 $800.000 $986.540 $650.000 $1,374.160 $900.000
CL C CONC (ABUT)
CY 92.700 $2,000.000 $1,186.590 $1,300.000 $2,705.320 $2,000.000
CL C CONC (CAP)
CY 51.800 $2,500.000 $3,057.220 $1,400.000 $3,531.450 $2,000.000
CL C CONC (COLUMN)
CY 84.300 $2,500.000 $1,296.360 $2,300.000 $2,169.960 $2,000.000
CL C CONC (RAIL FOUNDATION)
CY 150.000 $600.000 $1,718.570 $865.000 $651.590 $650.000
REINF CONC SLAB
SF 19,994.000 $48.000 $30.540 $32.000 $50.000 $55.000
BRIDGE MEDIAN
SF 1,251.000 $33.000 $9.570 $25.000 $15.150 $12.000
BRIDGE SIDEWALK
SF 3,253.000 $33.000 $37.600 $25.000 $12.160 $36.000
APPROACH SLAB
CY 330.500 $1,800.000 $730.480 $775.000 $632.380 $2,000.000
RETAINING WALL (MSE)
SF 13,071.000 $94.000 $112.640 $100.000 $175.010 $75.000
PRESTR CONC BOX BEAM (5XB34)
LF 2,157.690 $400.000 $576.050 $505.000 $474.980 $480.000
EPOXY WATERPROOF FINISH (TY X)
SF 991.000 $21.000 $5.260 $15.000 $20.060 $30.000
RIPRAP (CONC)(4 IN)
CY 5.000 $1,200.000 $749.770 $730.000 $1,042.980 $700.000
RIPRAP (CONC)(FLUME)
CY 81.000 $800.000 $429.270 $650.000 $656.540 $670.000
RIPRAP (MOW STRIP)(4 IN)
CY 51.000 $650.000 $914.850 $650.000 $660.980 $670.000
STR STEEL (MISC NON - BRIDGE)
LB 341.000 $32.000 $22.160 $42.000 $35.210 $20.000
RAIL (TY SSTR)
LF 1,111.600 $135.000 $301.380 $220.000 $449.980 $125.000
RAIL (TY C221)
LF 381.000 $200.000 $113.550 $275.000 $544.980 $140.000
HEADER TYPE EXPANSION JOINT
LF 232.000 $225.000 $107.000 $160.000 $304.310 $150.000
CMP (GAL STL 24 IN)
LF 90.000 $135.000 $65.700 $106.000 $71.570 $50.000
CMP (GAL STL 42 IN)
LF 155.000 $170.000 $146.810 $162.000 $135.530 $70.000
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
LF 9.000 $600.000 $690.580 $2,370.000 $751.620 $2,500.000
RC PIPE (CL III)(24 IN)
LF 194.000 $150.000 $124.700 $275.000 $134.480 $200.000
RC PIPE (CL III)(30 IN)
LF 8.000 $200.000 $170.470 $575.000 $437.010 $250.000
INL(CMP)(PAZD-CZ)(FG)(5FTX5FT-4FTX4FT)
EA 3.000 $8,000.000 $12,141.540 $22,000.000 $12,950.510 $12,000.000
SET (REMOV & REINSTALL)
EA 1.000 $2,000.000 $493.270 $3,000.000 $12,109.420 $5,200.000
CLEAN EXIST CULVERTS
EA 2.000 $2,000.000 $2,565.000 $7,700.000 $2,015.970 $2,600.000
REMOV STR (INLET)
EA 2.000 $1,000.000 $1,085.190 $5,000.000 $4,658.360 $1,300.000
REMOV STR (PIPE)
LF 97.000 $50.000 $24.660 $70.000 $48.020 $30.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $260,000.000 $253,993.110 $275,000.000 $301,050.600 $1,000,000.000
MOBILIZATION
LS 1.000 $800,000.000 $1,004,192.410 $1,000,000.000 $1,048,675.000 $1,100,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $19,000.000 $2,776.780 $40,000.000 $32,440.000 $50,000.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 156.000 $50.000 $31.570 $80.000 $44.820 $72.000
CONSTRUCTION EXITS (REMOVE)
SY 156.000 $18.000 $10.850 $25.000 $32.910 $25.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 140.000 $9.000 $4.100 $11.000 $3.580 $12.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 140.000 $2.000 $0.990 $1.300 $1.450 $2.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 140.000 $12.000 $6.810 $12.000 $3.710 $12.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 140.000 $2.000 $1.640 $1.300 $1.630 $2.000
CONSTRUCTING DETOURS (TY 2)
SY 32,789.000 $19.500 $32.530 $39.000 $19.680 $22.000
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
LF 600.000 $30.000 $35.190 $29.000 $27.410 $12.000
PORT CTB (STKPL)(F-SHAPE)(TY 1)
LF 600.000 $30.000 $38.000 $31.000 $23.610 $12.000
PERM CTB (SGL SLOPE) (TY 3) (42 )
LF 370.000 $200.000 $382.420 $470.000 $457.480 $275.000
CONC CURB & GUTTER (TY II)
LF 270.000 $35.000 $53.520 $80.000 $39.420 $50.000
CONC SIDEWALKS (6")
SY 69.000 $99.000 $126.520 $95.000 $69.480 $125.000
CURB RAMPS (TY 20)
EA 2.000 $2,000.000 $3,896.830 $5,500.000 $2,478.720 $1,800.000
CONC MEDIAN
SY 58.000 $140.000 $147.980 $90.000 $64.910 $120.000
MTL W-BEAM GD FEN (STEEL POST)
LF 50.000 $45.000 $52.430 $40.000 $69.160 $37.250
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $3,000.000 $4,327.950 $3,500.000 $4,464.010 $3,075.000
REMOVE METAL BEAM GUARD FENCE
LF 1,275.000 $5.000 $4.220 $3.500 $4.090 $3.000
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $500.000 $562.990 $450.000 $1,112.860 $400.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 4.000 $500.000 $197.310 $450.000 $465.260 $400.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 2.000 $220.000 $562.990 $450.000 $465.260 $400.000
CABLE BARRIER SYSTEM (TL-3)
LF 856.000 $25.000 $28.150 $23.000 $31.910 $20.000
REMOVE CABLE BARRIER TERMINAL SECTION
EA 1.000 $500.000 $3,518.660 $2,500.000 $1,921.400 $2,500.000
INSTALL SALVAGE CABLE BAR TERM SECTION
EA 1.000 $3,000.000 $6,333.580 $4,500.000 $3,842.710 $4,500.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $3,500.000 $4,961.310 $4,100.000 $4,904.120 $3,525.000
CRASH CUSH ATTEN (REMOVE)
EA 1.000 $1,500.000 $3,518.660 $3,000.000 $2,420.360 $3,500.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 3.000 $10,000.000 $8,436.880 $8,700.000 $12,444.380 $10,500.000
IN RD IL (U/P) (TY 2) (150W EQ) LED
EA 4.000 $1,850.000 $1,269.810 $5,700.000 $2,209.370 $3,650.000
CONDT (PVC) (SCH 80) (2")
LF 220.000 $23.000 $18.600 $75.000 $31.440 $24.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 80.000 $40.000 $31.570 $190.000 $47.780 $38.000
CONDT (RM) (3/4")
LF 220.000 $29.000 $29.770 $140.000 $62.870 $21.000
ELEC CONDR (NO.12) BARE
LF 240.000 $1.800 $1.180 $16.000 $1.260 $2.500
ELEC CONDR (NO.12) INSULATED
LF 480.000 $2.000 $1.460 $16.000 $1.320 $2.500
ELEC CONDR (NO.8) BARE
LF 325.000 $2.500 $1.970 $16.000 $2.010 $3.500
ELEC CONDR (NO.8) INSULATED
LF 650.000 $3.000 $1.970 $16.000 $5.030 $4.000
GROUND BOX TY A (122311)W/APRON
EA 2.000 $1,900.000 $1,312.950 $7,000.000 $3,017.920 $2,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 1.000 $900.000 $1,383.790 $1,135.000 $1,322.850 $1,100.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $1,150.000 $1,220.680 $1,100.000 $1,166.930 $1,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $1,300.000 $1,632.390 $1,135.000 $1,560.520 $1,300.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 5.000 $1,150.000 $1,273.290 $1,125.000 $1,217.230 $1,000.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 5.000 $1,400.000 $1,585.040 $1,340.000 $1,515.250 $1,250.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 1.000 $1,500.000 $1,783.660 $1,550.000 $1,705.120 $1,400.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 2.000 $1,200.000 $4,618.320 $3,800.000 $4,414.960 $4,000.000
REMOVE SM RD SN SUP&AM
EA 6.000 $200.000 $140.750 $100.000 $157.180 $100.000
RELOCATE LRSA
EA 1.000 $5,500.000 $2,312.450 $5,000.000 $2,210.620 $1,800.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 6.000 $42.000 $60.420 $43.000 $188.620 $45.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
EA 15.000 $46.000 $87.260 $62.000 $188.620 $65.000
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 54.000 $1.500 $3.950 $3.000 $3.770 $3.000
REFL PAV MRK TY I(W)(UTURN ARW)(100MIL)
EA 2.000 $300.000 $526.150 $400.000 $502.990 $400.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 2.000 $300.000 $460.390 $350.000 $440.120 $350.000
PREFAB PAV MRK TY B (W)(18")(YLD TRI)
EA 8.000 $57.000 $98.650 $75.000 $94.310 $75.000
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 62.000 $20.000 $26.310 $20.000 $25.150 $20.000
REFL PAV MRKR TY II-C-R
EA 146.000 $7.000 $9.210 $7.000 $8.800 $7.000
PAV SURF PREP FOR MRK (6")
LF 1,500.000 $0.250 $1.320 $1.000 $1.260 $1.000
PAV SURF PREP FOR MRK (8")
LF 676.000 $0.250 $2.300 $1.750 $2.200 $1.750
SP MIXES SP-D SAC-A PG70-28
TON 865.000 $160.000 $341.380 $250.000 $215.000 $185.000
INSTALL BRIDGE IDENTIFICATION NUMBERS
EA 2.000 $1,100.000 $2,111.190 $1,500.000 $952.460 $2,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $18,000.000 $24,860.790 $25,000.000 $29,755.410 $18,500.000
HPPM W/RET REQ TY I(W)6"(BRK)(090MIL)
LF 1,640.000 $1.000 $1.640 $1.250 $1.570 $1.250
HPPM W/RET REQ TY I(W)6"(SLD)(090MIL)
LF 10,350.000 $1.000 $0.760 $1.000 $1.260 $1.000
HPPM W/RET REQ TY I(W)6"(SLD)(100MIL)
LF 1,777.000 $1.000 $1.640 $1.250 $1.570 $1.250
HPPM W/RET REQ TY I(Y)6"(SLD)(090MIL)
LF 10,405.000 $1.000 $1.320 $1.000 $1.260 $1.000
TMA (STATIONARY)
DAY 8.000 $400.000 $281.490 $400.000 $1,327.300 $1,500.000
TMA (MOBILE OPERATION)
HR 40.000 $100.000 $73.990 $275.000 $160.670 $95.000
Totals: $9,565,794.000 $10,246,889.620 $10,650,047.200 $11,565,191.536 $11,687,192.950