PREPARING ROW
|
STA
|
350.100
|
$3,000.000
|
$345.000
|
$550.000
|
$535.900
|
$1,000.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
320.000
|
$10.000
|
$33.000
|
$10.700
|
$14.000
|
$50.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
178.000
|
$20.000
|
$33.000
|
$31.000
|
$21.000
|
$50.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (2"-6")
|
SY
|
921.000
|
$5.000
|
$12.900
|
$17.600
|
$7.000
|
$25.000
|
|
|
REMOVING STB BASE AND ASPH PAV(10-14")
|
SY
|
2,629.000
|
$12.000
|
$14.900
|
$17.500
|
$11.700
|
$20.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
4,168.000
|
$10.000
|
$40.500
|
$24.200
|
$14.000
|
$30.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
4,594.000
|
$10.000
|
$34.650
|
$23.900
|
$36.110
|
$25.000
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY B)
|
CY
|
1,017.000
|
$20.000
|
$43.000
|
$30.000
|
$16.400
|
$100.000
|
|
|
BACKFILLING PAVEMENT EDGES
|
CY
|
464.000
|
$30.000
|
$100.000
|
$161.000
|
$17.500
|
$150.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
26,673.000
|
$2.000
|
$3.000
|
$3.450
|
$2.850
|
$5.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
26,673.000
|
$0.500
|
$0.180
|
$0.270
|
$0.280
|
$0.500
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
26,673.000
|
$0.500
|
$0.120
|
$0.230
|
$0.250
|
$0.250
|
|
|
VEGETATIVE WATERING
|
MG
|
874.000
|
$20.000
|
$34.000
|
$33.900
|
$21.000
|
$50.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
26,673.000
|
$2.000
|
$0.960
|
$0.960
|
$1.130
|
$3.000
|
|
|
PROOF ROLLING
|
HR
|
36.000
|
$150.000
|
$129.000
|
$103.000
|
$108.000
|
$200.000
|
|
|
FL BS (CIP)(TY D GR 1-2, OR 5)FINAL POS
|
CY
|
5,896.000
|
$60.000
|
$80.800
|
$85.000
|
$69.190
|
$100.000
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
4,246.000
|
$5.000
|
$4.750
|
$2.150
|
$5.360
|
$8.000
|
|
|
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
|
GAL
|
6,368.000
|
$6.000
|
$4.400
|
$4.600
|
$5.360
|
$7.000
|
|
|
AGGR (TY-PB GR-4)
|
CY
|
182.000
|
$180.000
|
$255.000
|
$280.000
|
$162.570
|
$225.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
1,845.000
|
$75.000
|
$70.000
|
$90.000
|
$74.880
|
$125.000
|
|
|
CEM STABIL BKFL
|
CY
|
49.000
|
$100.000
|
$165.000
|
$245.000
|
$225.560
|
$250.000
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
52.000
|
$130.000
|
$375.000
|
$133.000
|
$95.090
|
$300.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
43.000
|
$160.000
|
$217.000
|
$325.000
|
$330.610
|
$300.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
75.000
|
$5.000
|
$25.000
|
$27.700
|
$58.600
|
$40.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
142.000
|
$25.000
|
$18.000
|
$112.000
|
$38.700
|
$25.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
5.000
|
$500.000
|
$655.000
|
$640.000
|
$772.890
|
$1,000.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
35.000
|
$150.000
|
$250.000
|
$214.000
|
$315.130
|
$300.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
149.000
|
$530.000
|
$585.000
|
$747.000
|
$637.990
|
$700.000
|
|
|
CMP AR (GAL STL DES 5)
|
LF
|
15.000
|
$240.000
|
$350.000
|
$280.000
|
$368.200
|
$500.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
157.000
|
$80.000
|
$105.000
|
$81.100
|
$98.410
|
$150.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
143.000
|
$100.000
|
$134.000
|
$110.000
|
$185.540
|
$175.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
45.000
|
$130.000
|
$169.000
|
$176.000
|
$245.470
|
$225.000
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
180.000
|
$320.000
|
$527.000
|
$502.000
|
$429.990
|
$700.000
|
|
|
RC PIPE (ARCH)(CL III)(DES 2)
|
LF
|
50.000
|
$200.000
|
$244.000
|
$299.000
|
$352.720
|
$325.000
|
|
|
RC PIPE (ARCH)(CL III)(DES 5)
|
LF
|
60.000
|
$290.000
|
$422.000
|
$496.000
|
$441.180
|
$550.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$1,100.000
|
$2,237.000
|
$2,010.000
|
$2,210.310
|
$3,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$1,800.000
|
$2,543.000
|
$2,350.000
|
$2,210.310
|
$3,500.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$3,000.000
|
$3,014.000
|
$2,880.000
|
$3,316.010
|
$4,000.000
|
|
|
SET (TY II) (48 IN) (RCP) (3: 1) (C)
|
EA
|
2.000
|
$7,080.000
|
$6,823.000
|
$7,260.000
|
$7,176.030
|
$9,000.000
|
|
|
SET (TY II) (48 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$7,540.000
|
$9,144.000
|
$9,820.000
|
$8,834.590
|
$12,000.000
|
|
|
SET (TY II) (48 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$10,000.000
|
$13,025.000
|
$15,200.000
|
$14,915.970
|
$17,000.000
|
|
|
SET (TY II) (DES 2) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$5,840.000
|
$1,447.000
|
$6,670.000
|
$5,517.470
|
$2,000.000
|
|
|
SET (TY II) (DES 5) (CMP) (4: 1) (C)
|
EA
|
4.000
|
$7,000.000
|
$2,750.000
|
$2,770.000
|
$6,080.270
|
$3,800.000
|
|
|
SET (TY II) (DES 5) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$9,200.000
|
$3,050.000
|
$17,300.000
|
$8,281.730
|
$4,000.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
2.000
|
$2,000.000
|
$3,050.000
|
$11,200.000
|
$4,975.670
|
$4,500.000
|
|
|
REMOV STR (SET)
|
EA
|
12.000
|
$700.000
|
$550.000
|
$213.000
|
$735.290
|
$2,500.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
4.000
|
$2,000.000
|
$1,500.000
|
$347.000
|
$3,316.010
|
$3,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
746.000
|
$20.000
|
$22.000
|
$10.700
|
$25.190
|
$40.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$755,290.000
|
$487,650.000
|
$570,000.000
|
$584,217.140
|
$900,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
13.000
|
$15,000.000
|
$5,800.000
|
$6,000.000
|
$6,267.900
|
$15,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
320.000
|
$45.000
|
$38.500
|
$28.800
|
$36.060
|
$35.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
145.000
|
$50.000
|
$43.800
|
$38.400
|
$46.200
|
$45.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
465.000
|
$12.000
|
$5.880
|
$10.700
|
$16.900
|
$12.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
1,184.000
|
$30.000
|
$19.850
|
$21.300
|
$22.540
|
$25.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
1,184.000
|
$10.000
|
$4.250
|
$10.700
|
$11.270
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
5,985.000
|
$4.000
|
$3.500
|
$2.650
|
$2.820
|
$3.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
5,985.000
|
$1.000
|
$0.500
|
$0.530
|
$2.250
|
$1.250
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (6")
|
LF
|
1,020.000
|
$5.000
|
$5.800
|
$4.450
|
$4.680
|
$5.000
|
|
|
ONE-WAY TRAF CONT (FLAGGER CONT)
|
HR
|
904.000
|
$90.000
|
$60.000
|
$78.100
|
$120.000
|
$120.000
|
|
|
ONE-WAY TRAF CONT (PILOT CAR)
|
HR
|
296.000
|
$110.000
|
$148.000
|
$181.000
|
$120.000
|
$155.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
1,305.000
|
$50.000
|
$41.000
|
$68.000
|
$69.700
|
$100.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
850.000
|
$5.000
|
$5.100
|
$12.200
|
$16.180
|
$50.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
1,305.000
|
$8.000
|
$15.600
|
$19.500
|
$18.210
|
$30.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
123.000
|
$95.000
|
$114.000
|
$123.000
|
$142.640
|
$150.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
1,346.000
|
$65.000
|
$45.250
|
$60.300
|
$50.600
|
$110.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,425.000
|
$30.000
|
$27.000
|
$28.100
|
$28.510
|
$32.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,575.000
|
$4.000
|
$2.000
|
$1.600
|
$3.240
|
$5.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
8.000
|
$3,340.000
|
$3,200.000
|
$3,280.000
|
$3,611.870
|
$4,500.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
8.000
|
$280.000
|
$300.000
|
$293.000
|
$215.960
|
$400.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$1,410.000
|
$1,100.000
|
$800.000
|
$1,079.780
|
$1,200.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,050.000
|
$500.000
|
$373.000
|
$1,079.780
|
$1,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(W)(TL3)
|
EA
|
2.000
|
$8,400.000
|
$7,900.000
|
$8,920.000
|
$9,556.070
|
$15,000.000
|
|
|
PIPE UNDERDRAINS (TY 8) (6")
|
LF
|
10.000
|
$50.000
|
$62.000
|
$38.000
|
$138.210
|
$400.000
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 1
|
EA
|
2.000
|
$560.000
|
$675.000
|
$720.000
|
$728.850
|
$1,000.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
6.000
|
$320.000
|
$318.000
|
$339.000
|
$343.370
|
$900.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
19.000
|
$665.000
|
$772.000
|
$824.000
|
$833.590
|
$1,800.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
2.000
|
$700.000
|
$807.000
|
$861.000
|
$871.380
|
$2,100.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
6.000
|
$805.000
|
$916.000
|
$977.000
|
$989.080
|
$2,100.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
3.000
|
$1,020.000
|
$1,035.000
|
$1,100.000
|
$1,117.570
|
$2,200.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
7.000
|
$560.000
|
$659.000
|
$703.000
|
$711.580
|
$1,500.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
24.000
|
$125.000
|
$150.000
|
$160.000
|
$161.970
|
$500.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
28.000
|
$30.000
|
$20.000
|
$21.300
|
$21.600
|
$125.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
21.000
|
$35.000
|
$40.000
|
$32.000
|
$32.390
|
$30.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
8.000
|
$80.000
|
$122.000
|
$130.000
|
$131.730
|
$60.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
65,860.000
|
$0.900
|
$0.700
|
$0.750
|
$0.760
|
$1.000
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
48.000
|
$12.000
|
$6.000
|
$6.400
|
$6.480
|
$8.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
65,860.000
|
$0.900
|
$0.700
|
$0.750
|
$0.760
|
$1.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
3,502.000
|
$1.000
|
$1.150
|
$1.750
|
$1.770
|
$1.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
3,502.000
|
$1.000
|
$1.150
|
$1.750
|
$1.770
|
$1.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,740.000
|
$1.200
|
$1.000
|
$1.050
|
$1.080
|
$1.250
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
146.000
|
$7.000
|
$9.500
|
$10.100
|
$10.260
|
$12.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
70.000
|
$185.000
|
$150.000
|
$160.000
|
$161.970
|
$175.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
16.000
|
$90.000
|
$170.000
|
$181.000
|
$183.560
|
$200.000
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
|
EA
|
5.000
|
$60.000
|
$75.000
|
$80.000
|
$80.980
|
$90.000
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
187.000
|
$6.000
|
$9.000
|
$9.600
|
$9.720
|
$10.000
|
|
REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)
|
EA
|
7.000
|
$540.000
|
$190.000
|
$203.000
|
$205.160
|
$200.000
|
|
|
PAVEMENT SEALER 6"
|
LF
|
144,700.000
|
$0.300
|
$0.200
|
$0.210
|
$0.220
|
$0.250
|
|
|
PAVEMENT SEALER 8"
|
LF
|
1,740.000
|
$0.500
|
$0.400
|
$0.430
|
$0.430
|
$0.500
|
|
|
PAVEMENT SEALER 24"
|
LF
|
333.000
|
$2.000
|
$2.000
|
$2.150
|
$2.160
|
$2.500
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
70.000
|
$35.000
|
$25.000
|
$26.700
|
$26.990
|
$30.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
16.000
|
$42.000
|
$30.000
|
$32.000
|
$32.390
|
$35.000
|
|
|
PAVEMENT SEALER (MED NOSE)
|
EA
|
7.000
|
$205.000
|
$35.000
|
$37.400
|
$37.790
|
$40.000
|
|
|
PAVEMENT SEALER (YLD TRI)
|
EA
|
5.000
|
$25.000
|
$10.000
|
$10.700
|
$10.800
|
$12.000
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
68,612.000
|
$0.500
|
$0.730
|
$0.780
|
$0.790
|
$0.750
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
4,821.000
|
$0.600
|
$0.750
|
$0.800
|
$0.810
|
$0.800
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
71,267.000
|
$0.500
|
$0.730
|
$0.780
|
$0.790
|
$0.750
|
|
|
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
|
LF
|
45,477.000
|
$1.000
|
$0.950
|
$1.000
|
$1.030
|
$1.000
|
|
|
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
|
LF
|
29,300.000
|
$1.000
|
$0.950
|
$1.000
|
$1.030
|
$1.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
107.000
|
$5.000
|
$5.250
|
$5.600
|
$5.670
|
$6.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
3,173.000
|
$4.000
|
$5.250
|
$5.600
|
$5.670
|
$6.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
38,440.000
|
$0.500
|
$0.400
|
$0.430
|
$0.430
|
$0.500
|
|
|
TREE REMOVAL (4" - 12" DIA)
|
EA
|
3.000
|
$860.000
|
$2,110.000
|
$2,070.000
|
$3,300.000
|
$5,000.000
|
|
|
TREE PROTECTION
|
AC
|
0.300
|
$8,000.000
|
$33,000.000
|
$50,408.030
|
$22,538.450
|
$75,000.000
|
|
|
D-GR HMA TY-D PG76-22 (LEVEL-UP)
|
TON
|
9,287.000
|
$160.000
|
$103.500
|
$109.000
|
$112.000
|
$125.000
|
|
|
SP MIXES SP-C SAC-B PG76-22
|
TON
|
17,794.000
|
$130.000
|
$97.250
|
$105.000
|
$120.100
|
$120.000
|
|
|
BONDING COURSE
|
GAL
|
18,567.000
|
$4.000
|
$4.200
|
$5.600
|
$4.090
|
$7.000
|
|
|
UNDERSEAL COURSE
|
GAL
|
30,939.000
|
$6.000
|
$4.200
|
$5.600
|
$4.640
|
$6.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
20.000
|
$70.000
|
$400.000
|
$277.000
|
$350.660
|
$200.000
|
|
|
TMA (STATIONARY)
|
DAY
|
123.000
|
$200.000
|
$220.000
|
$143.000
|
$292.220
|
$500.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
20.000
|
$300.000
|
$550.000
|
$556.000
|
$350.660
|
$550.000
|
|
Totals: |
$8,308,212.100
|
$6,260,528.550
|
$6,840,175.909
|
$6,904,102.105
|
$8,810,162.550
|