HARRIS FM 1093 (1258-04-065)

Items: 134

County: HARRIS
Length: N/A
Highway: FM 1093
District: HOUSTON
Control Number: 1258-04-065
DBE Goal: N/A
Project: STP 2017(976)TP
Guaranty: N/A
Time: 850 WORKING DAYS
Engineer's Estimate: $12,182,874.52
Date: 09/06/2019 (6 years ago)
Contract Number: N/A
Type: CONSTRUCT PEDESTRIAN INFRASTRUCTURE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$12,182,874.52
$12,691,072.79
Over/Under Est: 4.17% $508,198.27
Over/Under Est: 13.65% $1,662,553.57
Amt Left: 9.1% $1,154,355.30
Over/Under Est: 31.24% $3,805,345.18
Amt Left: 25.98% $3,297,146.91
Delta: -15.48% -$2,142,791.61
Subcontractor Percentage Amount
THIRD COAST SERVICES LLC 32.57% $3,922,386.57
TEXAS WALL & LANDSCAPE 15.59% $1,877,494.83
GEORGE MEEKS LANDPRO, INC. 6.59% $793,629.95
717 CONSTRUCTION SERVICES, LLC 5.61% $675,609.11
PROFESSIONAL TRAFFIC CONTROL LLC 2.42% $291,439.22
DOUBLE OAK EROSION, INC. 0.81% $97,547.84
MVA CONSTRUCTION LLC 0.79% $95,139.25
RAY'S THREADING AND FAB SHOP 0.74% $89,117.78
CHERRY CRUSHED CONCRETE 0.63% $75,870.54
GMJ PAVING COMPANY LLC 0.55% $66,236.19
ZAMCO DIRECTIONAL DRILLING LLC 0.35% $42,150.30
MICKIE SERVICE, INC. 0.26% $31,311.65
BOOT CONSTRUCTION, LLC 0.17% $20,473.00
Total: 67.08% $8,078,406.23

Bid Items & Bid Tabulations

134 Total 0 of 134
HARRIS  |  FM 1093  |  HOUSTON  |  1258-04-065  |  09/06/2019  |  $12,182,874.52  |  STP 2017(976)TP  |  CONSTRUCT PEDESTRIAN INFRASTRUCT  |  850 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HARPER BROTHERS CONSTRUCTION LLC
MILLIS DEVELOPMENT AND CONSTRUCTION, LLC
MAIN LANE INDUSTRIES LTD.
PREPARING ROW
STA 186.000 $1,000.000 $2,530.000 $2,116.600 $1,400.000
REMOVING CONC (PAV)
SY 546.000 $25.000 $10.000 $25.660 $55.000
REMOVING CONC (DRIVEWAYS)
SY 4,572.000 $15.000 $7.000 $23.090 $27.000
REMOVING CONC (CURB)
LF 5,382.000 $3.000 $3.000 $9.620 $5.000
REMOVING CONC (SIDEWALK OR RAMP)
SY 19,152.000 $10.000 $5.000 $23.090 $10.000
REMOVE CONC (MISC)
EA 1.000 $1,200.000 $500.000 $19,241.830 $100.000
REMOVE STAB BASE & ASPH PAV (13"-18")
SY 550.000 $3.500 $5.000 $20.520 $10.000
BLOCK SODDING(OPT1)
SY 6,355.000 $10.000 $5.440 $5.770 $6.000
FERTILIZER
AC 1.000 $700.000 $13,784.120 $1,421.330 $3,500.000
VEGETATIVE WATERING
MG 1,313.000 $8.640 $35.000 $25.660 $57.000
IRRIGATION SYSTEM (TY I)
LS 1.000 $952,000.000 $772,807.170 $891,538.120 $1,760,000.000
PLANT MATERIAL (4" CNTR)
EA 4,268.000 $6.000 $2.270 $2.570 $4.000
PLANT MATERIAL (1-GAL)
EA 10,774.000 $11.400 $5.240 $7.700 $11.000
PLANT MATERIAL (3-GAL)
EA 3,434.000 $16.000 $20.810 $19.240 $22.000
PLANT MATERIAL (5-GAL)
EA 758.000 $30.000 $21.410 $26.940 $25.000
MULCH
CY 720.000 $40.000 $56.220 $80.820 $95.000
PLANT SOIL MIX
CY 4,994.000 $45.000 $68.410 $51.310 $70.000
LANDSCAPE EDGE
LF 319.000 $15.000 $3.730 $8.980 $5.000
PLANT BED PREPARATION
SY 6,400.000 $5.000 $1.060 $17.960 $19.000
VEGETATION BARRIER
SY 102.000 $15.000 $2.020 $71.840 $34.000
PLANT MATERIAL (100 GAL) (TREE)
EA 155.000 $2,260.000 $975.320 $1,103.200 $1,500.000
PLANT MATERIAL (5 GAL) (SHRUB)
EA 20.000 $40.000 $21.410 $32.070 $25.000
PLANT MATERIAL (7-GAL)
EA 828.000 $60.000 $62.370 $47.460 $50.000
PLANT SOIL MIX (PLANTING SOIL)
CY 5,160.000 $40.000 $63.380 $51.310 $70.000
PLANT SOIL MIX (TURF SOIL)
CY 715.000 $1.000 $63.380 $60.290 $70.000
PLANT MATERIAL (200 GAL) (TREE)
EA 136.000 $2,800.000 $2,136.220 $2,389.840 $3,400.000
HMCL ACP TY-D AC-1.5
TON 30.800 $160.000 $140.000 $186.000 $1,200.000
D-GR HMA(SQ) TY-D SAC-A PG70-22
TON 32.000 $120.000 $140.000 $237.320 $1,200.000
PLANE ASPH CONC PAV (2")
SY 397.600 $0.500 $10.000 $20.520 $150.000
CONC PVMT (CONT REINF)(FAST TRK)(10")
SY 555.000 $95.000 $150.000 $141.110 $450.000
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 226.400 $340.000 $275.000 $352.770 $300.000
DRILL SHAFT (TRF SIG POLE) (48 IN)
LF 498.900 $400.000 $365.000 $468.220 $400.000
CL C CONC (FOOTING)
CY 24.400 $675.000 $500.000 $288.630 $1,500.000
ADJUSTING MANHOLES & INLETS
EA 19.000 $1,300.000 $400.000 $769.670 $1,500.000
ADJUSTING MANHOLES (WATER METER)
EA 32.000 $275.000 $250.000 $455.390 $400.000
ADJUSTING MANHOLES (ELECTRIC BOX)
EA 93.000 $250.000 $350.000 $833.810 $450.000
ADJUSTING MANHOLES (IRRIGATION BOX)
EA 7.000 $250.000 $350.000 $513.120 $400.000
ADJUSTING MANHOLES (TELEPHONE BOX)
EA 30.000 $675.000 $400.000 $962.090 $500.000
MOBILIZATION
LS 1.000 $1,173,030.060 $1,060,000.000 $125,000.000 $1,500,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 18.000 $7,000.000 $10,000.000 $19,883.220 $36,500.000
SANDBAGS FOR EROSION CONTROL
EA 104.000 $6.000 $12.000 $115.450 $50.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 17,180.000 $4.000 $2.250 $1.990 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 17,180.000 $1.000 $1.000 $1.350 $0.500
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 624.000 $4.000 $5.000 $8.340 $8.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 624.000 $2.000 $2.000 $3.850 $0.500
CONC CURB (TY II)
LF 6,020.000 $6.000 $3.000 $8.340 $30.000
CONCRETE CURB (SPECIAL)
LF 1,905.000 $20.000 $3.000 $16.030 $35.000
DRIVEWAYS (CONC)
SY 1,689.000 $75.000 $100.000 $63.500 $108.000
DRIVEWAYS (CONC) (HES)
SY 2,956.000 $95.000 $110.000 $80.240 $126.000
CURB RAMPS (TY 1)
EA 42.000 $1,400.000 $1,500.000 $1,603.500 $1,500.000
CURB RAMPS (TY 2)
EA 79.000 $1,600.000 $1,500.000 $1,731.750 $1,500.000
CURB RAMPS (TY 5)
EA 1.000 $2,000.000 $2,500.000 $2,116.600 $3,000.000
CONC SIDEWALKS (5") (TYPE 1)
SY 14,439.000 $65.000 $110.000 $66.960 $99.000
CONC SIDEWALKS (5") (TYPE 2)
SY 188.000 $85.000 $130.000 $69.270 $135.000
CONC SIDEWALKS (6") (TYPE 1)
SY 34.000 $75.000 $140.000 $67.990 $200.000
CONDT (PVC) (SCH 40) (1")
LF 5,000.000 $27.000 $4.160 $5.340 $5.000
CONDT (PVC) (SCH 40) (1 1/4")
LF 3,205.000 $8.000 $4.310 $5.530 $5.000
CONDT (PVC) (SCH 80) (2")
LF 59,477.000 $8.000 $5.780 $7.410 $7.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 340.000 $15.000 $11.730 $15.050 $13.000
CONDT (PVC) (SCH 80) (3")
LF 530.000 $15.000 $5.780 $7.410 $7.000
CONDT (PVC) (SCH 80) (3") (BORE)
LF 945.000 $25.000 $12.550 $16.100 $13.000
CONDT (PVC) (SCH 80) (4")
LF 650.000 $23.000 $6.720 $8.620 $8.000
CONDT (PVC) (SCH 80) (4") (BORE)
LF 3,135.000 $37.000 $13.490 $17.300 $15.000
ELEC CONDR (NO.10) INSULATED
LF 15,000.000 $2.800 $0.650 $0.830 $0.700
ELEC CONDR (NO.8) INSULATED
LF 60,696.000 $1.250 $0.790 $1.010 $0.800
ELEC CONDR (NO.6) BARE
LF 6,935.000 $1.500 $0.930 $1.190 $1.000
ELEC CONDR (NO.6) INSULATED
LF 53,883.000 $1.500 $1.010 $1.300 $1.100
ELEC CONDR (NO.4) INSULATED
LF 1,280.000 $2.000 $1.300 $1.670 $1.500
TRAY CABLE (4 CONDR) (12 AWG)
LF 6,995.000 $2.250 $1.400 $1.800 $1.600
GROUND BOX TY A (122311)W/APRON
EA 102.000 $975.000 $751.160 $963.580 $800.000
GROUND BOX TY D (162922)W/APRON
EA 49.000 $925.000 $1,127.350 $1,446.150 $1,200.000
RELOCATE ELECTRICAL SERVICES
EA 24.000 $2,500.000 $2,210.900 $2,836.120 $2,400.000
ELC SRV TY D 120/240 060(NS)SS(E)PS(U)
EA 10.000 $7,000.000 $4,284.290 $5,495.840 $5,000.000
RELOCATE SM RD SN SUP&AM TY S80
EA 67.000 $300.000 $550.000 $641.390 $600.000
INSTALL HWY TRF SIG (ISOLATED)
EA 10.000 $32,000.000 $48,973.930 $62,823.200 $55,000.000
REMOVING TRAFFIC SIGNALS
EA 10.000 $4,000.000 $2,117.000 $2,715.660 $2,500.000
VEH SIG SEC (12")LED(GRN)
EA 120.000 $225.000 $154.580 $198.290 $170.000
VEH SIG SEC (12")LED(GRN ARW)
EA 46.000 $200.000 $154.580 $198.290 $170.000
VEH SIG SEC (12")LED(YEL)
EA 120.000 $210.000 $154.580 $198.290 $170.000
VEH SIG SEC (12")LED(YEL ARW)
EA 45.000 $200.000 $154.580 $198.290 $170.000
VEH SIG SEC (12")LED(RED)
EA 120.000 $210.000 $154.580 $198.290 $170.000
VEH SIG SEC (12")LED(RED ARW)
EA 44.000 $195.000 $154.580 $198.290 $170.000
VEH SIG SEC (12")LED(GRN U-TURN ARW)
EA 2.000 $350.000 $195.180 $250.370 $220.000
VEH SIG SEC (12")LED(YEL U-TURN ARW)
EA 2.000 $350.000 $195.180 $250.370 $220.000
VEH SIG SEC (12")LED(RED U-TURN ARW)
EA 2.000 $350.000 $195.180 $250.370 $220.000
PED SIG SEC (LED)(COUNTDOWN)
EA 82.000 $450.000 $347.420 $445.670 $400.000
BACK PLATE (12")(3 SEC)
EA 162.000 $100.000 $78.820 $101.110 $100.000
BACK PLATE (12")(4 SEC)
EA 1.000 $110.000 $102.020 $130.870 $110.000
BACK PLATE (12")(5 SEC)ALUM
EA 1.000 $120.000 $118.260 $151.700 $120.000
TRF SIG CBL (TY A)(14 AWG)(3 CONDR)
LF 12,930.000 $1.250 $0.770 $0.990 $0.800
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
LF 12,770.000 $1.410 $0.920 $1.180 $1.000
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
LF 19,475.000 $1.650 $1.310 $1.680 $1.400
TRF SIG CBL (TY C)(14 AWG)(2 CONDR)
LF 103,576.000 $1.200 $1.070 $1.370 $1.100
INS TRF SIG PL AM (S)1 ARM(20')LUM
EA 1.000 $5,900.000 $7,145.600 $9,166.000 $7,500.000
INS TRF SIG PL AM(S)1 ARM(28')LUM
EA 4.000 $7,500.000 $7,578.280 $9,721.300 $8,000.000
INS TRF SIG PL AM(S)1 ARM(32')LUM
EA 5.000 $7,650.000 $8,429.720 $10,813.500 $9,000.000
INS TRF SIG PL AM(S)1 ARM(36')LUM
EA 4.000 $7,900.000 $8,769.600 $11,249.500 $9,500.000
INS TRF SIG PL AM(S)1 ARM(40')LUM
EA 2.000 $9,000.000 $9,155.880 $11,745.000 $10,000.000
INS TRF SIG PL AM(S)1 ARM(50')LUM
EA 1.000 $8,800.000 $22,925.080 $29,408.000 $25,000.000
INS TRF SIG PL AM(S)1 ARM(55')LUM
EA 1.000 $21,000.000 $23,387.920 $30,002.000 $25,000.000
INS TRF SIG PL AM(S)1 ARM(60')LUM
EA 14.000 $22,200.000 $23,639.640 $30,324.660 $25,000.000
INS TRF SIG PL AM(S)1 ARM(65')LUM
EA 7.000 $21,500.000 $23,766.080 $30,486.860 $25,000.000
PED POLE ASSEMBLY
EA 16.000 $1,800.000 $1,598.950 $2,051.100 $1,700.000
PEDESTRIAN PUSH BUTTON POLE
EA 37.000 $2,240.000 $1,494.550 $1,917.200 $1,600.000
PED DETECT PUSH BUTTON (APS)
EA 83.000 $775.000 $737.200 $945.670 $800.000
VEH LP DETECT (SAWCUT)
LF 24,599.000 $13.000 $8.950 $11.480 $10.000
INSTALL OF ELECTRICAL SERVICE
EA 4.000 $500.000 $5,244.300 $6,727.330 $5,500.000
REMOVAL OF PEDESTRIAN PUSH BUTTONS
EA 1.000 $100.000 $21.180 $27.170 $25.000
REMOVE PED POLE ASSM
EA 4.000 $350.000 $338.720 $434.500 $400.000
LANDSCAPE AMENITY (TY 4)
EA 26.000 $1,741.670 $2,000.000 $2,976.000 $100.000
LANDSCAPE AMENITY (TY 5)
EA 309.000 $4,000.000 $3,324.540 $4,264.680 $3,500.000
LANDSCAPE AMENITY (TY 10)
EA 72.000 $25.000 $2,500.000 $6,157.390 $2,600.000
LANDSCAPE AMENITY (TY 11)
EA 5.000 $15.000 $3,600.000 $4,938.750 $2,500.000
LANDSCAPE AMENITY (TY 12)
EA 26.000 $500.000 $1,275.000 $1,539.350 $1,000.000
LANDSCAPE AMENITY (TY 13)
EA 21.000 $3,141.640 $3,000.000 $13,469.000 $5,000.000
LANDSCAPE AMENITY (TY 14)
EA 7.000 $394.640 $12,102.550 $26,938.500 $5,000.000
LANDSCAPE AMENITY (TY 15)
EA 2.000 $80,000.000 $87,000.000 $103,905.000 $50,000.000
LANDSCAPE AMENITY (TY 18)
EA 24.000 $5,000.000 $5,830.000 $6,221.500 $15,000.000
LANDSCAPE AMENITY (TY 19)
EA 26.000 $375.000 $6,000.000 $10,518.000 $100.000
LANDSCAPE AMENITY (TY 20)
EA 2.000 $5,000.000 $3,000.000 $1,988.000 $2,500.000
LANDSCAPE AMENITY (TRASH/RECYCLE BIN)
EA 26.000 $900.000 $2,000.000 $2,976.000 $100.000
TREE PROTECTION
EA 195.000 $303.400 $400.000 $198.830 $330.000
LOOSE AGGR FOR GROUNDCOVER (TYPE I)
CY 5.000 $16.500 $1,355.170 $115.450 $1,500.000
DECORATIVE LANDSCAPE PAVING (TYPE 1)
SY 897.000 $225.000 $250.000 $207.810 $180.000
DECORATIVE LANDSCAPE PAVING (TYPE 2)
SY 1,631.000 $225.000 $220.000 $207.810 $180.000
DECORATIVE LANDSCAPE PAVING (TYPE 3)
SY 359.400 $180.000 $350.000 $230.900 $450.000
DECORATIVE LANDSCAPE PAVING (TYPE 4)
SY 291.900 $180.000 $350.000 $230.900 $450.000
ADJUST FIRE HYDRANT
EA 17.000 $850.000 $750.000 $3,444.000 $1,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $9,900.000 $15,000.000 $10,903.700 $20,000.000
MULTIPOLYMER PAV MRK (W)(12")(SLD)
LF 6,551.000 $6.000 $3.500 $9.940 $8.000
MULTIPOLYMER PAV MRK (W)(24")(SLD)
LF 1,570.000 $9.000 $8.000 $17.960 $14.000
TMA (STATIONARY)
EA 3.000 $4,125.000 $18,000.000 $4,490.000 $50,000.000
TMA (MOBILE OPERATION)
HR 500.000 $24.000 $30.000 $211.660 $80.000
NATURAL GAS PIPELINE
EA 10.000 $500.000 $750.000 $8,787.000 $500.000
Totals: $12,182,874.520 $12,691,072.790 $13,845,428.110 $15,988,219.700