BRAZORIA SH 288 (0598-02-112)

Items: 161

County: BRAZORIA
Length: N/A
Highway: SH 288
District: HOUSTON
Control Number: 0598-02-112
DBE Goal: N/A
Project: C 598-2-112
Guaranty: N/A
Time: 409 WORKING DAYS
Engineer's Estimate: $28,379,847.40
Date: 06/29/2022 (3 years ago)
Contract Number: N/A
Type: CONSTRUCT BRIDGE
Mail/Deliver Bids To: N/A
MARIA APONTE
RAJENDRA HADA
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (8)
E
Engineer's Estimate
$28,379,847.40
$38,504,600.15
Over/Under Est: 35.68% $10,124,752.75
Over/Under Est: 35.92% $10,193,990.99
Amt Left: 0.18% $69,238.24
Over/Under Est: 37.13% $10,537,766.75
Amt Left: 1.07% $413,014.00
Delta: -0.89% -$343,775.76
$39,074,665.53
Over/Under Est: 37.68% $10,694,818.13
Amt Left: 1.48% $570,065.38
Delta: -0.40% -$157,051.38
Over/Under Est: 38.22% $10,847,131.35
Amt Left: 1.88% $722,378.60
Delta: -0.39% -$152,313.22
Over/Under Est: 39.92% $11,328,620.98
Amt Left: 3.13% $1,203,868.23
Delta: -1.23% -$481,489.63
Over/Under Est: 53.29% $15,124,080.90
Amt Left: 12.98% $4,999,328.15
Delta: -9.56% -$3,795,459.92
Over/Under Est: 70.62% $20,041,957.03
Amt Left: 25.76% $9,917,204.28
Delta: -11.30% -$4,917,876.13
Subcontractor Percentage Amount
JAMES CONSTRUCTION GROUP, LLC 5.48% $2,130,736.37
VULCAN MATERIALS ASPHALT AND CONSTRUCTION, LLC 5.48% $2,130,736.37
DUSTROL, INC. 3.81% $1,481,406.12
HB FARMER FOUNDATION, LLC 2.15% $835,964.09
QUALITY TURF FARMS, L.C. 1.86% $723,206.14
CREACOM, INC. 1.21% $470,472.81
AARON CONCRETE CONTRACTORS, LLC 1.08% $419,926.15
ROMAR UNLIMITED, INC. 0.81% $314,944.61
A&J REBAR LLC 0.58% $225,515.89
MILSTEAD HIGHWAY SERVICES, LLC 0.55% $213,851.28
REPUBLIC TRAFFIC SAFETY, INC. 0.41% $159,416.41
C.G. ANTHONY DELIVERIES, LLC 0.37% $143,863.59
ALLSTATE SIGNAL & CONSTRUCTION, LLC 0.33% $128,310.77
PROFESSIONAL TRAFFIC CONTROL LLC 0.31% $120,534.36
ROADWAY SPECIALTIES, INC. 0.30% $116,646.15
FORDE CONSTRUCTION COMPANY, INC. 0.27% $104,981.54
SB FLEET - LUBE, LLC 0.23% $89,428.72
PRIMATE CONSTRUCTION, LP 0.20% $77,764.10
SCOTT DERR PAINTING CO, LLC 0.17% $66,099.49
JRB ENGINEERING, LLC 0.15% $58,323.08
DORAN STEEL, INC. 0.13% $50,546.67
A&J REBAR LLC 0.12% $46,658.46
SK CONCRETE SERVICES LLC 0.12% $46,658.46
ANTIGO CONSTRUCTION, INC. 0.10% $38,882.05
WILLOW CITY SIGN & RAIL, INC. 0.10% $38,882.05
CLEAN-CO SYSTEMS, INC. 0.05% $19,441.03
YELLOWSTONE LANDSCAPE - CENTRAL, INC. 0.04% $15,552.82
CURB PLANET INC. 0.02% $7,776.41
Total: 26.43% $10,276,525.99

Bid Items & Bid Tabulations

161 Total 0 of 161
BRAZORIA  |  SH 288  |  HOUSTON  |  0598-02-112  |  06/29/2022  |  $28,379,847.40  |  C 598-2-112  |  CONSTRUCT BRIDGE  |  409 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
GRANITE CONSTRUCTION COMPANY
JAMES CONSTRUCTION GROUP, LLC
ZACHRY CONSTRUCTION CORPORATION
WEBBER, LLC
HARPER BROTHERS CONSTRUCTION LLC
SER CONSTRUCTION PARTNERS, LLC
PULICE CONSTRUCTION, INC.
THE LANE CONSTRUCTION CORPORATION
PREPARING ROW
STA 51.310 $8,000.000 $19,000.000 $12,910.000 $48,731.080 $74,000.000 $8,000.000 $13,784.400 $84,786.450 $64,000.000
REMOVING CONC (PAV)
SY 29,454.000 $5.000 $20.000 $3.440 $6.000 $9.000 $10.000 $6.500 $5.330 $6.000
REMOVING CONC (RIPRAP)
CY 15.000 $80.000 $20.000 $91.890 $120.350 $100.000 $150.000 $26.400 $20.000 $35.900
REMOV STAB BASE AND ASPH PAV (2"-15")
SY 59,956.000 $6.000 $10.000 $3.410 $5.130 $5.000 $5.500 $5.800 $5.270 $3.230
EXCAVATION (ROADWAY)
CY 46,267.000 $8.000 $3.000 $6.190 $3.000 $3.250 $15.000 $15.800 $3.500 $10.700
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 221,020.000 $8.000 $14.000 $21.490 $8.000 $12.300 $2.000 $21.100 $13.000 $11.500
EMBANK(FINAL)(DC)(TY E)(CSBE)
CY 38,758.000 $50.000 $45.000 $51.790 $53.000 $60.000 $55.000 $52.700 $55.000 $55.000
EMB(FNL)(DC)(TYE)(CSBE)(RWALL FND IMPR
CY 7,893.000 $50.000 $46.000 $52.280 $53.000 $60.000 $65.000 $52.700 $47.010 $64.000
BLOCK SODDING
SY 105,584.000 $3.000 $4.500 $4.090 $2.780 $2.800 $4.090 $3.300 $2.780 $2.780
STRAW OR HAY MULCH
SY 263,943.000 $0.150 $0.150 $0.350 $0.150 $0.150 $0.350 $0.200 $0.150 $0.150
DRILL SEED (TEMP)(WARM OR COOL)
SY 263,943.000 $0.100 $0.220 $0.090 $0.220 $0.200 $0.090 $0.200 $0.220 $0.220
DRILL SEEDING (PERM)(WARM OR COOL)
SY 158,373.000 $0.200 $0.260 $0.230 $0.260 $0.250 $0.230 $0.300 $0.260 $0.260
FERTILIZER
AC 72.560 $600.000 $325.000 $816.000 $500.000 $500.000 $815.080 $520.000 $500.000 $500.000
VEGETATIVE WATERING
MG 8,708.500 $12.000 $24.000 $40.300 $15.000 $28.000 $30.000 $3.200 $20.000 $25.900
LIME TRT (EXST MATL) (6")
SY 103,963.000 $2.000 $3.470 $2.850 $3.250 $2.800 $1.000 $3.000 $1.260 $3.240
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 1,404.000 $175.000 $270.000 $288.640 $240.000 $265.000 $295.000 $290.400 $265.000 $228.000
CEM TRT(PLNT MX) (CL N)(TY E)(GR 4)(6")
SY 103,963.000 $6.500 $15.000 $10.990 $14.000 $16.700 $13.000 $15.200 $14.140 $18.500
ASPHALT STAB BASE (GR 2)(PG 64)
TON 5,718.000 $72.000 $130.000 $109.980 $98.500 $101.000 $101.000 $122.000 $125.580 $110.000
SALV, HAUL & STKPL RCL APH PV (0 TO 8")
SY 59,956.000 $5.000 $2.000 $1.760 $1.500 $3.000 $0.250 $3.400 $0.410 $1.320
CONC PVMT (CONT REINF - CRCP) (10")
SY 44,927.000 $50.000 $77.000 $87.830 $90.000 $56.000 $105.000 $85.800 $105.270 $95.000
CONC PVMT (CONT REINF - CRCP) (12")
SY 52,145.000 $70.000 $82.000 $92.830 $93.000 $65.000 $110.000 $95.500 $119.820 $105.000
STRUCT EXCAV
CY 7,893.000 $6.000 $2.830 $7.330 $12.000 $15.000 $17.500 $14.900 $15.000 $9.700
CEM STABIL BKFL
CY 4,361.000 $70.000 $64.140 $58.540 $58.000 $48.000 $65.000 $59.300 $65.000 $63.000
CEMENT STAB BACKFILL (INLET OR MH)
CY 330.000 $80.000 $166.600 $58.540 $58.000 $48.000 $65.000 $59.300 $65.000 $62.000
FLOWABLE BACKFILL
CY 140.000 $85.000 $216.660 $287.160 $300.000 $180.000 $225.000 $165.700 $159.370 $236.000
TRENCH EXCAVATION PROTECTION
LF 6,750.000 $2.000 $3.240 $1.070 $5.000 $1.250 $1.500 $0.200 $1.500 $7.500
TEMPORARY SPL SHORING
SF 11,523.000 $7.000 $5.220 $3.820 $2.000 $1.250 $0.500 $1.200 $1.190 $5.800
DRILL SHAFT (24 IN)
LF 168.000 $170.000 $170.000 $100.000 $90.000 $161.000 $150.000 $167.100 $139.710 $91.000
DRILL SHAFT (36 IN)
LF 3,696.000 $180.000 $175.000 $165.350 $203.000 $165.000 $275.000 $234.800 $220.380 $222.000
DRILL SHAFT (84 IN)
LF 512.000 $800.000 $1,000.000 $1,068.950 $993.520 $1,098.000 $1,750.000 $1,112.300 $1,166.520 $1,090.000
DRILL SHAFT (NON - REINFORCED) (12 IN)
LF 14.000 $95.000 $97.980 $192.000 $65.000 $200.000 $150.000 $120.600 $216.500 $66.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 370.000 $280.000 $149.490 $148.050 $142.000 $142.000 $148.050 $209.600 $148.050 $142.000
CL C CONC (ABUT)
CY 292.600 $825.000 $1,000.000 $1,048.260 $1,200.000 $1,100.000 $1,100.000 $1,137.800 $785.160 $1,700.000
CL C CONC (COLUMN)
CY 127.600 $900.000 $1,600.000 $2,002.770 $1,700.000 $1,100.000 $2,325.000 $1,491.300 $1,832.920 $2,070.000
CL F CONC (CAP)
CY 350.000 $800.000 $1,600.000 $943.950 $1,800.000 $1,100.000 $1,475.000 $1,176.400 $911.560 $1,920.000
REINF CONC SLAB
SF 39,828.000 $14.000 $21.000 $19.630 $19.000 $17.000 $28.000 $27.700 $30.000 $29.500
RETAINING WALL (MSE) (WAVE SCHEME)
SF 64,505.000 $30.000 $32.000 $31.780 $60.000 $58.700 $70.000 $33.700 $29.500 $75.000
PRESTR CONC U - BEAM (U54)
LF 3,829.870 $200.000 $340.000 $332.380 $310.000 $350.000 $390.000 $414.900 $320.590 $375.000
RIPRAP (CONC)(4 IN)
CY 715.000 $425.000 $314.600 $382.080 $450.000 $363.000 $650.000 $414.200 $432.830 $500.000
RIPRAP (CONC)(5 IN)
CY 10.000 $425.000 $323.010 $533.410 $800.000 $389.000 $850.000 $353.600 $413.940 $550.000
RIPRAP (CONC)(6 IN)
CY 15.000 $400.000 $268.870 $432.520 $900.000 $429.000 $600.000 $396.600 $402.830 $600.000
RIPRAP (MOW STRIP)(4 IN)
CY 313.000 $480.000 $402.470 $526.090 $600.000 $473.000 $700.000 $456.800 $432.830 $910.000
RAIL (TY SSTR)
LF 14,240.000 $40.000 $64.910 $52.600 $50.000 $52.750 $70.000 $54.000 $59.870 $68.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 274.000 $110.000 $209.610 $187.400 $203.990 $204.000 $250.000 $188.200 $193.820 $228.000
CMP (GAL STL 36 IN)
LF 814.000 $125.000 $92.730 $110.520 $96.000 $118.000 $75.000 $113.200 $90.000 $150.000
CONC BOX CULV (4 FT X 2 FT)
LF 80.000 $189.000 $500.000 $302.410 $277.120 $293.000 $400.000 $308.600 $304.960 $422.000
CONC BOX CULV (5 FT X 4 FT)
LF 1,449.000 $400.000 $600.000 $436.000 $416.780 $437.000 $500.000 $449.000 $450.000 $620.000
RC PIPE (CL III)(24 IN)
LF 1,125.000 $80.000 $100.000 $109.360 $83.660 $92.000 $150.000 $105.700 $122.440 $133.000
RC PIPE (CL III)(30 IN)
LF 756.000 $90.000 $125.000 $105.650 $93.130 $109.000 $175.000 $114.600 $103.080 $152.000
RC PIPE (CL III)(36 IN)
LF 1,711.000 $125.000 $145.000 $149.560 $130.080 $138.000 $225.000 $158.200 $138.500 $199.000
RC PIPE (CL III)(42 IN)
LF 1,043.000 $150.000 $250.000 $187.970 $194.480 $195.000 $300.000 $209.100 $186.300 $278.000
RC PIPE (CL III)(48 IN)
LF 98.000 $225.000 $300.000 $210.670 $198.550 $258.000 $350.000 $235.500 $233.330 $335.000
JCTBOX(COMPL)(PJB)(8FTX8FT)
EA 9.000 $14,000.000 $20,000.000 $14,406.150 $16,766.600 $15,000.000 $18,000.000 $15,082.700 $15,745.440 $25,700.000
INLET (COMPL)(TY AAD)
EA 7.000 $5,000.000 $7,000.000 $6,175.500 $7,190.010 $7,500.000 $7,925.000 $6,231.700 $6,607.730 $11,900.000
INLET (COMPL)(TY AZR2G)
EA 20.000 $10,000.000 $12,000.000 $13,046.750 $10,980.280 $12,000.000 $13,550.000 $11,889.400 $8,129.700 $16,000.000
MANH (COMPL)(TY A)
EA 26.000 $6,500.000 $7,500.000 $6,626.060 $6,745.290 $7,000.000 $8,100.000 $7,536.200 $8,440.440 $11,000.000
INLET (COMPL)(CURB)(TY C)
EA 9.000 $8,000.000 $8,500.000 $5,810.100 $7,025.290 $7,500.000 $7,925.000 $6,199.900 $6,557.720 $10,500.000
WINGWALL (PW - 1) (HW=5 FT)
EA 2.000 $17,000.000 $20,000.000 $16,461.410 $32,304.140 $30,000.000 $20,500.000 $17,397.300 $11,690.620 $19,300.000
SET (TY I)(S= 5 FT)(HW= 5 FT)(6:1) (P)
EA 1.000 $11,000.000 $21,648.200 $16,682.940 $17,052.970 $17,500.000 $17,725.000 $13,141.300 $15,087.730 $24,200.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 2.000 $2,000.000 $2,173.270 $1,445.290 $1,390.750 $2,000.000 $1,550.000 $1,340.000 $2,152.730 $2,970.000
SET (TY II) (36 IN) (CMP) (6: 1) (P)
EA 3.000 $4,180.000 $663.800 $2,115.630 $2,865.420 $5,000.000 $2,050.000 $4,895.300 $2,277.730 $5,600.000
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 3.000 $4,000.000 $4,766.120 $5,128.200 $4,509.100 $5,000.000 $5,300.000 $4,895.300 $4,942.730 $6,000.000
CLEAN EXIST CULVERTS
EA 1.000 $2,000.000 $18,106.270 $3,509.000 $10,000.000 $15,000.000 $25,000.000 $18,200.000 $4,819.220 $8,300.000
REMOV STR (INLET)
EA 11.000 $700.000 $400.000 $700.230 $1,500.000 $1,000.000 $1,000.000 $297.400 $804.730 $1,560.000
REMOV STR (MANHOLE)
EA 1.000 $700.000 $800.000 $770.260 $3,000.000 $1,000.000 $2,150.000 $377.500 $1,278.890 $1,580.000
REMOV STR (SET)
EA 21.000 $500.000 $200.000 $366.790 $750.000 $750.000 $1,000.000 $175.800 $594.850 $1,000.000
REMOV STR (HEADWALL)
EA 2.000 $1,000.000 $2,000.000 $2,481.140 $2,500.000 $5,000.000 $2,100.000 $832.000 $2,049.560 $2,110.000
REMOV STR (PIPE)
LF 4,284.000 $15.000 $20.000 $22.650 $22.000 $23.000 $25.000 $27.500 $32.510 $36.400
MOBILIZATION
LS 1.000 $2,800,000.000 $3,700,000.000 $3,800,000.000 $3,499,500.000 $3,800,000.000 $1,350,000.000 $2,850,000.000 $4,350,392.840 $5,240,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 16.000 $8,000.000 $15,000.000 $7,478.080 $5,600.000 $10,000.000 $15,000.000 $18,370.300 $18,665.120 $24,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 1,110.000 $28.000 $60.000 $34.910 $30.000 $35.000 $34.910 $36.400 $34.910 $37.700
ROCK FILTER DAMS (REMOVE)
LF 1,110.000 $8.000 $3.830 $11.890 $10.000 $11.900 $11.890 $10.400 $11.890 $12.900
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 624.000 $20.000 $20.000 $29.940 $30.000 $29.900 $29.940 $21.900 $29.940 $32.400
CONSTRUCTION EXITS (REMOVE)
SY 624.000 $7.000 $2.550 $7.760 $10.000 $7.750 $7.760 $6.000 $7.760 $8.400
SANDBAGS FOR EROSION CONTROL (6")
LF 276.000 $2.200 $8.000 $14.790 $4.000 $14.800 $14.790 $9.900 $14.790 $17.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,153.000 $2.200 $4.000 $3.780 $2.250 $3.800 $3.780 $1.800 $3.780 $4.090
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,153.000 $0.650 $0.400 $0.990 $1.000 $1.000 $0.990 $0.600 $0.990 $1.070
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 1,205.000 $4.000 $12.000 $5.580 $5.000 $5.600 $5.580 $4.800 $5.580 $6.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,205.000 $0.900 $2.550 $0.990 $1.000 $1.000 $0.990 $1.900 $0.990 $1.070
CONSTRUCTING DETOURS
SY 19,970.000 $65.000 $125.000 $82.300 $85.000 $80.000 $85.000 $81.800 $82.660 $100.000
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
LF 13,050.000 $8.000 $7.000 $11.090 $5.000 $7.500 $15.500 $11.500 $7.390 $10.300
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 10,950.000 $5.000 $2.000 $7.450 $2.000 $5.500 $5.000 $9.400 $5.900 $4.440
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 13,050.000 $6.000 $5.000 $10.280 $5.000 $7.000 $12.500 $11.400 $7.390 $9.200
CONC CURB (MONO) (TY II)
LF 11,702.000 $6.000 $3.410 $3.480 $4.000 $5.450 $7.500 $3.800 $5.340 $8.800
DRIVEWAYS (CONC)
SY 116.000 $70.000 $350.000 $127.150 $85.000 $70.750 $125.000 $84.200 $35.000 $144.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 4.000 $1,500.000 $3,900.540 $4,285.000 $1,300.000 $2,500.000 $4,285.000 $2,665.500 $2,425.000 $1,320.000
CRASH CUSH ATTEN (REMOVE)
EA 6.000 $800.000 $1,592.670 $1,200.000 $800.000 $1,500.000 $1,200.000 $1,612.000 $895.000 $810.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 10.000 $24,000.000 $26,088.470 $25,600.000 $24,900.000 $20,000.000 $25,600.000 $28,785.100 $26,600.000 $25,300.000
REMOVE RD IL ASM (U/P)
EA 16.000 $350.000 $146.460 $145.700 $167.000 $167.000 $145.700 $260.000 $145.700 $167.000
IN RD IL (U/P) (TY 1) (150W EQ) LED
EA 8.000 $1,300.000 $1,599.080 $1,583.090 $1,020.000 $1,020.000 $1,583.090 $1,173.100 $1,583.090 $1,020.000
IN RD IL (TY SA) 50T-8 (400W EQ) LED
EA 37.000 $4,300.000 $5,504.980 $5,449.930 $3,358.000 $3,360.000 $5,449.930 $3,857.400 $5,449.930 $3,360.000
CONDT (PVC) (SCH 80) (2")
LF 8,580.000 $9.000 $12.030 $11.910 $14.750 $14.800 $11.910 $13.700 $11.910 $14.800
CONDT (PVC) (SCH 80) (2") (BORE)
LF 2,215.000 $19.000 $13.870 $13.730 $22.770 $22.800 $13.730 $18.000 $13.730 $22.800
CONDT (RM) (1")
LF 180.000 $20.000 $21.430 $21.220 $18.080 $18.100 $21.220 $39.100 $21.220 $18.100
ELEC CONDR (NO.8) BARE
LF 6,240.000 $1.100 $1.150 $1.140 $1.800 $1.800 $1.140 $2.000 $1.140 $1.800
ELEC CONDR (NO.8) INSULATED
LF 12,470.000 $1.200 $1.240 $1.230 $1.910 $1.900 $1.230 $2.000 $1.230 $1.910
GROUND BOX TY A (122311)
EA 6.000 $740.000 $738.380 $731.030 $768.000 $768.000 $731.030 $743.600 $731.030 $770.000
GROUND BOX TY A (122311)W/APRON
EA 10.000 $900.000 $917.820 $908.640 $814.000 $814.000 $908.640 $1,040.000 $908.640 $810.000
ELC SRV TY A 240/480 060(NS)SS(E)TP(O)
EA 3.000 $5,000.000 $6,622.360 $6,556.140 $7,678.000 $7,680.000 $6,556.140 $5,969.600 $6,556.140 $7,700.000
ALUMINUM SIGNS (TY G)
SF 686.000 $30.000 $34.340 $39.000 $23.000 $45.000 $39.000 $26.700 $29.540 $23.400
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 34.000 $500.000 $695.690 $475.000 $495.000 $800.000 $475.000 $832.000 $670.930 $500.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 4.000 $800.000 $781.200 $595.000 $620.000 $850.000 $595.000 $884.000 $1,082.510 $630.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 10.000 $700.000 $965.360 $665.000 $675.000 $900.000 $665.000 $936.000 $947.200 $690.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 5.000 $1,600.000 $1,014.380 $745.000 $800.000 $1,050.000 $745.000 $1,092.000 $1,127.620 $810.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 2.000 $680.000 $1,243.860 $865.000 $900.000 $1,130.000 $865.000 $1,170.000 $1,195.280 $910.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 2.000 $900.000 $1,540.270 $1,335.000 $1,510.000 $1,200.000 $1,335.000 $1,248.000 $1,928.230 $1,530.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
EA 2.000 $2,500.000 $2,044.450 $2,450.000 $1,800.000 $2,500.000 $2,450.000 $1,664.200 $2,046.740 $1,830.000
REMOVE SM RD SN SUP&AM
EA 41.000 $80.000 $106.000 $70.000 $50.000 $100.000 $70.000 $104.000 $95.850 $51.000
INSTALL LRSS (STRUCT STEEL)
LB 5,372.000 $10.000 $5.490 $4.980 $4.600 $3.700 $5.100 $3.800 $5.620 $4.670
RELOCATE LRSA
EA 1.000 $4,000.000 $2,805.050 $4,350.000 $3,400.000 $2,750.000 $3,350.000 $10,954.500 $4,905.130 $3,450.000
REMOVE LRSA
EA 3.000 $1,200.000 $607.070 $595.000 $850.000 $500.000 $1,850.000 $9,654.500 $670.930 $600.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 95.000 $18.000 $11.800 $25.000 $20.000 $25.000 $25.000 $2.300 $23.680 $21.300
INSTL OM ASSM (OM-2Y)(WC)GND
EA 5.000 $60.000 $85.000 $65.000 $60.000 $83.750 $65.000 $26.000 $101.490 $91.000
INSTL OM ASSM (OM-1)(WFLX)GND
EA 18.000 $120.000 $75.000 $185.000 $160.000 $185.000 $185.000 $52.000 $202.970 $162.000
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 3,655.000 $1.000 $0.810 $2.000 $0.800 $1.450 $0.800 $1.500 $0.800 $0.810
WK ZN PAV MRK REMOV (W)4"(DOT)
LF 206.000 $1.500 $2.020 $2.750 $2.000 $3.000 $2.000 $3.100 $2.000 $2.030
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 15,166.000 $1.000 $0.730 $1.750 $0.720 $1.450 $0.720 $1.500 $0.720 $0.730
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 2,900.000 $1.700 $1.410 $2.000 $1.400 $2.000 $1.400 $2.100 $1.400 $1.420
WK ZN PAV MRK REMOV (W)(ARROW)
EA 6.000 $180.000 $139.390 $200.000 $138.000 $265.000 $138.000 $275.600 $138.000 $140.000
WK ZN PAV MRK REMOV (W)(WORD)
EA 4.000 $180.000 $166.670 $200.000 $165.000 $300.000 $165.000 $312.000 $165.000 $168.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 14,960.000 $1.000 $0.730 $1.750 $0.720 $1.250 $0.720 $1.300 $0.720 $0.730
REFL PAV MRK TY II (W) 18" (YLD TRI)
EA 86.000 $20.000 $20.200 $25.000 $20.000 $25.000 $20.000 $26.000 $20.000 $20.300
PAVEMENT SEALER 6"
LF 52,130.000 $0.150 $0.170 $0.250 $0.170 $0.300 $0.170 $0.300 $0.170 $0.170
PAVEMENT SEALER 8"
LF 6,432.000 $0.300 $0.210 $0.400 $0.210 $0.450 $0.210 $0.500 $0.210 $0.210
PAVEMENT SEALER 12"
LF 1,522.000 $1.000 $0.300 $2.000 $0.300 $0.650 $0.300 $0.700 $0.300 $0.300
PAVEMENT SEALER 24"
LF 419.000 $2.000 $0.690 $4.000 $0.680 $2.000 $0.680 $2.100 $0.680 $0.690
PAVEMENT SEALER (ARROW)
EA 14.000 $35.000 $9.090 $35.000 $9.000 $35.000 $9.000 $36.400 $9.000 $9.100
PAVEMENT SEALER (WORD)
EA 13.000 $40.000 $11.110 $35.000 $11.000 $45.000 $11.000 $46.800 $11.000 $11.200
PAVEMENT SEALER (DBL ARROW)
EA 6.000 $40.000 $11.110 $50.000 $11.000 $60.000 $11.000 $62.400 $11.000 $11.200
PAVEMENT SEALER (YLD TRI)
EA 86.000 $14.000 $6.060 $20.000 $6.000 $5.000 $6.000 $5.200 $6.000 $6.100
REFL PAV MRKR TY II-A-A
EA 65.000 $3.500 $5.050 $6.000 $5.000 $5.000 $5.000 $5.200 $5.000 $5.100
REFL PAV MRKR TY II-C-R
EA 583.000 $3.500 $5.050 $6.000 $5.000 $5.000 $5.000 $5.200 $5.000 $5.100
ELIM EXT PAV MRK & MRKS (4")
LF 10,823.000 $0.400 $0.410 $0.750 $0.410 $0.650 $0.410 $0.700 $0.410 $0.420
ELIM EXT PAV MRK & MRKS (ARROW)
EA 3.000 $50.000 $30.300 $75.000 $30.000 $100.000 $30.000 $104.000 $30.000 $30.500
ELIM EXT PAV MRK & MRKS (WORD)
EA 7.000 $50.000 $7.070 $75.000 $40.000 $100.000 $40.000 $104.000 $40.000 $40.600
PAV SURF PREP FOR MRK (6")
LF 52,130.000 $0.040 $0.040 $0.050 $0.040 $0.050 $0.040 $0.100 $0.040 $0.040
PAV SURF PREP FOR MRK (8")
LF 6,432.000 $0.100 $0.080 $0.100 $0.080 $0.150 $0.080 $0.200 $0.080 $0.080
PAV SURF PREP FOR MRK (12")
LF 1,522.000 $0.300 $0.120 $0.500 $0.120 $0.250 $0.120 $0.200 $0.120 $0.120
PAV SURF PREP FOR MRK (24")
LF 419.000 $1.000 $0.250 $1.000 $0.250 $0.650 $0.250 $0.700 $0.250 $0.250
PAV SURF PREP FOR MRK (ARROW)
EA 14.000 $15.000 $5.050 $10.000 $5.000 $25.000 $5.000 $26.000 $5.000 $5.100
PAV SURF PREP FOR MRK (DBL ARROW)
EA 6.000 $15.000 $5.050 $10.000 $5.000 $35.000 $5.000 $36.400 $5.000 $5.100
PAV SURF PREP FOR MRK (WORD)
EA 13.000 $15.000 $5.050 $10.000 $5.000 $25.000 $5.000 $26.000 $5.000 $5.100
PAV SURF PREP FOR MRK (18")(YLD TRI)
EA 86.000 $7.000 $5.050 $5.000 $5.000 $10.000 $5.000 $10.400 $5.000 $5.100
REMOVE RDSD FLASH BEACON ASSEMBLY
EA 4.000 $600.000 $956.930 $947.360 $296.500 $297.000 $947.360 $312.000 $947.360 $297.000
REMOVAL OF GROUND BOXES
EA 6.000 $233.000 $389.100 $385.270 $250.500 $251.000 $385.270 $52.000 $385.270 $251.000
WIDE FLANGE PAVEMENT TERMINALS
LF 192.000 $250.000 $444.070 $576.740 $540.450 $700.000 $900.000 $626.700 $272.300 $760.000
TIP TESTING(DRILL SHAFT)
EA 8.000 $7,000.000 $7,200.000 $7,500.000 $6,562.500 $6,046.510 $6,250.000 $7,836.400 $7,850.270 $7,600.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 2,244.000 $75.000 $31.460 $21.210 $70.000 $55.000 $10.000 $11.100 $120.080 $49.100
MULTIPOLYMER PAV MRK (W)(6")(SLD)
LF 27,183.000 $1.000 $0.560 $0.850 $0.550 $0.900 $0.550 $0.900 $0.550 $0.560
MULTIPOLYMER PAV MRK (W)(6")(BRK)
LF 4,468.000 $1.000 $0.570 $0.850 $0.560 $0.900 $0.560 $0.900 $0.560 $0.570
MULTIPOLYMER PAV MRK (W)(6")(DOT)
LF 93.000 $1.500 $1.010 $3.500 $1.000 $1.500 $1.000 $1.600 $1.000 $1.020
MULTIPOLYMER PAV MRK (W)(8")(SLD)
LF 6,432.000 $1.500 $0.960 $1.500 $0.950 $1.850 $0.950 $1.900 $0.950 $0.960
MULTIPOLYMER PAV MRK (W)(12")(SLD)
LF 1,489.000 $4.000 $2.020 $7.000 $2.000 $4.000 $2.000 $4.200 $2.000 $2.030
MULTIPOLYMER PAV MRK (W)(24")(SLD)
LF 419.000 $8.000 $5.150 $14.000 $5.100 $8.000 $5.100 $8.300 $5.100 $5.200
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
LF 20,386.000 $1.000 $0.550 $0.850 $0.540 $0.900 $0.540 $0.900 $0.540 $0.550
MULTIPOLYMER PAV MRK (Y)(12")(SLD)
LF 33.000 $5.000 $6.060 $7.000 $6.000 $4.000 $6.000 $4.200 $6.000 $6.100
MULTIYPOLYMER PAV MRK (W) (ARROW)
EA 14.000 $230.000 $148.490 $340.000 $147.000 $375.000 $147.000 $390.000 $147.000 $149.000
MULTIPOLYMER PAV MRK (W) (DBL ARROW)
EA 6.000 $230.000 $166.670 $440.000 $165.000 $450.000 $165.000 $468.000 $165.000 $168.000
MULTIPOLYMER PAV MRK (W) (WORD)
EA 13.000 $230.000 $181.820 $360.000 $180.000 $400.000 $180.000 $416.000 $180.000 $183.000
REMOVE EXISTING CABLES (POWER)
LF 3,873.000 $2.000 $0.520 $0.510 $0.930 $0.950 $0.510 $2.900 $0.510 $0.930
TMA (STATIONARY)
DAY 1,466.000 $175.000 $225.000 $218.300 $145.000 $150.000 $100.000 $11.400 $48.140 $135.000
Totals: $28,379,847.400 $38,504,600.150 $38,573,838.399 $38,917,614.155 $39,074,665.530 $39,226,978.755 $39,708,468.387 $43,503,928.321 $48,421,804.430