Show Job Controls
Bid Cobra

BEXAR US 90 (0024-08-141)

Items: 123

County: BEXAR
Length: N/A
Highway: US 90
District: SAN ANTONIO
Control Number: 0024-08-141
DBE Goal: N/A
Project: F 2023(121)
Guaranty: N/A
Time: 461 WORKING DAYS
Engineer's Estimate: $31,007,249.04
Date: 09/08/2022 (3 years ago)
Contract Number: N/A
Type: RESURFACE ROADWAY
Mail/Deliver Bids To: N/A
SERGIO GARCIA
DANNY GALLEGOS
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$31,007,249.04
$28,447,459.12
Over/Under Est: -8.26% -$2,559,789.92
Over/Under Est: -3.27% -$1,015,236.93
Amt Left: 5.43% $1,544,552.99
Over/Under Est: -0.91% -$281,536.23
Amt Left: 8.01% $2,278,253.69
Delta: -2.45% -$733,700.70
$34,778,802.24
Over/Under Est: 12.16% $3,771,553.20
Amt Left: 22.26% $6,331,343.12
Delta: -13.19% -$4,053,089.43
Over/Under Est: 25.64% $7,951,534.12
Amt Left: 36.95% $10,511,324.04
Delta: -12.02% -$4,179,980.92
Subcontractor Percentage Amount
LONE STAR EROSION CONTROL 5.04% $1,547,677.98
TRP CONSTRUCTION GROUP, LLC 3.06% $939,661.63
DUSTROL, INC. 2.13% $654,078.19
SK QUALITY CONCRETE LP 1.74% $534,317.40
PERFORMANCE EQUIPMENT SERVICE 1.18% $362,353.18
PRIMATE CONSTRUCTION, LP 1.03% $316,291.33
THE LEVY COMPANY, INC. 0.93% $285,583.44
FLASHER EQUIPMENT COMPANY 0.74% $227,238.43
GIBSON & ASSOCIATES, INC. 0.30% $92,123.69
SERNA'S TRUCKING 0.13% $39,920.27
A. H. BECK FOUNDATION CO., INC. 0.05% $15,353.95
CALAME CONTRACTING, LLC 0.05% $15,353.95
S&S BRIDGE PAINTING 0.04% $12,283.16
SWEEPING CORPORATION OF AMERICA, LLC 0.02% $6,141.58
BUYERS BARRICADES, INC. 0.02% $6,141.58
BUYERS BARRICADES SAN ANTONIO, LLC 0.02% $6,141.58
AWP SAFETY 0.01% $3,070.79
Total: 16.49% $5,063,732.13

Bid Items & Bid Tabulations

123 Total 0 of 123
BEXAR  |  US 90  |  SAN ANTONIO  |  0024-08-141  |  09/08/2022  |  $31,007,249.04  |  F 2023(121)  |  RESURF ROADWAY  |  461 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
AUSTIN BRIDGE & ROAD SERVICES, LP
LONE STAR PAVING COMPANY
TEXAS MATERIALS GROUP, INC.
HUNTER INDUSTRIES, LTD.
CLARK CONSTRUCTION OF TEXAS, INC.
PREPARING ROW
STA 465.000 $5,000.000 $1,720.000 $216.000 $520.000 $470.340 $200.000
REMOVING CONC (RIPRAP)
SY 2,022.000 $7.500 $15.300 $22.850 $15.000 $25.200 $13.800
REMOVING CONCRETE(MOW STRIP)
LF 273.000 $4.000 $9.450 $27.180 $15.000 $13.680 $27.600
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 899.000 $50.000 $36.290 $540.000 $50.000 $49.500 $26.450
BLOCK SODDING
SY 12,778.000 $6.000 $7.000 $5.710 $7.500 $7.850 $11.500
VEGETATIVE WATERING
MG 201.600 $30.000 $30.000 $54.000 $55.000 $23.940 $115.000
ASPH (AC-20-5TR)
GAL 218,012.000 $5.000 $4.420 $4.700 $5.000 $5.490 $5.050
AGGR (TY-PB GR-4)
CY 5,677.000 $95.000 $192.430 $122.520 $215.000 $140.620 $102.650
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 7,592.000 $35.000 $42.000 $40.570 $43.000 $57.020 $56.610
FLEXIBLE PAVEMENT STRUCTURE REPAIR(7")
SY 16,540.000 $38.000 $48.000 $46.210 $48.000 $64.430 $65.170
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 48,689.000 $39.000 $54.500 $54.550 $56.000 $75.230 $75.830
PLANE ASPH CONC PAV(0" TO 4")
SY 67,328.000 $2.200 $2.740 $2.360 $3.300 $2.830 $7.570
PLANE ASPH CONC PAV (2")
SY 717,001.000 $2.000 $1.820 $2.290 $2.150 $2.390 $4.030
CL C CONC (RAIL FOUNDATION)
CY 38.000 $250.000 $629.510 $815.550 $1,250.000 $800.000 $1,440.950
CONC STR REPAIR(DECK REP (FULL DEPTH))
SF 156.000 $150.000 $456.690 $604.800 $225.000 $240.000 $260.000
RIPRAP (CONC)(4 IN)
CY 217.000 $550.000 $537.020 $655.880 $475.000 $699.930 $627.000
RIPRAP (MOW STRIP)(4 IN)
CY 1,679.000 $550.000 $549.880 $596.330 $465.000 $583.260 $627.000
CLEANING EXISTING JOINTS
LF 4,584.000 $16.000 $9.750 $10.530 $9.750 $10.170 $23.000
RAIL (TY SSTR)
LF 260.000 $45.000 $158.970 $209.240 $150.000 $110.000 $201.250
RETROFIT RAIL (TY T221)
LF 1,694.000 $220.000 $123.490 $240.750 $150.000 $140.000 $201.250
HEADER TYPE EXPANSION JOINT
CF 790.000 $280.000 $298.630 $322.520 $300.000 $311.420 $955.000
JOINT SEALANT
LF 4,584.000 $20.000 $7.000 $7.500 $7.000 $7.300 $17.250
REMOVE STR (RAIL)
LF 1,694.000 $20.000 $20.000 $14.600 $30.000 $10.000 $34.500
MOBILIZATION
LS 1.000 $2,935,641.890 $2,700,000.000 $1,500,000.000 $2,373,000.000 $3,463,919.870 $1,525,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 29.000 $15,000.000 $23,000.000 $999.000 $3,700.000 $13,975.080 $2,500.000
SANDBAGS FOR EROSION CONTROL
EA 6.000 $15.000 $10.000 $48.600 $8.000 $11.220 $575.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 38,299.000 $4.000 $3.900 $4.970 $5.750 $4.380 $7.190
BIODEG EROSN CONT LOGS (REMOVE)
LF 38,299.000 $0.750 $1.000 $0.910 $0.750 $1.120 $0.580
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 660.000 $25.000 $48.860 $107.150 $30.000 $35.000 $34.500
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 2,640.000 $5.500 $13.160 $16.200 $20.000 $12.000 $23.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 660.000 $5.500 $13.160 $23.850 $30.000 $20.000 $34.500
MTL W-BEAM GD FEN (TIM POST)
LF 31,528.000 $29.000 $23.150 $25.000 $25.750 $27.950 $37.660
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 35.000 $2,500.000 $1,600.000 $1,728.000 $3,575.000 $1,843.070 $3,277.500
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 74.000 $1,500.000 $1,470.000 $1,587.600 $1,500.000 $1,367.640 $2,070.000
MTL BM GD FEN TRANS (ANCHOR PLATE)
EA 10.000 $1,000.000 $1,105.000 $1,193.400 $500.000 $1,145.840 $2,259.750
REMOVE METAL BEAM GUARD FENCE
LF 27,349.000 $4.500 $2.000 $2.160 $1.750 $3.060 $3.450
REMOVE TERMINAL ANCHOR SECTION
EA 97.000 $235.000 $350.000 $378.000 $200.000 $260.520 $569.250
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 28.000 $230.000 $125.000 $135.000 $200.000 $173.740 $517.500
GUARDRAIL END TREATMENT (INSTALL)
EA 79.000 $3,100.000 $2,955.000 $3,191.400 $2,900.000 $322.520 $4,398.750
GUARDRAIL END TREATMENT (REMOVE)
EA 56.000 $375.000 $175.000 $189.000 $200.000 $260.580 $460.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 4.000 $1,300.000 $750.000 $810.000 $1,500.000 $1,071.770 $1,725.000
CRASH CUSH ATTEN (REMOVE)
EA 1.000 $1,300.000 $500.000 $540.000 $1,500.000 $765.780 $1,725.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 1.000 $9,500.000 $8,830.000 $9,536.000 $9,500.000 $8,531.290 $10,925.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 7.000 $575.000 $550.000 $594.000 $550.000 $734.400 $649.750
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 1.000 $680.000 $655.000 $707.400 $655.000 $790.500 $672.750
IN SM RD SN SUP&AM (INST SIGN ONLY)
EA 1.000 $350.000 $340.000 $367.200 $340.000 $332.520 $402.500
REMOVE SM RD SN SUP&AM
EA 8.000 $135.000 $120.000 $129.600 $120.000 $61.200 $143.750
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 370.000 $24.000 $28.000 $29.160 $28.000 $36.210 $78.200
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 73.000 $27.000 $28.000 $29.160 $28.000 $36.210 $78.200
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
EA 40.000 $80.000 $112.000 $120.960 $112.000 $40.800 $78.200
INSTL DEL ASSM (D-DW)SZ 1(WFLX)GND
EA 31.000 $50.000 $117.000 $126.360 $117.000 $31.620 $78.200
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 1,510.000 $0.400 $1.000 $0.580 $0.540 $1.020 $0.460
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 2,808.000 $0.400 $0.850 $0.580 $0.540 $0.870 $0.460
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 3,006.000 $0.400 $0.850 $0.580 $0.540 $0.870 $0.460
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 6,020.000 $0.900 $1.000 $0.900 $0.830 $1.020 $1.730
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 20,333.000 $0.650 $0.850 $0.680 $0.630 $0.870 $0.980
WK ZN PAV MRK REMOV (W)6"(BRK)
LF 62,995.000 $0.950 $0.900 $0.900 $0.830 $0.920 $2.010
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 98,611.000 $0.700 $0.900 $0.680 $0.630 $0.920 $2.010
WK ZN PAV MRK REMOV (W)8"(LNDP)
LF 182.000 $1.700 $2.000 $1.620 $1.500 $2.040 $2.880
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 12,799.000 $1.700 $1.250 $1.620 $1.500 $1.270 $2.880
WK ZN PAV MRK REMOV (W)12"(LNDP)
LF 2,558.000 $3.000 $1.500 $2.700 $2.500 $1.530 $5.750
WK ZN PAV MRK REMOV (W)12"(SLD)
LF 15,062.000 $3.500 $2.750 $2.700 $2.500 $2.810 $5.750
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 1,060.000 $7.500 $5.000 $6.480 $6.000 $5.100 $11.500
WK ZN PAV MRK REMOV (W)(ARROW)
EA 30.000 $165.000 $150.000 $178.200 $165.000 $153.000 $230.000
WK ZN PAV MRK REMOV (W)(DBL ARROW)
EA 5.000 $290.000 $200.000 $243.000 $225.000 $204.000 $287.500
WK ZN PAV MRK REMOV (W)(ENTR GORE)
EA 30.000 $975.000 $400.000 $540.000 $500.000 $408.000 $862.500
WK ZN PAV MRK REMOV (W)(EXIT GORE)
EA 31.000 $975.000 $400.000 $540.000 $500.000 $408.000 $1,437.500
WK ZN PAV MRK REMOV (W)(WORD)
EA 31.000 $165.000 $200.000 $178.200 $165.000 $204.000 $287.500
WK ZN PAV MRK REMOV (W)36"(YLD TRI)
EA 37.000 $50.000 $60.000 $86.400 $80.000 $61.200 $34.500
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 28,892.000 $0.650 $0.850 $0.680 $0.630 $0.870 $1.040
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 98,452.000 $0.850 $0.900 $0.680 $0.630 $0.920 $1.440
WK ZN PAV MRK REMOV (Y)24"(SLD)
LF 161.000 $5.000 $5.000 $6.480 $6.000 $5.100 $5.750
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 24,453.000 $2.000 $2.000 $1.080 $1.150 $1.460 $1.250
REFL PAV MRK TY I (W)4"(LNDP)(100MIL)
LF 364.000 $0.800 $1.500 $0.830 $0.770 $1.530 $1.440
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 12,799.000 $1.000 $0.900 $1.030 $0.950 $0.920 $1.090
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
LF 2,558.000 $3.500 $1.500 $3.780 $3.500 $1.530 $1.730
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 15,062.000 $3.250 $3.500 $3.240 $3.000 $3.570 $1.730
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 1,219.000 $7.250 $8.500 $9.180 $8.500 $8.670 $6.900
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 30.000 $165.000 $150.000 $199.800 $185.000 $153.000 $143.750
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
EA 5.000 $230.000 $200.000 $243.000 $225.000 $204.000 $201.250
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
EA 22.000 $300.000 $275.000 $378.000 $350.000 $280.500 $517.500
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 31.000 $165.000 $200.000 $216.000 $200.000 $204.000 $172.500
REFL PAV MRK TY I(W)(ENTR GORE)(100MIL)
EA 30.000 $750.000 $750.000 $864.000 $800.000 $765.000 $575.000
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
EA 31.000 $800.000 $750.000 $864.000 $800.000 $765.000 $920.000
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 37.000 $50.000 $60.000 $56.160 $52.000 $61.200 $98.750
REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
LF 161.000 $5.500 $0.900 $1.620 $1.500 $0.920 $1.440
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
LF 320.000 $7.000 $8.500 $9.180 $8.500 $8.670 $6.900
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
LF 320.000 $1.000 $10.000 $5.400 $5.000 $10.200 $0.580
PAVEMENT SEALER 4"
LF 48,224.000 $0.200 $0.200 $0.280 $0.260 $0.200 $0.290
PAVEMENT SEALER 6"
LF 258,868.000 $0.250 $0.200 $0.420 $0.390 $0.200 $0.350
PAVEMENT SEALER 8"
LF 12,799.000 $0.550 $0.300 $0.560 $0.520 $0.310 $0.520
PAVEMENT SEALER 12"
LF 17,620.000 $1.400 $0.700 $0.840 $0.780 $0.710 $1.150
PAVEMENT SEALER 24"
LF 1,221.000 $3.000 $2.000 $1.620 $1.500 $2.040 $2.300
PAVEMENT SEALER (ARROW)
EA 30.000 $75.000 $30.000 $78.840 $73.000 $30.600 $57.500
PAVEMENT SEALER (WORD)
EA 31.000 $75.000 $40.000 $86.400 $80.000 $40.800 $69.000
PAVEMENT SEALER (DBL ARROW)
EA 5.000 $150.000 $45.000 $129.600 $120.000 $45.900 $86.250
PAVEMENT SEALER (LNDP ARROW)
EA 22.000 $165.000 $60.000 $180.360 $167.000 $61.200 $109.250
PAVEMENT SEALER (ENTR GORE)
EA 30.000 $260.000 $300.000 $486.000 $450.000 $306.000 $287.500
PAVEMENT SEALER (EXIT GORE)
EA 31.000 $275.000 $300.000 $486.000 $450.000 $306.000 $575.000
PAVEMENT SEALER (YLD TRI)
EA 37.000 $25.000 $7.500 $16.200 $15.000 $7.650 $17.250
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 9,072.000 $0.650 $0.500 $0.530 $0.490 $0.510 $0.580
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 37,044.000 $0.550 $0.450 $0.460 $0.430 $0.460 $0.580
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 64,116.000 $0.650 $0.650 $0.650 $0.600 $0.660 $0.690
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 42,938.000 $0.500 $0.450 $0.460 $0.430 $0.460 $0.580
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
LF 104,686.000 $1.000 $0.850 $0.970 $0.900 $0.870 $0.860
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
LF 104,320.000 $1.000 $0.850 $0.970 $0.900 $0.870 $0.860
REFL PAV MRKR TY I-C
EA 92.000 $16.000 $5.000 $10.800 $10.000 $5.100 $5.750
REFL PAV MRKR TY I-R
EA 420.000 $11.000 $9.000 $10.800 $10.000 $9.180 $17.250
REFL PAV MRKR TY II-A-A
EA 53.000 $6.500 $5.000 $10.800 $10.000 $5.100 $5.750
REFL PAV MRKR TY II-C-R
EA 5,676.000 $4.500 $5.000 $4.320 $4.000 $3.060 $5.750
FULL - WIDTH MOWING
CYC 10.000 $2,000.000 $5,000.000 $27,000.000 $3,520.000 $8,000.000 $4,048.000
LITTER REMOVAL
CYC 29.000 $2,000.000 $539.430 $540.000 $1,200.000 $1,800.000 $1,380.000
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
CYC 29.000 $3,500.000 $4,800.000 $2,700.000 $2,100.000 $2,800.000 $6,100.000
CLEANING / SWEEPING (FRONTAGE ROAD)
CYC 9.000 $2,500.000 $4,800.000 $2,700.000 $3,200.000 $2,800.000 $6,100.000
CLEANING / SWEEPING(ENTRANCE/EXIT RAMP)
CYC 29.000 $1,000.000 $4,800.000 $2,700.000 $1,600.000 $2,800.000 $3,720.000
SP MIXES SP-C SAC-B PG70-22
TON 11,851.000 $120.000 $105.000 $112.590 $120.000 $129.060 $153.590
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
TON 81,091.000 $150.000 $125.000 $156.520 $164.000 $179.820 $207.970
UNDERSEAL COURSE
GAL 20,608.000 $4.500 $3.960 $4.510 $4.000 $4.550 $6.170
INSTALL BRIDGE IDENTIFICATION NUMBERS
EA 50.000 $270.000 $400.000 $540.000 $465.000 $255.000 $57.500
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 924.000 $110.000 $125.060 $216.000 $140.000 $100.000 $100.000
TMA (STATIONARY)
DAY 891.000 $290.000 $309.740 $540.000 $82.500 $225.000 $600.000
TMA (MOBILE OPERATION)
DAY 60.000 $300.000 $450.000 $648.000 $335.000 $240.000 $400.000
LCS SYSTEM (REMOVE)
EA 52.000 $2,000.000 $4,900.000 $5,292.000 $5,500.000 $5,000.000 $5,635.000
Totals: $31,007,249.040 $28,447,459.120 $29,992,012.110 $30,725,712.810 $34,778,802.244 $38,958,783.160