Low bids by ACCELERATED CRITICAL PATH, INC. (TxDOT)
Email:
Phone:
214-796-4898
Address:
5760 LEGACY DR, STE B3-513 PLANO TX 75024
Fax:
972-346-7072
| Control | County | District | Estimate | Highway | Project | Date | Added | Type | Low Bidder | |
|---|---|---|---|---|---|---|---|---|---|---|
| 0519-01-030 | JOHNSON | FORT WORTH | $2,044,215 | SH 174 | STP 2020(490)HES | 06/05/2020 | 11/15/2023 | HAZARD ELIM AND SAFETY | ACCELERATED CRITICAL PATH, INC. ($1,837,416) | |
| 0047-18-081 | GRAYSON | PARIS | $1,795,653 | US 75 | NH 2017(244) | 03/05/2019 | 11/15/2023 | REPAIR SLOPE FAILURE AND ROADWAY | ACCELERATED CRITICAL PATH, INC. ($1,629,373) | |
| 0092-05-051 | ELLIS | DALLAS | $1,213,647 | IH 45 | STP 2019(499)MM | 02/05/2019 | 11/15/2023 | CONSTRUCT INTERS IMPRVS | ACCELERATED CRITICAL PATH, INC. ($1,593,213) | |
| 0092-03-050 | ELLIS | DALLAS | $3,261,978 | IH 45 | C 92-3-50 | 06/05/2018 | 11/15/2023 | SLOPE FAILURE REPAIR | ACCELERATED CRITICAL PATH, INC. ($2,877,641) |
