JOHNSON SH 174 (0519-01-030)

Items: 79

County: JOHNSON
Length: N/A
Highway: SH 174
District: FORT WORTH
Control Number: 0519-01-030
DBE Goal: N/A
Project: STP 2020(490)HES
Guaranty: N/A
Time: 192 WORKING DAYS
Engineer's Estimate: $2,044,215.04
Date: 06/05/2020 (6 years ago)
Contract Number: N/A
Type: HAZARD ELIMINATION AND SAFETY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (6)
E
Engineer's Estimate
$2,044,215.04
$1,837,416.19
Over/Under Est: -10.12% -$206,798.85
Over/Under Est: -6.19% -$126,481.48
Amt Left: 4.37% $80,317.37
Over/Under Est: -1.75% -$35,703.63
Amt Left: 9.31% $171,095.22
Delta: -4.73% -$90,777.85
Over/Under Est: 7% $143,195.06
Amt Left: 19.05% $349,993.91
Delta: -8.91% -$178,898.69
$2,594,590.60
Over/Under Est: 26.92% $550,375.56
Amt Left: 41.21% $757,174.41
Delta: -18.61% -$407,180.50
$2,718,968.40
Over/Under Est: 33.01% $674,753.36
Amt Left: 47.98% $881,552.21
Delta: -4.79% -$124,377.80

Bid Items & Bid Tabulations

79 Total 0 of 79
JOHNSON  |  SH 174  |  FORT WORTH  |  0519-01-030  |  06/05/2020  |  $2,044,215.04  |  STP 2020(490)HES  |  HAZARD ELIM AND SAFETY  |  192 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ACCELERATED CRITICAL PATH, INC.
JAY MILLS CONTRACTING, INCORPORATED
TEXAS MATERIALS GROUP, INC.
ED BELL CONSTRUCTION COMPANY
ALTUS CONSTRUCTION LLC
FNH CONSTRUCTION, LLC
PREPARING ROW
STA 42.000 $2,000.000 $450.000 $1,100.000 $1,300.000 $4,000.000 $2,035.840 $4,000.000
REMOVING CONC (RIPRAP)
SY 62.000 $35.000 $7.000 $18.000 $28.500 $42.000 $10.540 $20.000
REMOVING CONC (DRIVEWAYS)
SY 725.000 $21.000 $24.000 $18.000 $29.500 $15.000 $22.600 $20.000
REMOVING CONC (HEADWALL)
CY 32.000 $1,300.000 $50.000 $150.000 $285.000 $105.000 $1,357.230 $200.000
REMOVING STAB BASE AND ASPH PAV(0"-16")
SY 878.000 $7.500 $39.000 $15.000 $16.000 $21.000 $3.950 $20.000
OBLITERATING ABANDONED ROAD
STA 2.500 $1,500.000 $2,900.000 $3,000.000 $4,100.000 $2,100.000 $2,035.840 $25,000.000
EXCAVATION (ROADWAY)
CY 4,021.000 $13.000 $9.500 $16.000 $6.000 $6.300 $21.720 $20.000
EXCAVATION (CHANNEL)
CY 10.000 $50.000 $49.000 $100.000 $125.000 $157.500 $67.860 $100.000
EMBANKMENT (FINAL)(DENS CONT)(TY D)
CY 3,229.000 $6.500 $7.000 $14.000 $14.000 $1.000 $40.720 $35.000
COMPOST MANUF TOPSOIL (4")
SY 8,778.000 $2.500 $3.500 $1.250 $1.050 $1.250 $1.590 $8.000
BLOCK SODDING
SY 9,778.000 $5.000 $4.000 $3.850 $4.000 $4.200 $4.750 $6.000
VEGETATIVE WATERING
MG 347.260 $25.000 $59.000 $30.000 $42.000 $52.500 $33.930 $50.000
WILDFLOWER SEEDING
AC 2.050 $2,000.000 $2,500.000 $2,695.000 $2,150.000 $2,520.000 $3,325.210 $2,500.000
FL BS (CMP IN PLC)(TYA GR1-2) (6")
SY 7,414.400 $20.000 $14.000 $11.250 $13.000 $12.000 $12.570 $16.000
LIME (HYD, COM OR QK)(SLURRY)
TON 155.100 $200.000 $230.000 $200.000 $200.000 $177.000 $244.300 $200.000
LIME TRT (SUBGRADE)(8")
SY 7,846.500 $5.000 $3.900 $5.300 $9.500 $4.000 $13.570 $8.000
PRIME COAT (MC-30 OR EC-30)
GAL 2,966.400 $10.000 $5.500 $7.000 $5.000 $5.250 $7.800 $10.000
D-GR HMA(SQ) TY-B PG64-22
TON 1,204.800 $100.000 $99.000 $90.000 $91.000 $90.000 $117.600 $120.000
CEM STABIL BKFL
CY 25.000 $200.000 $290.000 $220.000 $200.000 $250.000 $101.950 $350.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 62.000 $140.000 $190.000 $125.000 $185.000 $200.000 $158.800 $185.000
RIPRAP (MOW STRIP)(4 IN)
CY 35.000 $500.000 $790.000 $660.000 $700.000 $630.000 $607.450 $550.000
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
LF 16.000 $550.000 $1,300.000 $500.000 $550.000 $1,000.000 $439.740 $1,000.000
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
LF 72.000 $720.000 $1,100.000 $600.000 $600.000 $1,250.000 $719.330 $1,000.000
RC PIPE (CL III)(18 IN)
LF 172.000 $65.000 $70.000 $65.000 $50.000 $63.000 $70.580 $85.000
WINGWALL (PW - 1) (HW=4 FT)
EA 1.000 $9,200.000 $13,900.000 $10,500.000 $10,000.000 $17,500.000 $12,945.030 $15,000.000
WINGWALL (PW - 1) (HW=5 FT)
EA 1.000 $11,300.000 $19,000.000 $17,500.000 $16,000.000 $25,000.000 $18,657.940 $25,000.000
SET (TY I)(S= 4 FT)(HW= 3 FT)(3:1) (C)
EA 2.000 $4,300.000 $8,900.000 $5,500.000 $5,750.000 $10,000.000 $7,768.280 $18,500.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 36.000 $850.000 $1,800.000 $1,000.000 $925.000 $1,250.000 $1,900.120 $1,850.000
REMOV STR (SET)
EA 2.000 $500.000 $900.000 $350.000 $140.000 $525.000 $724.950 $500.000
REMOV STR (WINGWALL)
EA 2.000 $2,000.000 $1,900.000 $1,225.000 $675.000 $2,520.000 $1,764.570 $2,500.000
REMOV STR (PIPE)
EA 5.000 $700.000 $490.000 $350.000 $225.000 $525.000 $780.460 $500.000
MOBILIZATION
LS 1.000 $146,721.040 $175,000.000 $190,000.000 $200,000.000 $250,000.000 $257,873.420 $250,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $8,000.000 $9,500.000 $11,000.000 $8,100.000 $21,000.000 $16,286.740 $8,500.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 226.000 $25.000 $45.000 $24.500 $35.000 $24.000 $29.990 $30.000
ROCK FILTER DAMS (REMOVE)
LF 226.000 $8.000 $10.000 $7.400 $12.500 $12.000 $9.090 $15.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 178.000 $21.500 $45.000 $30.000 $32.000 $24.000 $36.690 $40.000
CONSTRUCTION EXITS (REMOVE)
SY 178.000 $9.750 $8.000 $9.900 $8.500 $12.000 $12.220 $20.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 10,362.000 $2.250 $1.600 $2.500 $3.000 $1.500 $2.710 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 10,362.000 $1.000 $0.300 $0.450 $0.600 $0.150 $0.560 $2.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 300.000 $4.050 $7.000 $5.500 $4.500 $4.000 $6.790 $18.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 300.000 $1.000 $2.000 $3.300 $2.500 $1.000 $4.070 $9.000
DRIVEWAYS (CONC)
SY 624.000 $77.000 $99.000 $75.000 $91.000 $80.000 $95.380 $85.000
DRIVEWAYS (BASE)
SY 814.000 $35.000 $24.000 $16.000 $31.000 $20.000 $40.720 $35.000
RUMBLE STRIPS (SHOULDER)
LF 5,835.000 $1.500 $1.000 $0.850 $0.620 $1.100 $2.270 $1.000
MTL W-BEAM GD FEN (TIM POST)
LF 300.000 $25.000 $18.000 $18.700 $20.000 $18.300 $26.350 $25.000
REMOVE METAL BEAM GUARD FENCE
LF 621.000 $5.000 $4.000 $3.300 $3.000 $3.250 $3.410 $3.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,640.000 $2,700.000 $2,750.000 $3,000.000 $2,700.000 $3,339.600 $2,850.000
GUARDRAIL END TREATMENT (REMOVE)
EA 6.000 $350.000 $240.000 $275.000 $285.000 $270.000 $359.070 $1,500.000
CHAIN LINK FENCE (INSTALL) (6')
LF 135.000 $60.000 $25.000 $20.000 $55.000 $52.500 $25.870 $30.000
CHAIN LINK FENCE (REMOVE)
LF 220.000 $15.000 $7.000 $4.000 $20.000 $10.500 $10.990 $10.000
MAILBOX INSTALL-S (TWG-POST) TY 1
EA 10.000 $230.000 $290.000 $275.000 $250.000 $242.000 $303.430 $850.000
ALUMINUM SIGNS (TY A)
SF 154.000 $35.000 $27.000 $27.500 $30.000 $28.000 $43.160 $30.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 20.000 $502.000 $600.000 $625.000 $500.000 $480.000 $900.450 $850.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 1.000 $800.000 $600.000 $735.000 $610.000 $580.000 $1,259.810 $850.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 8.000 $50.000 $29.000 $35.000 $30.000 $30.000 $52.660 $100.000
REFL PAV MRK TY I (W)8"(LNDP)(100MIL)
LF 27.000 $5.000 $2.200 $1.380 $1.400 $2.200 $1.700 $6.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 990.000 $2.000 $2.200 $0.720 $0.750 $2.200 $0.880 $6.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 155.000 $10.000 $6.500 $6.600 $6.750 $6.500 $8.140 $20.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 15.000 $165.000 $170.000 $126.500 $130.000 $162.000 $156.080 $250.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 5.000 $200.000 $190.000 $148.500 $150.000 $189.000 $183.230 $250.000
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
LF 129.000 $10.000 $7.000 $6.600 $7.000 $6.500 $8.140 $20.000
REFL PAV MRK TY II (W) 4" (SLD)
LF 7,965.000 $0.500 $0.300 $0.110 $0.110 $0.300 $0.140 $1.000
REFL PAV MRK TY II (W) 8" (LNDP)
LF 27.000 $1.500 $1.100 $0.500 $0.500 $1.100 $0.610 $6.000
REFL PAV MRK TY II (W) 8" (SLD)
LF 990.000 $1.000 $0.800 $0.280 $0.280 $1.100 $0.340 $6.000
REFL PAV MRK TY II (W) 24" (SLD)
LF 155.000 $5.000 $3.500 $1.650 $1.700 $3.300 $2.040 $20.000
REFL PAV MRK TY II (W) (ARROW)
EA 15.000 $70.000 $80.000 $33.000 $34.000 $81.000 $40.720 $250.000
REFL PAV MRK TY II (W) (WORD)
EA 5.000 $82.000 $90.000 $38.500 $40.000 $103.000 $47.500 $250.000
REFL PAV MRK TY II (Y) 4" (BRK)
LF 1,580.000 $0.500 $0.250 $0.170 $0.170 $0.300 $0.200 $1.000
REFL PAV MRK TY II (Y) 4" (SLD)
LF 9,062.000 $0.500 $0.300 $0.110 $0.120 $0.300 $0.140 $1.000
REFL PAV MRK TY II (Y) 24" (SLD)
LF 129.000 $5.000 $3.300 $1.650 $1.700 $3.300 $2.040 $20.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 7,965.000 $1.000 $0.500 $0.440 $0.450 $0.500 $0.540 $1.000
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 1,580.000 $1.000 $0.600 $0.440 $0.450 $0.600 $0.540 $1.000
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 9,062.000 $1.000 $0.500 $0.440 $0.450 $0.500 $0.540 $1.000
REFL PAV MRKR TY I-C
EA 56.000 $5.000 $7.000 $5.500 $5.750 $7.000 $6.790 $5.000
REFL PAV MRKR TY II-A-A
EA 273.000 $5.000 $7.000 $5.500 $5.750 $7.000 $6.790 $5.000
SP MIXES SP-C SAC-A PG70-28
TON 5,303.400 $120.000 $97.000 $120.000 $127.000 $120.000 $140.470 $120.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 380.000 $150.000 $35.000 $95.000 $90.000 $73.500 $67.860 $150.000
TMA (STATIONARY)
DAY 250.000 $200.000 $60.000 $215.000 $250.000 $157.500 $339.310 $300.000
TMA (MOBILE OPERATION)
DAY 10.000 $250.000 $500.000 $215.000 $100.000 $420.000 $542.890 $850.000
Totals: $2,044,215.040 $1,837,416.190 $1,917,733.560 $2,008,511.410 $2,187,410.100 $2,594,590.593 $2,718,968.400