Show Job Controls
Bid Cobra

ELLIS IH 45 (0092-05-051)

Items: 109

County: ELLIS
Length: N/A
Highway: IH 45
District: DALLAS
Control Number: 0092-05-051
DBE Goal: N/A
Project: STP 2019(499)MM
Guaranty: N/A
Time: 0 X
Engineer's Estimate: $1,213,647.29
Date: 02/05/2019 (7 years ago)
Contract Number: N/A
Type: CONSTRUCT INTERSECTION IMPROVEMENTS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$1,213,647.29
$1,593,213.30
Over/Under Est: 31.27% $379,566.01
$1,680,405.32
Over/Under Est: 38.46% $466,758.03
Amt Left: 5.47% $87,192.02
Over/Under Est: 44.17% $536,008.84
Amt Left: 9.82% $156,442.83
Delta: -4.12% -$69,250.81
$1,922,928.00
Over/Under Est: 58.44% $709,280.71
Amt Left: 20.69% $329,714.70
Delta: -9.90% -$173,271.87

Bid Items & Bid Tabulations

109 Total 0 of 109
ELLIS  |  IH 45  |  DALLAS  |  0092-05-051  |  02/05/2019  |  $1,213,647.29  |  STP 2019(499)MM  |  CONSTRUCT INTERS IMPRVS  |  0 X
Item Code
Description
Unit
Quantity
Engineer's Estimate
ACCELERATED CRITICAL PATH, INC.
SJ&J CONSTRUCTION, LLC
ED BELL CONSTRUCTION COMPANY
FNH CONSTRUCTION, LLC
PREPARING ROW
STA 27.230 $1,500.000 $900.000 $700.000 $5,250.000 $4,300.000
REMOVING STAB BASE AND ASPH PAV (2"-6")
SY 62.000 $1.800 $23.000 $8.000 $31.500 $20.000
REMOVING STAB BASE & ASPH PV(10 TO 16")
SY 2,511.000 $8.000 $30.000 $18.000 $15.750 $20.000
EXCAVATION (ROADWAY)
CY 768.100 $15.000 $8.000 $15.000 $21.000 $20.000
EXCAVATION (CHANNEL)
CY 180.000 $16.000 $39.000 $15.000 $21.000 $30.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 3,293.900 $14.000 $30.000 $18.000 $21.000 $30.000
COMPOST MANUF TOPSOIL (4")
SY 6,024.000 $1.500 $3.400 $4.000 $1.260 $6.000
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 6,024.000 $0.500 $0.300 $0.500 $2.360 $1.000
DRILL SEED (TEMP)(WARM OR COOL)
SY 6,024.000 $0.500 $0.300 $0.500 $0.010 $1.000
VEGETATIVE WATERING
MG 1,792.000 $6.000 $15.000 $13.000 $3.150 $50.000
FL BS (CMP IN PLC)(TY D GR1-2)(12")
SY 4,784.000 $21.000 $30.000 $35.000 $31.500 $30.000
PRIME COAT(MC-30 OR AE-P)
GAL 958.000 $4.750 $6.000 $8.000 $7.510 $8.000
SUPERPAVE MIXTURES SP-B PG64-22
TON 1,051.000 $80.000 $120.000 $160.000 $106.710 $95.000
SUPERPAVE MIXTURES SP-C SAC-B PG64-22
TON 1,238.400 $90.000 $125.000 $160.000 $107.970 $110.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 80.000 $40.000 $120.000 $90.000 $136.140 $85.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(9")
SY 80.000 $60.000 $135.000 $100.000 $154.460 $125.000
PLANE ASPH CONC PAV(0" TO 2")
SY 976.000 $4.500 $5.000 $8.000 $6.300 $20.000
PLANE ASPH CONC PAV (2")
SY 7,972.000 $2.500 $3.500 $8.000 $4.200 $12.500
CEM STABIL BKFL
CY 43.000 $140.000 $230.000 $220.000 $315.000 $350.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 16.000 $225.130 $260.000 $280.000 $367.500 $250.000
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 26.000 $265.310 $370.000 $320.000 $483.000 $285.000
DRILL SHAFT (TRF SIG POLE) (48 IN)
LF 44.000 $400.930 $550.000 $400.000 $514.500 $350.000
RIPRAP (STONE COMMON)(GROUT)(12 IN)
CY 88.000 $360.000 $240.000 $350.000 $315.000 $185.000
RIPRAP (MOW STRIP)(4 IN)
CY 15.000 $450.000 $900.000 $600.000 $630.000 $550.000
GABIONS (GALV)
CY 19.000 $400.000 $350.000 $350.000 $735.000 $300.000
RC PIPE (CL III)(12 IN)
LF 20.000 $55.000 $75.000 $70.000 $84.000 $50.000
RC PIPE (CL III)(30 IN)
LF 235.000 $91.000 $150.000 $160.000 $126.000 $105.000
RC PIPE (CL IV)(30 IN)
LF 96.000 $129.000 $160.000 $180.000 $147.000 $125.000
HEADWALL (CH - FW - 0) (DIA= 30 IN)
EA 1.000 $4,500.000 $9,500.000 $5,000.000 $10,500.000 $5,000.000
HEADWALL (CH - FW - 15) (DIA= 30 IN)
EA 2.000 $5,000.000 $9,500.000 $7,000.000 $10,500.000 $7,500.000
SET (TY II) (12 IN) (RCP) (6: 1) (P)
EA 2.000 $700.000 $1,200.000 $700.000 $735.000 $1,500.000
SET (TY II) (30 IN) (RCP) (3: 1) (C)
EA 1.000 $1,250.000 $4,500.000 $2,500.000 $7,350.000 $3,500.000
REMOV STR (HEADWALL)
EA 4.000 $1,200.000 $1,200.000 $500.000 $945.000 $2,500.000
REMOV STR (PIPE)
LF 50.000 $20.000 $15.000 $30.000 $21.000 $50.000
MOBILIZATION
LS 1.000 $106,752.000 $160,000.000 $80,000.000 $148,000.000 $170,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $6,000.000 $7,500.000 $5,000.000 $21,000.000 $8,500.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 132.000 $54.000 $80.000 $30.000 $30.450 $30.000
ROCK FILTER DAMS (REMOVE)
LF 132.000 $9.000 $8.000 $10.000 $14.700 $15.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 344.000 $20.000 $40.000 $14.000 $21.000 $45.000
CONSTRUCTION EXITS (REMOVE)
SY 344.000 $7.000 $9.000 $8.000 $10.500 $20.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 5,056.000 $2.000 $3.500 $3.000 $1.470 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 5,056.000 $1.000 $0.750 $1.000 $0.110 $2.000
DRIVEWAYS (ACP)
SY 90.000 $31.000 $45.000 $120.000 $84.000 $42.000
MTL W-BEAM GD FEN (TIM POST)
LF 200.000 $25.000 $12.000 $30.000 $19.370 $25.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,800.000 $950.000 $1,800.000 $1,762.210 $1,850.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,291.000 $750.000 $2,200.000 $1,023.750 $1,850.000
REMOVE METAL BEAM GUARD FENCE
LF 343.000 $2.900 $3.500 $3.000 $2.050 $3.000
REMOVE TERMINAL ANCHOR SECTION
EA 4.000 $200.000 $220.000 $400.000 $105.000 $800.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 4.000 $240.000 $270.000 $600.000 $105.000 $850.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $2,605.000 $1,900.000 $2,800.000 $2,551.500 $2,850.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 1.000 $285.000 $70.000 $400.000 $246.750 $650.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 1.000 $643.000 $350.000 $400.000 $624.750 $650.000
RELOCATE RD IL ASM (TRANS-BASE)
EA 2.000 $2,121.000 $2,000.000 $800.000 $3,150.000 $3,000.000
REPLACE LUMINAIRE W/LED (250W EQ)
EA 2.000 $615.390 $750.000 $600.000 $1,050.000 $1,000.000
CONDT (PVC) (SCH 40) (2")
LF 279.000 $10.120 $10.000 $12.000 $9.450 $15.000
CONDT (PVC) (SCH 40) (2") (BORE)
LF 226.000 $23.740 $25.000 $27.000 $20.630 $40.000
CONDT (PVC) (SCH 40) (3")
LF 49.000 $12.670 $10.000 $13.000 $25.200 $18.000
CONDT (PVC) (SCH 40) (4") (BORE)
LF 322.000 $24.500 $28.000 $33.000 $29.400 $40.000
CONDT (PVC) (SCH 80) (2")
LF 30.000 $9.110 $10.000 $13.000 $18.380 $16.000
ELEC CONDR (NO.12) INSULATED
LF 320.000 $1.160 $1.500 $2.000 $0.950 $2.000
ELEC CONDR (NO.8) BARE
LF 550.000 $1.090 $2.000 $2.000 $1.260 $2.000
ELEC CONDR (NO.8) INSULATED
LF 1,800.000 $1.280 $2.000 $2.000 $1.470 $2.000
ELEC CONDR (NO.6) BARE
LF 316.000 $1.460 $2.000 $2.000 $1.310 $2.000
ELEC CONDR (NO.6) INSULATED
LF 632.000 $1.610 $2.200 $2.000 $1.680 $2.000
GROUND BOX TY A (122311)W/APRON
EA 3.000 $1,052.130 $1,100.000 $1,200.000 $855.750 $750.000
GROUND BOX TY C (162911)W/APRON
EA 4.000 $1,024.270 $1,200.000 $1,200.000 $892.500 $850.000
ELC SRV TY D 120/240 070(NS)SS(E)PS(U)
EA 1.000 $5,396.960 $7,500.000 $8,000.000 $7,140.000 $5,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 12.000 $650.000 $275.000 $600.000 $479.850 $650.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 3.000 $610.000 $400.000 $600.000 $632.100 $650.000
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
EA 2.000 $550.000 $350.000 $600.000 $551.250 $650.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 1.000 $1,000.000 $600.000 $1,100.000 $882.000 $650.000
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
EA 8.000 $70.000 $14.000 $90.000 $50.400 $100.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 4.000 $90.000 $17.000 $90.000 $52.500 $100.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 9,670.000 $0.700 $0.500 $2.000 $0.470 $1.000
WK ZN PAV MRK NON-REMOV (W)12"(SLD)
LF 184.000 $2.400 $4.500 $5.000 $4.200 $6.000
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 4,294.000 $0.950 $0.500 $3.000 $0.470 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 106.000 $0.500 $3.500 $3.000 $2.760 $5.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,147.000 $1.000 $2.000 $5.000 $1.730 $6.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 231.000 $6.000 $8.000 $25.000 $7.350 $20.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 12.000 $123.000 $180.000 $250.000 $162.750 $250.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 7.000 $225.000 $230.000 $250.000 $204.750 $250.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 240.000 $0.750 $2.500 $3.000 $2.100 $1.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 5,409.000 $0.400 $0.800 $4.000 $0.790 $1.000
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 5,812.000 $0.400 $0.800 $2.000 $0.790 $1.000
REFL PAV MRKR TY I-C
EA 70.000 $4.000 $9.000 $20.000 $8.400 $15.000
REFL PAV MRKR TY II-A-A
EA 73.000 $4.500 $9.000 $20.000 $8.400 $15.000
ELIM EXT PAV MRK & MRKS (4")
LF 1,440.000 $0.530 $3.000 $2.000 $2.630 $1.000
INSTALL HWY TRF SIG (ISOLATED)
EA 1.000 $17,500.000 $27,000.000 $30,000.000 $42,000.000 $30,000.000
VEH SIG SEC (12")LED(GRN)
EA 8.000 $225.970 $260.000 $270.000 $315.000 $285.000
VEH SIG SEC (12")LED(YEL)
EA 8.000 $232.940 $260.000 $270.000 $315.000 $285.000
VEH SIG SEC (12")LED(YEL ARW)
EA 8.000 $230.030 $260.000 $270.000 $315.000 $285.000
VEH SIG SEC (12")LED(RED)
EA 8.000 $240.050 $260.000 $270.000 $315.000 $285.000
VEH SIG SEC (12")LED(RED ARW)
EA 8.000 $228.350 $260.000 $270.000 $315.000 $285.000
BACK PLATE (12")(3 SEC)(VENTED)ALUM
EA 8.000 $107.660 $120.000 $80.000 $105.000 $125.000
BACK PLATE (12")(4 SEC)(VENTED)ALUM
EA 4.000 $116.340 $140.000 $150.000 $126.000 $150.000
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
LF 384.000 $1.690 $2.200 $1.400 $1.680 $3.000
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
LF 266.000 $1.750 $3.000 $2.050 $2.100 $3.000
TRF SIG CBL (TY A)(14 AWG)(16 CONDR)
LF 692.000 $2.990 $4.500 $3.660 $5.250 $3.000
INS TRF SIG PL AM(S)1 ARM(36')LUM
EA 1.000 $6,735.910 $11,000.000 $9,250.000 $15,750.000 $8,500.000
INS TRF SIG PL AM(S)1 ARM(44')LUM
EA 1.000 $8,048.500 $12,000.000 $9,995.000 $17,850.000 $18,500.000
INS TRF SIG PL AM(S)1 ARM(60')LUM
EA 2.000 $18,555.380 $22,500.000 $25,750.000 $31,500.000 $26,500.000
FULL - WIDTH MOWING
CYC 1.000 $1,500.000 $1,500.000 $500.000 $1,785.000 $3,000.000
NO. OF WORKING DAYS
$/D 1,250.000 $125.000 $100.000 $110.000 $90.000 $125.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $9,500.000 $15,000.000 $16,800.000 $16,500.000
BBU SYSTEM (EXTERNAL BATT CABINET)
EA 1.000 $6,964.140 $8,000.000 $6,000.000 $8,085.000 $9,500.000
DEAD END ROADWAY BARRICADE
LF 24.000 $135.000 $75.000 $120.000 $126.000 $50.000
TMA (STATIONARY)
EA 2.000 $9,000.000 $4,900.000 $8,000.000 $6,300.000 $10,000.000
TMA (MOBILE OPERATION)
HR 55.000 $45.000 $50.000 $400.000 $73.500 $250.000
RVDS(PRESENCE DETECTION ONLY)
EA 4.000 $6,586.120 $6,500.000 $7,000.000 $10,290.000 $8,500.000
Totals: $1,213,647.290 $1,593,213.300 $1,680,405.320 $1,749,656.138 $1,922,928.000