|
|
PREPARING ROW
|
AC
|
1.700
|
$12,000.000
|
$4,678.380
|
$6,000.000
|
$5,000.000
|
$5,967.310
|
$14,000.000
|
$2,000.000
|
$27,000.000
|
$15,000.000
|
|
|
PREPARING ROW
|
STA
|
79.100
|
$3,000.000
|
$1,105.430
|
$6,274.000
|
$1,500.000
|
$9,975.000
|
$4,800.000
|
$1,500.000
|
$3,500.000
|
$7,500.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
813.000
|
$8.500
|
$29.020
|
$48.000
|
$20.000
|
$38.460
|
$65.000
|
$45.700
|
$72.000
|
$32.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
730.000
|
$11.960
|
$23.630
|
$14.000
|
$20.000
|
$13.000
|
$12.000
|
$9.000
|
$11.000
|
$20.000
|
|
|
REMOVING CONC (CTB)
|
LF
|
941.000
|
$12.000
|
$16.910
|
$9.000
|
$20.000
|
$13.290
|
$10.000
|
$9.000
|
$11.000
|
$25.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
17,874.700
|
$11.500
|
$3.010
|
$9.000
|
$10.000
|
$3.690
|
$10.000
|
$3.500
|
$8.000
|
$12.000
|
|
|
EXCAVATION (SPECIAL)
|
CY
|
2,915.000
|
$15.000
|
$17.520
|
$12.000
|
$10.000
|
$5.050
|
$10.000
|
$10.600
|
$15.000
|
$7.050
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
29,757.800
|
$14.000
|
$15.700
|
$13.000
|
$8.000
|
$11.500
|
$14.000
|
$15.000
|
$5.000
|
$16.780
|
|
|
BLOCK SODDING
|
SY
|
62,373.000
|
$4.750
|
$2.930
|
$3.110
|
$3.000
|
$3.110
|
$3.110
|
$3.400
|
$3.500
|
$3.110
|
|
|
STRAW OR HAY MULCH
|
SY
|
27,771.000
|
$0.440
|
$0.360
|
$0.360
|
$0.380
|
$0.360
|
$0.360
|
$0.400
|
$0.400
|
$0.360
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
27,771.000
|
$0.090
|
$0.130
|
$0.130
|
$0.140
|
$0.130
|
$0.130
|
$0.150
|
$0.150
|
$0.130
|
|
|
FERTILIZER
|
AC
|
18.700
|
$700.000
|
$673.730
|
$675.090
|
$700.000
|
$675.090
|
$675.000
|
$730.000
|
$700.000
|
$675.090
|
|
|
VEGETATIVE WATERING
|
MG
|
2,264.520
|
$17.500
|
$27.000
|
$19.000
|
$27.000
|
$37.690
|
$18.000
|
$30.000
|
$32.000
|
$27.050
|
|
|
LIME TRT (EXST MATL) (6")
|
SY
|
35,600.000
|
$3.500
|
$6.680
|
$4.000
|
$3.000
|
$2.800
|
$3.400
|
$4.600
|
$4.000
|
$3.840
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
481.000
|
$230.000
|
$341.440
|
$280.000
|
$280.000
|
$308.620
|
$230.000
|
$320.000
|
$300.000
|
$211.470
|
|
|
CEM TRT(PLNT MX) (CL N)(TY E)(GR 4)(6")
|
SY
|
35,600.000
|
$12.000
|
$17.970
|
$18.000
|
$18.000
|
$18.270
|
$20.000
|
$17.500
|
$19.000
|
$22.630
|
|
|
ASPHALT STAB BASE (GR 4)(PG 64)
|
TON
|
1,958.000
|
$125.000
|
$103.790
|
$104.000
|
$140.000
|
$114.930
|
$140.000
|
$120.000
|
$140.000
|
$105.250
|
|
|
CONC PVMT (CONT REINF - CRCP) (10")
|
SY
|
31,988.000
|
$85.000
|
$85.980
|
$83.000
|
$90.000
|
$82.910
|
$90.000
|
$97.000
|
$90.000
|
$83.740
|
|
|
CONC PVMT (CONT REINF)(FAST TRK)(13")
|
SY
|
169.000
|
$145.000
|
$141.330
|
$190.000
|
$200.000
|
$200.170
|
$280.000
|
$137.000
|
$250.000
|
$312.660
|
|
|
CEM STABIL BKFL
|
CY
|
3,049.000
|
$71.930
|
$49.680
|
$57.000
|
$50.000
|
$57.260
|
$60.000
|
$70.000
|
$60.000
|
$62.290
|
|
|
CUT & RESTORE CONC PAVING
|
SY
|
257.000
|
$250.000
|
$113.550
|
$174.000
|
$210.000
|
$197.600
|
$190.000
|
$132.000
|
$200.000
|
$250.000
|
|
|
CEMENT STAB BACKFILL (INLET OR MH)
|
CY
|
60.000
|
$72.000
|
$68.540
|
$57.000
|
$50.000
|
$57.260
|
$60.000
|
$70.000
|
$60.000
|
$100.790
|
|
|
FLOWABLE BACKFILL
|
CY
|
6.000
|
$200.000
|
$1,053.120
|
$160.000
|
$495.000
|
$352.610
|
$400.000
|
$230.000
|
$300.000
|
$270.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
1,310.000
|
$2.800
|
$4.170
|
$1.000
|
$1.000
|
$1.080
|
$2.000
|
$3.000
|
$1.000
|
$7.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
4,947.000
|
$20.000
|
$22.390
|
$20.000
|
$10.000
|
$23.480
|
$15.000
|
$22.000
|
$10.000
|
$57.290
|
|
|
DRILL SHAFT (NON - REINFORCED) (12 IN)
|
LF
|
7.000
|
$200.000
|
$50.400
|
$50.000
|
$110.000
|
$110.000
|
$50.000
|
$6.280
|
$120.000
|
$200.000
|
|
|
DRILL SHAFT (SIGN MTS) (36 IN)
|
LF
|
168.000
|
$360.000
|
$387.430
|
$290.000
|
$375.000
|
$289.640
|
$330.000
|
$481.950
|
$300.000
|
$376.450
|
|
|
DRILL SHAFT (SIGN MTS) (42 IN)
|
LF
|
128.000
|
$370.000
|
$423.180
|
$385.000
|
$450.000
|
$366.480
|
$540.000
|
$586.890
|
$400.000
|
$442.600
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
145.000
|
$253.510
|
$191.520
|
$180.000
|
$200.000
|
$95.760
|
$190.000
|
$211.810
|
$200.000
|
$169.950
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
32.000
|
$239.440
|
$297.350
|
$253.720
|
$230.000
|
$276.500
|
$300.000
|
$283.170
|
$270.000
|
$214.870
|
|
|
DRILL SHAFT (TRF SIG POLE) (48 IN)
|
LF
|
88.000
|
$371.880
|
$393.100
|
$400.000
|
$340.000
|
$336.000
|
$400.000
|
$413.900
|
$420.000
|
$316.510
|
|
|
CL C CONC (SIGN COLUMN)
|
CY
|
100.070
|
$1,050.000
|
$1,603.160
|
$1,280.000
|
$1,300.000
|
$1,552.490
|
$1,500.000
|
$1,806.470
|
$1,900.000
|
$1,242.670
|
|
|
CL C CONC (COLLAR)
|
EA
|
44.000
|
$1,971.270
|
$1,649.100
|
$405.000
|
$1,300.000
|
$1,034.210
|
$900.000
|
$418.910
|
$1,400.000
|
$1,350.000
|
|
|
CL C CONC (SIGN FOOTING)
|
CY
|
34.600
|
$1,050.000
|
$1,514.170
|
$920.000
|
$1,200.000
|
$1,167.430
|
$1,300.000
|
$638.130
|
$1,600.000
|
$956.390
|
|
|
RETAINING WALL (CAST - IN - PLACE)
|
SF
|
4,428.000
|
$70.000
|
$30.960
|
$65.000
|
$85.000
|
$50.490
|
$78.000
|
$62.910
|
$85.000
|
$70.490
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
155.340
|
$430.000
|
$582.510
|
$445.000
|
$515.000
|
$424.670
|
$540.000
|
$473.330
|
$550.000
|
$600.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
80.000
|
$500.000
|
$591.240
|
$460.000
|
$550.000
|
$447.400
|
$550.000
|
$439.930
|
$790.000
|
$700.000
|
|
|
RIPRAP (CONC) (CL B) (4")
|
CY
|
8.000
|
$500.000
|
$880.570
|
$610.000
|
$800.000
|
$980.410
|
$670.000
|
$484.960
|
$900.000
|
$600.000
|
|
|
RIPRAP (CONC)(CL B)(5 IN)
|
CY
|
22.000
|
$515.080
|
$610.240
|
$430.000
|
$550.000
|
$599.690
|
$840.000
|
$478.570
|
$800.000
|
$700.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
55.000
|
$170.000
|
$216.070
|
$150.000
|
$160.000
|
$188.870
|
$270.000
|
$133.430
|
$200.000
|
$140.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
24.820
|
$500.000
|
$910.050
|
$710.000
|
$580.000
|
$588.120
|
$650.000
|
$852.280
|
$760.000
|
$600.000
|
|
|
RAIL (TY SSTR)
|
LF
|
408.000
|
$45.000
|
$84.370
|
$65.000
|
$80.000
|
$64.320
|
$80.000
|
$91.000
|
$84.000
|
$72.000
|
|
|
RAIL (TY SSTR) (W/DRAIN SLOTS)
|
LF
|
1,516.000
|
$57.000
|
$74.760
|
$62.000
|
$90.000
|
$56.800
|
$79.000
|
$92.000
|
$82.000
|
$70.000
|
|
|
CONC BOX CULV (4 FT X 2 FT)
|
LF
|
41.000
|
$280.000
|
$603.090
|
$290.000
|
$420.000
|
$415.610
|
$400.000
|
$390.000
|
$470.000
|
$412.830
|
|
|
CONC BOX CULV (5 FT X 2 FT)
|
LF
|
108.000
|
$331.280
|
$519.380
|
$350.000
|
$400.000
|
$438.770
|
$480.000
|
$530.000
|
$540.000
|
$543.120
|
|
|
CONC BOX CULV (6 FT X 3 FT)
|
LF
|
96.000
|
$450.000
|
$583.520
|
$450.000
|
$520.000
|
$610.170
|
$600.000
|
$1,670.000
|
$690.000
|
$691.610
|
|
|
CONC BOX CULV (7 FT X 3 FT)
|
LF
|
246.000
|
$500.000
|
$638.010
|
$570.000
|
$620.000
|
$697.530
|
$700.000
|
$810.000
|
$760.000
|
$775.360
|
|
|
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
|
LF
|
36.000
|
$678.100
|
$1,202.510
|
$340.000
|
$630.000
|
$1,252.940
|
$700.000
|
$555.000
|
$810.000
|
$1,800.000
|
|
|
CONC BOX CULV (10 FT X 7 FT)(EXTEND)
|
LF
|
120.000
|
$1,174.400
|
$1,885.510
|
$1,200.000
|
$1,600.000
|
$1,232.980
|
$1,600.000
|
$1,890.000
|
$1,600.000
|
$2,700.000
|
|
|
CONC BOX CULV (7 FT X 2 FT)
|
LF
|
118.000
|
$425.000
|
$622.040
|
$660.000
|
$650.000
|
$703.680
|
$700.000
|
$750.000
|
$770.000
|
$619.680
|
|
|
CONC BOX CULV (6 FT X 2 FT)
|
LF
|
451.000
|
$419.160
|
$516.190
|
$450.000
|
$460.000
|
$513.560
|
$550.000
|
$460.000
|
$560.000
|
$527.070
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
875.000
|
$87.000
|
$103.120
|
$73.000
|
$140.000
|
$88.920
|
$92.000
|
$90.000
|
$110.000
|
$112.040
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
1,043.000
|
$110.000
|
$139.690
|
$82.000
|
$100.000
|
$102.220
|
$100.000
|
$91.000
|
$95.000
|
$117.860
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
1,817.000
|
$120.000
|
$104.920
|
$105.000
|
$120.000
|
$135.140
|
$130.000
|
$85.000
|
$120.000
|
$156.180
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
400.000
|
$150.000
|
$167.640
|
$140.000
|
$200.000
|
$170.840
|
$173.000
|
$145.000
|
$185.000
|
$202.970
|
|
|
INLET (COMPL)(TY AAD)
|
EA
|
3.000
|
$10,427.960
|
$7,469.870
|
$7,380.000
|
$8,000.000
|
$6,851.120
|
$7,500.000
|
$6,000.000
|
$7,500.000
|
$7,770.380
|
|
|
MANH (COMPL)(TY A)
|
EA
|
3.000
|
$7,600.000
|
$8,840.800
|
$6,500.000
|
$6,000.000
|
$7,026.080
|
$6,500.000
|
$5,000.000
|
$6,000.000
|
$6,930.380
|
|
|
INLET (COMPL)(CURB)(TY C)
|
EA
|
4.000
|
$6,079.960
|
$5,320.310
|
$5,100.000
|
$5,300.000
|
$4,547.110
|
$5,000.000
|
$3,500.000
|
$5,500.000
|
$4,387.690
|
|
|
INLET (COMPL)(TY AZ2G)
|
EA
|
3.000
|
$7,392.670
|
$10,617.220
|
$13,200.000
|
$13,000.000
|
$11,832.050
|
$14,000.000
|
$11,000.000
|
$14,000.000
|
$11,618.580
|
|
|
JCT BOX (COMPL)(SPL)
|
EA
|
13.000
|
$32,000.000
|
$17,770.530
|
$14,900.000
|
$19,000.000
|
$17,518.450
|
$23,000.000
|
$11,000.000
|
$23,000.000
|
$14,811.360
|
|
|
INLET (COMPL)(EXT TY C)
|
EA
|
8.000
|
$2,000.000
|
$2,970.530
|
$1,850.000
|
$1,400.000
|
$1,443.470
|
$1,900.000
|
$1,200.000
|
$1,500.000
|
$2,012.380
|
|
|
WINGWALL (PW) (HW=10FT) (MOD)
|
EA
|
1.000
|
$25,000.000
|
$61,724.760
|
$105,500.000
|
$96,000.000
|
$76,045.800
|
$86,000.000
|
$60,000.000
|
$230,000.000
|
$127,345.080
|
|
|
SET (TY I) (30 IN) (4: 1) (C)
|
EA
|
2.000
|
$3,719.190
|
$3,349.930
|
$9,500.000
|
$4,100.000
|
$2,682.890
|
$6,400.000
|
$8,700.000
|
$2,500.000
|
$4,264.560
|
|
|
SET (TY I) (36 IN) (4: 1) (C)
|
EA
|
2.000
|
$6,002.840
|
$3,618.990
|
$13,400.000
|
$7,900.000
|
$3,032.390
|
$19,000.000
|
$12,700.000
|
$20,000.000
|
$7,008.560
|
|
|
SET (TY I)(S= 4 FT)(HW= 3 FT)(4:1) (P)
|
EA
|
1.000
|
$6,000.000
|
$10,281.720
|
$9,900.000
|
$6,900.000
|
$9,620.220
|
$17,000.000
|
$4,500.000
|
$10,000.000
|
$9,534.130
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(6:1) (P)
|
EA
|
4.000
|
$7,983.240
|
$5,379.740
|
$7,600.000
|
$11,000.000
|
$10,737.620
|
$10,000.000
|
$8,000.000
|
$13,000.000
|
$10,828.560
|
|
|
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
1.000
|
$6,000.000
|
$3,152.300
|
$26,500.000
|
$8,800.000
|
$10,647.180
|
$20,000.000
|
$12,400.000
|
$12,000.000
|
$21,334.130
|
|
|
SET (TY I)(S= 6 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
1.000
|
$10,862.060
|
$8,047.980
|
$8,550.000
|
$12,000.000
|
$12,701.110
|
$11,000.000
|
$7,800.000
|
$15,000.000
|
$13,267.130
|
|
|
SET (TY I)(S= 6 FT)(HW= 4 FT)(6:1) (P)
|
EA
|
4.000
|
$11,788.750
|
$10,833.290
|
$12,200.000
|
$15,000.000
|
$14,935.930
|
$14,000.000
|
$10,100.000
|
$15,000.000
|
$15,588.560
|
|
|
SET (TY I)(S= 7 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
1.000
|
$6,800.000
|
$8,200.080
|
$8,700.000
|
$13,000.000
|
$13,488.620
|
$11,000.000
|
$6,500.000
|
$15,000.000
|
$14,049.130
|
|
|
SET (TY I)(S= 7 FT)(HW= 4 FT)(6:1) (P)
|
EA
|
4.000
|
$14,000.000
|
$9,760.840
|
$14,100.000
|
$19,000.000
|
$16,862.150
|
$16,000.000
|
$12,000.000
|
$18,000.000
|
$18,370.560
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$1,350.650
|
$1,511.540
|
$1,000.000
|
$1,700.000
|
$1,666.550
|
$1,400.000
|
$1,220.000
|
$1,900.000
|
$3,044.130
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
13.000
|
$1,488.070
|
$1,804.240
|
$1,100.000
|
$1,500.000
|
$1,376.200
|
$1,400.000
|
$1,600.000
|
$1,800.000
|
$1,959.530
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$2,575.000
|
$1,282.860
|
$1,200.000
|
$1,600.000
|
$1,836.830
|
$2,500.000
|
$1,500.000
|
$2,500.000
|
$3,204.130
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
12.000
|
$1,586.850
|
$1,206.870
|
$1,300.000
|
$1,800.000
|
$1,765.790
|
$1,600.000
|
$1,800.000
|
$2,200.000
|
$2,099.560
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
24.000
|
$2,496.030
|
$1,820.290
|
$1,380.000
|
$1,800.000
|
$2,033.710
|
$2,000.000
|
$2,200.000
|
$2,300.000
|
$2,154.560
|
|
|
ADJUSTING INLET (CAP)
|
EA
|
2.000
|
$3,200.000
|
$663.700
|
$1,250.000
|
$3,000.000
|
$1,402.990
|
$3,000.000
|
$350.000
|
$1,500.000
|
$3,000.000
|
|
|
REMOV STR (SET)
|
EA
|
47.000
|
$385.920
|
$613.830
|
$340.000
|
$500.000
|
$276.340
|
$300.000
|
$450.000
|
$700.000
|
$550.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
2.000
|
$1,653.700
|
$2,425.730
|
$7,000.000
|
$8,000.000
|
$7,950.760
|
$3,500.000
|
$3,500.000
|
$1,500.000
|
$3,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
879.000
|
$20.280
|
$25.530
|
$18.000
|
$20.000
|
$30.390
|
$24.000
|
$10.000
|
$15.000
|
$30.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
80.000
|
$68.640
|
$200.680
|
$180.000
|
$125.000
|
$101.330
|
$117.000
|
$135.000
|
$100.000
|
$70.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$978,500.000
|
$986,565.650
|
$1,090,000.000
|
$900,000.000
|
$1,137,000.000
|
$910,000.000
|
$1,170,000.000
|
$1,200,000.000
|
$1,395,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
15.000
|
$3,000.000
|
$2,107.830
|
$4,000.000
|
$6,000.000
|
$2,553.910
|
$4,000.000
|
$5,100.000
|
$4,000.000
|
$8,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
12.000
|
$25.000
|
$93.740
|
$9.930
|
$35.000
|
$93.930
|
$100.000
|
$104.480
|
$100.000
|
$180.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
12.000
|
$10.000
|
$16.390
|
$16.420
|
$11.000
|
$16.420
|
$18.000
|
$18.490
|
$17.000
|
$35.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
200.000
|
$25.000
|
$37.700
|
$37.780
|
$40.000
|
$37.780
|
$38.000
|
$42.020
|
$40.000
|
$37.780
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 2)
|
SY
|
934.000
|
$25.000
|
$45.250
|
$132.730
|
$135.000
|
$132.730
|
$50.000
|
$147.640
|
$135.000
|
$132.730
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
1,134.000
|
$7.460
|
$16.420
|
$16.450
|
$17.000
|
$16.450
|
$18.000
|
$18.400
|
$15.000
|
$16.450
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
6,532.000
|
$1.900
|
$4.770
|
$6.000
|
$4.750
|
$4.780
|
$5.000
|
$5.320
|
$5.000
|
$4.780
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
6,532.000
|
$0.490
|
$0.970
|
$0.970
|
$1.000
|
$0.970
|
$1.000
|
$1.080
|
$1.000
|
$0.970
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
40.000
|
$3.520
|
$7.840
|
$7.850
|
$8.000
|
$7.850
|
$8.000
|
$8.730
|
$8.000
|
$15.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
40.000
|
$0.510
|
$2.050
|
$2.060
|
$3.000
|
$2.060
|
$2.000
|
$2.290
|
$2.000
|
$4.000
|
|
|
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
|
LF
|
1,920.000
|
$16.000
|
$25.000
|
$14.000
|
$15.000
|
$11.970
|
$20.000
|
$12.000
|
$20.000
|
$13.940
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
|
LF
|
1,640.000
|
$12.000
|
$26.560
|
$14.000
|
$15.000
|
$9.330
|
$20.000
|
$10.000
|
$15.000
|
$10.170
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$12.000
|
$10.510
|
$14.000
|
$40.000
|
$13.210
|
$30.000
|
$10.000
|
$30.000
|
$10.170
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
1,110.000
|
$9.750
|
$25.000
|
$5.000
|
$10.000
|
$2.890
|
$15.000
|
$8.000
|
$8.000
|
$10.870
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
3,000.000
|
$8.610
|
$4.070
|
$4.000
|
$8.000
|
$2.890
|
$15.000
|
$8.000
|
$6.000
|
$7.310
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
140.000
|
$8.260
|
$4.630
|
$4.000
|
$10.000
|
$2.880
|
$35.000
|
$8.000
|
$20.000
|
$7.310
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
1,920.000
|
$18.250
|
$17.760
|
$14.000
|
$12.000
|
$10.160
|
$14.000
|
$12.000
|
$15.000
|
$13.940
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 1)
|
LF
|
1,640.000
|
$12.000
|
$21.490
|
$14.000
|
$15.000
|
$8.690
|
$15.000
|
$10.000
|
$15.000
|
$10.170
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$10.490
|
$10.510
|
$14.000
|
$40.000
|
$12.460
|
$29.000
|
$10.000
|
$15.000
|
$10.170
|
|
|
PORT CTB CONNECT HARDWARE
|
EA
|
145.000
|
$100.000
|
$122.890
|
$90.000
|
$70.000
|
$128.770
|
$100.000
|
$200.000
|
$125.000
|
$81.040
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
6,625.000
|
$4.500
|
$6.110
|
$3.000
|
$4.000
|
$4.220
|
$5.000
|
$6.000
|
$5.000
|
$5.270
|
|
|
CONC CURB (U-TURN)
|
LF
|
499.000
|
$9.530
|
$26.280
|
$30.000
|
$45.000
|
$32.730
|
$45.000
|
$29.000
|
$65.000
|
$31.700
|
|
|
CONC CURB (DOWEL)
|
LF
|
1,500.000
|
$8.520
|
$14.410
|
$9.000
|
$12.000
|
$9.190
|
$18.000
|
$13.000
|
$10.000
|
$9.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
1,497.000
|
$80.000
|
$71.520
|
$62.000
|
$85.000
|
$59.860
|
$90.000
|
$70.000
|
$80.000
|
$84.480
|
|
|
CONC SIDEWALKS (4")
|
SY
|
3,766.000
|
$59.740
|
$49.780
|
$48.000
|
$60.000
|
$36.720
|
$60.000
|
$57.000
|
$70.000
|
$67.590
|
|
|
CURB RAMPS (TY 1)
|
EA
|
4.000
|
$1,536.540
|
$1,800.520
|
$1,800.000
|
$2,000.000
|
$1,981.420
|
$2,500.000
|
$1,200.000
|
$3,000.000
|
$1,986.000
|
|
|
CURB RAMPS (TY 7)
|
EA
|
2.000
|
$1,393.190
|
$1,800.520
|
$1,500.000
|
$2,500.000
|
$2,032.500
|
$2,400.000
|
$1,200.000
|
$3,000.000
|
$1,850.000
|
|
|
CURB RAMPS (TY 21)
|
EA
|
3.000
|
$2,056.250
|
$1,800.520
|
$2,100.000
|
$2,500.000
|
$2,420.530
|
$3,100.000
|
$1,200.000
|
$3,000.000
|
$2,415.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
275.000
|
$30.670
|
$25.900
|
$25.950
|
$30.000
|
$24.000
|
$26.000
|
$30.590
|
$26.000
|
$27.500
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
2.000
|
$1,283.590
|
$1,306.360
|
$1,309.000
|
$1,500.000
|
$1,485.000
|
$1,400.000
|
$1,523.920
|
$1,500.000
|
$13,760.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
25.000
|
$3.260
|
$3.990
|
$4.000
|
$4.000
|
$2.000
|
$4.000
|
$2.060
|
$2.000
|
$1.850
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
2.000
|
$3,392.460
|
$3,046.090
|
$3,052.250
|
$3,500.000
|
$3,005.000
|
$3,100.000
|
$3,420.470
|
$3,100.000
|
$3,075.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
1.000
|
$263.620
|
$379.230
|
$380.000
|
$500.000
|
$200.000
|
$400.000
|
$428.250
|
$250.000
|
$385.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
1.000
|
$2,462.990
|
$15,000.000
|
$2,850.000
|
$2,000.000
|
$4,700.000
|
$2,900.000
|
$2,502.780
|
$5,000.000
|
$2,250.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
1.000
|
$1,650.470
|
$2,544.850
|
$2,550.000
|
$1,100.000
|
$1,200.000
|
$2,600.000
|
$1,056.730
|
$1,200.000
|
$950.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
1.000
|
$23,834.650
|
$10,154.450
|
$10,175.000
|
$36,000.000
|
$28,850.000
|
$11,000.000
|
$33,815.380
|
$30,000.000
|
$30,400.000
|
|
|
RELOCATE RD IL ASM (TRANS-BASE)
|
EA
|
1.000
|
$1,589.620
|
$1,363.850
|
$1,430.000
|
$2,000.000
|
$997.000
|
$1,500.000
|
$2,335.930
|
$1,200.000
|
$2,580.960
|
|
|
IN RD IL (TY SA) 50T-10 (400W EQ) LED
|
EA
|
11.000
|
$4,141.990
|
$4,763.960
|
$4,555.000
|
$4,600.000
|
$4,406.000
|
$5,000.000
|
$4,649.610
|
$5,000.000
|
$4,898.160
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
3,450.000
|
$12.500
|
$10.490
|
$16.000
|
$18.000
|
$15.900
|
$11.000
|
$14.280
|
$17.000
|
$10.640
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
130.000
|
$25.850
|
$13.350
|
$20.000
|
$23.000
|
$31.350
|
$14.000
|
$19.530
|
$22.000
|
$18.390
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
55.000
|
$14.050
|
$20.980
|
$36.000
|
$25.000
|
$26.000
|
$22.000
|
$27.330
|
$39.000
|
$23.650
|
|
|
CONDT (PVC) (SCH 80) (4")
|
LF
|
535.000
|
$20.380
|
$27.660
|
$31.000
|
$25.000
|
$33.900
|
$29.000
|
$31.570
|
$33.000
|
$22.490
|
|
|
CONDT (PVC) (SCH 80) (4") (BORE)
|
LF
|
630.000
|
$26.500
|
$29.570
|
$32.000
|
$30.000
|
$57.000
|
$31.000
|
$36.350
|
$34.000
|
$29.770
|
|
|
CONDT (RM) (3")
|
LF
|
10.000
|
$57.630
|
$47.680
|
$100.000
|
$55.000
|
$46.800
|
$50.000
|
$52.840
|
$110.000
|
$52.620
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
965.000
|
$1.800
|
$1.860
|
$1.950
|
$1.200
|
$1.600
|
$2.000
|
$8.650
|
$2.000
|
$1.120
|
|
|
ELEC CONDR (NO.4) BARE
|
LF
|
430.000
|
$2.470
|
$2.670
|
$3.100
|
$1.800
|
$2.700
|
$2.800
|
$3.720
|
$3.400
|
$1.720
|
|
|
ELEC CONDR (NO.4) INSULATED
|
LF
|
855.000
|
$2.750
|
$2.860
|
$3.450
|
$2.300
|
$3.100
|
$3.000
|
$3.500
|
$4.000
|
$2.260
|
|
|
TRAY CABLE (4 CONDR) (12 AWG)
|
LF
|
3,465.000
|
$2.080
|
$3.340
|
$3.200
|
$2.100
|
$3.240
|
$3.500
|
$3.110
|
$3.500
|
$1.970
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
18.000
|
$1,043.160
|
$1,125.420
|
$1,440.000
|
$1,500.000
|
$1,016.900
|
$1,200.000
|
$1,110.120
|
$1,500.000
|
$1,005.560
|
|
|
ELC SRV TY A 240/480 060(SS)SS(E)GC(U)
|
EA
|
2.000
|
$6,787.620
|
$5,722.480
|
$7,250.000
|
$5,800.000
|
$9,418.690
|
$6,000.000
|
$8,873.200
|
$7,500.000
|
$6,655.130
|
|
|
ELC SRV TY D 120/240 060(NS)SS(E)SP(O)
|
EA
|
1.000
|
$5,206.760
|
$5,579.420
|
$6,670.000
|
$7,000.000
|
$5,336.000
|
$6,000.000
|
$6,786.440
|
$7,000.000
|
$6,812.750
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
30.000
|
$40.000
|
$23.850
|
$25.000
|
$40.000
|
$40.000
|
$25.000
|
$38.100
|
$42.000
|
$40.000
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
479.250
|
$30.000
|
$21.940
|
$29.000
|
$40.000
|
$26.730
|
$23.000
|
$28.260
|
$31.000
|
$28.940
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
9.000
|
$620.000
|
$589.870
|
$624.660
|
$550.000
|
$475.000
|
$480.000
|
$739.710
|
$500.000
|
$700.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
11.000
|
$600.000
|
$820.500
|
$868.900
|
$700.000
|
$645.000
|
$650.000
|
$939.930
|
$700.000
|
$890.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
2.000
|
$710.000
|
$908.190
|
$961.750
|
$800.000
|
$760.000
|
$760.000
|
$1,112.350
|
$800.000
|
$1,045.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
|
EA
|
2.000
|
$1,000.000
|
$1,098.700
|
$1,163.500
|
$925.000
|
$860.000
|
$860.000
|
$1,073.420
|
$900.000
|
$1,140.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
1.000
|
$950.000
|
$1,041.560
|
$1,103.000
|
$850.000
|
$825.000
|
$830.000
|
$1,156.840
|
$900.000
|
$1,150.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
1.000
|
$800.000
|
$1,240.810
|
$1,314.000
|
$850.000
|
$975.000
|
$1,000.000
|
$1,307.010
|
$1,000.000
|
$1,350.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
1.000
|
$1,800.000
|
$1,859.800
|
$1,964.000
|
$1,900.000
|
$2,600.000
|
$2,000.000
|
$2,291.440
|
$3,000.000
|
$2,830.000
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
278.300
|
$6.000
|
$6.240
|
$6.550
|
$6.500
|
$6.530
|
$7.000
|
$7.010
|
$7.000
|
$15.000
|
|
|
REMOVE LRSA
|
EA
|
1.000
|
$2,000.000
|
$333.810
|
$350.000
|
$800.000
|
$2,004.000
|
$350.000
|
$595.110
|
$1,600.000
|
$2,500.000
|
|
|
INS OH SN SUP(40 FT CANT)(SPAN ONLY)
|
EA
|
2.000
|
$20,000.000
|
$22,122.140
|
$25,000.000
|
$25,000.000
|
$26,945.000
|
$24,000.000
|
$27,646.300
|
$27,000.000
|
$28,005.190
|
|
|
INS OH SN SUP(80 FT BRDG)(SPAN ONLY)
|
EA
|
1.000
|
$50,000.000
|
$46,318.660
|
$50,200.000
|
$55,000.000
|
$59,905.000
|
$50,000.000
|
$57,254.780
|
$55,000.000
|
$64,099.020
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
42.000
|
$30.000
|
$25.490
|
$27.000
|
$20.000
|
$25.000
|
$25.000
|
$55.620
|
$27.000
|
$25.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
3.000
|
$40.000
|
$25.490
|
$27.000
|
$30.000
|
$32.000
|
$27.000
|
$55.620
|
$35.000
|
$45.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
3.000
|
$28.000
|
$25.490
|
$27.000
|
$30.000
|
$32.000
|
$27.000
|
$55.620
|
$35.000
|
$50.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
|
EA
|
9.000
|
$60.000
|
$89.710
|
$95.000
|
$70.000
|
$65.000
|
$65.000
|
$55.620
|
$70.000
|
$100.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
90.000
|
$1.450
|
$4.720
|
$5.000
|
$2.000
|
$5.000
|
$5.000
|
$2.220
|
$2.000
|
$5.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(DOT)
|
LF
|
139.000
|
$2.600
|
$4.720
|
$5.000
|
$2.500
|
$5.000
|
$5.000
|
$3.340
|
$3.000
|
$5.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
5,249.000
|
$0.820
|
$0.940
|
$1.000
|
$1.800
|
$1.000
|
$1.000
|
$1.280
|
$1.200
|
$1.000
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
851.000
|
$1.500
|
$1.890
|
$2.000
|
$2.500
|
$2.000
|
$2.000
|
$2.220
|
$2.000
|
$2.000
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
25.000
|
$8.560
|
$5.670
|
$6.000
|
$7.000
|
$6.000
|
$6.000
|
$9.450
|
$9.000
|
$6.000
|
|
|
WK ZN PAV MRK REMOV (W)(ARROW)
|
EA
|
2.000
|
$178.680
|
$155.810
|
$165.000
|
$250.000
|
$165.000
|
$165.000
|
$222.470
|
$220.000
|
$165.000
|
|
|
WK ZN PAV MRK REMOV (W)(WORD)
|
EA
|
2.000
|
$198.840
|
$188.860
|
$200.000
|
$200.000
|
$200.000
|
$200.000
|
$244.720
|
$240.000
|
$200.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
3,414.000
|
$0.820
|
$0.940
|
$1.000
|
$1.800
|
$1.000
|
$1.000
|
$1.280
|
$1.200
|
$1.000
|
|
REFL PAV MRK TY II (W) 12" (SLD)
|
LF
|
138.000
|
$1.000
|
$1.180
|
$1.250
|
$3.500
|
$1.250
|
$1.300
|
$3.340
|
$3.000
|
$1.250
|
|
|
PAVEMENT SEALER 12"
|
LF
|
138.000
|
$1.000
|
$0.710
|
$0.750
|
$1.500
|
$0.750
|
$0.750
|
$0.020
|
$0.020
|
$0.750
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
12.000
|
$30.000
|
$4.720
|
$5.000
|
$45.000
|
$5.000
|
$5.000
|
$22.250
|
$20.000
|
$5.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
15.000
|
$30.000
|
$9.440
|
$10.000
|
$45.000
|
$10.000
|
$10.000
|
$22.250
|
$20.000
|
$10.000
|
|
|
PAVEMENT SEALER (DBL ARROW)
|
EA
|
3.000
|
$14.000
|
$9.440
|
$10.000
|
$60.000
|
$10.000
|
$10.000
|
$22.250
|
$20.000
|
$10.000
|
|
|
PAVEMENT SEALER (UTURN ARROW)
|
EA
|
3.000
|
$50.000
|
$9.440
|
$10.000
|
$90.000
|
$10.000
|
$10.000
|
$22.250
|
$20.000
|
$10.000
|
|
|
PAVEMENT SEALER (YLD TRI)
|
EA
|
9.000
|
$20.000
|
$4.720
|
$5.000
|
$25.000
|
$5.000
|
$5.000
|
$5.560
|
$5.000
|
$5.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
12.000
|
$215.000
|
$165.250
|
$175.000
|
$300.000
|
$175.000
|
$180.000
|
$335.930
|
$330.000
|
$175.000
|
|
PREFAB PAV MRK TY C (W) (DBL ARROW)
|
EA
|
3.000
|
$260.000
|
$330.510
|
$350.000
|
$475.000
|
$350.000
|
$350.000
|
$391.920
|
$400.000
|
$350.000
|
|
PREFAB PAV MRK TY C (W) (UTURN ARROW)
|
EA
|
3.000
|
$280.000
|
$330.510
|
$350.000
|
$500.000
|
$350.000
|
$350.000
|
$404.870
|
$400.000
|
$350.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
15.000
|
$245.000
|
$236.080
|
$250.000
|
$325.000
|
$250.000
|
$250.000
|
$350.390
|
$350.000
|
$250.000
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
9.000
|
$30.000
|
$42.490
|
$45.000
|
$55.000
|
$45.000
|
$45.000
|
$44.490
|
$50.000
|
$45.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
353.000
|
$7.000
|
$5.190
|
$5.500
|
$8.000
|
$5.500
|
$5.500
|
$6.670
|
$7.000
|
$5.500
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
10,077.000
|
$0.550
|
$0.380
|
$0.400
|
$0.700
|
$0.400
|
$0.400
|
$0.430
|
$0.400
|
$0.400
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
1,915.000
|
$0.700
|
$0.570
|
$0.600
|
$1.400
|
$0.600
|
$0.600
|
$0.650
|
$0.600
|
$0.600
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
251.000
|
$1.500
|
$0.940
|
$1.000
|
$2.000
|
$1.000
|
$1.000
|
$1.390
|
$1.300
|
$1.000
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
77.000
|
$3.500
|
$1.890
|
$2.000
|
$4.000
|
$2.000
|
$2.000
|
$2.500
|
$2.500
|
$2.000
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
6.000
|
$50.000
|
$33.050
|
$35.000
|
$85.000
|
$35.000
|
$35.000
|
$66.740
|
$70.000
|
$35.000
|
|
|
ELIM EXT PAV MRK & MRKS (DBL ARROW)
|
EA
|
1.000
|
$60.000
|
$56.660
|
$60.000
|
$100.000
|
$60.000
|
$60.000
|
$66.740
|
$70.000
|
$60.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
2.000
|
$55.000
|
$42.490
|
$45.000
|
$85.000
|
$45.000
|
$45.000
|
$66.740
|
$70.000
|
$45.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
24,792.000
|
$0.060
|
$0.030
|
$0.030
|
$0.100
|
$0.030
|
$0.030
|
$0.030
|
$0.040
|
$0.030
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
4,456.000
|
$0.080
|
$0.040
|
$0.040
|
$0.200
|
$0.040
|
$0.040
|
$0.040
|
$0.050
|
$0.040
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
2,220.000
|
$0.040
|
$0.050
|
$0.060
|
$0.500
|
$0.060
|
$0.060
|
$0.070
|
$0.060
|
$0.060
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
360.000
|
$0.060
|
$0.120
|
$0.120
|
$1.000
|
$0.120
|
$0.120
|
$0.130
|
$0.150
|
$0.120
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
12.000
|
$6.000
|
$4.720
|
$5.000
|
$10.000
|
$5.000
|
$5.000
|
$5.560
|
$6.000
|
$5.000
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
3.000
|
$7.000
|
$9.440
|
$10.000
|
$10.000
|
$10.000
|
$10.000
|
$5.560
|
$6.000
|
$10.000
|
|
|
PAV SURF PREP FOR MRK (UTURN ARR)
|
EA
|
3.000
|
$5.000
|
$9.440
|
$10.000
|
$10.000
|
$10.000
|
$10.000
|
$5.560
|
$6.000
|
$10.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
15.000
|
$9.000
|
$9.440
|
$10.000
|
$10.000
|
$10.000
|
$10.000
|
$5.560
|
$6.000
|
$10.000
|
|
|
PAV SURF PREP FOR MRK (36")(YLD TRI)
|
EA
|
9.000
|
$4.000
|
$4.720
|
$5.000
|
$5.000
|
$5.000
|
$5.000
|
$5.560
|
$6.000
|
$5.000
|
|
|
INSTALL HWY TRF SIG (SYSTEM)
|
EA
|
1.000
|
$27,749.600
|
$37,181.780
|
$37,300.000
|
$40,000.000
|
$37,233.000
|
$40,000.000
|
$38,789.800
|
$40,000.000
|
$36,337.380
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
10.000
|
$210.330
|
$228.900
|
$310.000
|
$275.000
|
$226.000
|
$250.000
|
$283.650
|
$330.000
|
$258.840
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
4.000
|
$198.890
|
$228.900
|
$310.000
|
$275.000
|
$229.000
|
$250.000
|
$283.650
|
$330.000
|
$258.840
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
10.000
|
$191.660
|
$228.900
|
$310.000
|
$275.000
|
$226.000
|
$250.000
|
$283.650
|
$330.000
|
$258.840
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
4.000
|
$206.730
|
$228.900
|
$310.000
|
$275.000
|
$229.000
|
$250.000
|
$283.650
|
$330.000
|
$258.840
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
10.000
|
$191.780
|
$228.820
|
$310.000
|
$275.000
|
$226.000
|
$250.000
|
$283.650
|
$330.000
|
$258.840
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
8.000
|
$189.630
|
$228.820
|
$310.000
|
$275.000
|
$226.000
|
$250.000
|
$283.650
|
$330.000
|
$258.840
|
|
|
PED SIG SEC (LED)(2 INDICATIONS)
|
EA
|
4.000
|
$123.500
|
$524.380
|
$315.000
|
$600.000
|
$588.000
|
$550.000
|
$1,051.170
|
$330.000
|
$533.540
|
|
|
PED SIG SEC (LED)(COUNTDOWN)
|
EA
|
4.000
|
$517.500
|
$533.910
|
$735.000
|
$800.000
|
$588.000
|
$570.000
|
$706.340
|
$750.000
|
$756.720
|
|
|
BACKPLATE W/REFL BRDR(4 SEC)
|
EA
|
4.000
|
$134.080
|
$191.640
|
$100.000
|
$215.000
|
$218.000
|
$210.000
|
$159.070
|
$110.000
|
$202.380
|
|
|
BACKPLATE W/REFL BRDR(3 SEC)
|
EA
|
10.000
|
$116.610
|
$162.090
|
$80.000
|
$190.000
|
$189.000
|
$170.000
|
$164.630
|
$90.000
|
$176.120
|
|
|
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
|
LF
|
1,805.000
|
$1.640
|
$1.860
|
$1.850
|
$1.500
|
$1.630
|
$2.000
|
$1.910
|
$2.000
|
$1.380
|
|
|
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
|
LF
|
2,415.000
|
$2.040
|
$2.380
|
$2.600
|
$2.000
|
$2.230
|
$2.500
|
$2.630
|
$3.000
|
$1.960
|
|
|
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
|
LF
|
4,920.000
|
$2.730
|
$3.000
|
$3.400
|
$3.000
|
$3.060
|
$3.200
|
$3.460
|
$3.500
|
$2.810
|
|
|
INS TRF SIG PL AM(S)1 ARM(40')LUM
|
EA
|
1.000
|
$11,531.460
|
$15,445.490
|
$15,300.000
|
$20,000.000
|
$14,413.000
|
$17,000.000
|
$17,332.610
|
$16,000.000
|
$17,947.830
|
|
|
INS TRF SIG PL AM(S)1 ARM(44')LUM
|
EA
|
1.000
|
$12,504.460
|
$16,208.230
|
$16,000.000
|
$20,000.000
|
$15,144.000
|
$18,000.000
|
$18,057.860
|
$17,000.000
|
$18,730.300
|
|
|
INS TRF SIG PL AM(S)1 ARM(55')LUM
|
EA
|
1.000
|
$29,163.090
|
$32,035.100
|
$32,100.000
|
$40,000.000
|
$30,450.000
|
$34,000.000
|
$36,274.780
|
$35,000.000
|
$37,541.770
|
|
|
INS TRF SIG PL AM(S)1 ARM(65')LUM
|
EA
|
3.000
|
$29,003.320
|
$33,775.100
|
$33,200.000
|
$40,000.000
|
$32,046.000
|
$36,000.000
|
$36,274.780
|
$36,000.000
|
$39,587.870
|
|
|
PED POLE ASSEMBLY
|
EA
|
5.000
|
$1,676.790
|
$2,083.240
|
$1,880.000
|
$2,000.000
|
$673.000
|
$2,200.000
|
$2,030.040
|
$2,000.000
|
$1,727.680
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
6.000
|
$755.580
|
$657.860
|
$790.000
|
$900.000
|
$714.000
|
$700.000
|
$1,028.920
|
$800.000
|
$812.420
|
|
|
PED DETECTOR CONTROLLER UNIT
|
EA
|
1.000
|
$2,120.450
|
$3,861.370
|
$3,600.000
|
$6,000.000
|
$3,666.000
|
$4,100.000
|
$2,030.040
|
$4,000.000
|
$5,670.170
|
|
|
FULL - WIDTH MOWING
|
CYC
|
4.000
|
$2,200.000
|
$1,224.260
|
$2,000.000
|
$3,000.000
|
$1,117.890
|
$3,500.000
|
$3,337.050
|
$1,700.000
|
$2,888.810
|
|
|
LITTER REMOVAL
|
CYC
|
15.000
|
$1,400.000
|
$861.890
|
$750.000
|
$1,000.000
|
$861.050
|
$500.000
|
$1,692.350
|
$1,400.000
|
$1,365.880
|
|
|
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
|
CYC
|
15.000
|
$1,030.540
|
$1,510.710
|
$460.000
|
$1,500.000
|
$544.330
|
$500.000
|
$3,337.040
|
$900.000
|
$988.930
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
90.000
|
$132.570
|
$215.880
|
$35.000
|
$75.000
|
$83.560
|
$60.000
|
$278.090
|
$50.000
|
$56.120
|
|
|
CTMS RELOCATION (HEC)
|
EA
|
1.000
|
$7,500.000
|
$2,031.040
|
$8,650.000
|
$1,950.000
|
$8,936.000
|
$2,100.000
|
$3,615.130
|
$10,000.000
|
$2,693.690
|
|
MULTIPOLYMER PAV MRK (W)(6")(SLD)
|
LF
|
13,373.000
|
$1.100
|
$0.810
|
$0.850
|
$1.000
|
$0.850
|
$0.850
|
$1.000
|
$1.000
|
$0.850
|
|
MULTIPOLYMER PAV MRK (W)(6")(BRK)
|
LF
|
1,780.000
|
$1.000
|
$0.850
|
$0.900
|
$1.000
|
$0.900
|
$0.900
|
$1.000
|
$1.000
|
$0.900
|
|
MULTIPOLYMER PAV MRK (W)(6")(DOT)
|
LF
|
30.000
|
$0.750
|
$3.770
|
$2.000
|
$35.000
|
$2.000
|
$2.000
|
$6.670
|
$7.000
|
$2.000
|
|
MULTIPOLYMER PAV MRK (W)(8")(SLD)
|
LF
|
4,431.000
|
$1.200
|
$1.600
|
$1.700
|
$2.000
|
$1.700
|
$1.700
|
$2.220
|
$2.200
|
$1.700
|
|
MULTIPOLYMER PAV MRK (W)(12")(SLD)
|
LF
|
1,122.000
|
$3.500
|
$3.300
|
$3.500
|
$6.000
|
$3.500
|
$3.500
|
$7.210
|
$7.000
|
$3.500
|
|
MULTIPOLYMER PAV MRK (W)(12")(LNDP)
|
LF
|
960.000
|
$3.000
|
$3.300
|
$3.500
|
$6.000
|
$3.500
|
$3.500
|
$7.430
|
$7.000
|
$3.500
|
|
MULTIPOLYMER PAV MRK (W)(24")(SLD)
|
LF
|
360.000
|
$7.000
|
$5.670
|
$6.000
|
$12.000
|
$6.000
|
$6.000
|
$13.530
|
$13.000
|
$6.000
|
|
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
|
LF
|
7,829.000
|
$1.100
|
$0.850
|
$0.900
|
$1.000
|
$0.900
|
$0.900
|
$1.840
|
$1.700
|
$0.900
|
|
MULTIPOLYMER PAV MRK (Y)(8")(SLD)
|
LF
|
25.000
|
$0.970
|
$1.890
|
$2.000
|
$2.000
|
$2.000
|
$2.000
|
$5.010
|
$5.000
|
$2.000
|
|
MULTIPOLYMER PAV MRK (BLK)(6")(BRK)
|
LF
|
1,780.000
|
$1.200
|
$0.850
|
$0.900
|
$2.000
|
$0.900
|
$0.900
|
$1.280
|
$1.200
|
$0.900
|
|
|
BBU SYSTEM (EXTERNAL BATT CABINET)
|
EA
|
1.000
|
$6,590.160
|
$7,722.750
|
$8,100.000
|
$9,000.000
|
$10,038.000
|
$8,500.000
|
$8,064.520
|
$9,000.000
|
$8,586.730
|
|
|
TMA (STATIONARY)
|
DAY
|
47.000
|
$272.000
|
$229.080
|
$65.000
|
$250.000
|
$299.040
|
$85.000
|
$500.000
|
$250.000
|
$209.700
|
|
|
RVDS(PRESENCE DETECTION ONLY)
|
EA
|
6.000
|
$7,633.110
|
$8,676.170
|
$8,750.000
|
$8,000.000
|
$9,253.000
|
$9,100.000
|
$8,931.470
|
$9,000.000
|
$7,787.920
|
|
|
RVDS(ADVANCE DETECTION ONLY)
|
EA
|
4.000
|
$7,537.580
|
$8,676.170
|
$8,750.000
|
$8,000.000
|
$9,009.000
|
$9,100.000
|
$9,007.930
|
$9,000.000
|
$7,421.410
|
|
Totals: |
$10,755,429.380
|
$10,942,905.022
|
$10,963,075.388
|
$11,269,557.210
|
$11,384,145.652
|
$11,795,158.780
|
$11,807,251.071
|
$12,294,824.480
|
$12,996,672.449
|