TRAVIS FM 734 (3417-03-021)

Items: 103

County: TRAVIS
Length: N/A
Highway: FM 734
District: AUSTIN
Control Number: 3417-03-021
DBE Goal: N/A
Project: F 2023(337)
Guaranty: N/A
Time: 155 WORKING DAYS
Engineer's Estimate: $5,259,191.66
Date: 12/01/2022 (3 years ago)
Contract Number: N/A
Type: RECONSTRUCT EXISTING ROADWAY
Mail/Deliver Bids To: N/A
MATTHEW KELLY
JASON CAVNESS
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (6)
E
Engineer's Estimate
$5,259,191.66
$5,597,210.35
Over/Under Est: 6.43% $338,018.69
Over/Under Est: 9.8% $515,175.87
Amt Left: 3.17% $177,157.18
Over/Under Est: 15.47% $813,842.28
Amt Left: 8.5% $475,823.59
Delta: -5.17% -$298,666.41
Over/Under Est: 19.59% $1,030,067.17
Amt Left: 12.36% $692,048.48
Delta: -3.56% -$216,224.89
Over/Under Est: 30.13% $1,584,368.36
Amt Left: 22.27% $1,246,349.67
Delta: -8.81% -$554,301.19
$7,107,969.08
Over/Under Est: 35.15% $1,848,777.42
Amt Left: 26.99% $1,510,758.73
Delta: -3.86% -$264,409.06
Subcontractor Percentage Amount
TEXAS MATERIALS GROUP, INC. 35.84% $2,006,040.19
CAVE TRUCKING, LLC 9.94% $556,362.71
ENVIRONMENTAL SAFETY SERVICES, INC. 4.56% $255,232.79
FLASHER EQUIPMENT COMPANY 2.24% $125,377.51
Total: 52.58% $2,943,013.20

Bid Items & Bid Tabulations

103 Total 0 of 103
TRAVIS  |  FM 734  |  AUSTIN  |  3417-03-021  |  12/01/2022  |  $5,259,191.66  |  F 2023(337)  |  RECON EXIST ROADWAY  |  155 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
AARON CONCRETE CONTRACTORS, L.P.
CAPITAL EXCAVATION COMPANY
JORDAN FOSTER CONSTRUCTION, LLC
JOE BLAND CONSTRUCTION, L.P.
HUNTER INDUSTRIES, LTD.
DAN WILLIAMS COMPANY
PREPARING ROW
STA 66.000 $2,000.000 $250.000 $500.000 $3,800.000 $1,130.000 $3,000.000 $7,500.000
REMOVING CONC (CURB AND GUTTER)
LF 6,750.000 $7.000 $7.000 $11.000 $10.000 $17.000 $10.260 $3.000
REMOVING CONC (MISC)
SY 100.000 $25.000 $30.000 $38.000 $30.000 $25.000 $27.360 $20.000
EXCAVATION (ROADWAY)
CY 12,466.000 $15.000 $19.000 $16.000 $33.000 $32.000 $17.100 $34.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 1,236.000 $20.000 $16.000 $18.000 $25.000 $15.000 $17.100 $20.000
FURNISHING AND PLACING TOPSOIL (4")
SY 20,534.000 $2.000 $0.700 $3.400 $3.450 $2.250 $2.020 $1.500
BROADCAST SEED (PERM) (URBAN) (CLAY)
SY 20,534.000 $0.500 $0.300 $0.300 $0.260 $0.290 $0.270 $0.260
BROADCAST SEED (TEMP) (WARM)
SY 20,534.000 $0.500 $0.300 $0.250 $0.240 $0.270 $0.250 $0.240
BROADCAST SEED (TEMP) (COOL)
SY 20,534.000 $0.500 $0.300 $0.250 $0.240 $0.270 $0.250 $0.240
VEGETATIVE WATERING
MG 347.000 $20.000 $30.000 $41.000 $32.000 $61.000 $20.520 $15.000
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 20,534.000 $1.500 $1.450 $1.030 $1.350 $1.440 $1.340 $1.300
SOIL RETENTION BLANKETS (CL 1) (TY C)
SY 20,534.000 $2.250 $1.450 $1.140 $1.350 $1.440 $1.340 $1.300
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
CY 11,081.000 $55.000 $80.000 $55.000 $56.000 $76.500 $84.100 $90.000
FL BS (RDWY DEL)(TY A GR 5)
TON 550.000 $20.000 $40.000 $24.000 $25.000 $160.000 $55.800 $35.000
REWORK BS MATL (TY B)(10")(OC)
SY 33,241.000 $2.570 $18.000 $21.000 $8.500 $7.000 $14.450 $12.500
PRIME COAT (MULTI OPTION)
GAL 6,648.000 $6.000 $4.200 $4.250 $4.000 $4.660 $5.490 $4.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 2,587.000 $55.000 $63.000 $64.000 $61.000 $69.950 $65.750 $65.000
PLANE ASPH CONC PAV (1")
SY 25,829.000 $2.000 $1.850 $1.850 $2.500 $2.040 $2.340 $2.500
FLOWABLE BACKFILL
CY 1,425.000 $160.000 $215.000 $238.000 $181.000 $197.000 $324.530 $200.000
CL A CONC (MISC)
CY 12.000 $625.000 $270.000 $1,010.000 $750.000 $684.000 $800.000 $850.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 12.000 $280.000 $430.000 $420.000 $650.000 $316.000 $900.000 $450.000
RIPRAP (MOW STRIP)(4 IN)
CY 90.000 $550.000 $640.000 $1,020.000 $650.000 $641.000 $627.250 $600.000
CLEANING AND SEALING EXIST JOINTS(CL7)
LF 270.000 $45.000 $43.000 $42.150 $45.000 $50.000 $47.400 $30.000
SET (REMOV & REINSTALL)
EA 11.000 $1,200.000 $2,240.000 $3,000.000 $0.010 $1,646.000 $3,302.550 $1,200.000
MOBILIZATION
LS 1.000 $430,000.000 $250,000.000 $400,000.000 $600,000.000 $110,000.000 $673,475.430 $700,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $10,000.000 $960.000 $13,700.000 $12,000.000 $9,043.000 $7,500.000 $35,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 150.000 $32.000 $38.000 $37.800 $36.000 $38.680 $36.050 $35.000
ROCK FILTER DAMS (REMOVE)
LF 150.000 $13.720 $27.000 $10.530 $26.000 $27.620 $25.750 $25.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,400.000 $3.500 $4.000 $3.800 $4.000 $3.870 $3.600 $3.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,400.000 $0.700 $1.000 $0.800 $1.000 $3.870 $0.770 $0.750
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 800.000 $5.000 $4.000 $3.800 $4.000 $3.870 $3.600 $3.500
BIODEG EROSN CONT LOGS (REMOVE)
LF 800.000 $3.000 $1.000 $0.800 $1.000 $0.830 $0.770 $0.750
PTB(FRN&INSTL)(SSCB OR CSB)(TY1)OR(STL)
LF 7,000.000 $45.000 $14.000 $18.500 $40.000 $60.000 $50.000 $40.000
PTB(MOVE)(SSCB OR CSB)(TY1)OR(STL)
LF 12,260.000 $8.000 $7.000 $3.950 $13.000 $8.000 $5.000 $3.000
PTB(REMOVE)(SSCB OR CSB)(TY1)OR(STL)
LF 7,000.000 $12.000 $15.000 $18.500 $11.500 $12.000 $25.000 $6.000
CONC CURB & GUTTER (TY II)
LF 6,750.000 $25.000 $22.000 $23.350 $24.000 $22.000 $27.400 $35.000
INTRSCT, DRVWAYS, & TURNOUT (ACP)
SY 956.000 $40.000 $96.000 $90.200 $100.000 $90.360 $124.200 $85.000
MTL W-BEAM GD FEN (TIM POST)
LF 1,450.000 $30.000 $27.000 $26.300 $23.000 $26.900 $25.080 $26.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 8.000 $2,400.000 $2,000.000 $2,000.000 $1,900.000 $2,044.280 $2,420.500 $2,000.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 4.000 $1,400.000 $1,500.000 $1,440.000 $1,500.000 $1,475.200 $1,375.050 $1,450.000
REMOVE METAL BEAM GUARD FENCE
LF 1,450.000 $2.000 $2.200 $2.150 $4.500 $2.210 $2.060 $2.500
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 8.000 $240.000 $166.000 $162.000 $190.000 $165.710 $154.500 $175.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,400.000 $3,500.000 $3,390.000 $3,700.000 $3,463.320 $3,229.050 $4,000.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $270.000 $220.000 $216.000 $285.000 $221.000 $206.000 $250.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 5.000 $1,400.000 $1,660.000 $1,620.000 $1,400.000 $1,657.090 $1,545.000 $750.000
CRASH CUSH ATTEN (REMOVE)
EA 3.000 $950.000 $720.000 $700.000 $1,050.000 $718.070 $669.500 $700.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 3.000 $9,500.000 $8,400.000 $8,200.000 $8,200.000 $8,340.000 $7,776.500 $10,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 6.000 $750.000 $750.000 $730.000 $725.000 $746.800 $696.280 $700.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 6.000 $750.000 $870.000 $850.000 $840.000 $867.210 $808.550 $785.000
INSTL DEL ASSM (D-DY)SZ 2(WC)GND
EA 16.000 $80.000 $61.000 $59.400 $60.000 $60.760 $56.650 $55.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 12.000 $32.000 $22.000 $21.600 $22.000 $22.090 $20.600 $20.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 24.000 $35.000 $40.000 $38.900 $39.000 $39.770 $37.080 $36.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BR)
EA 16.000 $35.000 $18.000 $17.300 $17.000 $17.680 $16.480 $16.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BR)
EA 16.000 $35.000 $18.000 $17.300 $17.000 $17.680 $16.480 $16.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 16,000.000 $0.280 $0.300 $0.200 $0.210 $0.220 $0.200 $0.200
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 26,400.000 $0.230 $0.250 $0.200 $0.210 $0.220 $0.200 $0.200
WK ZN PAV MRK NON-REMOV (W)12"(SLD)
LF 500.000 $1.010 $0.700 $3.450 $3.450 $3.540 $3.200 $3.200
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 412.000 $4.330 $1.400 $6.500 $6.450 $6.630 $6.000 $6.000
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 12.000 $80.000 $85.000 $124.000 $123.000 $127.040 $115.000 $115.000
WK ZN PAV MRK NON-REMOV(W)18"(YLD TRI)
EA 296.000 $15.000 $8.000 $21.600 $22.000 $22.090 $20.000 $20.000
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 52,800.000 $0.230 $0.250 $0.220 $0.210 $0.220 $0.200 $0.200
WK ZN PAV MRK REMOV (REFL) TY I-C
EA 1,110.000 $5.440 $4.800 $3.500 $3.500 $3.590 $3.250 $3.250
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 1,320.000 $4.460 $4.800 $3.500 $3.500 $3.590 $3.250 $3.250
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 1,600.000 $0.820 $0.800 $0.650 $0.670 $0.670 $0.610 $0.620
WK ZN PAV MRK REMOV (W)8"(DOT)
LF 500.000 $2.260 $1.600 $1.250 $1.250 $1.270 $1.150 $1.150
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 8,990.000 $2.000 $1.500 $1.250 $1.250 $1.270 $1.150 $1.150
WK ZN PAV MRK REMOV (W)(ARROW)
EA 36.000 $175.000 $188.000 $180.000 $180.000 $184.490 $167.000 $170.000
WK ZN PAV MRK REMOV (W)(WORD)
EA 24.000 $175.000 $215.000 $216.000 $215.000 $220.950 $200.000 $200.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 3,160.000 $1.160 $0.900 $1.200 $1.350 $1.660 $1.660 $2.250
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 1,300.000 $1.000 $0.900 $1.200 $1.350 $1.660 $1.660 $2.250
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 4,810.000 $1.100 $1.350 $0.850 $0.820 $0.850 $0.770 $0.770
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 316.000 $7.000 $7.500 $7.550 $7.500 $7.730 $7.000 $7.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 22.000 $170.000 $215.000 $180.000 $180.000 $184.490 $167.000 $170.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 19.000 $200.000 $240.000 $190.000 $190.000 $194.430 $176.000 $180.000
REF PAV MRK TY I(W)18"(YLD TRI)(100MIL)
EA 48.000 $35.000 $56.000 $27.000 $27.000 $27.620 $25.000 $25.000
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 1,275.000 $4.000 $4.300 $3.650 $3.600 $3.760 $3.400 $3.400
REFL PAV MRK TY II (W) 4" (BRK)
LF 3,195.000 $0.170 $0.150 $0.150 $0.150 $0.130 $0.140 $0.150
REFL PAV MRK TY II (W) 4" (SLD)
LF 12,296.000 $0.140 $0.150 $0.150 $0.150 $0.130 $0.120 $0.120
REFL PAV MRK TY II (W) 8" (SLD)
LF 4,810.000 $0.700 $0.300 $0.300 $0.320 $0.330 $0.300 $0.300
REFL PAV MRK TY II (W) 24" (SLD)
LF 316.000 $4.000 $0.850 $3.250 $3.220 $3.310 $3.000 $3.000
REFL PAV MRK TY II (W) (ARROW)
EA 22.000 $80.000 $92.000 $83.200 $83.000 $85.060 $77.000 $80.000
REFL PAV MRK TY II (W) (WORD)
EA 19.000 $110.000 $114.000 $83.200 $83.000 $85.060 $77.000 $80.000
REFL PAV MRK TY II (W) 18" (YLD TRI)
EA 96.000 $20.000 $21.000 $15.100 $16.000 $15.470 $14.000 $15.000
REFL PAV MRK TY II (Y) 4" (SLD)
LF 12,580.000 $0.150 $0.150 $0.150 $0.150 $0.130 $0.120 $0.120
REFL PAV MRK TY II (Y) 12" (SLD)
LF 1,275.000 $1.200 $0.550 $1.800 $2.000 $1.840 $1.670 $1.700
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 3,195.000 $0.400 $0.550 $0.500 $0.500 $0.500 $0.450 $0.450
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 12,296.000 $0.540 $0.500 $0.450 $0.500 $0.460 $0.420 $0.450
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 12,580.000 $0.490 $0.500 $0.450 $0.500 $0.460 $0.420 $0.450
REFL PAV MRKR TY II-C-R
EA 445.000 $4.500 $4.800 $4.850 $4.850 $4.970 $4.500 $4.500
ELIM EXT PAV MRK & MRKS (4")
LF 1,280.000 $0.400 $0.500 $0.650 $0.700 $0.670 $0.610 $0.650
ELIM EXT PAV MRK & MRKS (8")
LF 600.000 $0.910 $1.000 $0.650 $0.700 $0.670 $0.610 $0.650
ELIM EXT PAV MRK & MRKS (12")
LF 600.000 $2.500 $1.500 $1.100 $1.500 $1.100 $1.000 $1.000
FULL - WIDTH MOWING
CYC 3.000 $2,000.000 $1,900.000 $2,780.000 $1,300.000 $5,083.000 $3,500.000 $1,550.000
LITTER REMOVAL
CYC 2.000 $1,000.000 $4,000.000 $3,470.000 $1,000.000 $2,431.000 $3,000.000 $600.000
CLEANING / SWEEPING (SPOT)
MI 3.000 $1,200.000 $130.000 $500.000 $1,700.000 $2,763.000 $5,400.000 $1,500.000
D-GR HMA TY-B PG64-22
TON 9,145.000 $110.000 $98.000 $99.500 $100.000 $109.000 $111.600 $105.000
D-GR HMA TY-D PG76-22
TON 2,025.000 $130.000 $142.000 $143.000 $142.000 $157.000 $121.320 $145.000
TOM-C PG76-22 SAC-A
TON 3,523.000 $135.000 $158.000 $159.000 $158.000 $174.000 $150.480 $155.000
BONDING COURSE
GAL 8,600.000 $5.000 $4.000 $4.200 $4.000 $4.610 $4.550 $4.000
GEOGRID BASE REINFORCEMENT (TY II)
SY 33,241.000 $1.500 $1.550 $1.750 $1.750 $4.950 $1.550 $2.500
PORTABLE CHANGEABLE MESSAGE SIGN
EA 3.000 $12,000.000 $8,500.000 $11,300.000 $9,500.000 $12,707.000 $10,000.000 $20,000.000
TMA (STATIONARY)
DAY 260.000 $200.000 $279.000 $1.300 $0.010 $829.000 $300.000 $200.000
TMA (MOBILE OPERATION)
HR 125.000 $100.000 $100.000 $91.100 $95.000 $74.000 $100.000 $65.000
Totals: $5,259,191.660 $5,597,210.350 $5,774,367.530 $6,073,033.940 $6,289,258.830 $6,843,560.020 $7,107,969.080