TRAVIS VA (0914-00-507)

Items: 52

County: TRAVIS
Length: N/A
Highway: VA
District: AUSTIN
Control Number: 0914-00-507
DBE Goal: 0.0%
Project: C 914-00-507
Guaranty: N/A
Time: 260 WORKING DAYS
Engineer's Estimate: $1,841,608.68
Date: 07/10/2024 (1 year ago)
Contract Number: N/A
Type: BRIDGE MAINTENANCE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$1,841,608.68
$2,572,807.00
Over/Under Est: 39.7% $731,198.32
Over/Under Est: 64.17% $1,181,789.32
Amt Left: 17.51% $450,591.00
Over/Under Est: 118.39% $2,180,231.32
Amt Left: 56.32% $1,449,033.00
Delta: -33.02% -$998,442.00
Subcontractor Percentage Amount
S & S BRIDGE PAINTING, INC. 34.98% $899,967.89
ALBECO CONTRACTORS LLC 19.43% $499,896.40
BUYERS BARRICADES AUSTIN, LLC 3.89% $100,082.19
SOUTH TEXAS TRAFFIC ALLIANCE INC. 0.97% $24,956.23
Total: 59.27% $1,524,902.71

Bid Items & Bid Tabulations

52 Total 0 of 52
TRAVIS  |  VA  |  AUSTIN  |  0914-00-507  |  07/10/2024  |  $1,841,608.68  |  C 914-00-507  |  BRIDGE MAINT  |  260 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TAYLOR CONTRACTING LLC
SCR CIVIL CONSTRUCTION, LLC
ROY JORGENSEN ASSOCIATES, INC.
PREP ROW (TREE)(LESS THAN 24" DIA)
EA 10.000 $1,825.000 $725.000 $1,500.000 $2,500.000
PREP ROW (TREE)(GREATER THAN 24" DIA)
EA 10.000 $3,100.000 $725.000 $2,300.000 $10,000.000
REMOVING CONC (RIPRAP)
SY 122.000 $79.140 $80.000 $125.000 $125.000
EXCAVATION (SPECIAL)
CY 20.000 $31.670 $180.000 $120.000 $151.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 20.000 $30.000 $200.000 $100.000 $100.000
BACKFILLING PAVEMENT EDGES
CY 3.000 $195.000 $1,000.000 $600.000 $500.000
CEM STABIL BKFL
CY 5.000 $235.000 $1,000.000 $3,500.000 $2,500.000
FLOWABLE BACKFILL
CY 12.000 $375.000 $1,000.000 $2,700.000 $2,500.000
TEMPORARY SPL SHORING (COFFERDAM)
SF 880.000 $35.000 $35.000 $45.000 $40.000
CL C CONC (RAIL FOUNDATION)
CY 1.000 $934.010 $4,000.000 $2,000.000 $15,000.000
CONC STR REPAIR(CLEAN & COAT WTH EPOXY)
SF 3.000 $386.580 $1,000.000 $3,000.000 $2,500.000
CONC STR REPAIR (EPOXY MORTAR)
SF 30.000 $300.000 $250.000 $400.000 $1,250.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 247.000 $345.000 $300.000 $665.000 $750.000
CONC STR REPAIR (STANDARD)
SF 1.000 $264.220 $1,000.000 $2,000.000 $800.000
CONC STR REPR(REMOV AND REPL WINGWALL)
CY 34.000 $8,000.000 $1,250.000 $6,200.000 $4,000.000
RIPRAP (CONC)(4 IN)
CY 17.000 $700.000 $900.000 $1,850.000 $1,500.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 1.000 $207.750 $2,500.000 $4,000.000 $2,500.000
RIPRAP (STONE PROTECTION)(24 IN)
CY 260.000 $207.750 $340.000 $300.000 $500.000
RIPRAP (STONE PROTECTION)(30 IN)
CY 5.000 $265.000 $1,500.000 $1,145.000 $1,250.000
CLEANING AND SEALING EXIST JOINTS(CL3)
LF 2,004.000 $45.630 $55.000 $40.000 $75.000
CLEANING AND SEALING EXIST JOINTS(CL7)
LF 1,649.000 $50.630 $55.000 $55.000 $80.000
CLEAN & PAINT EXIST STR (SYSTEM I)
LS 1.000 $68,080.000 $600,000.000 $712,000.000 $650,000.000
SPOT CLEAN & PAINT EXT STR(SPL PRT SYS)
LS 1.000 $75,560.000 $280,000.000 $346,000.000 $350,000.000
ANCHOR BOLTS
EA 10.000 $1,400.000 $500.000 $1,800.000 $1,750.000
GABION MATTRESSES (GALV)(18 IN)
SY 20.000 $200.000 $425.000 $230.000 $1,500.000
CLEAN EXIST CULVERTS
CY 54.000 $60.000 $200.000 $230.000 $1,500.000
RAISING EXIST STRUCT
LS 1.000 $186,000.000 $320,000.000 $270,000.000 $570,000.000
MOBILIZATION
LS 1.000 $216,731.570 $280,000.000 $256,000.000 $400,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $15,000.000 $25,000.000 $15,200.000 $7,000.000
SANDBAGS FOR EROSION CONTROL
EA 100.000 $90.620 $11.000 $13.750 $150.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 750.000 $1.730 $1.000 $2.300 $3.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 100.000 $10.290 $10.000 $13.750 $15.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 100.000 $2.890 $1.000 $2.300 $3.000
TEMP SDMT CONT FENCE (INLET PROTECTION)
LF 750.000 $11.870 $10.000 $8.000 $50.000
JT / CRCK SEAL (HOT - POURED RUBBER)
LF 160.000 $15.000 $100.000 $65.000 $150.000
TREE TRIMMING / BRUSH REMOVAL(CHANNELS)
AC 0.250 $8,222.500 $20,000.000 $23,000.000 $20,000.000
TREE AND BRUSH REMOVAL
AC 0.250 $15,780.000 $20,000.000 $23,000.000 $20,000.000
REALIGN POSTS
EA 2.000 $45.200 $500.000 $2,000.000 $300.000
CONCRETE RAIL REPLACEMENT (IN-KIND)
LF 5.000 $750.000 $1,000.000 $5,100.000 $7,500.000
CNC CRACK REPAIR (DISCRETE)(INJECT)
LF 176.000 $105.790 $100.000 $165.000 $175.000
CNC CRACK REPAIR (FLOOD)(GRAVITY)
SF 17,550.000 $8.160 $1.500 $3.900 $12.000
REP STL BRDG MEMB (WELD REPAIR)
EA 1.000 $1,275.000 $14,000.000 $9,500.000 $12,500.000
BRIDGE JOINT REPAIR (ARMOR)
LF 31.000 $600.000 $750.000 $1,800.000 $2,500.000
BRIDGE JOINT REPAIR (HEADER)
LF 19.000 $130.000 $1,000.000 $1,100.000 $2,000.000
CARBON FIBER REINF POLYMER PROTECTION
SF 3.000 $159.620 $3,750.000 $500.000 $3,000.000
CONCRETE BEAM REPAIR (CFRP)
EA 1.000 $20,000.000 $25,000.000 $31,000.000 $35,000.000
FILTER FABRIC (TY 2)
SY 127.000 $15.000 $16.000 $14.000 $100.000
STENCILING STRUCTURE NUMBERS
EA 5.000 $250.000 $250.000 $1,500.000 $5,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 260.000 $138.910 $75.000 $125.000 $150.000
TMA (STATIONARY)
DAY 100.000 $333.840 $250.000 $450.000 $1,000.000
TMA (MOBILE OPERATION)
DAY 100.000 $419.690 $1.000 $100.000 $1.000
REML & DISPL DRIFTWOOD & DEBRIS
CY 45.000 $750.000 $275.000 $175.000 $1,500.000
Totals: $1,841,608.685 $2,572,807.000 $3,023,398.000 $4,021,840.000